NO ITEMS NO OF ITEMS LENGTH WIDTH HEIGHT TOTAL UNITS


1 SITE CLEANING
PART1 1 14.68 16.25 238.55 SQM
PART2 1 1.5 6 9 SQM
TOTAL SITE CLEANING 247.55 SQM
2 EXCAVATION
FOOTING 12 1.8 1.8 1.2 46.656 CUM
TOTAL EXCAVATION 46.656 CUM

3 PCC(1:4:8) 12 1.2 1.2 0.1 1.728 CUM


TOTAL PCC 1.728 CUM

4 FOOTING SHUTTERING 12 4 0.3 14.4 SQM


TOTAL FOOTING SHUTTERING 14.4 SQM

5 FOOTING CONCRETE
RECTANGULAR 12 1 1 0.3 3.6 CUM
TRAPAZOIDAL 12 0.4 0.5 0.2 1.318 CUM
TOTAL FOOTING CONCRETE(1:1.5:3) 4.918 CUM

6 PADESTAL COLUMN 12 1 0.6 7.2 SQM


SHUTTERING
TOTAL COLUMN SHUTTERING 7.2 SQM

PADESTAL COLUMN 12 0.2 0.3 0.6 0.432 CUM


7 CONCRETE(1:1.5:3)M-20
TOTAL COLUMN CONCRETE 0.432 CUM

8 PLINTH BEAM SHUTTERING


BEAM-1 4 12.68 0.8 40.576 SQM
BEAM-2 3 14.25 0.8 34.2 SQM
TOTAL PLINTH BEAM SHUTTERING 74.776 SQM

9 PLINTH BEAM CONCRETE


BEAM-1 4 12.68 0.2 0.3 3.0432 CUM
BEAM-2 3 14.25 0.2 0.3 2.565 CUM
TOTAL PLINTH BEAM CONCRETE 5.6082 CUM

10 BACK FILLING 39.578 CUM


TOTAL BACK FILLING 39.578 CUM

11 PLINTH FILLING 6 5.99 4.35 0.2 31.268 CUM


TOTAL PLINTH FILLING 31.268 CUM

12 PLINTH PCC 6 5.99 4.35 0.1 15.6339 CUM


TOTAL PLINTH PCC 15.635 CUM
13 PUFF PANNEL
PANEL-1 3 14.25 3 128.25 SQM
PANEL-2 2 12.68 3 76.08 SQM
PANEL-3 2 2.75 3 16.5 SQM
PANEL-4 4 1.5 3 18 SQM
PANEL-5 2 1.4 3 8.4 SQM
PANEL-6 2 3.05 3 18.3 SQM
PANEL-7 1 2.4 3 7.2 SQM
PANEL-8 1 2.8 3 8.4 SQM
DEDUCTION
DD -1 1.5 2.1 -3.15 SQM
D1 -1 1.2 2.1 -2.52 SQM
D2 -4 1 2.1 -8.4 SQM
DD2 -2 0.8 2.1 -3.36 SQM
W -8 1.5 1.5 -18 SQM
V -6 0.4 0.4 -0.96 SQM
SQM
TOTAL PUFF PANELS 244.74 SQM

14 TILES
CERAMIC FLOORING TILE
TOILET 4 1.5 1.4 8.4 SQM
WASHROOM 2 3.05 1.4 8.54 SQM
ADDITION
D2 4 1 0.1 0.4 SQM
DD2 2 0.8 0.1 0.16 SQM
TOTAL CERAMIC FLOOR TILES 17.5 SQM

15 VITRIFIED FLOOR TILES


PART-1 1 5.99 11.22 67.21 SQM
PART-2` 1 5.99 14.25 85.36 SQM
TOTAL VITRIFIED FLOOR TILES 152.57 SQM

16 RAMP PART(CHEQUERED TILES) 1 1.5 1.5 2.25 SQM


TOTAL CHEQUERED TILES 2.25 SQM
REMARK
S.NO. ITEMS OF WORK NO. OF ITEMS LENGTH WIDTH
FOUNDATION
1 SITE CLENING 1 24.3 18.2

2 EXCAVATION
F1 16 2.4 2.4
F2 8 2.1 2.1
TOTAL QTY OF EXCAVATION

3 SAND FILLING
F1 16 2.4 2.4
F2 8 2.1 2.1
TOTAL QTY OF SAND FILLING

4 P.C.C.
F1 16 2.4 2.4
F2 8 2.1 2.1
TOTAL QTY OF P.C.C

5 FOTTING CONCRETE
F1
RECTANGULAR 16 1.8 1.8
TRAPAZOIDAL 16 0.6 0.45
F2
RECTANGULAR 8 1.5 1.5
TRAPAZOIDAL 8 0.6 0.45
TOTAL QTY OF FOOTING CONCRETE

