Attachment To Evaluation Region 8
Attachment To Evaluation Region 8
Attachment To Evaluation Region 8
(2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)
DIRECT COST
Force Account Works
Institutional Dev't Program LS 13,709,231.79 1.971 13,704,884.79 99.97 13,689,963.22 99.86 1.97
Construction Survey LS 15,072,238.77 2.167 15,072,238.77 100.00 15,072,238.77 100.00 2.17
Parcellary Survey LS 1,946,435.64 0.280 1,946,435.64 100.00 1,915,139.27 98.39 0.28
Right of Way (ROW Damages) LS 17,435,338.13 2.507 17,097,473.13 98.06 16,393,782.66 94.03 2.46
FSSM (Field Support Supervision & Monitoring) LS 8,531,630.52 1.227 8,516,678.35 99.82 8,504,866.03 99.69 1.22
Project Facilities LS 200,000.00 0.029 200,000.00 100.00 200,000.00 100.00 0.03
Equipment Repair and Maintenance LS 1,000,000.00 0.144 1,000,000.00 100.00 1,000,000.00 100.00 0.14
Design and Plans Preparation LS 500,000.00 0.072 500,000.00 100.00 500,000.00 100.00 0.07
TOTAL CONTRACT WORKS LS 637,005,125.16 91.603 630,910,942.23 99.04 617,061,564.49 96.87 90.73
(1) (2) (3) (4) (5) (6) (8) (9) (10) (11) (12) (13) (14)
A DIRECT COST
Force Account Works
1 IDP (Institutional Dev't Program) l.s. 3,754,795.01 1.539 100.00% 3,754,795.01 3,754,795.01 100.00 100.00
2 Construction Survey l.s. 2,795,915.18 1.146 100.00% 2,795,915.18 2,795,915.18 100.00 100.00
3 Parcellary Survey l.s. 1,329,174.61 0.545 100.00% 1,329,174.61 1,326,350.11 100.00 99.79
4 Office Tools and Equipment l.s. 684,282.28 0.280 100.00% 684,282.28 684,282.28 100.00 100.00
5 ROW Acquisitions/Damages l.s. 7,342,643.67 3.009 100.00% 7,342,643.67 6,842,643.67 100.00 93.19
6 FSSM (Field Support Supervion & Monitoring) l.s. 1,453,008.28 0.595 100.00% 1,453,008.29 1,424,616.64 100.00 98.05
7 Other Irrigation Facilities l.s. 2,351,800.00 0.964 100.00% 2,351,800.00 2,351,800.00 100.00 100.00
8 Farm Level System (SFDs) l.s. 18,565.75 0.008 100.00% 18,565.75 18,565.75 100.00 100.00
Sub-Total 19,730,184.78 8.086 19,730,184.79 19,198,968.64 100.00 97.31
Contract Works
1 CY 2014 l.s. 34,107,034.25 13.98 100.00% 34,107,034.25 34,107,034.25 100.00 100.00
2 CY 2015 l.s. 106,031,861.25 43.46 100.00% 106,031,861.25 106,031,861.25 100.00 100.00
3 CY 2017 l.s. 65,335,516.85 26.78 93.51% 61,093,311.86 53,099,498.30 93.51 81.27
4 CY 2018 l.s. 18,795,402.87 7.70 76.83% 14,441,255.86 14,441,255.86 76.83 76.83
Sub-Total 224,269,815.22 91.91 215,673,463.22 207,679,649.66 96.17 92.60
DIRECT COST 244,000,000.00 100.00 96.48% 235,403,648.01 226,878,618.30 96.48 92.98
CMD Form ME-01 2018 CALENDAR YEAR MONTHLY ACCOMPLISHMENT REPORT
PROJECT TITLE: HIBULANGAN SMALL RESERVOIR IRRIGATION PROJECT
as of March 15, 2021
REVISED CY 2018 POW ACTUAL % ACCOMP./ITEM
VALUE OF WORK TOTAL %
WORK DESCRIPTION UNIT EXPENDITURES
ACCOMP. (Pesos) ACCOMP.
UNIT COST AMOUNT (Pesos) WTD. % (Pesos) Phy. Fin.
