Project Diary
Project Diary
Week No: 1
(18-02-2022 to 25-02-2022)
Activities planned:
1. Planning about the features of web application.
2. Research about UI designing.
3. Plan the interface of the web application.
Activities Executed:
1. Took ideas from various other websites and listed the features to be included in our
project.
2. Learned to prepare the tentative design and its importance from:
https://f5-studio.com/articles/what-is-user-interface-design-and-why-is-it-important/
3. Learned to design user interface in Figma.
Week No: 2
(25-02-2022 to 04-03-2022)
Activities planned:
1. Design UI/UX of the web application with mobile-first approach.
2. Learn about splash screen for the web application.
Activities Executed:
1. Designed the UI of the application using Figma.
2. Learned how to implement loading screen for the web application
Activities Executed:
1. We had prepared a rough diagram of the user interface of how our application should look
like, after that we started coding on the very first part of our application which was the
home page.
2. Distributed the responsibilities amongst the team members.
3. Learned about APIs. https://www.w3schools.com/js/js_api_intro.asp
Week No: 4
(25-03-2022 to 01-04-2022)
Activities planned:
1. Development of Home page
2. Development of Navigation bar
Activities Executed:
1. Developed the Home page which would be displayed when we open the web application.
2. Developed the navigation bar with all planned features of the project.
Activities Executed:
1. A contact us page was developed like the UI designed with the help of Figma.
2. A login page with required login fields was developed.
Week No: 6
(09-04-2022 to 16-04-2022)
Activities planned:
1. Making all the pages accessible and linked to each other.
2. Explore scope of API integration in the project.
Activities Executed:
1. All the pages were made dynamically clickable and linked to each other with the help
of JavaScript.
2. Understood the process of integrating third-party APIs in the project.
Activities Executed:
1. The week was dedicated for integrating third party APIs and confirming whether the APIs
are working appropriately or not.
Week No: 8
(23-04-2022 to 30-04-2022)
Activities planned:
1. Integrating backend to the login page.
2. Integrating backend to the Contact Us page.
Activities Executed:
1. Login page was integrated with backend to have user registration and login details.
2. Contact Us page was integrated in order to keep a check on user contact requests and do
the needful to solve their queries, complaints or concerns if any.
Activities Executed:
1. Tested the working condition of web application with various possible inputs and flows of
project.
2. Issues/Bugs raised in accessibility of the project were resolved.
Week No: 10
(07-05-2022 to 14-05-2022)
Activities planned:
1. Preparation of Black Book, project report and documentation
Activities Executed:
1. Prepared the Black Book – a book with all detailed information regarding the project.
2. Prepared all other required documentation regarding the developed project.