6 FOTTING SHUTTERING
F1 16 7.2
F2 8 6
TOTAL QTY OF FOOTING SHUTTERING

7 PADESTAL COLUMN CONCRETE


F1C1 16 0.25 0.4
F2C1 4 0.25 0.4
F2C2 4 0.25 0.4
TOTAL QTY OF PADESTAL COLUMN CONCRETE

8 PADESTIAL COLUMN SHUTTRING


F1C1 16 1.3
F2C1 4 1.3
F2C2 4 1.3
TOTAL QTY OF PADESTAL COLUMN SHUTTRING

9 BACK FILLING TOTAL QTY OF BACK FILLING


SUB-STRUCTURE PART

10 G.B. BRICK WORK(ONE LINE B.W.)


GB1 6 2.5 0.25
GB2 4 3.4 0.25
GB3 4 1.5 0.25
GB4 6 2.05 0.25
GB5 4 2.4 0.25
GB6 2 3.5 0.25
GB7 2 3.35 0.25
GB8 2 2.55 0.25
GB9 6 3.25 0.25
GB10 2 1.6 0.25
GB11 2 0.8 0.25
GB12 2 2.65 0.25
GB13 2 2.5 0.25
GB14 2 2.2 0.25
GB15 2 2.25 0.25
GB16 4 2.4 0.25
TOTAL QTY OF ONE LINE B.W.

11 GROUND BEAM CONCRETE


GB1 6 2.5 0.25
GB2 4 3.4 0.25
GB3 4 1.5 0.25
GB4 6 2.05 0.25
GB5 4 2.4 0.25
GB6 2 3.5 0.25
GB7 2 3.35 0.25
GB8 2 2.55 0.25
GB9 6 3.25 0.25
GB10 2 1.6 0.25
GB11 2 0.8 0.25
GB12 2 2.65 0.25
GB13 2 2.5 0.25
GB14 2 2.2 0.25
GB15 2 2.25 0.25
GB16 4 2.4 0.25
TOTAL QTY OF G.B. CONCRETE

12 GROUND BEAM SHUTTERING 2 * CLEAR SPAN


GB1 6 5
GB2 4 6.8
GB3 4 3
GB4 6 4.1
GB5 4 4.8
GB6 2 7
GB7 2 6.7
GB8 2 5.1
GB9 6 6.5
GB10 2 3.2
GB11 2 1.6
GB12 2 5.3
GB13 2 5
GB14 2 4.4
GB15 2 4.5
GB16 4 4.8
TOTAL QTY OF G.B. SHUTTERING

13 B.W. UPTO D.P.C. BOTTOM


GB1 6 2.5 0.25
GB2 4 3.4 0.25
GB3 4 1.5 0.25
GB4 6 2.05 0.25
GB5 4 2.4 0.25
GB6 2 3.5 0.25
GB7 2 3.35 0.25
GB8 2 2.55 0.25
GB9 6 3.25 0.25
GB10 2 1.6 0.25
GB11 2 0.8 0.25
GB12 2 2.65 0.25
GB13 2 2.5 0.25
GB14 2 2.2 0.25
GB15 2 2.25 0.25
GB16 3 2.4 0.25
GB16 1 2.4 0.25
TOTAL QTY OF B.W. UPTO D.P.C. BOTTOM

14 D.P.C
GB1 6 2.5 0.25
GB2 4 3.4 0.25
GB3 4 1.5 0.25
GB4 6 2.05 0.25
GB5 4 2.4 0.25
GB6 2 3.5 0.25
GB7 2 3.35 0.25
GB8 2 2.55 0.25
GB9 6 3.25 0.25
GB10 2 1.6 0.25
GB11 2 0.8 0.25
GB12 2 2.65 0.25
GB13 2 2.5 0.25
GB14 2 2.2 0.25
GB16 3 2.4 0.25
TOTAL QTY OF D.P.C.

15 BITUMIN COAT
GB1 6 2.5 0.25
GB2 4 3.4 0.25
GB3 4 1.5 0.25
GB4 6 2.05 0.25
GB5 4 2.4 0.25
GB6 2 3.5 0.25
GB7 2 3.35 0.25
GB8 2 2.55 0.25
GB9 6 3.25 0.25
GB10 2 1.6 0.25
GB11 2 0.8 0.25
GB12 2 2.65 0.25
GB13 2 2.5 0.25
GB14 2 2.2 0.25
GB16 3 2.4 0.25
TOTAL QTY OF BITUMIN COAT

16 PLINTH BEAM CONCRETE


PB15 2 2.25 0.25
PB16 1 2.4 0.25
TOTAL QTY OF PLINTH BEAM CONCRETE

17 PLINTH BEAM CONCRETE 2 * CLEAR SPAN

PB15 2 4.5
PB16 1 4.8
TOTAL QTY OF PLINTH BEAM SHUTTERING

18 PLINTH FILLING
AREA 1 2 3.4 2.8
AREA 2 2 2.05 2.8
AREA 3 2 2.05 1.25
AREA 4 4 2.2 1.075
AREA 5 2 3.25 2.4
AREA 6 2 2.8 3.5
AREA 7 2 3.25 2.7
AREA 8 2 3.25 1.35
AREA 9 1 2.4 3.45
AREA 10 1 2.4 1.75
AREA 11 1 2.4 2.7
TOTAL QTY OF PLINTH FILLING

