TIME
TIME
Together
1. A can do a piece of work in 30 days while B
can do it in 20 days. In how many days can A
and B working together can do it?
2. Rajan can finish a work in 24 days but Kumar
does the same in half of the time taken by
Rajan. Then working together, what part of the
same work can they finish in a day?
3. A and B together can do a work in 10 days.
Aalone can do the same work in 30 days. In
how many days B can alone finish the work?
4. A,B and C can do a piece of work in 10,15 and
30 days respectively. Working together they can
do it?
5. A can do a piece of work in 16 days and B can
do it in 12 days. Together A,B and C did the job
in 4 days. Only C alone can do the job in
6. A and B can complete the piece of work in 30
days, B and C in 20 days, C and A in 15 days. If
all of them are work together in
7. A,B and C can do the piece of work in 6 days,
if A and B together do in 8 days and B and C
together do it in 12 days. In how many days C
and A together do it in:
Efficiency
8. A is 30% more efficient than B. How much
time will they working together take to
complete a job which A alone cloud done 23
days?
9. Sitatakes twice as much time as Geethato
complete a work and Rita does it in the same
time as Sitaand Geethatogether. If all three are
working together can finish the work in 6 days,
then the time taken by each them to finish the
work is
10. A is thrice as good workman as B and
therefore is able to finish a job in 60 days less
than B. Working together, they can do it in
11. B is 20% more efficient than C. A takes
25% less time than C. If A alone can complete
the work in 20 days, then in how many days can
A,B and C complete it?
Partial
12. A and B can complete a work in 30 days.
They worked it for 20 days and B left. The
remaining work was done by A alone in 20
more days. In how many days A alone can
complete the whole work?
13. A and B can do a piece of work in 40 & 50
days respectively. Both begin together but after
certain time A leaves off. In this case B finished
remaining work in 20 days. After how many
days A leaves?
14. A,B and C working alone can do a work in
6,8 and 12 days respectively. B & C starts the
work together but after 2 days A replaces C.
How soon will the work be finished?
15. P and R complete a work in 24 days
working together. If P works 6.4 days and R for
20.4 days, they finish half of the work. In how
much time can P alone complete the work?
16. A,B and C can do a piece of work in 24,30
and 20 days respectively. They started the work
but A left 6 days before the completion of work
while B left 3 days before the completion of
work. The number of days which C is work?
17. P,Q,R and S can do a piece of work in 8,
12, 16 and 24 days respectively. They started
working together after 2 days P and Q left. One
day before the completion of the work S also
left. How many days are required for
completing the whole work?
18. A,B and D working together can do a
piece of work in 513days. A alone can do a
piece of work in 24 days. B alone can do the
same work in 16 days. C is twice as efficient as
D. If A,B and D work together for 4 days and
then C replaces D, in how many days A,B and
C together can complete the remaining work?
19. A,B and C can complete a work in 12
days, 48 days and 60 days respectively. A
started the work B and C joined on fourth and
sixth days, respectively. B left 2 days before the
completion of work. In how many days will the
work be completed?
Salary
20. A alone can do a piece of work in 15 days
and B alone can do the same work in 30 days.
With the help of C they can complete the entire
work in 5 days. If the wage for total work is
Rs.2400. Find C’s share?
21. A,B and C together can complete a piece
1
of work in 7 5 days. A,B and C started and
worked together for 4 days and the remaining
work is completed by D in 8 days. If the total
wage is Rs.4900, what is the share of D?
Alternative Work
22. A and B working separately can do a piece
of work in 9 days and 12 days respectively. If
they work for a day alternately. A beginning, in
how many days the work will be completed?
23. A, B and C can do a piece of work in 20,
30 and 60 days respectively. In how many days
can A do the work if he is assisted by B and C
on every third day?