0% found this document useful (0 votes)
28 views2 pages

STM Mid-Ii

QUESTION

Uploaded by

hanuman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views2 pages

STM Mid-Ii

QUESTION

Uploaded by

hanuman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Vivekananda Institute of Technology & Science Karimnagar(N6)

III B.Tech II Sem CSE II Mid-term Examination Aug-2024.

__________ ____________________________________________________________________________________

Subject: Software Testing Methodologies SET-I DATE:06-08-2024 (AN)


Time: 1 Hour Max. Marks: 10
Answer any Two of the following questions.
1) Write short notes on:
a. Transition Bugs b.Dead States c. State Bugs d.Encoding Bugs
2) Discuss in brief applications of paths
3) What are graph matrices and their applications
4) What are the principles of state testing. Discuss advantages and disadvantages

Vivekananda Institute of Technology & Science Karimnagar(N6)


III B.Tech II Sem CSE II Mid-term Examination Aug-2024.
__________ ____________________________________________________________________________________

Subject: Software Testing Methodologies SET-I DATE:06-08-2024 (AN)


Time: 1 Hour Max. Marks: 10
Answer any Two of the following questions.
1) Write short notes on:
a. Transition Bugs b.Dead States c. State Bugs d.Encoding Bugs
2) Discuss in brief applications of paths
3) What are graph matrices and their applications
4) What are the principles of state testing. Discuss advantages and disadvantages

Vivekananda Institute of Technology & Science Karimnagar(N6)


III B.Tech II Sem CSE II Mid-term Examination Aug-2024.
__________ ____________________________________________________________________________________

Subject: Software Testing Methodologies SET-I DATE:06-08-2024 (AN)


Time: 1 Hour Max. Marks: 10
Answer any Two of the following questions.
1) Write short notes on:
a. Transition Bugs b.Dead States c. State Bugs d.Encoding Bugs
2) Discuss in brief applications of paths
3) What are graph matrices and their applications
4) What are the principles of state testing. Discuss advantages and disadvantages

Vivekananda Institute of Technology & Science Karimnagar(N6)


III B.Tech II Sem CSE II Mid-term Examination Aug-2024.
__________ ____________________________________________________________________________________

Subject: Software Testing Methodologies SET-I DATE:06-08-2024 (AN)


Time: 1 Hour Max. Marks: 10
Answer any Two of the following questions.
1) Write short notes on:
a. Transition Bugs b.Dead States c. State Bugs d.Encoding Bugs
2) Discuss in brief applications of paths
3) What are graph matrices and their applications
4) What are the principles of state testing. Discuss advantages and disadvantages
Vivekananda Institute of Technology & Science Karimnagar(N6)
III B.Tech II Sem CSE II Mid-term Examination Aug-2024

HTNO:- ______________________________________, NAME:________________________________

All questions carry equal marks. 20 X 0.5 = 10

1 Which of the following testing is also known as white-box testing? [ ]


a) Structural testing b) Error guessing technique
c) Design based testing d) None of the above
2) Under different loads, ____records the application's performance [ ]
a) Citrus b) Zap c) Load runner d) N unit
3) An ____ connects two nodes in a control flow graph. [ ]
a)Edge b) Decision node c) Junction Node d) Node
4) Which testing technique is used to design the cases of the white box? [ ]
a)Branch coverage testing technique b) Data flow testing technique
c) Statement coverage testing technique d) Decision coverage testing technique
5) Which methodology is used to performed Maintenance testing? [ ]
a) Breadth test and depth test b) Confirmation testing
c) Retesting d) Sanity testing
6) Which of the following is not part of the Test document? [ ]
a. Test Case b) Requirements Traceability Matrix [RTM]
c) Test strategy d) Project Initiation Note [PIN]
7) Which term is used to define testing? [ ]
a)Evaluating deliverable to find errors b) Finding broken code
8) c)A stage of all Which term is used to define testing? [ ]
a)Evaluating deliverable to find errors b) Finding broken code
c) A stage of projects d)None of the above
9) Which type of test plan has multiple levels of testing? [ ]
a) Master test plan b) Phase test plan c)Testing type-specific test plans
10) In Which type of testing discrete units are combined and tested as a group? [ ]
A. Unit testing b) Accountability testing c) Integration testing d)Reliability testing

11) Analyzing data flow in a program is done using __________________________


12) ___________ shows which procedure follows the previous one in a series of procedures in the control
flow graph.
13) When the application built is against the business requirement then it is known as____________
14) When the problem occurs in the code then it is called_______________
15) _______________in which all the units are combined at once and then tested as a unit?
16) _______________________ type of testing is the final phase testing?
17) Executing arbitrary testing without any strategy is known as__________________ testing.
18) ________________type of testing is responsible for testing how stable the software is built?
19) RTM stands for ______________________________________________
20) _____________ is a type of software testing, where the discrete component of the software is tested.

You might also like