19 PLINTH (FLOOR) P.C.C.


AREA 1 2 3.4 2.8
AREA 2 2 2.05 2.8
AREA 3 2 2.05 1.25
AREA 4 4 2.2 1.075
AREA 5 2 3.25 2.4
AREA 6 2 2.8 3.5
AREA 7 2 3.25 2.7
AREA 8 2 3.25 1.35
AREA 9 1 2.4 3.45
AREA 10 1 2.4 1.75
AREA 11 1 2.4 2.7
TOTAL QTY OF PLINTH (FLOOR P.C.C.)

COLUMN CONCRETE FOR SUB-


20 STRUCTURE PART
C1 20 0.25 0.4
C2 TOTAL QTY OF 4COLUMN 0.25
CONCRETE0.4
FOR SUB-
STRUCTURE

COLUMN SHUTTERING FOR SUB-


21 STRUCTURE PART
C1 20 1.3
C2 4
TOTAL QTY OF COLUMN 1.3
SHUTTERING FOR SUB-
STRUCTURE

COLUMN CONCRETE FOR SUPER-


22 STRUCTURE PART
C1 20 0.25 0.4
C2 4 0.25 0.4 SUPER-
TOTAL QTY OF COLUMN CONCRETE FOR
STRUCTURE

COLUMN SHUTTERING FOR SUPER-


23 STRUCTURE PART
C1 20 1.3
C2 4 1.3
TOTAL QTY OF COLUMN SHUTTERING FOR SUPER-
STRUCTURE PART

ONE LINE B.W. FOR SUPER-STRUCTURE


24 FOR (200MM WALL)
GB1 4 2.5 0.2
GB2 2 3.4 0.2
GB4 2 2.05 0.2
GB5 2 2.4 0.2
GB6 2 3.5 0.2
GB8 2 2.55 0.2
GB9 2 3.25 0.2
GB12 2 2.65 0.2
GB15 2 2.25 0.2
GB16 2 2.4 0.2
DEDUCTION
MD -1 1.2 0.2
D1 -4 1.05 0.2
D2 -2 0.9 0.2
TOTAL QTY OF ONE LINE B.W. FOR 200MM WALL

ONE LINE B.W. FOR SUPER-STRUCTURE


25 FOR (100MM WALL)
GB1 2 2.5 0.1
GB2 2 3.4 0.1
GB4 2 2.05 0.1
GB5 2 2.4 0.1
GB7 2 3.35 0.1
GB13 2 2.5 0.1
GB14 2 2.2 0.1
DEDUCTION
D2 -6 0.9 0.1
D3 -4 0.75 0.1
TOTAL QTY OF ONE LINE B.W. FOR 100MM WALL

26 D.P.C. FOR 200MM WALL(50MM THICK)


GB1 4 2.5 0.2
GB2 2 3.4 0.2
GB4 2 2.05 0.2
GB5 2 2.4 0.2
GB6 2 3.5 0.2
GB8 2 2.55 0.2
GB9 2 3.25 0.2
GB12 2 2.65 0.2
GB15 2 2.25 0.2
GB16 2 2.4 0.2
DEDUCTION 0.2
MD -1 1.2 0.2
D1 -4 1.05 0.2
D2 -2 0.9 0.2

D.P.C. FOR 100MM WALL(50MM THICK)


GB1 2 2.5 0.1
GB2 2 3.4 0.1
GB4 2 2.05 0.1
GB5 2 2.4 0.1
GB7 2 3.35 0.1
GB13 2 2.5 0.1
GB14 2 2.2 0.1
DEDUCTION 0.1
D2 -6 0.9 0.1
D3 -4 0.75 0.1
TOTAL QTY OF D.P.C.(200MM & 100MM WALL)

BRICK WALL UPTO SILL BAND BOTTOM


27 FOR 200MM WALL
GB1 4 2.5 0.2
GB2 2 3.4 0.2
GB4 2 2.05 0.2
GB5 2 2.4 0.2
GB6 2 3.5 0.2
GB8 2 2.55 0.2
GB9 2 3.25 0.2
GB12 2 2.65 0.2
GB15 2 2.25 0.2
GB16 2 2.4 0.2
DEDUCTION
MD -1 1.2 0.2
D1 -4 1.05 0.2
D2 -2 0.9 0.2 BAND
TOTAL QTY OF BRICK WALL UPTO SILL
BOTTOM FOR 200MM WALL

