0% found this document useful (0 votes)
289 views20 pages

Pool Details

earqwerwefrawef

Uploaded by

Jay De La Rocha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
289 views20 pages

Pool Details

earqwerwefrawef

Uploaded by

Jay De La Rocha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 20

3 4 5 6 7 8 9 10

24-SEATS 18-SEATS 18-SEATS 24-SEATS 8


24-SEATS 18-SEATS 18-SEATS 24-SEATS 7
24-SEATS 18-SEATS 18-SEATS 24-SEATS 6
24-SEATS COLUMN-A (185 SEATS) 18-SEATS COLUMN-B (140 SEATS) 18-SEATS COLUMN-C (140 SEATS) 24-SEATS COLUMN-D (185 SEATS) 5
24-SEATS 18-SEATS 18-SEATS 24-SEATS 4
24-SEATS 18-SEATS 18-SEATS 24-SEATS 3
24-SEATS 18-SEATS 18-SEATS 24-SEATS 2
RAILING-1
17-SEATS
RAILING-3
14-SEATS 14-SEATS
RAILING-3
17-SEATS RAILING-7
1
A B C D
RAILING-2 RAILING-4 RAILING-5

1 BLEACHER DETAIL PLAN


A 27 SCALE 1:50 MTS

3 4 5 6 7 8 9 10

A
COLUMN-A (185 SEATS)
B
COLUMN-B (140 SEATS)
C
COLUMN-C (140 SEATS)
D
COLUMN-D (185 SEATS)
W
O
R

PLASTERED WALL IN
SEMI-GLOSS LATEX FINISH

2 ELEVATION-A
A 27 SCALE 1:50 MTS

J I H' H

5
3
7 10
50MMØ 304 STAINLESS STEEL PIPE
50MMØ 304 STAINLESS STEEL PIPE HANDRAIL IN HAIRLINE FINISH
50MMØ 304 STAINLESS STEEL PIPE
HANDRAIL IN HAIRLINE FINISH
HANDRAIL IN HAIRLINE FINISH
25MMØ 304 STAINLESS STEEL PIPE RAILING-1 25MMØ 304 STAINLESS STEEL PIPE 25MMØ 304 STAINLESS STEEL PIPE RAILING-1
INTERMEDIATE RAIL INTERMEDIATE RAIL INTERMEDIATE RAIL

38MMØ 304 STAINLESS STEEL PIPE 38MMØ 304 STAINLESS STEEL PIPE 38MMØ 304 STAINLESS STEEL PIPE
VERTICAL SUPPORT IN HAIRLINE FINISH VERTICAL SUPPORT IN HAIRLINE FINISH VERTICAL SUPPORT IN HAIRLINE FINISH
8
PLASTERED WALL IN PLASTERED WALL IN PLASTERED WALL IN
BLEACHER SEATS (VERIFY SPECS) SEMI-GLOSS LATEX FINISH SEMI-GLOSS LATEX FINISH SEMI-GLOSS LATEX FINISH
7
50MM THK. CONCRETE TOPPING WITH APPLIED 50MM THK. CONCRETE TOPPING WITH APPLIED 50MM THK. CONCRETE TOPPING WITH APPLIED
6 50MM THK. CONCRETE TOPPING WITH APPLIED
SODIUM-BASED LIQUID CONCRETE HARDENER SODIUM-BASED LIQUID CONCRETE HARDENER SODIUM-BASED LIQUID CONCRETE HARDENER
SODIUM-BASED LIQUID CONCRETE HARDENER WITH
WITH FLEXIBLE EPOXY PAINT FINISH WITH FLEXIBLE EPOXY PAINT FINISH WITH FLEXIBLE EPOXY PAINT FINISH
FLEXIBLE EPOXY PAINT FINISH
5
4
3
2
1
4 SECTION THRU - B 5 SECTION THRU - C 6 SECTION THRU - D
A 27 SCALE 1:50 MTS
A 27 SCALE 1:50 MTS
A 27 SCALE 1:50 MTS

50MM THK. CONCRETE TOPPING


WITH APPLIED SODIUM-BASED LIQUID
CONCRETE HARDENER WITH
SLEEPING FLEXIBLE EPOXY PAINT FINISH

QUARTERS
38MMØ 304 STAINLESS
50MMØ 304 STAINLESS 25MMØ 304 STAINLESS STEEL PIPE VERTICAL
STEEL PIPE HANDRAIL STEEL PIPE INTERMEDIATE SUPPORT IN HAIRLINE FINISH
IN HAIRLINE FINISH RAIL IN HAIRLINE FINISH
50MM THK. CONCRETE TOPPING
WITH APPLIED SODIUM-BASED
LIQUID CONCRETE HARDENER WITH
FLEXIBLE EPOXY PAINT FINISH
WELDED CONNECTION WELDED CONNECTION
R.C. BLEACHERS 100X100X6MM THK. BASEPLATE
38MMØ 304 STAINLESS STEEL PIPE WELDED TO VERTICAL SUPPORT
250MM THK. CONCRETE UPSTAND 38MMØ 304 STAINLESS STEEL PIPE
VERTICAL SUPPORT IN HAIRLINE FINISH
SPACED EVERY BEAM VERTICAL SUPPORT IN HAIRLINE FINISH
10MM Ø ANCHOR BOLTS
R.C. BEAM

