BIS File
BIS File
(103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
Hkkjrh; ekud IS/ISO/IEC 13863 : 1998
(Reaffirmed 2023)
Indian Standard
Information Technology —
Telecommunications and Information
Exchange Between Systems —
Private Integrated Services Network
— Specification, Functional Model
and Information Flows — Path
Replacement Additional Network
Feature
ICS 33.040.35
© BIS 2019
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
Information and Communication Technology Sectional Committee, LITD 13
NATIONAL FOREWORD
This Indian Standard which is identical with ISO/IEC 13863 : 1998 ‘Information technology —
Telecommunications and information exchange between systems — Private Integrated Services Network —
Specification, functional model and information flows — Path replacement additional network feature’ issued
by the International Organization for Standardization (ISO) and International Electrotechnical Commission
(IEC) jointly and was adopted by the Bureau of Indian Standards on the recommendations of the Information
and Communication Technology Sectional Committee and approval of the Electronics and Information
Technology Division Council.
The text of the ISO/IEC Standard has been approved as suitable for publication as an Indian Standard without
deviations. Certain conventions are however not identical to those used in Indian Standards. Attention is
particularly drawn to the following:
a) Wherever the words ‘International Standard’ appear referring to this standard, they should be read as
‘Indian Standard’.
b) Comma (,) has been used as a decimal marker while in Indian Standards, the current practice is to use a
point (.) as the decimal marker.
The technical committee has reviewed the provisions of the following International Standards referred in this
adopted standard and has decided that they are acceptable for use in conjunction with this standard. For undated
references, the latest edition of the referenced document applies, including any corrigenda and amendment.
International Standard Title
ISO/IEC 11571 : 1994 Information technology — Telecommunications and information exchange
between systems — Numbering and sub-addressing in private integrated
services networks
ISO/IEC 11574 : 1994 Information technology — Telecommunications and information exchange
between systems — Private Integrated Services Network-Circuit-mode
64 kbit/s bearer services — Service description, functional capabilities and
information flows
ISO/IEC 11579-1 : 1994 Information technology — Telecommunications and information exchange
between systems — Private Integrated Services Network — Part 1:
Reference configuration for PISN Exchanges (PINX)
ITU-T Rec. I.112 : 1993 Vocabulary of terms for ISDNs
CCITT Rec. I.130 : 1988 Method for the characterization of telecommunication services supported by
an ISDN and network capabilities of an ISDN
ITU-T Rec. I.210 : 1993 Principles of telecommunication services supported by an ISDN and the
means to describe them
ITU-T Rec. Z.100 : 1993 Specification and description language
For the purpose of deciding whether a particular requirement of this standard is complied with, the final value,
observed or calculated, expressing the result of a test or analysis, shall be rounded off in accordance with
IS 2 : 1960 ‘Rules for rounding off numerical values (revised)’. The number of significant places retained in the
rounded off value should be the same as that of the specified value in this standard.
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
Indian Standard
INFORMATION TECHNOLOGY —
TELECOMMUNICATIONS AND INFORMATION
EXCHANGE BETWEEN SYSTEMS — PRIVATE
INTEGRATED SERVICES NETWORK —
SPECIFICATION, FUNCTIONAL MODEL AND
INFORMATION FLOWS — PATH REPLACEMENT
1 Scope ADDITIONAL NETWORK FEATURE
This International Standard specifies the Path Replacement additional network feature (ANF-PR), which is applicable to
various basic services supported by Private Integrated Services Networks (PISN). Basic services are specified in
ISO/IEC 11574.
ANF-PR is a feature which applies to an established call, allowing that call's connection between Private Integrated Services
Network Exchanges (PINXs) to be replaced by a new connection. If the new connection is required to satisfy certain criteria,
ANF-PR should be used in conjunction with other supplementary services and/or ANFs. Annex A gives examples of the
circumstances under which ANF-PR can be used and criteria which can govern the selection of the new connection.
Additional network feature specifications are produced in three stages, according to the method described in CCITT
Recommendation I.130 for supplementary services. This International Standard contains the stage 1 and stage 2 specifications
of ANF-PR. The stage 1 specification (clause 6) specifies the feature as seen by an entity which initiates path replacement, the
ANF-PR user. The stage 2 specification (clauses 7, 8 and 9) identifies the functional entities involved in the feature and the
information flows between them. Clause 7 contains the stage 2 specification for basic operation of the feature. Clause 8
contains the stage 2 specification for an enhanced mode of working which can be employed when supported by all the
equipment involved. It allows some of the elements of the old connection to be re-used. Clause 9 contains the stage 2
specification for an optional enhancement of the basic operation of the feature. It allows the ANF-PR user to be located in any
PINX in the old connection and to decide the direction of the new connection.
2 Conformance
In order to conform to this International Standard, a stage 3 standard shall specify signalling protocols and equipment
behaviour that are capable of being used in a PISN which supports the feature specified in this International Standard. This
means that, to claim conformance, a stage 3 standard is required to be adequate for the support of those aspects of clause 6
(stage 1) and clauses 7, 8 and 9 (stage 2) which are relevant to the interface or equipment to which the stage 3 standard applies.
3 Normative references
The following standards contain provisions which, through reference in this text, constitute provisions of this International
Standard. At the time of publication, the editions indicated were valid. All standards are subject to revision, and parties to
agreements based on this International Standard are encouraged to investigate the possibility of applying the most recent
editions of the standards indicated below. Members of IEC and ISO maintain registers of currently valid International
Standards.