BRICK WALL UPTO SILL BAND BOTTOM


28 FOR 100MM WALL
GB1 2 2.5
GB2 2 3.4
GB4 2 2.05
GB5 2 2.4
GB7 2 3.35
GB13 2 2.5
GB14 2 2.2
DEDUCTION
D2 -6 0.9
D3 TOTAL QTY OF-4BRICK WALL
0.75 UPTO SILL BAND
BOTTOM FOR 100MM WALL

29 SILL BAND CONCRETE


GB1 4 2.5 0.2
GB2 2 3.4 0.2
GB4 2 2.05 0.2
GB5 2 2.4 0.2
GB6 2 3.5 0.2
GB8 2 2.55 0.2
GB9 2 3.25 0.2
GB12 2 2.65 0.2
GB15 2 2.25 0.2
GB16 2 2.4 0.2
DEDUCTION
MD -1 1.2 0.2
D1 -4 1.05 0.2
D2 -2 0.9 0.2
GB1 2 2.5 0.1
GB2 2 3.4 0.1
GB4 2 2.05 0.1
GB5 2 2.4 0.1
GB7 2 3.35 0.1
GB13 2 2.5 0.1
GB14 2 2.2 0.1
DEDUCTION
D2 -6 0.9 0.1
D3 -4 0.75 0.1
TOTAL QTY OF SILL BAND CONCRETE

30 SILL BAND SHUTTERING


2 * CLEAR SPAN
GB1 4 5
GB2 2 6.8
GB4 2 4.1
GB5 2 4.8
GB6 2 7
GB8 2 5.1
GB9 2 6.5
GB12 2 5.3
GB15 2 4.5
GB16 2 4.8
DEDUCTION
MD -1 2.4
D1 -4 2.1
D2 -2 1.8
GB1 2 5
GB2 2 6.8
GB4 2 4.1
GB5 2 4.8
GB7 2 6.7
GB13 2 5
GB14 2 4.4
DEDUCTION
D2 -6 1.8
D3 -4 1.5
TOTAL QTY OF SILL BAND SHUTTERING

B.W. UPTO LINTEL LEVEL (FOR 200MM


31 WALL)
GB1 4 2.5 0.2
GB2 2 3.4 0.2
GB4 2 2.05 0.2
GB5 2 2.4 0.2
GB6 2 3.5 0.2
GB8 2 2.55 0.2
GB9 2 3.25 0.2
GB12 2 2.65 0.2
GB15 2 2.25 0.2
GB16 2 2.4 0.2
DEDUCTION
MD -1 1.2 0.2
D1 -4 1.05 0.2
D2 -2 0.9 0.2
W1 -6 1.5 0.2
W2 -10 0.9 0.2
TOTAL QTY OF B.W. UPTO LINTEL LEVEL

B.W. UPTO LINTEL LEVEL (FOR 100MM


32 WALL)
GB1 2 2.5
GB2 2 3.4
GB4 2 2.05
GB5 2 2.4
GB7 2 3.35
GB13 2 2.5
GB14 2 2.2
DEDUCTION
D2 -6 0.9
D3 -4 0.75
TOTAL QTY OF B.W. UPTO LINTEL LEVEL

33 LINTEL BEAM CONCRETE


GB1 4 2.5 0.2
GB2 2 3.4 0.2
GB4 2 2.05 0.2
GB5 2 2.4 0.2
GB6 2 3.5 0.2
GB8 2 2.55 0.2
GB9 2 3.25 0.2
GB12 2 2.65 0.2
GB15 2 2.25 0.2
GB16 1 2.4 0.2
GB1 2 2.5 0.1
GB2 2 3.4 0.1
GB4 2 2.05 0.1
GB5 2 2.4 0.1
GB7 2 3.35 0.1
GB13 2 2.5 0.1
GB14 2 2.2 0.1
TOTAL QTY OF LINTEL BEAM CONCRETE

34 LINTEL BEAM SHUTTERING 2 * CLEAR SPAN


GB1 4 5
GB2 2 6.8
GB4 2 4.1
GB5 2 4.8
GB6 2 7
GB8 2 5.1
GB9 2 6.5
GB12 2 5.3
GB15 2 4.5
GB16 1 4.8
GB1 2 5
GB2 2 6.8
GB4 2 4.1
GB5 2 4.8
GB7 2 6.7
GB13 2 5
GB14 2 4.4
ADDITION OF DOOR WINDOWS BOTTOM
MD 1 1.2 0.2
D1 4 1.05 0.2
D2 2 0.9 0.2
W1 6 1.5 0.2
W2 10 0.9 0.2
D2 6 0.9 0.1
D3 4 0.75 0.1
TOTAL QTY OF LINTEL BEAM SHUTTERING

B.W. UPTO SLAB BEAM BOTTOM (FOR


35 200MM WALL)
GB1 4 2.5 0.2
GB2 2 3.4 0.2
GB4 2 2.05 0.2
GB5 2 2.4 0.2
GB6 2 3.5 0.2
GB8 2 2.55 0.2
GB9 2 3.25 0.2
GB12 2 2.65 0.2
GB15 2 2.25 0.2
GB16 2 2.4 0.2
DEDUCTION
V -4 0.35 0.2
TOTAL QTY OF B.W. UPTO SLAB BEAM BOTTOM

