FOR MUNICIPALITY APPROVAL

LEGEND
50mm BLINDING/PCC
B A INTERLOCK LEVEL GEOTEXTILE 1000 SEPARATION LAYER
A-007 A-007
13990 SELECTED WASHED CRUSHED AGGREGATE

MIN. 1500
1000 20 1000 20 1375 20 1375 20 1000 20 1000 20 1000 20 1000 20 1000 20 1000 20 1000 20 1000 20 1000

VARIES
PEA GRAVEL ALL AROUND THE TANK.

DOUBLE WALL STEEL/ TANK (UL LISTED)

200
KEY PLAN
TANK ACCESS SHAFT
N
2150

175
2 COATS OF A SOLVENT FREE, 1.5kg/m² ON ALL SURFACES SBS
ELASTOMERIC BITUMEN GELLIFIED EMULSION WITH AN KKA
H
MA
1500 ELONGATION AT BREAK AT LEAST 1000% AS PER SPECIFICATIONS.
As per Mech.
C C 80mm. THK. CONC. INTERLOCK PAVIORS LAID TO SLOPE
4300

400 100 100 400 DECANTING POINT

[B4] Utility Building


2800Ø AS DIRECTED
A-007 200 200 A-007
MANHOLE COVER WITH SAFETY HANDLES FOR EASY [B3] Vacuum Bay
ACCESS (AS PER APPROVED BY CLIENT)
20mm. JOINT TO BE SEALED WITH APPROVED SEALANT
[B3] Car Care
2150

[B2] C-Store
PVC SLEEVE
[B1] 3 Islands Canopy
200mm THK. RC SLAB

25mm. SAND/CEMENT SCREED

B A HIDDEN LINE INDICATES OUT LINE OF TANK BELOW NOTES


750 2800 750
A-007 A-007
4300 OUTER OVER LAY LAMINATION

1 PLAN OVER CONCRETE SLABS 2 SECTION A-A GRP OVER LAMINATION AT SITE
Scale 1:50 Scale 1:50
4mm THK. WATER PROOF RUBBER

CL PU FOAM

200 1500 200 5 200 1500 200 INNER OVERLAY LAMINATION


As per Mech. A-007 As per Mech.
15

15
INTERLOCK LEVEL INTERLOCK LEVEL
GRP RESIN INFILL

320
GRP TIES OVER LAMINATED TO SHAFT (TYPICAL)

MIN. 1500
MIN. 1500

VARIES
VARIES
PROVIDE ONE LAYER OF ROAD BASE MATERIAL BELOW U/G
FUEL TANK. MINIMUM 250mm THICK, COMPACTED TO NOT
400 400 LESS THAN 95% OF MDD. 00 DETAILED DESIGN 24/03/2020
410 410
RECOMMENDATIONS OF GEOTECHNICAL INVESTIGATION REV. No. DESCRIPTION Date

200

200
REPORT SHALL BE FOLLOWED FOR IMPROVEMENT, OWNER:
REPLACEMENT OF SOIL IF ANY AT FOUNDATION LEVEL

175

175
DOUBLE WALL STEEL/ TANK (UL LISTED)
* FUEL TANK INSTALLATION SHALL COMPLY WITH SUPPLIER MERAAS ESTATES - L.L.C
RECOMMENDATION AND DETAILS AND ADNOC STANDARD.

2800Ø

3100
PROJECT MANAGEMENT:

NOTES ON FUEL TANK DETAILS:-

1. DURING MAINTENANCE IN FUTURE, THE CONCRETE SLAB AND


FILLING ABOVE SLAB SHALL BE REMOVED ONLY AFTER:-

300

300
a) INSTALLATION OF PROPER DEWATERING SYSTEM BASED ON
GROUND WATER LEVEL.
b) INSTALLATION OF PROPER SHORING SYSTEM. CLIENT :
EQUAL 2. THE CONTRACTOR SHALL PROVIDE NECESSARY SHORING FOR
EQUAL 750 2800 750 THE CONSTRUCTION OF UNDERGROUND FUEL TANKS.
3. SHORING SHOWN IN THE DRAWINGS IS INDICATIVE AND
13990 4300
SUITABLE TYPE OF SHORING SHALL BE PROVIDED BY THE
SPECIALIST SUB CONTRACTOR AS PER THE SITE CONDITION AND
3 SECTION C-C 4 SECTION B-B LOCAL AUTHORITY REQUIREMENTS. ADNOC DISTRIBUTION
Scale 1:50 Scale 1:50 4. THE SPECIALIST CONTRACTOR SHALL VERIFY THE DESIGN OF
SHORING AND SHALL SUBMIT STRUCTURAL DESIGN CONSULTANT:
CALCULATIONS, DETAIL SHOP DRAWINGS AND METHOD
STATEMENT FOR COMPANY'S APPROVAL.
5. SPECIALIST CONTRACTOR SHALL OBTAIN NECESSARY
APPROVALS FOR DESIGN AND DRAWINGS FROM THE LOCAL
AUTHORITIES

