Pool Details
Pool Details
3 4 5 6 7 8 9 10
A
COLUMN-A (185 SEATS)
B
COLUMN-B (140 SEATS)
C
COLUMN-C (140 SEATS)
D
COLUMN-D (185 SEATS)
W
O
R
PLASTERED WALL IN
SEMI-GLOSS LATEX FINISH
2 ELEVATION-A
A 27 SCALE 1:50 MTS
J I H' H
5
3
7 10
50MMØ 304 STAINLESS STEEL PIPE
50MMØ 304 STAINLESS STEEL PIPE HANDRAIL IN HAIRLINE FINISH
50MMØ 304 STAINLESS STEEL PIPE
HANDRAIL IN HAIRLINE FINISH
HANDRAIL IN HAIRLINE FINISH
25MMØ 304 STAINLESS STEEL PIPE RAILING-1 25MMØ 304 STAINLESS STEEL PIPE 25MMØ 304 STAINLESS STEEL PIPE RAILING-1
INTERMEDIATE RAIL INTERMEDIATE RAIL INTERMEDIATE RAIL
38MMØ 304 STAINLESS STEEL PIPE 38MMØ 304 STAINLESS STEEL PIPE 38MMØ 304 STAINLESS STEEL PIPE
VERTICAL SUPPORT IN HAIRLINE FINISH VERTICAL SUPPORT IN HAIRLINE FINISH VERTICAL SUPPORT IN HAIRLINE FINISH
8
PLASTERED WALL IN PLASTERED WALL IN PLASTERED WALL IN
BLEACHER SEATS (VERIFY SPECS) SEMI-GLOSS LATEX FINISH SEMI-GLOSS LATEX FINISH SEMI-GLOSS LATEX FINISH
7
50MM THK. CONCRETE TOPPING WITH APPLIED 50MM THK. CONCRETE TOPPING WITH APPLIED 50MM THK. CONCRETE TOPPING WITH APPLIED
6 50MM THK. CONCRETE TOPPING WITH APPLIED
SODIUM-BASED LIQUID CONCRETE HARDENER SODIUM-BASED LIQUID CONCRETE HARDENER SODIUM-BASED LIQUID CONCRETE HARDENER
SODIUM-BASED LIQUID CONCRETE HARDENER WITH
WITH FLEXIBLE EPOXY PAINT FINISH WITH FLEXIBLE EPOXY PAINT FINISH WITH FLEXIBLE EPOXY PAINT FINISH
FLEXIBLE EPOXY PAINT FINISH
5
4
3
2
1
4 SECTION THRU - B 5 SECTION THRU - C 6 SECTION THRU - D
A 27 SCALE 1:50 MTS
A 27 SCALE 1:50 MTS
A 27 SCALE 1:50 MTS
QUARTERS
38MMØ 304 STAINLESS
50MMØ 304 STAINLESS 25MMØ 304 STAINLESS STEEL PIPE VERTICAL
STEEL PIPE HANDRAIL STEEL PIPE INTERMEDIATE SUPPORT IN HAIRLINE FINISH
IN HAIRLINE FINISH RAIL IN HAIRLINE FINISH
50MM THK. CONCRETE TOPPING
WITH APPLIED SODIUM-BASED
LIQUID CONCRETE HARDENER WITH
FLEXIBLE EPOXY PAINT FINISH
WELDED CONNECTION WELDED CONNECTION
R.C. BLEACHERS 100X100X6MM THK. BASEPLATE
38MMØ 304 STAINLESS STEEL PIPE WELDED TO VERTICAL SUPPORT
250MM THK. CONCRETE UPSTAND 38MMØ 304 STAINLESS STEEL PIPE
VERTICAL SUPPORT IN HAIRLINE FINISH
SPACED EVERY BEAM VERTICAL SUPPORT IN HAIRLINE FINISH
10MM Ø ANCHOR BOLTS
R.C. BEAM
3 SECTION THRU - A
7 SPOT DETAIL 1 8 SPOT DETAIL 2 9 SPOT DETAIL 3 10 SPOT DETAIL 4
A 27 SCALE 1:50 MTS
A 27 SCALE NTS
A 27 SCALE NTS
A 27 SCALE NTS
A 27 SCALE NTS
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports BLEACHER DETAILS JOHNDY B. PICO
Complex and Facilities), Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3) A
ENGINEERS HILL, BAGUIO CITY PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 27
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1
10
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
OLYMPIC SIZE SWIMMING POOL PLAN JOHNDY B. PICO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports
ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities), Wangal, La Trinidad, Benguet A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 28
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1 SECTION THRU A
A 29 SCALE 1:50 MTS
2 SECTION THRU B
A 29 SCALE 1:50 MTS
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OLYMPIC SIZE SWIMMING POOL DETAIL SECTIONS JOHNDY B. PICO
Construction of Multi purpose Building (Benguet Sports ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities), Wangal, La Trinidad, Benguet A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 29
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1
4 PLAN BLOW-UP
A 30 SCALE 1:50 MTS
5 BLOW UP SECTION
A 30 SCALE 1:50 MTS
2 SECTION THRU A
A 30 SCALE 1:50 MTS
6 BLOW UP SECTION
A 30 SCALE 1:50 MTS
3 SECTION THRU B
A 30 SCALE 1:50 MTS
7 BLOW UP SECTION 8 LADDER RUNG BLOW UP
A 30 SCALE 1:50 MTS
A 30 SCALE 1:50 MTS
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports OLYMPIC SIZE SWIMMING POOL DETAIL SECTIONS JOHNDY B. PICO