B.W. UPTO SLAB BEAM BOTTOM (FOR


36 100MM WALL)
GB1 2 2.5
GB2 2 3.4
GB4 2 2.05
GB5 2 2.4
GB7 2 3.35
GB13 2 2.5
GB14 2 2.2
TOTAL QTY OF B.W. UPTO SLAB BEAM BOTTOM

37 SLAB BEAM CONCRETE


SB1 6 2.5 0.25
SB2 4 3.4 0.25
SB3 4 1.5 0.25
SB4 6 2.05 0.25
SB5 4 2.4 0.25
SB6 2 3.5 0.25
SB7 2 3.35 0.25
SB8 2 2.55 0.25
SB9 6 3.25 0.25
SB10 2 1.6 0.25
SB11 2 0.8 0.25
SB12 2 2.65 0.25
SB13 2 2.5 0.25
SB14 2 2.2 0.25
SB15 2 2.25 0.25
SB16 5 2.4 0.25
TOTAL QTY OF SLAB BEAM CONCRETE

38 SLAB BEAM SHUTTERING NO. CLEAR SPAN SHUTTRING PERIMETER

SB1(OUTER) 4 2.5 0.825


SB1(INNER) 2 2.5 0.7
SB2(OUTER) 2 3.4 0.825
SB2(INNER) 2 3.4 0.7
SB3(OUTER) 4 1.5 0.825
SB4(OUTER) 2 2.05 0.825
SB4(INNER) 4 2.05 0.7
SB5(OUTER) 2 2.4 0.825
SB5(INNER) 2 2.4 0.7
SB6(OUTER) 2 3.5 0.825
SB7(INNER) 2 3.35 0.7
SB8(INNER) 2 2.55 0.7
SB9(OUTER) 2 3.25 0.825
SB9(INNER) 4 3.25 0.7
SB10(OUTER) 2 1.6 0.825
SB11(OUTER) 2 0.8 0.825
SB12(OUTER) 2 2.65 0.825
SB13(INNER) 2 2.5 0.7
SB14(INNER) 2 2.2 0.7
SB15(INNER) 2 2.25 0.7
SB16(OUTER BOTH SIDES) 1 2.4 0.95
SB16(OUTER) 2 2.4 0.825
SB16(INNER) 2 2.4 0.7
TOTAL QTY OF SLAB BEAM SHUTTERING

39 SLAB CONCRETE
SLAB AREA 1 2 3.4 2.8
SLAB AREA 2 2 2.05 2.8
SLAB AREA 3 2 2.05 1.25
SLAB AREA 4 4 2.2 1.075
SLAB AREA 5 2 3.25 2.4
SLAB AREA 6 2 2.8 3.5
SLAB AREA 7 2 3.25 2.7
SLAB AREA 8 2 3.25 1.35
SLAB AREA 10 1 2.4 1.75
SLAB AREA 11 1 2.4 2.45
TOTAL QTY OF SLAB CONCRETE

40 SLAB SHUTTERING
SLAB AREA 1 2 3.4 2.8
SLAB AREA 2 2 2.05 2.8
SLAB AREA 3 2 2.05 1.25
SLAB AREA 4 4 2.2 1.075
SLAB AREA 5 2 3.25 2.4
SLAB AREA 6 2 2.8 3.5
SLAB AREA 7 2 3.25 2.7
SLAB AREA 8 2 3.25 1.35
SLAB AREA 10 1 2.4 1.75
SLAB AREA 11 1 2.4 2.45
TOTAL QTY OF SLAB SHUTTERING

41 CHAJJA CONCRETE

W1(1.5*1.2) 4 1.7 0.6


W2(0.9*1.2) 8 1.1 0.6
TOTAL QTY OF CHAJJA CONCRETE

42 CHAJJA SHUTTERING
W1(1.5*1.2) 4
BOTTOM 4 1.7 0.6
FRONT FACE 4 1.7
SIDE FACE 8 0.6

W2(0.9*1.2) 8
BOTTOM 8 1.1 0.6
FRONT FACE 8 1.1
SIDE FACE 16 0.6
TOTAL QTY OF CHAJJA SHUTTERING
43 ENTRANCE STEPS(BRICK WORK)
STAIR VOLUME 1 1 2.4 0.25
STAIR VOLUME 2 1 2.4 0.5
STAIR VOLUME 3 1 2.4 0.75
STAIR VOLUME 4 1 2.4 1
STAIR VOLUME 5 1 2.4 1.25
STAIR VOLUME 6 1 2.4 1.5
TOTAL QTY OF ENTRANCE STEPS