3 SECTION THRU - A
7 SPOT DETAIL 1 8 SPOT DETAIL 2 9 SPOT DETAIL 3 10 SPOT DETAIL 4
A 27 SCALE 1:50 MTS
A 27 SCALE NTS
A 27 SCALE NTS
A 27 SCALE NTS
A 27 SCALE NTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports BLEACHER DETAILS JOHNDY B. PICO
Complex and Facilities), Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3) A
ENGINEERS HILL, BAGUIO CITY PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 27
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1

10

1 OLYMPIC SIZE SWIMMING POOL PLAN


A 28 SCALE 1:50 MTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
OLYMPIC SIZE SWIMMING POOL PLAN JOHNDY B. PICO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports
ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities), Wangal, La Trinidad, Benguet A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 28
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1 SECTION THRU A
A 29 SCALE 1:50 MTS

2 SECTION THRU B
A 29 SCALE 1:50 MTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OLYMPIC SIZE SWIMMING POOL DETAIL SECTIONS JOHNDY B. PICO
Construction of Multi purpose Building (Benguet Sports ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities), Wangal, La Trinidad, Benguet A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 29
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1

4 PLAN BLOW-UP
A 30 SCALE 1:50 MTS

1 WARM UP POOL PLAN


A 30 SCALE 1:50 MTS

5 BLOW UP SECTION
A 30 SCALE 1:50 MTS

2 SECTION THRU A
A 30 SCALE 1:50 MTS

6 BLOW UP SECTION
A 30 SCALE 1:50 MTS

3 SECTION THRU B
A 30 SCALE 1:50 MTS
7 BLOW UP SECTION 8 LADDER RUNG BLOW UP
A 30 SCALE 1:50 MTS
A 30 SCALE 1:50 MTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports OLYMPIC SIZE SWIMMING POOL DETAIL SECTIONS JOHNDY B. PICO
SPOT DETAILS ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities), Wangal, La Trinidad, Benguet
A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 30
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1 ROOF PLAN
A 31 SCALE 1:100 MTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports ROOF PLAN JOHNDY B. PICO
ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities), Wangal, La Trinidad, Benguet A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 31
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
2
A 32

4
A 32

1 ROOF CROSS SECTION PLAN


A 32 SCALE 1:100 MTS

2 GUTTER AND ACP FASCIA BLOW-UP DETAIL


A 32 SCALE 1:10 MTS

3 RIGHT SIDE GUTTER PROFILE


A 32 SCALE 1:10 MTS

6
A 32

6 GUTTER BLOW-UP DETAIL


A 32 SCALE 1:5 MTS

4 LEFT SIDE GUTTER PROFILE


A 32 SCALE 1:10 MTS
5 RIGHT SIDE GUTTER BLOW-UP DETAIL
A 32 SCALE 1:10 MTS

7 GUTTER FLASHING PROFILE


A 32 SCALE 1:10 MTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports ROOF & GUTTER BLOW-UP DETAILS JOHNDY B. PICO
ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities), Wangal, La Trinidad, Benguet
A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 32
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
FRONT ACP

FRONT ACP
1 FRONT SIDE ACP FASCIA DETAIL 2 REAR SIDE ACP FASCIA DETAIL
A 33 SCALE 1:100 MTS
A 33 SCALE 1:100 MTS

3 FRONT SIDE ACP FASCIA BLOW-UP DETAIL


A 33 SCALE 1:10 MTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports ACP FASCIA DETAILS JOHNDY B. PICO
Complex and Facilities), Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 33
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1 2 3 4 5 6 7 8 9 10 11 12 13

6MM THK. SOLID POLYCARBONATE SHEET

1 TRIANGULAR ROOF ACCENT DETAIL PLAN


A 34 SCALE 1:100 MTS

12 12

INSIDE GUTTER (SEE DETAILS)

A A

6MM THK. SOLID POLYCARBONATE SHEET


(VERIFY COLOR)

50X150MM STEEL TUBULAR IN


EPOXY PAINT FINISH (WOOD FINISH)

W24X55 BEAM (SEE STRUCTURAL)

