Document Type
Discipline(s) involved
Location
Transmittal received date by NEOM
Disclaimer : Permission to proceed shall not constitute acceptance or approval of design details, calculations, analyses, test metho
Status Codes: All codes must be as per NEOM Documents NEOM-NPR-PLN-101 (Design Management Plan) & N E O M
A = Work may proceed , B = Incorporate Comments - Proceed , C = Revise & Resubmit - Do not Proceed , D= Rejected
1 03-540000-4800000882-FHD- MEP-PQD-000013_01
2 03-540000-4800000882-FHD- MEP-PQD-000013_01
3 03-540000-4800000882-FHD- MEP-PQD-000013_01
4 03-540000-4800000882-FHD- MEP-PQD-000013_01
5 03-540000-4800000882-FHD- MEP-PQD-000013_01
6 General
7 General
8 General
1
2
3
SHEET (DESIGNER TO PMC TO NEOM)
ARC
nce or approval of design details, calculations, analyses, test methods or materials developed or selected by the Contractor and shall not relieve
s NEOM-NPR-PLN-101 (Design Management Plan) & N E O M - N E N - P R C - 030 (Project Document Numbering and Revision Pr
eed , C = Revise & Resubmit - Do not Proceed , D= Rejected, E = Review not required - Proceed
Relevant Discipline N
Valid Saudization certificates to be provided
Neom approval and / or other Gov-Departments matching the scope of work to be provided
Subject to complying with above requirement. No contract with the subcontractor will be considered unless valid copy of the above is provided
Contrator and subcontractor to confirm complying with NEOM Quality requirement including but not limited to: NEOM- NEN-MAN-001_Quality
Manual, SCH002_Schedule Q - Quality Requirements for Contractors
Non Certified contractor shall not be employed. Contractor to renew all required certificates and resubmit for final review and approval
Relevant Discipline N
Relevant Discipline N
CRS DATA
CRS Identification:
Status Code:
NEOM No Objection :
veloped or selected by the Contractor and shall not relieve the Contractor from full compliance with Contractual obligations and NEOM requirem
AE B
AE B
AE B
AE B
RB B
RB B
RB B
he Contractor from full compliance with Contractual obligations and NEOM requirements
cedure)
Contractor's Responses
o:1
o:2
o:3
Revision:
1
B
Sign
Date
Sign
Date