A. DIRECT COST
I. CIVIL WORKS
A. CONTRACT WORKS
1. Construction of Irrigation Facilities L.S 107,240,683.52 107,240,683.52 96.27 104,974,417.73 91,709,926.25 97.89% 85.52% 94.24%
a. HSRIP 01-2018 (Partial) L.S 28,194,956.99 28,194,956.99 25.31 27,676,194.46 21,845,730.33 98.16% 77.48% 24.85%
b. HSRIP 02-2018 L.S 29,044,593.22 29,044,593.22 26.07 29,044,593.22 29,044,593.22 100.00% 100.00% 26.07%
c. HSRIP 03-2018 L.S 25,036,801.05 25,036,801.05 22.48 25,036,801.05 25,036,801.05 100.00% 100.00% 22.48%
d. HSRIP 04-2018 L.S 24,964,332.26 24,964,332.26 22.41 23,216,829.00 15,782,801.65 93.00% 63.22% 20.84%
e. Other Irrigation Facilities L.S - - -
2. Construction of Embankment Dam - -
Sub-Total (Civil Works) 107,240,683.52 96.27 104,974,417.73 91,709,926.25 97.89% 85.52% 94.24%
II. Institutional Development Program L.S 198,782.69 198,782.69 0.18 198,782.69 198,782.69 100.00% 100.00% 0.18%
a. Institutional Development Program/ GAD L.S 147,220.70 147,220.70 0.13 147,220.70 147,220.70 100.00% 100.00% 0.13%
b. Field Office (RIO) L.S 51,561.99 51,561.99 0.05 51,561.99 51,561.99 100.00% 100.00% 0.05%
III. Construction Survey L.S 1,183,780.11 1,183,780.11 1.06 1,183,780.11 1,183,780.11 100.00% 100.00% 1.06%
a. Construction Survey L.S 732,491.02 732,491.02 0.66 732,491.02 732,491.02 100.00% 100.00% 0.66%
b. Detailed Design of Irrigation Facilities L.S 451,289.09 451,289.09 0.41 451,289.09 451,289.09 100.00% 100.00% 0.41%
IV. Parcellary Mapping/ Survey L.S 191,606.10 191,606.10 0.17 191,606.10 191,606.10 100.00% 100.00% 0.17%
V. PROCUREMENT OF EQUIPMENT & VEHICLES L.S - - - - -
VI. Right of Way Acquisition, Plant/Property Damages L.S 2,477,444.04 2,477,444.04 2.22 967,792.35 440,998.66 39.06% 17.80% 0.87%
a. Land Acquisition L.S 712,915.20 712,915.20 0.64 517,595.63 46,241.78 72.60% 6.49% 0.46%
b. Crop Damages L.S 685,555.48 685,555.48 0.62 51,496.90 51,496.90 7.51% 7.51% 0.05%
c. Land Titling L.S 1,078,973.36 1,078,973.36 0.97 398,699.82 343,259.98 36.95% 31.81% 0.36%
VII. Field Support Supervision & Monitoring L.S 100,703.54 100,703.54 0.09 100,703.54 100,703.54 100.00% 100.00% 0.09%
1. RIO/ Field Office L.S 100,703.54 100,703.54 0.09 100,703.54 100,703.54 100.00% 100.00% 0.09%
Sub-Total (Pre-Construction Activities) 4,152,316.48 3.73 2,642,664.79 2,115,871.10 63.64% 50.96% 2.37%
TOTAL DIRECT COST 111,393,000.00 100.00 107,617,082.52 93,825,797.35 96.61% 84.23% 96.61%
CMD Form CA-01
CONTRACT WORK SUMMARY STATUS
HIBULANGAN SMALL RESERVOIR IRRIGATION PROJECT
CY 2018 FUND
As of: March 15, 2021
PARTICULAR Unit HSRIP #01-2018 HSRIP #02-2018 HSRIP #03-2018 HSRIP #04-2018
1. Kind of Contract LMC LMC LMC LMC
VICTORIA DEVELOPMENT AND VICTORIA DEVELOPMENT AND VICTORIA DEVELOPMENT AND VICTORIA DEVELOPMENT AND
2. Name of Contractor
CONSTRUCTION SUPPLY CORP. CONSTRUCTION SUPPLY CORP. CONSTRUCTION SUPPLY CORP. CONSTRUCTION SUPPLY CORP.
