Fiber Glass Ladder Assembly Instruction

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 2

ULTIMA TOWER KIT LIST

The ASCEND "ULTIMA TOWER" gives an excep�onally versa�le tower for working in normal applica�ons all frames can be used as upper or
lower sec�ons ,simply place the pla�orm on the third rung from the top of the tower and correct guardrail height is achieved. The number of
trapdoor pla�orm in the tower kit is sufficient to assemble and dismantle the tower using 3T method .

WORKING HEIGHT 3.2 3.7 4.2 4.8 5.3 5.8 6.3 6.8 7.3 7.8 8.3 8.8 9.3 9.8 10.3

easily into frames.


TOWER HEIGHT 2.2 2.7 3.2 3.8 4.3 4.8 5.3 5.8 6.3 6.8 7.3 7.8 8.3 8.8 9.3

lubricate with light oil.

MOVING A TOWER :
PLATFORM HEIGHT 1.2 1.7 2.2 2.8 3.3 3.8 4.3 4.8 5.3 5.8 6.3 6.8 7.3 7.8 8.3

MAINTENANCE RULES

secured by an interlock clip.


SIZE: WIDTH 75 CM LENGTH 208CM
UNIT
COMPONENTS
WEIGHT

reposition stabilizer before use .


WHEEL 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
5.78

ensure that the frame rungs are kept clean.


ADJUSTABLE LEG 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

Ensure that the scaffold tower is kept clean.


2 RUNG LADDER FRAME 6.70 1 1 1 1 1 1 1 1
2 RUNG SPAN FRAME 4.78 1 1 1 1 1 1 1 1
3 RUNG LADDER FRAME 10.05 1 1 1 1 1 1 1

scaffold tower equipment, consult the manufacturer.


3 RUNG SPAN FRAME 7.17 1 1 1 1 1 1 1

2. Check the location is �irm and free from pot holes.


4 RUNG LADDER FRAME 13.40 1 1 1 2 1 2 2 3 2 3 3 4 3 4

ensure they �it to other components without being forced.


4 RUNG SPAN FRAME 9.50 1 1 1 2 1 2 2 3 2 3 3 4 3 4

Where brace, ladder and platform hooks attach the frames,

Please check that spigot are in to the position and should �it

If in any doubt about the proper use and maintenance of the


Position the stabilizers symmetrically to obtain the MAXIMUM BASE

Ensure that all locking hooks function correctly. If necessary


TRAPDOOR PLATFORM 17.80 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4

Grease all moving parts with commercial oil. Wipe off excess oil.

tower. Adjustable leg's thread should be clean and lightly


Do not misuse or abuse the scaffold tower with heavy objects,

or to the ground when the tower is being dismantled. Such


The inside diameter of all hooks should be kept clean to
grit, burrs etc. Remove any foreign substance with a light wire
Check frames and braces, adjustable legs and boards for paint,
Spigots and sockets should �it together with ease and be

components shall be used , Either repair it or get replacement.


oiled. Under no circumstances damage or incorrect
abuse may reduce the structural integrity of the scaffold
hammers etc. Do not throw components in and out of vehicles

4. Wind speed should not exceed 29km/h(Beau fort force 4).


HORIZONTAL BRACE 2.42 6 6 6 6 10 10 10 10 14 14 14 14 18 18 18

8. That no environmental changes in�luenc safe use of the MAT.


5. Check that there are no power lines or obstruction overhead.

7. Whether the structure assembly is still correct and complete.


DIAGAONAL BRACE 3.04 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15
TOE BOARD 5.66 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
300 CM LONG STABLIZER 5.14 4 4 4 4 4 4 4

(Fig 3)

6. Before each use check that the MAT is vertical or need readjustment.
450CM LONG STABLIZER 7.70 4 4 4 4 4

3. Raise the stabilizer feet only enough (25mm) to clear the Obstructions.
600CM LONG STABLIZER 10.28 4

Fig 1
TOWER WEIGHT IN KGS 90.08 98.92 125.16 151.74 170.14 178.98 187.7 214.28 232.68 251.76 260.48 287.06 305.46 314.3 328.68
SIZE: WIDTH 135 CM LENGTH 208CM
UNIT
COMPONENTS
WEIGHT
WHEEL 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
5.78

USE OF STABILIZERS
ADJUSTABLE LEG 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
2 RUNG LADDER FRAME 7.86 1 1 1 1 1 1 1 1

ABLE TO SUPPORT TOWER


2 RUNG SPAN FRAME 5.95 1 1 1 1 1 1 1 1

structural stability of the tower


3 RUNG LADDER FRAME 11.79 1 1 1 1 1 1 1
3 RUNG SPAN FRAME 8.925 1 1 1 1 1 1 1

position, tighten the clamps �irmly.


