100% found this document useful (2 votes)
3K views19 pages

Automobile IG2

Uploaded by

PRATIK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
3K views19 pages

Automobile IG2

Uploaded by

PRATIK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 19

Unit IG2: Risk assessment

Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that the work is my
own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).

Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while completing all
parts of this assessment. Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant resources section for this
qualification on the NEBOSH website.

Part 1: Background

You should aim to complete this section in 150 - 200 words.

Topic Comments
Name of organisation* SMTB Engineering Pvt. Ltd.
Site location* Pithampur, Dhar (M.P) India
Number of workers 270
SMTB Engineering Private. Limited. is a pioneer leading organisation in automobile
manufacturing, who are engaged in automobile components accessories, it is a ISO:9001:2015
certified organisation and recently adopted of ISO-45001:2018 Occupational Health and Safety
Management System (OSHMS).

Here are many activities is being carried out in order to fabricated and to achieve job order
General description of the organisation services viz machining process in machine shop, grinding, heat treatment, gas cutting, welding,
manual handling, mechanical handling, quality checks.

Shift Pattern:8 to 20:00 and 20:00 to 8:00. Every Sunday is week off for selective staff and
the workers, while their off adjustment is done in any alternative day of week.

I have taken a risk assessment area of maintenance of the machine shop area and various machine
Description of the area to be included in the risk
operation there, auto components manufacturing unit including of fabrication area, spare parts division,
assessment
manual and mechanical handling, gas cutting, heat treatment, welding, etc.
General Manager of Operation and Safety has a overall responsibility of Health and Safety at the
Any other relevant information automobile component fabrication/manufacturing, machine shop unit and liable to reporting to Managing
Director.
* If you’re worried about confidentiality, you can invent a false name and location for your organisation but, all other information provided must be factual.

Learner number: 0000000 Learner name: Amitabh Bachhan Page 1 of 19


You should aim to complete this section in 100 - 200 words.
Note: this section can be completed after you have completed your risk assessment.
Outline how the risk assessment was carried out
this should include: I referred discreate sources of information related to automobile components manufacturing activities, I
 sources of information consulted; refer HSE websites, ILO convention and recommendations, ILO code of Practices of safety and health in
 who you spoke to; and the use of machinery. I found ILO code of practices most suitable to make my risk assessment as all related
 how you identified: information is readily available there.
- the hazards; Recommendation R118 - Guarding of Machinery Recommendation, 1963 (No. 118) (ilo.org)
- what is already being done; and Recommendation R128 - Maximum Weight Recommendation, 1967 (No. 128) (ilo.org)
- any additional controls/actions that may
be required. For collecting the Information, I went to the Supervisors, workers and their representatives, Shift Manager,
Concerning Supervisors, Machine Operators, Welder. Machine operator, maintenance department, utility
department, material supplier etc.
I also refer the present records of method statement, present risk assessment, accident/incident records,
first aid register, sick leaves, audit reports, training records, employer turn over records of last 24 months.
as this information lead me to understand the trends and status.

I went to the passenger car manufacturing unit and consulted the workers and various departmental heads,
during my visit I identified the various hazards the workers are exposed to, what control measures are being
taken to elimination of hazards and from the sources of information what additional control measures to be
proposed to ensure for a better workplace safety for the workers.

.
Part 2: Risk Assessment

Organisation name: SMTB Engineering Private Limited.


Date of assessment:-12th May 2023:
Scope of risk assessment: Entire workshop. (I have taken a risk assessment area of maintenance of the machine shop area and various machine operation there,
auto components manufacturing unit including of fabrication area, spare parts division, manual and mechanical handling, gas cutting, heat treatment, welding, etc.)