NOTES FOR SHORING DESIGN:-


10 CL CL CONSULTANT: ABU DHABI: Tel. :02-6444000
Fax :02-6445000
1 MINIMUM SURCHARGE LOAD SHALL BE 20 KN/M2 AND
15

15

INTERLOCK LEVEL P.O.Box : 139


SHALL ALSO BE AS PER THE LOCAL AUTHORITY'S AI-AIN: Tel. :03-7661553
7 Fax :03-7661554
13 REQUIREMENTS. P.O.Box : 20946
2 ADDITIONAL SURCHARGE LOADING SHOULD BE USED IN THE DUBAI: Tel. :04-2598825
MIN. 1500
24 March 2020

VARIES

Fax :04-2598826
DESIGN TO TAKE ACCOUNT OF INCIDENTAL LOADING ARISING
2 FROM CONSTRUCTION PLANT, STACKING OF MATERIALS AND
P.O.Box : 13480
E-mail [email protected]
20mm MOVEMENT OF TRAFFIC BOTH DURING CONSTRUCTION AND Web www.suweidi.com
12 SUBSEQUENTLY UNLESS THE NATURE OR LAYOUT OF THE SITE MAIN CONTRACTOR:
PRECLUDES THE NEED FOR SUCH ADDITIONAL SURCHARGE.
200

THE VARIOUS SURCHARGES IMPOSED ON A STRUCTURE MAY BE


CLASSIFIED AS:-
2(a) UNIFORMLY DISTRIBUTED LOAD, CONSISTING OF A
CONTINUOUS LOAD ON THE SURFACE OF THE BACKING (E.G.
200

ROADWAYS, GOODS STORED ON QUAYS BEHIND DOCK WALLS)


400

2(b) CONCENTRATED LOADS (E.G. COLUMN FOOTINGS).


2(c) LINE LOADS (E.G. STRIP FOOTINGS).
\\Server-1\2008\01 Arch\2008-GD-A036-FUEL TANK DETAILS (15000 GAL).dwg

PROJECT NAME AND LOCATION


2(d) DYNAMIC LOADS (E.G. TRAFFIC, IMPACT LOADS).

NOTES FOR LIFTING HOOKS :- ADNOC SERVICE STATIONS


1 PRECAST CONCRETE SLAB CONTRACTOR SHALL
PROVIDE NECESSARY HOOKS CAST IN ITEMS FOR
AT JEBEL ALI SN 18 (Near PS)
HANDLING AND LIFTING OF PRECAST CONCRETE SLABS. PARCEL ID. : 5997712
1 2 ALL FIXING HOOKS AND RESTRAINS SHALL BE GRADE
COMMUNITY : JABAL ALI INDUSTRIAL FIRST
316 (MARINE GRADE) STAINLESS STEEL.
3 NUMBER OF HOOKS ,LOCATION,MENTINED IN THE DRAWING TITLE
1400 750 750 1400 DRAWING ARE INDICATIVE ONLY.
20 4 SPECIALIST PRECAST CONCRETE SLAB SUB-CONTRACTOR
SHALL SUBMIT SHOP DRAWINGS WITH NECESSARY HOOK AT
PROPER LOCATION ALONG WITH STRUCTURAL CALCULATION
FOR COMPANY APPROVAL.
FUEL TANK DETAILS (15000 GAL)
5 AT PROPER LOCATION ALONG WITH STRUCTURAL
5 TYPICAL SLAB DETAIL WITHOUT JOINT 6 SECTION FOR MULTIPLE TANKS 7 TYPICAL MANHOLE DETAILED SECTION CALCULATION FOR COMPANY APPROVAL.
ARCHITECTURAL
Scale 1:10 Scale 1:50 Scale 1:10

DRAWING NO. GD-A036


DATE 24-Mar-2020 SCALE AS SHOWN