Fig 2
4 RUNG LADDER FRAME 15.72 1 1 1 2 1 2 2 3 2 3 3 4 3 4
4 RUNG SPAN FRAME 11.9 1 1 1 2 1 2 2 3 2 3 3 4 3 4
TRAPDOOR PLATFORM 17.8 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4
STANDARD PLATFORM 18.25 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
HORIZONTAL BRACE 2.42 6 6 6 6 10 10 10 10 14 14 14 14 18 18 18

stabilizer; move parallel with the wall. (Fig 2)


DIAGAONAL BRACE 3.05 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15
TOE BOARD 6.9 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

ALWAYS ENSURE STABILIZER SIZE IS CORRECT AND


300 CM LONG STABLIZER 5.14 4 4 4 4 4 4 4
450CM LONG STABLIZER 7.7 4 4 4 4 4

Stabilizers are to be used, when specified, to guarantee the


600CM LONG STABLIZER 10.28 4
TOWER WEIGHT IN KGS 114.31 124.26 151.73 179.49 199.12 209.07 219.03 246.79 266.42 286.61 296.57 324.32 343.96 353.95 374.19

stabilizer and place the outside two parallel with the wall.
approximately equidistant from each other, as shown in Fig

To position the tower in a corner, remove the inside


To position the tower against a wall, do not remove the
clips with locking pin are in place. When in the correct
required to make �irm contact with the ground. Ensure the
1. Adjust the stabilizer and reposition the clamps as
possible. Position the stabilizers so that the footpads are
bottom rung. Ensure the lower arm is as horizontal as
Lightly tighten the upper clamps above the third rung on
each corner post. Position the lower clamp above the
Fig 3

speed should not be exceeded during relocation. The ground over which a tower is moved should be capable of supporting
1. If you must move a tower, remove all materials and personnel. When moving a scaffold tower, force must always be moved

the weight of the structure. Make sure tower height is not above 4 mtr while moving the tower. Recheck the tower level and
from the base. The tower should only be moved manually on �irm, level ground which is free from obstacles. Normal walking

Tel
GENERAL SAFETY RULES
1. A risk assessment has been done and safety equipment (Rope etc) and auxiliary tools are 18. Do not work from ladders or stairways, they are a means of access only.
available on site for erec�on and dismantling the tower.
19. Always li� components from inside the tower.
2. The ground condi�on will take the working load as specified .
20. When li�ing materials or components always use reliable li�ing materials to ensure there
3. The loca�on of tower should be checked to prevent hazards during erec�on & is no possibility of it falling.
dismantling, moving and while working on the tower. Level and slope, obstruc�on and
21. Always �e the tower when it is le� una�ended .
wind condi�on should be checked.
22. Guardrails and toe boards must be fi�ed to the working pla�orms.
4. Minimum 2,3 persons are required to safely erect and dismantle the tower.

Toll Free : 800 722 33653


23. Never jump on to or off pla�orms.

: +971 4 885 5001


5. Check instruc�ons before use. Mobile access working towers may only be erected and
dismantled by person competent for working on movable tower. 24. Never place the working pla�orm on the guardrail frame. Always keep double height

Website : www.ascenduae.com
guardrail at each pla�orm levels, never stand on an unguarded pla�orm.

Email : [email protected]
6. Do not use any scaffold tower which is damaged, which has not been properly erected,
which is not firm and stable, and which has any missing or damaged parts. 25. DO NOT exceed the safe working load of the pla�orm or structure by accumula�ng debris,
7. Do not erect a scaffold tower on unstable ground, slopes or objects such as loose bricks, material tools on pla�orms as these can be a significant addi�onal load.
boxes or blocks. Only a sound rigid foo�ng must be used. 26. The tower should always be accessed from the inside using the ladder frame ,never climb
8. Ensure that the scaffold tower is always level and the adjustable legs are engaged. Check up from outside. Ensure that the locking hooks on the pla�orm are func�oning correctly.
that you have taken all necessary precau�ons to prevent the tower being moved, or 27. Beware of horizontal forces (e.g. when using power tools), which could generate
rolling away. Always apply all castor brakes or use base plates. instability or overturning of the tower. Maximum horizontal force 20kg.

ASCEND ACCESS SYSTEMS SCAFFOLDING L.L.C.