44 STAIR CONCRETE
STEPS 18 1.175 0.01875
WAIST SLAB 2 2.62 1.175
LANDING 1 2.4 1.2
MID-LANDING BEAM 1 2.4 0.25
TOTAL QTY OF STAIR CONCRETE

45 STAIR SHUTTERING
W.S. BOTTOM 2 2.62 1.175
W.S. SIDES 4 2.62 0.3
RISER 19 1.175
LANDING(BOTTOM) 1 2.4 1.2
LANDING SIDE FACE 2 1.2
MID-LANDING BEAM 1 2.4 0.7
TOTAL QTY OF STAIR SHUTTERING
DEPTH TOTAL UNITS RATE AMOUNT REMARKS

442.26 SQM

1.5 138.24 CUM


1.5 52.92 CUM
VATION 191.16 CUM

0.1 9.22 CUM


0.1 3.53 CUM
FILLING 12.74 CUM

0.1 9.22 CUM


0.1 3.53 CUM
.C.C 12.74 CUM

0.25 12.96 CUM


0.15 3.56 CUM

0.2 3.6 CUM


0.1 0.88 CUM
CONCRETE 21.00 CUM

0.25 28.8 SQM


0.2 9.6 SQM
SHUTTERING 38.4 SQM

0.9 1.44 CUM


1 0.4 CUM
1 0.4 CUM
LUMN CONCRETE 2.24 CUM

0.9 18.72 SQM


1 5.2 SQM
1 5.2 SQM
LUMN SHUTTRING 29.12 SQM

FILLING 142.44 CUM


0.1 0.375 CUM
0.1 0.34 CUM
0.1 0.15 CUM
0.1 0.3075 CUM
0.1 0.24 CUM
0.1 0.175 CUM
0.1 0.1675 CUM
0.1 0.1275 CUM
0.1 0.4875 CUM
0.1 0.08 CUM
0.1 0.04 CUM
0.1 0.1325 CUM
0.1 0.125 CUM
0.1 0.11 CUM
0.1 0.1125 CUM
0.1 0.24 CUM
INE B.W. 3.21 CUM

0.3 1.125 CUM


0.3 1.02 CUM
0.3 0.45 CUM
0.3 0.9225 CUM
0.3 0.72 CUM
0.3 0.525 CUM
0.3 0.5025 CUM
0.3 0.3825 CUM
0.3 1.4625 CUM
0.3 0.24 CUM
0.3 0.12 CUM
0.3 0.3975 CUM
0.3 0.375 CUM
0.3 0.33 CUM
0.3 0.3375 CUM
0.3 0.72 CUM
ONCRETE 9.63 CUM

0.3 9 SQM
0.3 8.16 SQM
0.3 3.6 SQM
0.3 7.38 SQM
0.3 5.76 SQM
0.3 4.2 SQM
0.3 4.02 SQM
0.3 3.06 SQM
0.3 11.7 SQM
0.3 1.92 SQM
0.3 0.96 SQM
0.3 3.18 SQM
0.3 3 SQM
0.3 2.64 SQM
0.3 2.7 SQM
0.3 5.76 SQM
UTTERING 77.04 SQM

0.45 1.6875 CUM


0.45 1.53 CUM
0.45 0.675 CUM
0.45 1.38375 CUM
0.45 1.08 CUM
0.45 0.7875 CUM
0.45 0.75375 CUM
0.45 0.57375 CUM
0.45 2.19375 CUM
0.45 0.36 CUM
0.45 0.18 CUM
0.45 0.59625 CUM
0.45 0.5625 CUM
0.45 0.495 CUM
0.2 0.225 CUM
0.45 0.81 CUM
0.2 0.12 CUM
D.P.C. BOTTOM 14.01 CUM

3.75 SQM
3.4 SQM
1.5 SQM
3.075 SQM
2.4 SQM
1.75 SQM
1.675 SQM
1.275 SQM
4.875 SQM
0.8 SQM
0.4 SQM
1.325 SQM
1.25 SQM
1.1 SQM
1.8 SQM
.P.C. 30.38 SQM

3.75 SQM
3.4 SQM
1.5 SQM
3.075 SQM
2.4 SQM
1.75 SQM
1.675 SQM
1.275 SQM
4.875 SQM
0.8 SQM
0.4 SQM
1.325 SQM
1.25 SQM
1.1 SQM
1.8 SQM
MIN COAT 30.38 SQM

0.3 0.34 CUM


0.3 0.18 CUM
AM CONCRETE 0.52 CUM

0.3 2.70 SQM


0.3 1.44 SQM
M SHUTTERING 4.14 SQM

0.8 15.23 CUM


0.8 9.18 CUM
0.8 4.10 CUM
0.8 7.57 CUM
0.8 12.48 CUM
0.8 15.68 CUM
0.8 14.04 CUM
0.8 7.02 CUM
0.8 6.62 CUM
0.8 3.36 CUM
0.8 5.18 CUM
H FILLING 100.47 CUM

