Automobile IG2
Automobile IG2
Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that the work is my
own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).
Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while completing all
parts of this assessment. Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant resources section for this
qualification on the NEBOSH website.
Part 1: Background
Topic Comments
Name of organisation* SMTB Engineering Pvt. Ltd.
Site location* Pithampur, Dhar (M.P) India
Number of workers 270
SMTB Engineering Private. Limited. is a pioneer leading organisation in automobile
manufacturing, who are engaged in automobile components accessories, it is a ISO:9001:2015
certified organisation and recently adopted of ISO-45001:2018 Occupational Health and Safety
Management System (OSHMS).
Here are many activities is being carried out in order to fabricated and to achieve job order
General description of the organisation services viz machining process in machine shop, grinding, heat treatment, gas cutting, welding,
manual handling, mechanical handling, quality checks.
Shift Pattern:8 to 20:00 and 20:00 to 8:00. Every Sunday is week off for selective staff and
the workers, while their off adjustment is done in any alternative day of week.
I have taken a risk assessment area of maintenance of the machine shop area and various machine
Description of the area to be included in the risk
operation there, auto components manufacturing unit including of fabrication area, spare parts division,
assessment
manual and mechanical handling, gas cutting, heat treatment, welding, etc.
General Manager of Operation and Safety has a overall responsibility of Health and Safety at the
Any other relevant information automobile component fabrication/manufacturing, machine shop unit and liable to reporting to Managing
Director.
* If you’re worried about confidentiality, you can invent a false name and location for your organisation but, all other information provided must be factual.
I went to the passenger car manufacturing unit and consulted the workers and various departmental heads,
during my visit I identified the various hazards the workers are exposed to, what control measures are being
taken to elimination of hazards and from the sources of information what additional control measures to be
proposed to ensure for a better workplace safety for the workers.
.
Part 2: Risk Assessment
3.Slips and trips CNC lathe operators, 1.Designated walkways 1. Stope the machine and repair the leakage 1week Workshop manager
other workers and (indicated by yellow paint from the oil sump of the machine .
It was found that visitors crossing such lines) in the shop floor. 2. Ensure the daily housekeeping is done to 1week Housekeeping
from CNC lathe slippery areas. get the floor of the shopfloor dry and clean Manager
machine the 2. Barricading of slippery 3. Provision of using the loose saw dust or 1week Workshop supervisor
lubrication oil is Many workers passing area done to avoid anyone sand while cleaning the slippery floor for
getting spilled over and crossing the entering the area of spillage. the lubrication.
the shop floor and slippery area in the shop 4. Do not over fill the lubrication tank of the
floor was slippery. floor may slip and fall all 3. The warning sign- Wet CNC machine to avoid the spillage of the
4. Manual Workers those are 1.Health surveillance is 1. Ensure that adequate lifting and moving 3 Months Finance Manager
handling regularly shifting carried out. mechanical device like forklift truck to be
material to the work provided to avoid the manual handling
It was found area are prone to activities.
workers frequently harmed. 2.A competent supervisor is 2. Hand operated trolley or cart or pallet 1 Month Finance Manager
carrying 6 meter deployed to monitor the trucks to be made provision to reduce the
channel bar and Due to frequent and work. human force and risk of manual handling.
other materials form regular doing the 3. Ensure that material are stored in a
store location to the manual handling work manner that minimizes moving and 2 Weeks Workshop Manager
fabrication area in while shifting the heavy handling distance.
an awkward channel of long length 3.Tool box talk was carried 4. Make arrangements to cut lengthy pieces 1 Month Store Manager
position during the from one location to out. of material as per job requirement near
5. Health, Welfare All workers involved in 1. Job specific training 1. Reduce daily task load so that they can 1 Week Administrative
and work heat, ventilation, air is providing for safe ensure to be more focused rather than Manager
environment. conditioning system, etc. working. multi-tasking.
2. Workers are 2. Shift timing will be reduced from 12 to 10 2 Week Administrative
Because of Excessive workload and regularly engaged to including with 1 hrs for a break. Manager
excessive workload shift timing have a lot of maintain their body’s 3. Health surveillance should be carried to 3 Week Safety Supervisor
pressure with 12 impact on workers it salt level by regular the workers working in HVAC.
hrs shift timing causes them certain water drinking. 4. Rest room should be provided to facilitate 1 Month Plant Manager
HVAC workers are mental illnesses like 3. Work is done under to the workers so the7 can take a break
found very tired anxiety, depression, the supervision. from routine work. It will help them to be
sometimes. unconsciousness, and proactive in further work.
lack of moral support in 5. Suitable and sufficient changing rooms 3 Week Finance Manager
production and also shall be provided with encouraging the
creates a huge impact worker to use lose clothing.
on worker’s product 6. Provide suitable rest and breaks to 1 Week Safety supervisor
efficiency. everyone.
7. Suitable and sufficient area should be 3 Week Finance Manager
provided for rest.
8. Adequate drinking facilities should be 3 Week Finance Manager
provided for every on e with a mobile
dispensary packaged bottle.
