0% found this document useful (0 votes)
432 views4 pages

EE3602 Power System Operation and Control PDF

Power system analysis

Uploaded by

Gifts Fgh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
432 views4 pages

EE3602 Power System Operation and Control PDF

Power system analysis

Uploaded by

Gifts Fgh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

EE3602 Power System Operation and Control

https://www.poriyaan.in/ https://eee.poriyaan.in/

Reg. No. :

Question Paper Code : 70482

B.E./B.Tech. DEGREE EXAMINATIONS, NOVEMBER/DECEMBER 2021.

Sixth Semester

/
in
Electrical and Electronics Engineering

n.
EE 6603 – POWER SYSTEM OPERATION AND CONTROL

aa
(Regulations 2013)

iy
or
(Common to : PTEE 6603 – Power System Operation and Control for
B.E. (Part-Time) – Electrical and Electronics Engineering – Sixth Semester
.p
(Regulations – 2014)
w

Time : Three hours Maximum : 100 marks


w

in
//w

Answer ALL questions.


n.
s:

PART A — (10 × 2 = 20 marks)


aa
tp

1. What is the need for frequency regulation in power system?


ht

riy

2. Define load duration curve.


o

3. What is the need for integral controller in ALFC?


.p

4. What do you understand by control area?


w

5. What are the sources of reactive power? How it is controlled?


w

6. What is the use of off-load tap changer and TCUL?


w

7. What is meant by priority list method?

8. Define incremental transmission loss.

9. What are the priorities for operation of modern power system?

10. Define weighted least-square criterion?

https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan
https://www.poriyaan.in/ https://eee.poriyaan.in/

PART B — (5 × 13 = 65 marks)

11. (a) (i) A generating station has following daily load cycle: (8)
Time in Hrs 0-6 6-10 10-12 12-16 16-20 20-24
Load in MW 20 25 30 25 35 20

Draw the load curve and Calculate


(1) Maximum Demand
(2) Units generated per day

/
in
(3) Average load

n.
(4) Load factor.

aa
(ii) Explain any one load forecasting method in power system
operation. (5)

iy
Or

(b) (i)
or
The quantity of fuel used in KWhr by an electric utility is given
.p
below. Forecast the Quantity of fuel to be used in the year 2030 by
w

fitting the following trend curve and Extrapolating method of


Exponential curve. (8)
w

Year :
in
1980 1990 2000 2010 2020
//w

n.
Fuel Quantity : 90 95 110 135 150
s:

aa

(ii) Explain briefly about plant level and system level control of a power
tp

system. (5)
ht

riy

12. (a) (i) Derive the block diagram of state variable model for ALFC. (7)
(ii) A power system has a total load of 1250 MW at 50 Hz. The load
o

varies 1.5% for every 1% change in frequency. Find the steady-state


frequency deviation when a 50MW load is suddenly tripped, if (6)
.p

(1) There is no speed control;


w

(2) The system has 250 MW of spinning reserve evenly spread


among 500 MW of generating capacity with 5% regulation
w

based on this capacity. Assume that the effect of governor


dead bands is such that only 80% of the governor respond to
w

the reduction in system Load.

Or

(b) Derive the transfer function model and draw the block diagram for a
single control area provided with governor system. From the transfer
function derive the expression for steady state frequency error for a step
change. (13)

2 70482

https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan
https://www.poriyaan.in/ https://eee.poriyaan.in/

13. (a) Draw the circuit diagram for a typical excitation system and derive the
transfer function model. (13)

Or

(b) Explain the operation of tap changing transformer and discuss its
application. (13)

14. (a) Write the algorithm for iterative solution of economic dispatch without
and with losses co-ordinated. (13)

/
in
Or

n.
(b) (i) Discuss the various constraints in unit commitment. (7)

aa
(ii) Explain dynamic programming solution for unit commitment with
flowchart. (6)

iy
15. (a)
or
Describe SCADA system for power system, its hardware components and
applications. (13)
.p
Or
w

(b) Draw the state transition diagram of a power system and explain the
w

different control strategies.


in (13)
//w

n.
PART C — (1 × 15 = 15 marks)
s:

aa

16. (a) Write short notes on state estimation? Explain the help of flow chart the
tp

weighted least square estimate.


ht

riy

Or
(b) Find the rating of synchronous compensator connected to the tertiary
winding of 60 kV Star connected, 33 kV star connected, 11 kV delta
o

connected three winding transformer to supply a load 60MW at 0.8 p.f


.p

lagging at 33 kV across the secondary. Equivalent primary and tertiary


winding reactance is are 18 Ω and 0.12 Ω respectively. While the
w

secondary winding reactance is negligible. Assume that V1 is 66 kV and


maximum off nominal setting between transformer primary and
w

secondary is 1:1.1.
w

—————————

3 70482

https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan
1st Semester Anna University EEE- Reg 2021
Professional English – I
2nd Semester 3rd Semester
Matrices and Calculus
Probability and Complex
Professional English - II Functions
Engineering Physics
Statistics and Numerical Electromagnetic Fields
Engineering Chemistry Methods
Problem Solving and Physics for Electrical Digital Logic Circuits
Python Programming Engineering
Electron Devices and
Physics and Chemistry Basic Civil and Mechanical Circuits
Laboratory Engineering
Electrical Machines - I
Engineering Graphics
C Programming and Data
4th Semester Electric Circuit Analysis Structures
Environmental Sciences
and Sustainability 6th Semester
Transmission and 5th Semester
Distribution Protection and
Linear Integrated Power System Analysis Switchgear
Circuits
Power Electronics Power System
Measurements and Operation and Control
Instrumentation Control Systems
Open Elective – I
Microprocessor and
Microcontroller Professional Elective I
Professional Elective IV
Electrical Machines - II Professional Elective II
Professional Elective V
Professional Elective III
7th Semester Professional Elective VI
High Voltage Mandatory Course-I& Mandatory Course-
Engineering II& MC
Human Values and 8th Semester
Ethics
Elective –
Management Project Work /
Internship
Open Elective – II
Open Elective – III
Open Elective – IV
Professional Elective
VII Click on Clouds to navigate other department

https://www.poriyaan.in/

You might also like