0.1 1.90 CUM


0.1 1.15 CUM
0.1 0.51 CUM
0.1 0.95 CUM
0.1 1.56 CUM
0.1 1.96 CUM
0.1 1.76 CUM
0.1 0.88 CUM
0.1 0.83 CUM
0.1 0.42 CUM
0.1 0.65 CUM
LOOR P.C.C.) 12.56 CUM

0.9 1.8 CUM


CRETE FOR SUB-0.9 0.36 CUM
2.16 CUM

0.9 23.4 SQM


TERING FOR SUB-0.9 4.68 SQM
28.08 SQM

3 6.00 CUM
RETE FOR SUPER- 3 1.20 CUM
7.20 CUM

3 78.00 SQM
ERING FOR SUPER-3 15.60 SQM
RT 93.60 SQM

0.1 0.20 CUM


0.1 0.14 CUM
0.1 0.08 CUM
0.1 0.10 CUM
0.1 0.14 CUM
0.1 0.10 CUM
0.1 0.13 CUM
0.1 0.11 CUM
0.1 0.09 CUM
0.1 0.10 CUM
CUM
0.1 -0.02 CUM
0.1 -0.08 CUM
0.1 -0.04 CUM
FOR 200MM WALL 1.03 CUM

0.5 SQM
0.68 SQM
0.41 SQM
0.48 SQM
0.67 SQM
0.5 SQM
0.44 SQM
0 SQM
-0.54 SQM
-0.3 SQM
FOR 100MM WALL 2.84 SQM

2.00 SQM
1.36 SQM
0.82 SQM
0.96 SQM
1.40 SQM
1.02 SQM
1.30 SQM
1.06 SQM
0.90 SQM
0.96 SQM
0.00 SQM
-0.24 SQM
-0.84 SQM
-0.36 SQM

0.5 SQM
0.68 SQM
0.41 SQM
0.48 SQM
0.67 SQM
0.5 SQM
0.44 SQM

-0.54 SQM
-0.3 SQM
& 100MM WALL) 13.18 SQM

0.65 1.30 CUM


0.65 0.88 CUM
0.65 0.53 CUM
0.65 0.62 CUM
0.65 0.91 CUM
0.65 0.66 CUM
0.65 0.85 CUM
0.65 0.69 CUM
0.65 0.59 CUM
0.65 0.62 CUM

0.65 -0.16 CUM


0.65 -0.55 CUM
UPTO SILL BAND0.65 -0.23 CUM
M WALL 6.72 CUM

0.65 3.25 SQM


0.65 4.42 SQM
0.65 2.665 SQM
0.65 3.12 SQM
0.65 4.355 SQM
0.65 3.25 SQM
0.65 2.86 SQM

0.65 -3.51 SQM


UPTO SILL BAND0.65 -1.95 SQM
M WALL 18.46 SQM

0.1 0.20 CUM


0.1 0.14 CUM
0.1 0.08 CUM
0.1 0.10 CUM
0.1 0.14 CUM
0.1 0.10 CUM
0.1 0.13 CUM
0.1 0.11 CUM
0.1 0.09 CUM
0.1 0.10 CUM

0.1 -0.02 CUM


0.1 -0.08 CUM
0.1 -0.04 CUM
0.1 0.05 CUM
0.1 0.07 CUM
0.1 0.04 CUM
0.1 0.05 CUM
0.1 0.07 CUM
0.1 0.05 CUM
0.1 0.04 CUM

0.1 -0.05 CUM


0.1 -0.03 CUM
D CONCRETE 1.32 CUM

0.1 2.00 SQM


0.1 1.36 SQM
0.1 0.82 SQM
0.1 0.96 SQM
0.1 1.40 SQM
0.1 1.02 SQM
0.1 1.30 SQM
0.1 1.06 SQM
0.1 0.90 SQM
0.1 0.96 SQM

0.1 -0.24 SQM


0.1 -0.84 SQM
0.1 -0.36 SQM
0.1 1.00 SQM
0.1 1.36 SQM
0.1 0.82 SQM
0.1 0.96 SQM
0.1 1.34 SQM
0.1 1.00 SQM
0.1 0.88 SQM

0.1 -1.08 SQM


0.1 -0.60 SQM
SHUTTERING 16.02 SQM

1.2 2.40 CUM


1.2 1.63 CUM
1.2 0.98 CUM
1.2 1.15 CUM
1.2 1.68 CUM
1.2 1.22 CUM
1.2 1.56 CUM
1.2 1.27 CUM
1.2 1.08 CUM
1.2 1.15 CUM
CUM
1.2 -0.29 CUM
1.2 -1.01 CUM
1.2 -0.43 CUM
1.2 -2.16 CUM
1.2 -2.16 CUM
LINTEL LEVEL 8.09 CUM