REMARKS Subject for Liquidated Damages Completed Completed Subject for Liquidated Damages
STA. RITA SRIP As of March 15, 2021
DIRECT COST
I. CIVIL WORKS
A. CONTRACT WORKS
4. Construction of Earthfill Dam & Its Appurtenant Structures 336,397,618.81 335,334,387.30 310,887,219.30 99.6839 92.42
CY 2011
a. Package 1-2011, MC (Sta. 0+260 - 0+513) L=253m 21,283,335.97 21,283,335.97 21,283,335.97 100.00 100.00
b. Package 2-2011, MC (Sta. 0+513 - 0+698) L=185m 22,789,000.06 22,789,000.06 22,789,000.06 100.00 100.00
c. Package 3-2011, MC (Sta. 0+698 - 1+145) L=447m 19,987,663.81 19,987,663.81 19,987,663.81 100.00 100.00
d. Package 4-2011, MC (Sta. 1+145 - 1+414) L=269m 5,485,637.03 5,485,637.03 5,485,637.03 100.00 100.00
CY 2012 -
a. Package 1-2012, MC (Sta. 1+414 - 1+761) L=347m 7,588,664.42 7,588,664.42 7,588,664.42 100.00 100.00
b. Package 2-2012, MC (Sta. 1+761-2+168) L = 407m 7,105,424.88 7,105,424.88 7,105,424.88 100.00 100.00
c. Package 3-2012, MC (Sta. 2+168-2+476) L = 308m 5,550,445.98 5,550,445.98 5,550,445.98 100.00 100.00
CY 2013 -
a. Package 1-2013, MC (Sta. 2+476-2+985) L= 524m w/ 3 struc. 8,927,864.88 8,927,864.88 8,927,864.88 100.00 100.00
b. Package 2-2013, MC (Sta. 3+428-3+836) L= 443m w/ 2 struc. 8,979,131.19 8,979,131.19 8,979,131.19 100.00 100.00
c. Package 3-2013, MC (Sta. 2+985-3+428) L= 408m w/ 2 struc. 8,626,502.13 8,626,502.13 8,626,502.13 100.00 100.00
d. Package 4-2013, MC (Sta. 3+836-4+131) L= 295m w/ 2 struc. 3,542,889.59 3,542,889.59 3,542,889.59 100.00 100.00
CY 2016 -
a. Package 1-2016, MC (Sta. 4+131-4+835.85) L= 704.85m w/ 1 struc. 11,888,253.44 11,888,253.44 7,189,004.95 100.00 60.47
b. Package 2-2016, 1 siphon (Sta. 4+835.85-5+146.12) L= 310.27m 13,520,551.32 13,520,551.32 13,520,551.32 100.00 100.00
c. Package 3-2016, MC (Sta. 5+146.12-5+620) L= 473.88m w/ 1 struc. 9,203,634.57 9,203,634.57 9,203,634.57 100.00 100.00
d. Package 4-2016, MC (Sta. 5+620-5+790, 5+790-6+080) L= 460m w/ 1 struc. 12,427,561.58 12,427,561.58 4,357,426.48 100.00 35.06
e. Package 5-2016, MC (Sta. 6+4400-6+760) L= 320m w/ 1 struc. 10,569,745.45 10,569,745.45 10,569,745.45 100.00 100.00
CY 2017 -
c. Package 3-2017, MC (Sta. 0+000 - 0+260) L= 260m; 1 struc. 11,911,033.66 11,911,033.66 11,911,033.66 100.00 100.00
d. Package 4-2017, MC (Sta. 0+000 - 1+170) L= 1,170m w/ 3 struc. (Lateral A) 9,504,197.84 9,504,197.84 9,504,197.84 100.00 100.00
e. Package 5-2017, MC (Sta. 6+760 - 7+270) L= 510m w/ 1 struc. 8,497,241.27 8,497,241.27 8,497,241.27 100.00 100.00
f. Package 6-2017, MC (Sta. 7+270 - 8+110) L= 840m 14,880,380.86 14,880,380.86 14,880,380.86 100.00 100.00
g. Package 7-2017, MC (Sta. 8+110 - 9+000) L= 890m 11,075,041.30 11,075,041.30 11,075,041.30 100.00 100.00
CY 2018 -
a. Package 1-2018, MC ( Sta. 9+000 - 9+940, Sta. 10+011 - 10+500, Sta.10+760 -13+140 and Sta.
13+520-13+640), L= 3.929 kms.