POLY CARBONATE
SNAP H-PROFILE
STONE CLADDING

6MM THK. SOLID POLYCARBONATE


SHEET (VERIFY COLOR)
50X150MM STEEL
#10 SELF-TAPPING HEX HEAD TUBULAR IN EPOXY
SCREWS WITH NEOPRENE GASKET PAINT FINISH
(VERIFY SPACING)

50X150MM STEEL
TUBULAR IN EPOXY
PAINT FINISH @ 250MM
4 DETAIL SECTION
SPACING O.C. A 34 SCALE 1:30 MTS

#10 SELF-TAPPING HEX HEAD SCREWS WITH


NEOPRENE GASKET (VERIFY SPACING)

8MM THK. SOLID POLYCARBONATE


SHEET (VERIFY COLOR)
2 POLYCARB ROOFING BLOW-UP PLAN 3 STEEL TUBULAR FRAMING BLOW-UP PLAN 50X150MM STEEL TUBULAR IN EPOXY
A 34 SCALE 1:30 MTS
A 34 SCALE 1:30 MTS
PAINT FINISH (WOOD FINISH)

WELDED CONNECTION

W24X55 BEAM (SEE STRUCTURAL)

5 SPOT DETAIL
A 34 SCALE 1:30 MTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports TRIANGULAR ROOF ACCENT DETAILS JOHNDY B. PICO
Complex and Facilities), Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3) A
ENGINEERS HILL, BAGUIO CITY PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 34
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
COLUMN

LOUVER

RIGHT SIDE LOUVER


1 LOUVER FLOORPLAN
A 35 SCALE 1:100 MTS

LOUVER

COLUMN
STONE CLADDING

RIGHT SIDE LOUVER


2 LOUVER ELEVATION
A 35 SCALE 1:100 MTS

ALUMINUM TUBULAR FRAME


50mm x 100mm x 3mm
ALUMINUM TUBULAR FRAME IN
TUBULAR FRAME
PAINTED FINISH
ALUMINUM LOUVER BLADES

ALUMINUM
ALUMINUM
LOUVER BLADES
LOUVER BLADES
ALUMINUM
TUBULAR FRAME

ALUMINUM
TUBULAR FRAME

RIGHT SIDE LOUVER


5 BLOW UP DETAILS PER PANEL
RIGHT SIDE LOUVER RIGHT SIDE LOUVER A 35 SCALE 1:8 MTS

3 LOUVER SECTION 4 LOUVER PANEL DETAILS


A 35 SCALE 1:50 MTS
A 35 SCALE 1:20 MTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
LOUVER PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building LOUVER ELEVATION
JOHNDY B. PICO
ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Benguet Sports Complex and Facilities), LOUVER SECTION A
PREPARED:
ENGINEERS HILL, BAGUIO CITY Wangal, La Trinidad, Benguet (Phase 3) LOUVER PANEL DETAILS
BLOW UP DETAILS JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 35
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
GROUND FLOOR
1 STONE CLADDING DETAIL PLAN
A 36 SCALE 1:100 MTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports GROUND FLOOR STONE CLADDING DETAIL PLAN JOHNDY B. PICO
Complex and Facilities), Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3) A
ENGINEERS HILL, BAGUIO CITY PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 36
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
SECOND FLOOR
1 STONE CLADDING DETAIL PLAN
A 37 SCALE 1:100 MTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports SECOND FLOOR STONE CLADDING DETAIL PLAN JOHNDY B. PICO
ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities), Wangal, La Trinidad, Benguet
A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 37
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
BENGUET
AQUATIC CENTER

FRONT ELEVATION
1 STONE CLADDING DETAILS
A 38 SCALE 1:100 m

LEFT ELEVATION
2 STONE CLADDING DETAILS
A 38 SCALE 1:100 m

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports FRONT ELEVATION STONE CLADDING DETAILS JOHNDY B. PICO
Complex and Facilities), Wangal, La Trinidad, Benguet LEFT ELEVATION STONE CLADDING DETAILS ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3) A
ENGINEERS HILL, BAGUIO CITY PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 38
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
RIGHT ELEVATION
2 STONE CLADDING DETAILS
A 39 SCALE 1:100 m

REAR ELEVATION
2 STONE CLADDING DETAILS
A 39 SCALE 1:100 m

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports STONE CLADDING DETAILS JOHNDY B. PICO
Complex and Facilities), Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3) A
ENGINEERS HILL, BAGUIO CITY PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 39
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1 DETAIL A 2 DETAIL B 3 DETAIL C
A 40 SCALE 1:20 MTS
A 40 SCALE 1:20MTS
A 40 SCALE 1:20 MTS

6 DETAIL F
A 40 SCALE 1:20 MTS

4 DETAIL D
A 40 SCALE 1:20MTS

5 DETAIL E
A 40 SCALE 1:20 MTS

1 STONE CLADDING BLOW UP DETAIL


A 40 SCALE 1:20 MTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports STONE CLADDING BLOW-UP DETAILS JOHNDY B. PICO
Complex and Facilities), Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3) A
ENGINEERS HILL, BAGUIO CITY PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 40
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1 ACP CANOPY DETAIL PLAN
A 41 SCALE 1:50 MTS

2 ACP CANOPY REFLECTED CEILING PLAN


A 41 SCALE 1:50 MTS

3 SECTION THRU - A 4 SPOT DETAIL - 1


A 41 SCALE 1:50 MTS A 41 SCALE 1:50 MTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi purpose Building (Benguet Sports ACP CANOPY DETAILS JOHNDY B. PICO
ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities), Wangal, La Trinidad, Benguet
A
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 41
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
EXIT
S

LEGEND AND SYMBOLS:

NOTES:
1 SINGLE LINE DIAGRAM
3 SHORT CIRCUIT CALCULATIONS E-01 SCALE: NTS
E-01 SCALE: NTS

ABBREVIATION:

4 VOLTAGE DROP CALCULATIONS


E-01 SCALE: NTS

2 GROUNDING AND LIGHTNING PROTECTION SYSTEM RISER DIAGRAM


E-01 SCALE: NTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES GENERAL NOTES;
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi Purpose Building (Benguet Sports JOHNDY B. PICO
LEGEND; DRAWING INDEX;
Complex and Facilities) Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3)
SINGLE LINE DIAGRAM;
E
GROUNDING AND LIGHTNING PROTECTION RISER DIAGRAM; PREPARED:
ENGINEERS HILL, BAGUIO CITY
SHORT CIRCUIT CALCULATIONS; JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 1
VOLTAGE DROP CALCULATIONS
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1 PANEL SCHEDULE
E-02 SCALE: NTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES PANEL SCHEDULE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi Purpose Building (Benguet Sports JOHNDY B. PICO
Complex and Facilities) Wangal, La Trinidad, Benguet ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION (Phase 3) E
ENGINEERS HILL, BAGUIO CITY PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 2
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
CONTROL ROOM MEDIA AREA
OFFICE

188 142 660 142 188

38650
OFFICE

MAINTENANCE /
ELECTRICAL ROOM

1 FOUNDATION GROUNDING AND BONDING SYSTEM LAYOUT


E-03 SCALE: 1:100MTRS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES FOUNDATION GROUNDING AND BONDING SYSTEM LAYOUT
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JOHNDY B. PICO
Construction of Multi Purpose Building (Benguet Sports ARCHITECT II
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities) Wangal, La Trinidad, Benguet E
PREPARED:
ENGINEERS HILL, BAGUIO CITY (Phase 3)
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 3
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
1 ROOF LIGHTNING PROTECTION SYSTEM LAYOUT
E-04 SCALE: 1:200MTS

1 KEY PLAN
E-04 SCALE: 1:1000MTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
ROOF LIGHTNING PROTECTION SYSTEM LAYOUT
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi Purpose Building (Benguet Sports JOHNDY B. PICO
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities) Wangal, La Trinidad, Benguet ARCHITECT II
E
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 4
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:
EXIT
FEMALE C.R. MALE C.R.
SURGE TANK
SHOWER ROOM

STORAGE MULTI-PURPOSE HALL

SHOWER AREA

PWD AREA
LOCKER'S ROOM

EXIT

38650
PUMP ROOM 4

WARM-UP POOL SWIMMING POOL


6 MEDAL CEREMONY ZONE

LOCKER'S ROOM 9

10
EXIT

SHOWER ROOM

EXIT

GROUND FLOOR PLAN


1 (UNDER BLEACHER SWIMMING POOL) LIGHTING LAYOUT
E-05 SCALE: 1:200MTS

PROJECT TITLE/LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
GROUND FLOOR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Construction of Multi Purpose Building (Benguet Sports (UNDER BLEACHER SWIMMING POOL) LIGHTING LAYOUT
JOHNDY B. PICO
CORDILLERA ADMINISTRATIVE REGION Complex and Facilities) Wangal, La Trinidad, Benguet ARCHITECT II
E
ENGINEERS HILL, BAGUIO CITY (Phase 3) PREPARED:
JULIET W. CHAN ANGELITA B. MABITAZAN EMMANUEL W. DIAZ, CESE KHADAFFY D. TANGGOL 5
OIC - ASSISTANT - CHIEF, CHIEF, PLANNING AND ASST.-REGIONAL DIRECTOR REGIONAL DIRECTOR
LA TRINIDAD BENGUET CAESAR ROMEL P. QUINDARA PLANNING AND DESIGN DIVISION DESIGN DIVISION
ARCHITECT II DATE: DATE: DATE: DATE:

You might also like