Learner number: 0000000 Learner name: Amitabh Bachhan Page 2 of 19


Hazard category Who might be harmed What are you already What further controls/actions are required? Timescales for Responsible
and hazard and how? doing? further actions person’s job title
to be
completed
(within …)
1. As the workers are 1.Reverse alarm provided to 1. Provide separate traffic route system for 1Weeks Finance manager
Movement of using vehicle routes for all vehicles and equipment. both forklift operator and pedestrian
workers/visitors walking. Same route is 2.Provision signal men in the workers to ensure safe work environment
and Vehicles on being used by other FLT vehicle movement area. and avoid near miss collision.
the workplaces. drivers and lifting 3. The loading and unloading 2. For vehicle passing(entry and exist)
Forklift and load equipment trucks. A area was segregated. facilitates them with one way roadway or 1 Month Shift Manager
transporting trucks probability of happening 4.Visitors parking area was though certain yellow line to be made for
are moving towards collision between separated. understanding.
trucks standing at pedestrian workers and 5. PPE’s become mandatory 3. Use road sign to indicate about route for 2 Weeks Safety Officer
the exit gate for vehicle driver, near miss in working area. forklift or other lifting equipment.
distribution occurrences and 4. Stop the forklift movement and plan the
purposes and overturning vehicle etc. workplace to that pedestrians are safe from 1 Weeks Supervisor
workers involved in It may cause accidents vehicles routes.
packaging as well with severe injuries like 5. Make sure lighting is adequate where 1 Week Shift Manager
as other activities broken bones, fractures, people and vehicles are working.
are also walking cuts and bruises also 6. Ensure that vehicles are compatible with 3 Weeks Maintenance
though same which leads to fatalities the working environment. Manager
pathway of vehicle after the brain injuries. 7. Maintain vehicles in good repair, 1 Week Maintenance
routes. particularly the braking system, steering, Manager
tyres, lights, mirrors.
8. Arrange defensive driving trainings to all 1Week Safety Manager
drivers.
9. All FLT operators must be competent for 1 Month Safety Manager
their job.
10. Provide training to the FLT driver on 2 Weeks Safety Supervisor
regular basis about efficient handling of
hazard in the vehicle routes.
2.Hazardous Mainly the workers 1. Activities are carried 1. An automatic surface finishing machine to 3 Months. Finance Manager
substances those are preparing the out in an enclosed be used to avoid the exposure with high air
surface finishing by area. contaminated dust of zink and metal.
Zink and metal rubbing emery paper 2. Workers are found 2. Purchase the pneumatic surface 1Month Purchase Manager
dusts. and nearby workers. covering their face preparation grinding machine with dust
with normal cloth extraction tools inbuilt with the
Workers found not The prime red oxide mask. machine.
wearing mask, wile coated metal structure 3. Workers are using 3. Dust generation can be minimised with

Learner number: 0000000 Learner name: Amitabh Bachhan Page 3 of 19


Hazard category Who might be harmed What are you already What further controls/actions are required? Timescales for Responsible
and hazard and how? doing? further actions person’s job title
to be
completed
(within …)
carrying out surface to be surface finished closed cover kit to using water dilution system with the 3 Weeks. Workshop Manager
preparation with with emery paper before cover their body to rubbing process.
emery paper application of paint. avoid entering 4. Local exhaust ventilation (LEV) system to
rubbing on the through skin. be installed in the dust contaminated 3 Weeks Finance Manager
metal sheet which Workers engaged in 4. Googles are being workplace.
generates high Zink surface preparation used to avoid 5. While cleaning the dust. Purchase suitable
and metal dusts in activities are found entering through vacuum cleaners to keep dustless 2 Weeks Store Manager
the air without nose mask this eyes. workplace.
contamination. may lead to inhalation of 5. Frequent rest and 6. General hygiene education to be given by
Zink reach dust this breaks provided to prohibition of eating, drinking in the high 1 Week Safety Manager
contaminated inhalation the workers. dust contaminated area.
would be a hazard for 6. The workers are 7. Use of air filter respiratory equipment
the occupational engaged with (RPE) or N-95 face masks while doing the 1 Week Store Manager
diseases such as throat methods of weekly emery paper rubbing.
irritation, dry cough, , job rotation or shift 8. Suitable welfare for washing facilities to be
asthma, lung cancer rotation. made available in the workplace. 1 Week Workshop Manager
when exposed with 9. Training, supervision, and information
longer working duration. should be provided with safe working 3 Weeks Safety Manager
procedure in the dusty area.
10. Health surveillance to all works who are
exposed with highly contaminated dusts. 2 Weeks Safety Manager

3.Slips and trips CNC lathe operators, 1.Designated walkways 1. Stope the machine and repair the leakage 1week Workshop manager
other workers and (indicated by yellow paint from the oil sump of the machine .
It was found that visitors crossing such lines) in the shop floor. 2. Ensure the daily housekeeping is done to 1week Housekeeping
from CNC lathe slippery areas. get the floor of the shopfloor dry and clean Manager
machine the 2. Barricading of slippery 3. Provision of using the loose saw dust or 1week Workshop supervisor
lubrication oil is Many workers passing area done to avoid anyone sand while cleaning the slippery floor for
getting spilled over and crossing the entering the area of spillage. the lubrication.
the shop floor and slippery area in the shop 4. Do not over fill the lubrication tank of the
floor was slippery. floor may slip and fall all 3. The warning sign- Wet CNC machine to avoid the spillage of the

Learner number: 0000000 Learner name: Amitabh Bachhan Page 4 of 19


Hazard category Who might be harmed What are you already What further controls/actions are required? Timescales for Responsible
and hazard and how? doing? further actions person’s job title
to be
completed
(within …)
of sudden due to floor and slippery floor displayed. oil. 1week Workshop manager
got excessive slippery 5. Ensure the floor surface are made of a
surface that may results non-sleepy material or non-slippery tiles.
with injury with sprains 6. Every one in the shopfloor should take the 1 Month Safety Manager
or strains, broken responsibility to keep the workplace
bones, back injury and cleaned and tidy always. 3 Weeks Safety Manager
fatality due to serious 7. All housekeeping and cleaning activities
brain injury after hitting must be recorded for the review during the
from the machine and safety audit. 2 Weeks Electrical Engineer.
hard object. 8. The lightening in the shop floor should be
with good natural lighting or with suitable
lux of lamps. 3 Weeks Store manager.
9. Anti-slip foot ware to be used in the shop
floor by the workers and machine
operators. 2 Weeks Safety Manager
10. Emergency First-Aid keep with required
contains should be arranged.
11. Workers and machine operator must wear 1 Week Store Manager.
PPE’s such with safety hard hat etc.

1 Week Safety supervisor

4. Manual Workers those are 1.Health surveillance is 1. Ensure that adequate lifting and moving 3 Months Finance Manager
handling regularly shifting carried out. mechanical device like forklift truck to be
material to the work provided to avoid the manual handling
It was found area are prone to activities.
workers frequently harmed. 2.A competent supervisor is 2. Hand operated trolley or cart or pallet 1 Month Finance Manager
carrying 6 meter deployed to monitor the trucks to be made provision to reduce the
channel bar and Due to frequent and work. human force and risk of manual handling.
other materials form regular doing the 3. Ensure that material are stored in a
store location to the manual handling work manner that minimizes moving and 2 Weeks Workshop Manager
fabrication area in while shifting the heavy handling distance.
an awkward channel of long length 3.Tool box talk was carried 4. Make arrangements to cut lengthy pieces 1 Month Store Manager
position during the from one location to out. of material as per job requirement near

Learner number: 0000000 Learner name: Amitabh Bachhan Page 5 of 19


Hazard category Who might be harmed What are you already What further controls/actions are required? Timescales for Responsible
and hazard and how? doing? further actions person’s job title
to be
completed
(within …)
manual handling. another with bodily force store area and shift which can reduce the
and human efforts in The workers are physically weight of the heavy material handling.
awkward body posture, fit. 5. Provide frequent job breaks and frequent 1 Week Workshop Supervisor
they can be undergo rest to the workers.
muscular disorder, back 6. Follow job rotation or shift rotation of 2 Week Workshop Supervisor
pans, shoulder pain, working procedures.
work related upper limb 7. Ensure that staff has been trained in 1 Month Safety Manager
disorders (WRULDS), manual handling tasks with good
abrasions, cuts with the technology of manual handling about 3 Weeks. Safety Manager.
sharp edges of the carrying, twisting, moving, lifting, etc.
channels, may cause 8. Ensure that job specific training on manual 1 week Safety Manager
slips and fall, Hernia etc. handling has been provided.

5. Health, Welfare All workers involved in 1. Job specific training 1. Reduce daily task load so that they can 1 Week Administrative
and work heat, ventilation, air is providing for safe ensure to be more focused rather than Manager
environment. conditioning system, etc. working. multi-tasking.
2. Workers are 2. Shift timing will be reduced from 12 to 10 2 Week Administrative
Because of Excessive workload and regularly engaged to including with 1 hrs for a break. Manager
excessive workload shift timing have a lot of maintain their body’s 3. Health surveillance should be carried to 3 Week Safety Supervisor
pressure with 12 impact on workers it salt level by regular the workers working in HVAC.
hrs shift timing causes them certain water drinking. 4. Rest room should be provided to facilitate 1 Month Plant Manager
HVAC workers are mental illnesses like 3. Work is done under to the workers so the7 can take a break
found very tired anxiety, depression, the supervision. from routine work. It will help them to be
sometimes. unconsciousness, and proactive in further work.
lack of moral support in 5. Suitable and sufficient changing rooms 3 Week Finance Manager
production and also shall be provided with encouraging the
creates a huge impact worker to use lose clothing.
on worker’s product 6. Provide suitable rest and breaks to 1 Week Safety supervisor
efficiency. everyone.
7. Suitable and sufficient area should be 3 Week Finance Manager
provided for rest.
8. Adequate drinking facilities should be 3 Week Finance Manager
provided for every on e with a mobile
dispensary packaged bottle.
9. Other arrangements for washing and

Learner number: 0000000 Learner name: Amitabh Bachhan Page 6 of 19


Hazard category Who might be harmed What are you already What further controls/actions are required? Timescales for Responsible
and hazard and how? doing? further actions person’s job title
to be
completed
(within …)
changing clothes should be also provided. 1 Month Finance Manager
10. Should provide a proper PPE kit to ensure 2 Weeks Store manager.
a safe working environment.
6Electricity:- Grinder man and his 1. Rubber hand gloves 1. Provision for battery charged Pencil grinder 2 Months Purchase Manager.
associative workers provided to for the grinder men to avoid any risk of
While observing the including supervisor and electrician. electricity of AC.
works shop I other nearby. 2. Electrical safety 2. Stop issuing any damaged non-insulated 1 Week Store manager
observed Pencil related Do’s and cable connected machine to any workers
grinder’s (Used for The poor insulated cable Don’ts displayed at unless its safe with suitable strength and
final machined bore of the power saw cutting prominent places. capacity.
grinding to machine cab be high 3. Rubber mat 3. Double insulated electrical cable and tools 1 Month Purchase Manager
maintaining risk for the workers installed in front of to be provided for avoiding any earthing or
roughness average) when using such electric panel box. static current
power transmission machine because the 4. The isolator provision with cutting of 3 Week Electrical Engineer
cable had many current can leak, can power supply with fuse and circuit
cuts and joints cause electrical short breaker, RCCB, ELCB to be made.
circuit and the worker 5. Reduced low voltage current device power 1 Month Electrical manager
will be under the risk of tools should be produced with good rating
electrocution, may suffer of CE marked.
from electric shock, 6. The power tools and equipment should be 1 Week Electrical Manager
electrical burn injury, fire maintained by only qualified electrician in-
with the nearby hard charge.
paper/bush boxes, 7. The cable of the power tools should be 1 Week Site Supervisor
damage of body muscle protected from any sharp edge cut or
and tissues, damage.
electrocution, cardiac 8. The electrical safety training to be given to 1 Month Safety Manager
arrest. In addition, there all workers and its safety measures must
can be secondary be informed to all and well documented.
hazards those can have 9. Electrical emergency contact numbers to 1 Week Safety Officer
injuries like, head injury, be displayed at prominent locations.
bone injury, etc. 10. Avoid using the power tools in wet working. 1 Week Safety Manager
11. Provide the personal protective equipment 1 Week Site Manager
to the grinder men with suitable hand
gloves, rubber insulated sole type safety
shoe to be provided.

Learner number: 0000000 Learner name: Amitabh Bachhan Page 7 of 19


Hazard category Who might be harmed What are you already What further controls/actions are required? Timescales for Responsible
and hazard and how? doing? further actions person’s job title
to be
completed
(within …)
7. Load 1. Lift operator, 1. Provided trained flag 1. Make available/arrange multiple stainless- 3 Weeks Purchase manager
handling vendor, other man at evacuate steel lift to carried the excessive load
equipment. visitors and shop floor. through dividing in parts. It will make it
Stainless steel pedestrian 2. The work is done safer to use.
handling lift are workers. under supervision. 2. Check out the condition of handling lift if it’s 1 Week Plant Manager
carrying self- 3. First aid is arranged safe to use or not. It should be operated
indulgent load Carrying more with the dumper. safely with safe working load.
then its actual weight in lift 3. Don’t allow worker to use lift in loaded 1 Week Safety supervisor
potentiality. then its actual condition with high gradient.
capacity will 4. Lift drivers must be competent worker and 3 Weeks Safety supervisor
have chances also aware about all the control measures Safety
fall of the of operating system of lift.
material and it 5. Do not operate the lift unless a banks man 2 Weeks Safety Manager
lead to serious is available for giving signal.
accident to the 6. Do not allow anyone to seat over the 1 Week Safety supervisor
operator and loaded material over the lift.
other workers 7. The lift movement to be plan and area to 1 Week Safety supervisor
nearby. be barricaded.
8. Never keep the lift key left I the ignition 1 Week Safety Supervisor
Resulted in key.
serious personal 9. Rope off the load carrying for shipment 2 Weeks Purchase Manager
injury, multiple 10. Lift driver must wear proper PPE’s kit to 1 Week Site Manager
fractures, brain ensure safety at work place.
injury,
permanent
disability or
death and
property and
material
damage etc.
8. Vibration:- Operator using the Heath surveillance is being 1. Provision of suitable chipping machine with 3 Months Purchase manager
It was chipping machine may done for the vibration latest technology causing less vibration
observed get harmed due to workers. with electro hydraulic technology
that prolonged exposure with 2. Introduction of periodic maintenance 2 Weeks Maintenance
excessive the use of vibrating Necessary warning signs program of the chipping machine by Manager

Learner number: 0000000 Learner name: Amitabh Bachhan Page 8 of 19


Hazard category Who might be harmed What are you already What further controls/actions are required? Timescales for Responsible
and hazard and how? doing? further actions person’s job title
to be
completed
(within …)
vibration machine since the displayed related to vibration replacing the worn parts and lubrication.
generating excessive vibration can cautions. 3. Introduce anti-vibration tools like damping 3 Weeks Maintenance
during floor cause many ill health methods or springs loaded to ensure low Engineer
breaking concerns to the machine Limit the time spent to vibration from the machine.
when the operator which can working with tools by 4. Provision of shift rotation or job rotation to 2 Weeks Construction Manager
operator result with vibration viz provision of regular breaks. minimize the exposure.
was using white finger attack, pain 5. Only trained and authorized worker should 1 Week Site Engineer
high in bones joints, hand be allowed to use the chipping machine.
vibrating arm vibration syndrome, 6. Vibration safety training with good 3 Weeks Safety Manager
chipping loss of grip strength, ergonomics training to be done to machine
machine whole body vibration, operator.
nerves damage, stress, 7. The closed supervision and monitoring to 1 Week Project Supervisor
fatigue etc. be done for the machining operation.
8. Anti-vibration hand gloves to be provided 1 week Store Manager
as PPEs.

9. Fire Everybody working on 1. Waste Cotton yard 1. Hot work permit should have be done 1 Week Fire and Safety
It was or near the gas cutting immediately shifted after taking preventive action of removal Manager
observed that platform since fire never far from gas cutting of waste.
metal sheet escape any body in it’s bad so that
cutting platform way. produced spark due 2. Provision of storing of combustible 2 Weeks Store Supervisor
is just in vicinity to metal sheet material in secured place.
of waste cotton When any body effects cutting may be 3. Fire Extinguishers provision with all hot
storage area, with fire it may cause ineffective. work activities. 1 Week Store Supervisor
and other severe burn, damage of 2. Oil drums were kept 4. Fire sparks should be contained by a fire
machinery oil nervous system, burning aside of building blanket so that it will automatically 1 Week Work Supervisor
drums were of vital body parts, skin where fire hazard controlled.
kept nearby this irritation depending on not observed. 5. Only authorized person will engaged on
posses fire fire magnitude outcome. hot work job. 1 Week Workshop Manager
hazard.
6. The persons should have to trained for
fire fighting. 2 Weeks Safety Manager
7. The workers should be trained for the first
aid for fire burns and other fire related 3 Weeks Safety Manager

Learner number: 0000000 Learner name: Amitabh Bachhan Page 9 of 19


Hazard category Who might be harmed What are you already What further controls/actions are required? Timescales for Responsible
and hazard and how? doing? further actions person’s job title
to be
completed
(within …)
injuries.
8. Emergency Fire Service No. has to be
displayed on all campus and workshop. 1 Week Safety Officer
9. Fire alarm training and response training
should be provided to all workers and 3 Week Safety Manager
management.
10. Regular fire drill provisions should be
made. 6 Months Safety Manager

10 Noise:- Mainly maintenance Voice assessment carried 1. Sound absorbing barriers should have to 6 Month Finance Manager
department persons and out when the workshop had be installed.
Excessive noise the workers and been set up three years ago. 2. Setting of the program for job rotation to 3 weeks Site Manager
from workshop operator of Machine and the workers
activities people or visitors A recent review done of the 3. Giving frequent rest and breaks to the 2 weeks Site Manager
nearby. PPEs in use has been workers.
carried out. As part of this 4. Providing training to all workers related to 2 months Safety Manager
Who worked in the old/broken PPE (Specially safety from noise.
workshop area. hearing protector) was 5. Look into the possibility of setting up a 2 Months Safety manager
Prolonged uncontrolled replaced. health surveillance program for relevant
exposer to noise over at workers.
80db can overtime Suitable hearing protection 6. Purchas a simple noise meter. 1 Month Purchase manager
cause NIHL has been issued to all 7. Arrange noise meter training for the 2 Month Safety Manager
relevant workers. workshop manager.
The workshop is noisy 8. A simple noise survey should be 2 weeks Safety Manager
and at certain times All relevant workers have conducted.
voice has to rise when been trained in the correct 9. Use the British HSE’s noise calculation to 1 month Safety Manager
conversation. use of the PPEs. find out noise exposure level.
http://www.hse.gov.uk/noise/calculator.html
There is a preventive
maintenance program in
place for all the equipment
produces noise.

All workers are trained on

Learner number: 0000000 Learner name: Amitabh Bachhan Page 10 of 19


Hazard category Who might be harmed What are you already What further controls/actions are required? Timescales for Responsible
and hazard and how? doing? further actions person’s job title
to be
completed
(within …)
induction on the effect that
noise can have on
individuals. The noise effects
also discussed in tool box
talks.

Learner number: 0000000 Learner name: Amitabh Bachhan Page 11 of 19


Part 3: Prioritise 3 actions with justification for the selection
Suggested word counts
Moral, general legal and financial arguments for all actions: 300 to 350 words
For EACH action:
Specific legal arguments: 100 to 150 words
Likelihood AND severity: 75 to 150 words
How effective the action is likely to be in controlling the risk: 100 to 150 words

Moral, general legal and financial arguments for ALL actions


Moral, general legal and financial arguments Moral Arguments:-
The moral argument is to ensure free from any occupational injuries, ill health. Accident, fatality and therefor it
is duty of “M/s SMTB Engineering Private. Limited.” to provide safe machine, safe working culture, safe
welfare facilities, safe working environment to keep the workers safe and health.
Workers and employees are working in the organization to earn money, salary to have good wellbeing and
happy live if SMTB Engineering Private. Limited does not provide the suitable and safe working culture, the
worker can get injuries, ill-health, fatality, etc. which can have a massive impact of their life, family,
dependants, society, etc. which will be not accepted morally by anyone as humanitarian expectations as well.
Legal Arguments:-
As per ILO Convention C155 article 16, as an eemployer “M/s SMTB Engineering Private. Limited.” shall be
required to ensure that, so far as is reasonably practicable, the workplaces, machinery, equipment and
processes under their control are safe and without risk to health as legal responsibility. The breaching of
health and safety will lead to formal enforcement action, prosecution to the organization, imprisonment to the
top management, legal action against the company, workers compensations in the incident of accident. Such
non-compliance of legal responsibilities will cost he financial loss in the terms of legal fees, fines and
penalties, court fees, lawyer’s fees which shall not be recovered from any insurance company.
Financial Argument :-
If SMTB Engineering Pvt. Ltd. Does not control the Accidents occurrences are clearly cause of loss of
income in the sense of productivity, legal fee and penalties given to concern authorities/enforcement
agencies, increase in insurance premium, loss in getting less compensation by insurance agencies viz no
fault base compensation paid more than fault base compensation, insurance companies may hike the
insurance premium as well.
Direct cost: -

Learner number: 0000000 Learner name: Amitabh Bachhan Page 12 of 19


Medical treatment cost, hospital bills, ambulance cost etc. those are visible cost. Unnecessarily beard by the
company due to accident occurs, legal practitioner cost, fine pay to enforcement agencies etc.
Indirect cost: -
Due to accident occurrence other workers will get more attentive to the injured workers, that have may a
cause of production loss, low morale of the workers, poor brand image, increase in the training cost of new
workers, enforcement agencies may have cancelled the license of particular activities and even entire
business and by that companies market share may get devaluated, to normalised these adverse conditions
there may also require value addition (Marketing expenditure) and seems like iceberg effect.

Justification for action 1


Provision of storing of combustible material in secured place (Hazard category-“fire”)
Action (Taken from column 4 of risk
assessment)

Specific legal arguments As per ILO Code of practice safety and health in construction
3.6.2. Sufficient and suitable storage should be provided for flammable liquids, solids and gases.
As per ILO C167 - Safety and Health in Construction Convention, 1988
Article-26
2. Sufficient and suitable storage shall be provided for flammable liquids, solids and gases.
Consideration of likelihood AND severity Likelihood, I set following categories
Certain: It will happen again and soon;
Likely: It will reoccur, but not as an everyday event;
Possible: It may occur from time to time;
Unlikely: It is not expected to happen again in the foreseeable future;
Rare: so unlikely that it is not expected to happen aga
The likelihood of this hazard is Certain- The risk for fire widespread will be more when sources of ignition,
sparks make the fire with cotton and oils stored nearby and rapid fire will get spread may lead to fire and
explosion and fire disaster at the workplace.
Severity, I set following categories:
Minimal: No injury or damage occurred
Minor: Injury requiring first-aid and/or slight damage caused to plant/equipment/buildings

Learner number: 0000000 Learner name: Amitabh Bachhan Page 13 of 19


Major: Injury requiring hospital treatment/stay and/or significant damage caused to plant/equipment/buildings
Catastrophic: Death and/or irreparable damage to plant/equipment/buildings.
I set the severity of this hazard is catastrophic. The fire spread rapidly may cause fatality, severe burn
injuries, and other painful suffering.

 types of injury or ill health


 number of workers at risk Types of injuries and ill-health-
 how often the activity is carried out
Fatality, severe personal burn injuries, suffocation, damage of plant machinery, etc.
 how widespread the risk is
Numbers of workers at Risk:-
Approximately 8 workers were engaged and they are risk with the fire.
how often the activity is carried out:-
This is a regular activity carried out 6 to 7 hours every day during 6 working days of the shift.
How widespread the risk is:-
The risk is widely spread as sheet metal cutting, hot work is a core activity in the construction site.
How effective the action is likely to be in
 Providing the secured storage area for combustible and flammable materials will make the safer
controlling the risk. This should include:
workplace and will reduce the chance of sparks, naked flame and work can be performed safely.
 the intended impact of the action;  I am giving time scale for two weeks to take approval from management with justification of secured
 justification for the timescale that you storage area and shifting of the materials at safe location of secured storage facility.
indicated in your risk assessment;  It will not fully control the risk but it will minimize the risk of fire with low likelihood, however, additional
and control action should be considered to minimize the severity of the fire risk as well.
 whether you think the action will fully
control the risk

Learner number: 0000000 Learner name: Amitabh Bachhan Page 14 of 19


Justification for action 2
The isolator provision with cutting of power supply with fuse and circuit breaker, RCCB, ELCB to be made
Action (Taken from column 4 of risk
(Hazard Category-Electricity)
assessment)

Specific legal arguments As Per ILO convention Number C167, Article-26


1. All electrical equipment and installations shall be constructed, installed and maintained by a competent
person, and so used as to guard against danger.
2. Before construction is commenced and during the progress thereof adequate steps shall be taken to
ascertain the presence of and to guard against danger to workers from any live electrical cable or apparatus
which is under, over or on the site.
As per ILO Code of practice safety and health in construction
15.1.7. The power supply to all electrical equipment should be provided with means of cutting off current from
all conductors in an emergency
Consideration of likelihood AND severity Likelihood,
 types of injury or ill health I set same categories as given in Justification-1
 number of workers at risk
The likelihood of this hazard is certain. Because the poor insulated cable of the Pencil grinder can be high risk
 how often the activity is carried out
for the workers when using pencil grinder, because the current can leak and that can be a cause of electrical
 how widespread the risk is
short circuit and worker will be under the risk of electrocution.
Severity,
I set same categories as given in Justification-1
The severity rating is catastrophic.
Because of Risk from the electricity, the workers may suffer from electric shock, electric burn injury, fatality,
death fire with the waste cotton, electrocution, cardia arrest, damage of the body’s muscle and tissues. In
addition, there can be secondary hazards those can be lead to injuries like, head injury, bone injury etc.

Learner number: 0000000 Learner name: Amitabh Bachhan Page 15 of 19


Types of injuries and ill-health:-
electric shock, electric burn injury, fatality, death fire with the waste cotton, electrocution, cardia arrest,
damage of the body’s muscle and tissues. In addition, there can be secondary hazards those can be lead to
injuries like, head injury, bone injury etc..
Numbers of workers at Risk:
Approximately 8 workers were under the risk of the electricity.
how often the activity is carried out :-
This is a regular activity carried out 6 to 7 hours in a day and during 6 working days of the shift.
How widespread the risk is:-
The risk is widely spread as electricity risk will be remain there at the workplace nas electricity is main source
of energy for operation of power tools and equipment.
How effective the action is likely to be in
 The provision with cutting off power supply with fuse and circuit breaker, RCCB, ELCB will
controlling the risk. This should include:
immediately isolate the power supply and machine will get stopped when any short circuits happens
 the intended impact of the action; while operation. This action will reduce the likelihood and severity from the electricity and workers will
 justification for the timescale that you be safe from major accident from the electricity.
indicated in your risk assessment;  I have given time scale for 3 weeks to provide fuse and circuit breakers in the electric box to prevent
and the electricity risk which need approval from the management and then send the purchase order to
 whether you think the action will fully supplier and installation successfully within the given time scale.
control the risk  This action will not fully control the risk but bring the likelihood and severity with the minimum level.
However, to control the risk of the electricity fully-battery charged Pencil grinder can be used to get
minimize the severity and likelihood of AC (Alternative Current) Power.

Justification for action 3


Purchase the pneumatic surface preparation grinding machine with dust extraction tools inbuilt with the
Action (Taken from column 4 of risk
machine.
assessment)
(Hazard Category-Hazardous substance)

As per ILO C148 - Working Environment (Air Pollution, Noise and Vibration) Convention, 1977
Specific legal arguments
(No. 148), Article-9

As far as possible, the working environment shall be kept free from any hazard due to air pollution, noise or

Learner number: 0000000 Learner name: Amitabh Bachhan Page 16 of 19


vibration--

(a) by technical measures applied to new plant or processes in design or installation, or added to existing
plant or processes; or, where this is not possible,

(b) by supplementary organisational measures.

As per ILO R156 - Working Environment (Air Pollution, Noise and Vibration) Recommendation, 1977
(No. 156)

8.

(1) In appropriate cases the competent authority should approve standards for the emission levels of
machinery and installations as regards air pollution, noise and vibration.

(2) Those standards should be attained as appropriate by--

(a) design; or

(b) built-in devices; or

(c) technical measures during installation.

Consideration of likelihood AND severity Likelihood,


 types of injury or ill health I set same categories as given in Justification-1
 number of workers at risk
The likelihood of ill-health to workers is certain. Because the prime red metal structure to be surface finished
 how often the activity is carried out
with emery paper, before application of paint workers carrying surface preparation activities are found not
 how widespread the risk is
wearing nose mask. Inhalation of Zink rich dust for the prolong duration will make the ill-health of the worker
and it can lead to chronic ill-health.
Severity,
I set same categories as given in Justification-1
Severity rating for the hazard being understood and has been set as “Major” because inhalation of zink rich
dust causes throat irritation, dry cough occupational asthma; breathing in dust over a prolonged period could
also cause occupation cancers these worker will be requiring hospital treatment.
Types of injuries and ill-health:-

Learner number: 0000000 Learner name: Amitabh Bachhan Page 17 of 19


Throat irritation, dry cough occupational asthma; breathing in dust over a prolonged period could also cause
occupation cancers these worker will be requiring hospital treatment.
Numbers of workers at Risk:-
Approximately 12 workers were under the risk of the hazardous substances.
How often the activity is carried out :-
This is a regular activity carried out 6 to 7 hours every day during 6 working days of the shift.
How widespread the risk is:-
The risk is widely spread as process dust and other dust will be spread in the air at the workplace as
contaminated air dust as this is common in the site of construction.
How effective the action is likely to be in
 The intended impact of the action by using the inbuilt dust extraction with the machine while surface
controlling the risk. This should include:
preparation with grinding machine will extract the dust automatically and their will be less air
 the intended impact of the action; contaminated dust and the worker can work safely without excessive dust exposure and keep their
 justification for the timescale that you health in better condition.
indicated in your risk assessment;  I have given a time scale of within 1 month for the on tool extraction system due to it require the
and purchase from the supplier, approval for the finance installation with the machine and all process will
 whether you think the action will fully be successfully done within a month.
control the risk  The action will minimize the risk with low likelihood however the additional suggested control
measures with further reduce the risk with low likelihood and reduction of the severity rate.

Part 4: Review, communicate and check


Suggested word counts for each section:
 Planned review date or period and reasoning for this: 50 - 100 words
 How the risk assessment findings will be communicated and who needs to know the information: 100 - 150 words
 Follow up on the risk assessment: 100 - 150 words.

Planned review date/period with reasoning The company has HSE Policy states that every 12 months the risk assessment to be reviewed so I am going
to set the 12 months times 11th May 2024.
However in the following incidents the risk assessment can be reviewed when the management seek to
reviewed prior to above date.
1. Notice received from enforcement authority.
2. If any accident taken in the organisation.
3. If any changes in the working shift pattern
4. If any changes in the management taken in place.

How the risk assessment findings will be I will arrange the meeting with workshop manager to go through and agree to actions/measures in the risk

Learner number: 0000000 Learner name: Amitabh Bachhan Page 18 of 19


communicated AND who you need to tell assessment and when I provided summaries of the hazards identified and findings of the risk assessment
with desired actions that are need to be taken to ensure the safety and health of the workers.

The summary of the risk assessment shall be sent to everyone through email through respective official email
IDs.

The findings of the risk assessment will be available in the next toolbox talk. I will also instruct the workers on
actions that are to be taken.

Summary of the risk assessment and actions that are to be taken will be put of on notice board so that all
workers have access to it.

How you will follow up on the risk I will set the daily reminder for 10 days before the action is due to be completed. I will speak to the
assessment to check that the actions have responsible person for each of the actions to find out the progress against each action.
been carried out
Action that are very late to complete will be referred to the workshop manager if needed I will request financial
manager to allocate additional resources to complete the actions whenever it may be required.

I will involve the every responsible person to complete the action also I will start the counselling of the
supervisor hence we get the idea about the activities were taken or not.

In some cases I will add actions in the checklist to cross-check or follow up to get the information about the
activity.
If any action getting more delay for more than three months, I will involve top management to take the
necessary steps forward in the completion of the action of the risk assessment.

Learner number: 0000000 Learner name: Amitabh Bachhan Page 19 of 19