Term Paper Guidelines
I. PROCEDURAL INSTRUCTIONS
I. PROCEDURAL INSTRUCTIONS
• Step 1: This is an Individual Assignment.
I. PROCEDURAL INSTRUCTIONS
Preference 2
Preference 3
I. PROCEDURAL INSTRUCTIONS
• Step 4: Commence work and demonstrate your progress every
week sharing recorded video with the course teacher.
• Step 5: Submit Final Report & Project Model via email and on
Google Classroom by August 30, 2020 as per following:
I. PROCEDURAL INSTRUCTIONS
• The Final Report must be submitted in soft form in MS Word format
along with all supplementary material (Revit Project Files, Families
used in Modeling, Plugins, Snapshots, Video Files, Primavera Project
Schedules, Navisworks Project File, Computer/Web Generated
Analysis Reports) via email to [email protected] and
titled as: “BIM-XX_Final_Report” with email subject heading: “CE-
426 Spring 2020 BIM-XX Final Report” [Civil Engineering Students]or
: “CN-429 Spring 2020 BIM-XX Final Report” [Civil Engineering along
with Specialization in Construction Students] (Note: XX above would
be replaced by your Group number).
I. PROCEDURAL INSTRUCTIONS
• Report should be submitted along with the Project Model files.
Reports without project files will be considered as INCOMPLETE.
• Along with the Report, MUST attach Project Model File, Families,
Plugins, Project Schedules, Analysis Report, Cost Information File,
Videos, Snapshots, etc.)
• Also include any other supporting document used in the development
of Model
I. PROCEDURAL INSTRUCTIONS
• Step 6: Present your Term Project in a which will be held in the
week of August 31, 2020. (Schedule to be posted later.)
S. Submittal/ Grading
When?
No. Evaluation Proportion
Week of August
2. Presentation 20%
31, 2020
III. GRADING
III. GRADING
Term Project will constitute 10 marks of CE-426/CN-429 Sessional Work
for the course, distributed as follows:
• The Final Report will be judged on the following:
• Completeness of Work
• Technical Quality of Work
• Quality of BIM Model
• Quality of Snapshots
• Clearly Mentioned Steps
• Report Presentation/ Layout
• English Usage
• Literature Collected
• Project Model File
• Project Schedule
• Model Screenshots
• Simulation, Animation, Walkthroughs, flythrough video files
• Families
• Plugins Setup (If used any)
• Cost Data
• Any other pertinent data
https://youtu.be/bzzkms6wds4
https://youtu.be/qpoeeclyecE
https://youtu.be/vli6ckgBzdY
https://youtu.be/IpiGd7Bf11c
https://youtu.be/qKIQXvY8kxw
https://youtu.be/HKzXY9CZJWo
https://youtu.be/qKIQXvY8kxw
https://youtu.be/HKzXY9CZJWo
https://youtu.be/I0hykSR_oY4?list=PLvdUo6trYaFFBIPLrYzIl5OS
90hr0yUxK
https://youtu.be/jOUid33ho4E
https://www.autodesk.com/autodesk-university/class/Visual-
Planning-BIM-Safety-2013#video
https://youtu.be/IYHHrnDzMFE
https://youtu.be/CPyyNIcLTRY
https://youtu.be/Sz6JK6_ZtGA
https://youtu.be/QS03ykGSaE8
https://youtu.be/vUBBJpy2GL0
https://youtu.be/O3B2LrgTInM
Conclusion
Preference 2
Preference 3