SPOT DETAILS ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities), Wangal, La Trinidad, Benguet
A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 30
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1 ROOF PLAN
A 31 SCALE 1:100 MTS
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports ROOF PLAN JOHNDY B. PICO
ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities), Wangal, La Trinidad, Benguet A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 31
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
2
A 32
4
A 32
6
A 32
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports ROOF & GUTTER BLOW-UP DETAILS JOHNDY B. PICO
ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities), Wangal, La Trinidad, Benguet
A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 32
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
FRONT ACP
FRONT ACP
1 FRONT SIDE ACP FASCIA DETAIL 2 REAR SIDE ACP FASCIA DETAIL
A 33 SCALE 1:100 MTS
A 33 SCALE 1:100 MTS
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports ACP FASCIA DETAILS JOHNDY B. PICO
Complex and Facilities), Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 33
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1 2 3 4 5 6 7 8 9 10 11 12 13
12 12
A A
POLY CARBONATE
SNAP H-PROFILE
STONE CLADDING
50X150MM STEEL
TUBULAR IN EPOXY
PAINT FINISH @ 250MM
4 DETAIL SECTION
SPACING O.C. A 34 SCALE 1:30 MTS
WELDED CONNECTION
5 SPOT DETAIL
A 34 SCALE 1:30 MTS
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports TRIANGULAR ROOF ACCENT DETAILS JOHNDY B. PICO
Complex and Facilities), Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3) A
ENGINEERS HILL, BAGUIO CITY PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 34
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
COLUMN
LOUVER
LOUVER
COLUMN
STONE CLADDING
ALUMINUM
ALUMINUM
LOUVER BLADES
LOUVER BLADES
ALUMINUM
TUBULAR FRAME
ALUMINUM
TUBULAR FRAME
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
LOUVER PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building LOUVER ELEVATION
JOHNDY B. PICO
ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Benguet Sports Complex and Facilities), LOUVER SECTION A
PREPARED:
ENGINEERS HILL, BAGUIO CITY Wangal, La Trinidad, Benguet (Phase 3) LOUVER PANEL DETAILS
BLOW UP DETAILS JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 35
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
GROUND FLOOR
1 STONE CLADDING DETAIL PLAN
A 36 SCALE 1:100 MTS
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports GROUND FLOOR STONE CLADDING DETAIL PLAN JOHNDY B. PICO
Complex and Facilities), Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3) A
ENGINEERS HILL, BAGUIO CITY PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 36
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
SECOND FLOOR
1 STONE CLADDING DETAIL PLAN
A 37 SCALE 1:100 MTS
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports SECOND FLOOR STONE CLADDING DETAIL PLAN JOHNDY B. PICO
ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities), Wangal, La Trinidad, Benguet
A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 37
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
BENGUET
AQUATIC CENTER
FRONT ELEVATION
1 STONE CLADDING DETAILS
A 38 SCALE 1:100 m
LEFT ELEVATION
2 STONE CLADDING DETAILS
A 38 SCALE 1:100 m
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports FRONT ELEVATION STONE CLADDING DETAILS JOHNDY B. PICO
Complex and Facilities), Wangal, La Trinidad, Benguet LEFT ELEVATION STONE CLADDING DETAILS ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3) A
ENGINEERS HILL, BAGUIO CITY PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 38
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
RIGHT ELEVATION
2 STONE CLADDING DETAILS
A 39 SCALE 1:100 m
REAR ELEVATION
2 STONE CLADDING DETAILS
A 39 SCALE 1:100 m