10,075,206.78 7,605,773.60 6,125,357.87 75.49 60.80
b. Package 2-2018, MC, Cut & Cover (Sta. 9+940-10+011, Sta. 10+500 - 10+760, Sta. 13+140-
13+520), L=0.711 km.
27,327,567.74 21,659,830.19 20,679,899.84 79.26 75.67
c. Package 3-2018, Lateral A, @Sta. 1+170 -3+820, L=2.65km.; Lateral B, @ Sta. 0+000 - 5+260,
L=5.26km.; Lateral C, @ Sta. 0+000 to Sta. 7+680, L=7.68Km.; Lat. D , Sta. 0+000 to Sta. 6+920, L= 8,711,989.63 7,846,017.86 6,770,958.34 90.06 77.72
6.92Km.; Lateral E, @ Sta. 0+000 - 11+100, L=11.10Km., TOTAL length = 33.61km.
d. Package 4-2018, MC ( Sta. 9+000 - 9+940), L= 0.940 kms. 7,259,000.69 6,759,581.44 5,954,558.27 93.12 82.03
e. Package 5-2018, Repair of Main Canal, Construction of 4 Units of headgates, fabrication and
installation of steel gates
1,141,126.42 1,141,126.42 1,141,126.42 100.00 100.00
6. LAND ACQUISITION AND RESETTLEMENT PLAN (LARP) 108,416,640.14 107,788,728.98 104,757,534.60 99.42 96.62
V. RIGHT OF WAY NEGOTIATION, ACQUISITION/ DAMAGES 4,817,321.75 4,817,321.75 4,817,321.75 100.00 100.00
VI. Field Support, Supervision & Monitoring 7,819,423.51 7,764,087.93 7,764,087.93 99.29 99.29
VIII. CONTINGENCIES - - -
B. INDIRECT COST
As of 03/2021
ACCO MP LIS HMENT
S UB P RO JECT re g io n p ro vin c e MUNICIP MAINP RO JE ALLO CATI P HY FIN REMARKS
ALITY CT O N (P '0 0 0 ) (%) (%)
Jo b s FB
12 . Hib ulang an SRIP, No rthern Leyte REGION 8 LEYTE Villab a SRIP 8 5,0 0 0 .0 0 10 0 .0 0 10 0 .0 0 243 0 Co mp leted
15. Pinip is akan Irrig atio n Pro ject, No rthern Samar REGION 8 NORTHERN SAM AR Las Navas , Line Pro ject 12 4 ,2 3 0 .0 0 10 0 .0 0 9 9 .3 8 1,0 6 4 3 17 Co mp leted
Catub ig
16 . Bulao Irrig atio n Pro ject, , No rthern Samar REGION 8 NORTHERN SAM AR Las Navas Line Pro ject 8 3 ,0 0 0 .0 0 10 0 .0 0 6 4 .4 8 72 9 333 Co mp leted
17. Hag b ay Irrig atio n Pro ject, No rthern Samar REGION 8 NORTHERN SAM AR Las Navas Line Pro ject 71,0 0 0 .0 0 10 0 .0 0 8 7.6 8 8 54 267 Co mp leted
19 . Gand ara Irrig atio n Pro ject REGION 8 SAM AR San J o rg e FSDE 12 ,0 0 0 .0 0 10 0 .0 0 9 1.74 0 0 Co mp leted
2 1. Gand ara Irrig atio n Pro ject (Po lo g o n Area), REGION 8 SAM AR Gand ara Line Pro ject 3 5,8 6 0 .0 0 10 0 .0 0 10 0 .0 0 1,13 5 0 Co mp leted
Wes tern Samar
2 2 . Calb ig a Irrig tio n Pro ject, Wes tern Samar REGION 8 SAM AR Calb ig a Line Pro ject 9 0 ,0 0 0 .0 0 10 0 .0 0 10 0 .0 0 1,3 2 8 0 Co mp leted
2 3 . Sta. Rita SRIP, Wes tern Samar REGION 8 SAM AR Sta. Rita SRIP 4 5,0 0 0 .0 0 10 0 .0 0 10 0 .0 0 0 0 Co mp leted .