9. Ensure that all frames, braces and pla�orms are firmly in place and that all locking hooks 28. Should you require addi�onal pla�orm height, add further frames. NEVER extend your
are func�oning correctly. Ensure that all frame locking clips are engaged. If any missing, adjustable legs to achieve extra height, these are for levelling only. NEVER use a ladder or
replace them. Never mix parts or components from other manufacturers. Damaged other objects on the pla�orm to achieve addi�onal height.
components should be replaced with the new components.
29. Do not throw the scaffold parts , always lower them to the ground.
10. It is recommended that the ver�cal distance between two pla�orm level is 2mtr. 30. Mobile towers are not designed to be li�ed or suspended. Permissible load according to
Maximum ver�cal distance between pla�orm level must not exceed 4 mtr.
scaffold load group is 200 kg/m2.
11. Ensure that the scaffold tower is within the maximum pla�orm height stated, and that the 31. It is not permissible to a�ach and use hois�ng facili�es on towers, unless specifically
appropriate stabilizers are fi�ed.
provided for by the manufacturer.
12. Outdoor scaffold towers should, wherever possible, be secured to a building or other 32. According to HD 1004 the double width tower must not be exceeded 12 mtr to top
structure. It is good prac�ce to �e in all scaffold towers of any height, especially when they
pla�orm for indoor use and 8 Mtr pla�orm height (working height 10 mtr) for outdoor
are le� una�ended, or in exposed or windy condi�ons.
use.
13. A free standing scaffold tower must not be used in winds stronger than 17mph�27kph�
• For single width tower maximum working height for both interior and exterior work is 8 mtr.
Beaufort scale 4. Be cau�ous if erec�ng or using the tower in open places, such as hangers
• If the pla�orm height reaches more than 6 mtr for single width and 8 mtr for the double
or un-cladded buildings. In such circumstances the wind forces can be increased, as a
width scaffold, then it should be secured against the wall prior to use.
result of the funnelling effect.
• Always �e to a solid structure, while tying the tower a�ach a �e at 4 mtr interval.
MANUFACTURER OF ALUMINIUM SCAFFOLD TOWER

14. Do not use sheeted towers.


33. The maximum working load on the Ascend span 50 is 750 kg for overall structure
15. If an overhead hazard exists, head protec�on should be worn. (including tower self weight) and 250 kg evenly distributed on the pla�orm. This must not
“ULTIMA ” TOWER INSTRUCTION MANUAL 3T METHOD

SAFER ASSEMBLY OF SCAFFOLD


be exceeded.
16. Do not lean ladders against the tower, or climb outside of tower. Whatever your intended
access system, it should only be used inside the tower.

STRUCTURE 75O KG
34. Always take care of scaffold tower equipment. Remember your safety depends on the

PLATFORM 250 KG
ALWAYS READ THE INSTRUCTION MANUAL FOR

17. Never climb on horizontal or diagonal braces. Do not gain access or descend from the safe erec�on and use of the equipment.
working pla�orm other than by the intended access system.

MAX SAFE WORKING LOAD

MAX SAFE WORKING LOAD

PASMA(UK)APPROVED TRAINING CENTER


ULTIMA TOWER

Standing on the guarded platform,


Sit on the Platform attach 2 Horizon-
Fit Caster wheel into frame tubes & Fit Diagonal brace from bottom rung of Fit Trapdoor on 2nd rung of ladder Attach 4 rung span & Ladder Frame
tal brace on 3rd rung & 4th rung near
apply brake,, Attach 2 horizontals on Ladder frame to 3rd rung of Span frame on /span frame & make sure trapdoor on the lower Frame. Make sure
the platform on both sides
lower rung of 4 rung span farme & both sides in opposite direction. Diagonal opens on the ladder side. Ladder Frame area in Line.
ladder frame on each sides brace must be alligned (zig-zag pattern)

ILLUSTRATION

1)Brace lock - Sort the braces into horizon-


tal and diagonal braces, the diagonal
brasses are slightly longer in size.

Step 8
Engage Locking Pins . Attach Diagonal Brace from 4th rung Standing on the guarded Platform , �it Fit the stablizer to the base unit, adjust the
to 6th rung on both sides in opposite the 2nd Trapdoor Platform on the 3rd leg of stablizer to give �irm support to the
direction. Diagonal brace must be rung from the Top. ground. Position the Stablizer so that the foot
alligned (zig-zag pattern) pads are approx equidistant from each other
2)Snap pins - Unlock the interlock
at approx 45 degree for maximium stability Clips on all frames. When installed,
always move the interlock clip to the
“Locked” Position.

3)Wheel lock - Install castor / leg assem-


bly to frame by pushing the leg into the
frame tube. This Should be done with
Step 10 manual force only, no tools. Lock Castors
Sitting on the Trapdoor opening the before ascending any part of the tower.
Continue to build the tower using the 3T Sitting on the Trapdoor opening of the Fit the Toe Board
Platform & �it Horizontal Brace on 1st method, Same as step 5,6,7,8 and 10. Platform �it horizontal brace on 1st and 2nd
and 2nd rug from top on both sides near
rung from top on both the open end of
the platform.
plaform .
Dismantling- Please Dismantal the Tower
reverse from build process.