9. Other arrangements for washing and
9. Fire Everybody working on 1. Waste Cotton yard 1. Hot work permit should have be done 1 Week Fire and Safety
It was or near the gas cutting immediately shifted after taking preventive action of removal Manager
observed that platform since fire never far from gas cutting of waste.
metal sheet escape any body in it’s bad so that
cutting platform way. produced spark due 2. Provision of storing of combustible 2 Weeks Store Supervisor
is just in vicinity to metal sheet material in secured place.
of waste cotton When any body effects cutting may be 3. Fire Extinguishers provision with all hot
storage area, with fire it may cause ineffective. work activities. 1 Week Store Supervisor
and other severe burn, damage of 2. Oil drums were kept 4. Fire sparks should be contained by a fire
machinery oil nervous system, burning aside of building blanket so that it will automatically 1 Week Work Supervisor
drums were of vital body parts, skin where fire hazard controlled.
kept nearby this irritation depending on not observed. 5. Only authorized person will engaged on
posses fire fire magnitude outcome. hot work job. 1 Week Workshop Manager
hazard.
6. The persons should have to trained for
fire fighting. 2 Weeks Safety Manager
7. The workers should be trained for the first
aid for fire burns and other fire related 3 Weeks Safety Manager
10 Noise:- Mainly maintenance Voice assessment carried 1. Sound absorbing barriers should have to 6 Month Finance Manager
department persons and out when the workshop had be installed.
Excessive noise the workers and been set up three years ago. 2. Setting of the program for job rotation to 3 weeks Site Manager
from workshop operator of Machine and the workers
activities people or visitors A recent review done of the 3. Giving frequent rest and breaks to the 2 weeks Site Manager
nearby. PPEs in use has been workers.
carried out. As part of this 4. Providing training to all workers related to 2 months Safety Manager
Who worked in the old/broken PPE (Specially safety from noise.
workshop area. hearing protector) was 5. Look into the possibility of setting up a 2 Months Safety manager
Prolonged uncontrolled replaced. health surveillance program for relevant
exposer to noise over at workers.
80db can overtime Suitable hearing protection 6. Purchas a simple noise meter. 1 Month Purchase manager
cause NIHL has been issued to all 7. Arrange noise meter training for the 2 Month Safety Manager
relevant workers. workshop manager.
The workshop is noisy 8. A simple noise survey should be 2 weeks Safety Manager
and at certain times All relevant workers have conducted.
voice has to rise when been trained in the correct 9. Use the British HSE’s noise calculation to 1 month Safety Manager
conversation. use of the PPEs. find out noise exposure level.
http://www.hse.gov.uk/noise/calculator.html
There is a preventive
maintenance program in
place for all the equipment
produces noise.
Specific legal arguments As per ILO Code of practice safety and health in construction
3.6.2. Sufficient and suitable storage should be provided for flammable liquids, solids and gases.
As per ILO C167 - Safety and Health in Construction Convention, 1988
Article-26
2. Sufficient and suitable storage shall be provided for flammable liquids, solids and gases.
Consideration of likelihood AND severity Likelihood, I set following categories
Certain: It will happen again and soon;
Likely: It will reoccur, but not as an everyday event;
Possible: It may occur from time to time;
Unlikely: It is not expected to happen again in the foreseeable future;
Rare: so unlikely that it is not expected to happen aga
The likelihood of this hazard is Certain- The risk for fire widespread will be more when sources of ignition,
sparks make the fire with cotton and oils stored nearby and rapid fire will get spread may lead to fire and
explosion and fire disaster at the workplace.
Severity, I set following categories:
Minimal: No injury or damage occurred
Minor: Injury requiring first-aid and/or slight damage caused to plant/equipment/buildings
As per ILO C148 - Working Environment (Air Pollution, Noise and Vibration) Convention, 1977
Specific legal arguments
(No. 148), Article-9
As far as possible, the working environment shall be kept free from any hazard due to air pollution, noise or
(a) by technical measures applied to new plant or processes in design or installation, or added to existing
plant or processes; or, where this is not possible,
As per ILO R156 - Working Environment (Air Pollution, Noise and Vibration) Recommendation, 1977
(No. 156)
8.
(1) In appropriate cases the competent authority should approve standards for the emission levels of
machinery and installations as regards air pollution, noise and vibration.
(a) design; or
Planned review date/period with reasoning The company has HSE Policy states that every 12 months the risk assessment to be reviewed so I am going
to set the 12 months times 11th May 2024.
However in the following incidents the risk assessment can be reviewed when the management seek to
reviewed prior to above date.
1. Notice received from enforcement authority.
2. If any accident taken in the organisation.
3. If any changes in the working shift pattern
4. If any changes in the management taken in place.
How the risk assessment findings will be I will arrange the meeting with workshop manager to go through and agree to actions/measures in the risk
The summary of the risk assessment shall be sent to everyone through email through respective official email
IDs.
The findings of the risk assessment will be available in the next toolbox talk. I will also instruct the workers on
actions that are to be taken.
Summary of the risk assessment and actions that are to be taken will be put of on notice board so that all
workers have access to it.
How you will follow up on the risk I will set the daily reminder for 10 days before the action is due to be completed. I will speak to the
assessment to check that the actions have responsible person for each of the actions to find out the progress against each action.
been carried out
Action that are very late to complete will be referred to the workshop manager if needed I will request financial
manager to allocate additional resources to complete the actions whenever it may be required.
I will involve the every responsible person to complete the action also I will start the counselling of the
supervisor hence we get the idea about the activities were taken or not.
In some cases I will add actions in the checklist to cross-check or follow up to get the information about the
activity.
If any action getting more delay for more than three months, I will involve top management to take the
necessary steps forward in the completion of the action of the risk assessment.