CY 2015 Irrigation Program
As of 03/2021
ACCO MP LIS HMENT
S UB P RO JECT re g io n p ro vin c e MUNICIP MAINP RO JE ALLO CATI P HY FIN REMARKS
ALITY CT O N (P '0 0 0 ) (%) (%)
Jo b s FB
15. Hib ulang an SRIP REGION 8 LEYTE Villab a SRIP 10 0 ,0 0 0 .0 0 10 0 .0 0 9 9 .9 8 1,3 8 6 0 Overall acco mp lis hment o f d am
is 9 5.6 8 %.
16 . Bantayan Irrig atio n Pro ject REGION 8 NORTHERN SAM AR San Ro q ue BANTAYAN-IP 10 ,0 0 0 .0 0 10 0 .0 0 10 0 .0 0 247 150 Co mp leted .
17. Bulao Irrig atio n Pro ject REGION 8 NORTHERN SAM AR Las Navas BULAO-IP 4 0 ,0 0 0 .0 0 10 0 .0 0 3 7.6 2 348 0 Co mp leted
2 3 . Hag b ay Irrig atio n Pro ject REGION 8 NORTHERN SAM AR Las Navas HAGBAY-IP 4 0 ,0 0 0 .0 0 10 0 .0 0 2 7.0 1 444 0 Co mp leted
2 4 . Pinip is akan Irrig atio n Pro ject REGION 8 NORTHERN SAM AR Las Navas , PINIPISAKAN-IP 6 0 ,0 0 0 .0 0 10 0 .0 0 10 0 .0 0 73 1 0 Co mp leted
Catub ig
2 5. Calb ig a Irrig tio n Pro ject REGION 8 SAM AR Calb ig a CALBIGA-IP 15,0 0 0 .0 0 10 0 .0 0 10 0 .0 0 13 0 0 Co mp leted .
2 9 . Gand ara Irrig tio n Pro ject REGION 8 SAM AR Gand ara GANDARA-IP 114 ,6 2 2 .0 0 10 0 .0 0 9 9 .6 1 1,154 170 Co mp leted .
3 0 . Sta. Rita SRIP REGION 8 SAM AR Sta. Rita SRIP 2 0 0 ,0 0 0 .0 0 10 0 .0 0 8 6 .73 635 0 Overall acco mp lis hment o f d am
is 9 7.58 %.
Engineering Department
FORM-1A
(1) (2) (3) (4) (5) (6) (8) (11) (12) (13) (14)
A. DIRECT COST
Force Account Works
1 Institutional Dev't Program LS 1,660,000.00 2.00 100.00% 1,660,000.00 1,660,000.00 100.00 100.00
2 Construction Survey LS 356,227.00 0.43 100.00% 356,227.00 356,227.00 100.00 100.00
3 Parcellary Mapping/Survey LS 3,482,731.76 4.20 100.00% 3,482,731.06 3,482,731.06 100.00 100.00
4 Right of Way LS 774,500.00 0.93 100.00% 774,500.10 774,500.10 100.00 100.00
16,200,057.00
Prepared by: Note: Had been reported 100% previously and the Contract was Terminated Submitted by:
for Convenience based on actual expenditures #REF!
(1) (2) (3) (4) (5) (6) (8) (11) (12) (13) (14)
A. DIRECT COST
Force Account Works
1 Institutional Dev't Program LS 800,000.00 2.00 100.00% 800,000.00 800,000.00 100.00 100.00
2 Construction Survey LS 191,352.72 0.48 100.00% 191,352.72 191,352.72 100.00 100.00
3 Right of Way LS 598,272.05 1.50 100.00% 598,272.05 598,272.05 100.00 100.00
Prepared by: Note: Had been reported 100% previously and the Contract was Terminated Submitted by:
at 25.65% actual accomplishment for BIP#2-2015 Contract and the #REF!
remaining amount was on the process of procurement.
JUDE A. BIDO GEORDEN A. LEMSIC
Sup Engineer A Office In-Charge-NSIMO
Engineering Department
FORM-1A
CY 2014 71.000 71.000 71.000 71.000 100.00 100.00 100.00 100.00 400 400
Contract terminated, POW
CY 2015 40.000 40.000 40.000 10.699 100.00 31.87 100.00 26.75 prepared, procured already
Later Years
Overall 354.937 354.937 354.937 206.672 100.00 64.15 100.00 58.23 708 400
CALENDAR YEAR MONTHLY ACCOMPLISHMENT
PROJECT TITLE: HAGBAY IRRIGATION PROJECT
As of : March 15, 2021
(1) (2) (3) (4) (5) (6) (8) (11) (12) (13) (14)
A. DIRECT COST
Force Account Works
1 Institutional Dev't Program LS 1,420,000.00 2.00 100.00% 1,420,000.00 1,420,000.00 100.00 100.00
2 Construction Survey LS 376,085.46 0.53 100.00% 376,085.46 376,085.46 100.00 100.00
7,582,505.00
Prepared by: Submitted by:
#REF!
