0% found this document useful (0 votes)
11 views

Modification Proposal

Uploaded by

Muhaiminul Islam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Modification Proposal

Uploaded by

Muhaiminul Islam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

EASTERN REFINERY LIMITED

NORTH POTENGA, CHITTAGONG

MODIFICATION PROPOSAL
PROCESS DEPARTMENT
Date: 27.08.2024

Subject: Modification for Production of Jet A-1 from K-1 at NGCF unit.

Jet A-1 can be produced from K-1 of Topping unit by steam stripping. At present this
processing takes place at ADU of Topping Unit. But for this, Feed at Topping unit must be
lowered. To rectify this problem, a proposal was made to treat K-1 at NGCF unit to produce
Jet A-1. And as per the decision of meeting on _____ Trail run of NGCF unit was performed
with some temporary arrangement. This trail run came as a success and hence a
modification required for transferring the on-grade Jet A-1 to its dedicated tank T-13. The
schematic drawing for required modification is attached herewith.

This is for your kind approval and forwarding.