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports STONE CLADDING DETAILS JOHNDY B. PICO
Complex and Facilities), Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3) A
ENGINEERS HILL, BAGUIO CITY PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 39
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1 DETAIL A 2 DETAIL B 3 DETAIL C
A 40 SCALE 1:20 MTS
A 40 SCALE 1:20MTS
A 40 SCALE 1:20 MTS
6 DETAIL F
A 40 SCALE 1:20 MTS
4 DETAIL D
A 40 SCALE 1:20MTS
5 DETAIL E
A 40 SCALE 1:20 MTS
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports STONE CLADDING BLOW-UP DETAILS JOHNDY B. PICO
Complex and Facilities), Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3) A
ENGINEERS HILL, BAGUIO CITY PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 40
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1 ACP CANOPY DETAIL PLAN
A 41 SCALE 1:50 MTS
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports ACP CANOPY DETAILS JOHNDY B. PICO
ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities), Wangal, La Trinidad, Benguet
A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 41
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
EXIT
S
NOTES:
1 SINGLE LINE DIAGRAM
3 SHORT CIRCUIT CALCULATIONS E-01 SCALE: NTS
E-01 SCALE: NTS
ABBREVIATION:
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES GENERAL NOTES;
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi Purpose Building (Benguet Sports JOHNDY B. PICO
LEGEND; DRAWING INDEX;
Complex and Facilities) Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3)
SINGLE LINE DIAGRAM;
E
GROUNDING AND LIGHTNING PROTECTION RISER DIAGRAM; PREPARED:
ENGINEERS HILL, BAGUIO CITY
SHORT CIRCUIT CALCULATIONS; JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 1
VOLTAGE DROP CALCULATIONS
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1 PANEL SCHEDULE
E-02 SCALE: NTS
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES PANEL SCHEDULE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi Purpose Building (Benguet Sports JOHNDY B. PICO
Complex and Facilities) Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3) E
ENGINEERS HILL, BAGUIO CITY PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 2
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
CONTROL ROOM MEDIA AREA
OFFICE
38650
OFFICE
MAINTENANCE /
ELECTRICAL ROOM
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES FOUNDATION GROUNDING AND BONDING SYSTEM LAYOUT
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JOHNDY B. PICO
Construction of Multi Purpose Building (Benguet Sports ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities) Wangal, La Trinidad, Benguet E
PREPARED:
ENGINEERS HILL, BAGUIO CITY (Phase 3)
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 3
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1 ROOF LIGHTNING PROTECTION SYSTEM LAYOUT
E-04 SCALE: 1:200MTS
1 KEY PLAN
E-04 SCALE: 1:1000MTS
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
ROOF LIGHTNING PROTECTION SYSTEM LAYOUT
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi Purpose Building (Benguet Sports JOHNDY B. PICO
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities) Wangal, La Trinidad, Benguet ARCHITECT II
E
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 4
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
EXIT
FEMALE C.R. MALE C.R.
SURGE TANK
SHOWER ROOM
SHOWER AREA
PWD AREA
LOCKER'S ROOM
EXIT
38650
PUMP ROOM 4
LOCKER'S ROOM 9
10
EXIT
SHOWER ROOM
EXIT
PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
GROUND FLOOR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi Purpose Building (Benguet Sports (UNDER BLEACHER SWIMMING POOL) LIGHTING LAYOUT
JOHNDY B. PICO
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities) Wangal, La Trinidad, Benguet ARCHITECT II
E
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 5
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE: