AI ML Assignment II A Section AY 24 25
AI ML Assignment II A Section AY 24 25
Note. 1. Each Batch represents 5 students, in the sequence of roll No. after 30 students
questions will repeat, Ex. For Batch-VII, the question are 1-5 and so on.
Batch-I
Batch-II
1 33.6 50 1
2 26.6 30 0
3 43.1 67 0
4 35.3 23 1
R-20
RGM COLLEGE OF ENGINEERING & TECHNOLOGY, NANDYAL-518 501
(AUTONOMOUS)
DEPARTMENT OF MECANICAL ENGINEERING
5 35.9 67 1
6 36.7 45 1
7 25.7 46 0
8 23.3 29 0
9 31 56 1
Batch-VI
26. What do you understand by Model order reduction.
27. Define Process Optimization?
28. Elaborate with flow chart different stages involved in implementing SQI (Smart
Quality Inspection) in the manufacturing/production area.
29. Explain the following terms.
(i) Consistent hypothesis (ii) hypothesis (iii) Ockham’s Razor.
30. Explain fault diagnosis (of any suitable machine element) using ML.