(1) (2) (3) (4) (5) (6) (8) (11) (12) (13) (14)
A. DIRECT COST
Force Account Works
1 Institutional Dev't Program LS 800,000.00 2.00 100.00% 800,000.00 800,000.00 100.00 100.00
2 Construction Survey LS 240,880.09 0.60 100.00% 240,879.99 240,879.99 100.00 100.00
3 Parcellary Survey LS 1,357,726.24 3.39 100.00% 1,357,726.24 1,357,726.24 100.00 100.00
4 Right of Way Damages LS 718,272.05 1.80 100.00% 718,272.06 718,272.06 100.00 100.00
Sub-total 3,116,878.38 7.79 3,116,878.29 3,116,878.29 100.00 100.00
Contract Works
1 Hagbay Irrigation Project LS 36,883,121.62 92.21 100.00% 36,883,121.62 7,581,654.35 100.00 20.56
Canalization (Canal Lining Sta. 0+000 - 7+716 HLMC & Sta. 0+000 - 3+397 HRMC)
TOTAL CONTRACT WORKS 36,883,121.62 92.21 36,883,121.62 7,581,654.35 100.00 20.56
Prepared by: Note: Had been reported 100% previously and the Contract was Terminated Submitted by:
at 26.11% actual accomplishment and the remaining amount was #REF!
re-procured/bidded dated March 12, 2021
JUDE A. BIDO GEORDEN A. LEMSIC
Sup. Engineer A Officer In-Charge-NSIMO
Engineering Department
FORM-1A
CY 2014 124.230 124.230 124.230 124.230 100.00 100.00 100.00 100.00 475 475
CY 2015 60.000 60.000 60.000 60.000 100.00 100.00 100.00 100.00 120 120
1 contract package
on-going and 2
CY 2016 240.000 240.000 240.000 178.92 100.00 91.76 100.00 74.55 contract packages
terminantion on
process
CY 2018 95.000 95.000 95.000 75.20 100.00 81.17 100.00 79.16 367
CY 2020 68.750 68.750 68.081 25.41 30.77 27.74 30.77 26.09 540
Later Years 448
Overall 1,097.02 1,097.02 1,096.35 920.22 94.56 87.92 94.56 83.22 2000 595
CALENDAR YEAR MONTHLY ACCOMPLISHMENT
PROJECT TITLE: PINIPISAKAN IRRIGATION PROJECT
As of : March 15, 2021
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)
A. DIRECT COST
Force Account Works
1 Institutional Dev't Program LS 430,336.51 1.42 100.0% 430,336.51 148,742.98 100.00 34.56
2 Construction Survey LS 286,891.01 0.95 100.0% 286,891.01 286,891.01 100.00 100.00
3 Contract Supervision LS 860,671.85 2.84 100.0% 860,671.85 470,713.70 100.00 54.69
Sub-total 1,577,899.37 5.21 1,577,899.37 906,347.69 100.00 57.44
B Contract Works
1 PIP#1-2019 - CRMC Lateral 3 LS 8,406,133.58 27.77 34.78% 2,923,653.26 2,564,241.12 34.78 30.50
2 PIP#2-2019 - CRMC Lateral 4 LS 5,551,228.34 18.34 46.51% 2,581,876.30 1,189,911.98 46.51 21.44
3 PIP#3-2019 - CRMC Lateral 5 LS 12,954,970.97 42.80 7.60% 984,577.79 7.60 -
4 PIP#4-2019 - CRMC Lateral 1 LS 1,776,767.74 5.87 19.29% 342,738.50 19.29 -
4,491,850.04
Prepared by: Submitted by:
#REF! #REF!
#REF!
JUDE A. BIDO GEORDEN A. LEMSIC
Sup. Engineer A 578,954,301.84 Officer In-Charge-NSIMO