1.2 6 SQM
1.2 8.16 SQM
1.2 4.92 SQM
1.2 5.76 SQM
1.2 8.04 SQM
1.2 6 SQM
1.2 5.28 SQM
SQM
1.2 -6.48 SQM
1.2 -3.6 SQM
LINTEL LEVEL 34.08 SQM

0.2 0.40 CUM


0.2 0.27 CUM
0.2 0.16 CUM
0.2 0.19 CUM
0.2 0.28 CUM
0.2 0.20 CUM
0.2 0.26 CUM
0.2 0.21 CUM
0.2 0.18 CUM
0.2 0.10 CUM
0.2 0.10 CUM
0.2 0.14 CUM
0.2 0.08 CUM
0.2 0.10 CUM
0.2 0.13 CUM
0.2 0.10 CUM
0.2 0.09 CUM
AM CONCRETE 3.00 CUM
0.2 4.00 SQM
0.2 2.72 SQM
0.2 1.64 SQM
0.2 1.92 SQM
0.2 2.80 SQM
0.2 2.04 SQM
0.2 2.60 SQM
0.2 2.12 SQM
0.2 1.80 SQM
0.2 0.96 SQM
0.2 2.00 SQM
0.2 2.72 SQM
0.2 1.64 SQM
0.2 1.92 SQM
0.2 2.68 SQM
0.2 2.00 SQM
0.2 1.76 SQM

0.24 SQM
0.84 SQM
0.36 SQM
1.8 SQM
1.8 SQM
0.54 SQM
0.3 SQM
M SHUTTERING 43.20 SQM

0.35 0.70 CUM


0.35 0.48 CUM
0.35 0.29 CUM
0.35 0.34 CUM
0.35 0.49 CUM
0.35 0.36 CUM
0.35 0.45 CUM
0.35 0.37 CUM
0.35 0.32 CUM
0.35 0.34 CUM
0.00 CUM
0.35 -0.10 CUM
B BEAM BOTTOM 4.03 CUM

0.35 1.75 SQM


0.35 2.38 SQM
0.35 1.435 SQM
0.35 1.68 SQM
0.35 2.345 SQM
0.35 1.75 SQM
0.35 1.54 SQM
B BEAM BOTTOM 12.88 SQM

0.35 1.31 CUM


0.35 1.19 CUM
0.35 0.52 CUM
0.35 1.08 CUM
0.35 0.84 CUM
0.35 0.61 CUM
0.35 0.59 CUM
0.35 0.45 CUM
0.35 1.71 CUM
0.35 0.28 CUM
0.35 0.14 CUM
0.35 0.46 CUM
0.35 0.44 CUM
0.35 0.39 CUM
0.35 0.39 CUM
0.35 1.05 CUM
M CONCRETE 11.44 CUM

SHUTTRING PERIMETER

0.825 8.25 SQM


0.7 3.50 SQM
0.825 5.61 SQM
0.7 4.76 SQM
0.825 4.95 SQM
0.825 3.38 SQM
0.7 5.74 SQM
0.825 3.96 SQM
0.7 3.36 SQM
0.825 5.77 SQM
0.7 4.69 SQM
0.7 3.57 SQM
0.825 5.36 SQM
0.7 9.10 SQM
0.825 2.64 SQM
0.825 1.32 SQM
0.825 4.37 SQM
0.7 3.50 SQM
0.7 3.08 SQM
0.7 3.15 SQM
0.95 2.28 SQM
0.825 3.96 SQM
0.7 3.36 SQM
M SHUTTERING 99.67 SQM

0.125 2.38 CUM


0.125 1.43 CUM
0.125 0.64 CUM
0.125 1.18 CUM
0.125 1.95 CUM
0.125 2.45 CUM
0.125 2.19 CUM
0.125 1.10 CUM
0.125 0.53 CUM
0.125 0.74 CUM
ONCRETE 14.59 CUM

19.04 SQM
11.48 SQM
5.125 SQM
9.46 SQM
15.6 SQM
19.6 SQM
17.55 SQM
8.775 SQM
4.2 SQM
5.88 SQM
UTTERING 116.71 SQM

0.11 0.46 CUM


0.11 0.59 CUM
CONCRETE 1.05 CUM

4.08 SQM
0.10 0.68 SQM
0.11 0.53 SQM

5.28 SQM
0.1 0.88 SQM
0.11 1.06 SQM
HUTTERING 12.50 SQM
0.15 0.09 CUM
0.15 0.18 CUM
0.15 0.27 CUM
0.15 0.36 CUM
0.15 0.45 CUM
0.15 0.54 CUM
NCE STEPS 1.89 CUM

0.01875 0.40 CUM


0.15 0.92 CUM
0.15 0.43 CUM
0.3 0.18 CUM
CONCRETE 1.93 CUM

6.16 SQM
3.14 SQM
0.15 3.35 SQM
2.88 SQM
0.15 0.36 SQM
0.7 1.68 SQM
HUTTERING 17.57 SQM