ISO/IEC 11571:1994, Information technology - Telecommunications and information exchange between systems -
Numbering and sub-addressing in private integrated services networks.
ISO/IEC 11574:1994, Information technology - Telecommunications and information exchange between systems - Private
Integrated Services Network - Circuit-mode 64 kbit/s bearer services - Service description,
functional capabilities and information flows.
ISO/IEC 11579-1:1994, Information technology - Telecommunications and information exchange between systems - Private
Integrated Services Network - Part 1: Reference configuration for PISN Exchanges (PINX).
ITU-T Rec. I.112:1993, Vocabulary of terms for ISDNs.
CCITT Rec. I.130:1988, Method for the characterization of telecommunication services supported by an ISDN and network
capabilities of an ISDN.
ITU-T Rec. I.210:1993, Principles of telecommunication services supported by an ISDN and the means to describe them.
ITU-T Rec. Z.100:1993, Specification and description language.
1
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
4 Definitions
For the purposes of this International Standard, the following definitions apply.
4.1 External definitions
Definitions
This International Standard uses the following terms defined in other documents:
− Basic service (ITU-T Rec. I.210)
− Private Integrated Services Network (PISN) (ISO/IEC 11579-1)
− Private Integrated Services Network Exchange (PINX) (ISO/IEC 11579-1)
− Service (ITU-T Rec. I.112)
− Signalling (ITU-T Rec. I.112)
− Supplementary Service (ITU-T Rec. I.210)
− User (except in the context of ANF-PR user) (ISO/IEC 11574)
This International Standard refers to the following basic call functional entities (FEs) defined in ISO/IEC 11574:
− Call Control (CC)
− Call Control Agent (CCA)
This International Standard refers to the following basic call inter-FE relationships defined in ISO/IEC 11574:
− r1
− r2
− r3
This International Standard refers to the following basic call information flows defined in ISO/IEC 11574:
− CHANNEL_ACKNOWLEDGE request/indication
− RELEASE request/indication
− RELEASE response/confirmation
− SETUP request/indication
− SETUP response/confirmation.
This International Standard refers to the following basic call information flow service element defined in ISO/IEC 11574:
− Destination Number.
4.2 Other definitions
4.2.1 Additional network feature : An additional network feature (ANF) is a capability, over and above that of a basic
service, provided by a PISN, but not directly to a PISN user.
4.2.2 ANF-PR user : An entity, within a PISN, that requests ANF-PR.
4.2.3 Call, basic call : An instance of the use of a basic service.
4.2.4 Connection : As defined in ITU-T Rec. I.112, but limited to the case of providing for the transfer of signals between two
PINXs.
Note 1 - A connection between two PINXs can pass through zero or more Transit PINXs.
4.2.5 New connection : The connection established by ANF-PR and used to replace all or part of the old connection.
4.2.6 Old connection : The connection existing before ANF-PR is invoked.
4.2.7 Trombone connection : A connection which has both its ends in the same PINX but which involves at least one Transit
PINX.
2
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
5 List of acronyms
ANF Additional Network Feature
ANF-PR ANF Path Replacement
CC Call Control (functional entity)
CCA Call Control Agent (functional entity)
CID Call Identity (information flow service element)
FE Functional Entity
ISDN Integrated Services Digital Network
PINX Private Integrated Services Network Exchange
PISN Private Integrated Services Network
PRE Path Replacement Error (information flow)
PRI Path Replacement Invite (information flow)
PRP Path Replacement Propose (information flow)
PRR Path Replacement Re-use (information flow)
PRRR PRR Result (information flow service element)
PRS Path Replacement Setup (information flow)
PRSR PRS Result (information flow service element)
RN Rerouteing Number (information flow service element)
SDL Specification and Description Language
6.2 Procedures
6.2.1 Provision/withdrawal
This ANF shall be PISN instigated.
Note 3 - Means can be provided for preventing the use of ANF-PR for applications where the changeover from the old connection to the new connection is
likely to cause unacceptable disruption. See annex B.
3
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
6.2.2.2 Invocation and operation
Invocation shall be on request from an ANF-PR user and shall be permitted only after a call has reached the active state. As an
implementation option, the ANF-PR user may indicate the direction of the new connection.
On invocation an attempt shall be made to establish a new connection between the users. In the absence of specific criteria, the
new connection shall be established using the routeing rules which apply to basic call establishment. If the new connection is
successfully established it shall be used to replace the old connection, which shall be released.
Changeover from the old connection to the new connection should be done in a manner which minimises disruption to user
information.
Note 4 - The means of specifying criteria and ensuring that the new connection satisfies those criteria can involve the use of another ANF or supplementary
service, which can be either standardized or manufacturer specific.
In some circumstances it may be possible to re-use some elements of the old connection, so that only part of the old connection
has to be replaced by a new connection, subject to the given criteria being achievable in that way.
6.2.3 Exceptional procedures
6.2.3.1 Activation/deactivation/registration/interrogation
Not applicable.
6.2.3.2 Invocation and operation
If it is not possible to establish a new connection, the call shall continue to use the old connection and any resources reserved
for the new connection shall be released. There shall be no disruption to user information.
In the event of two ANF-users (at opposite ends of the connection) requesting the feature simultaneously, both requests shall
be rejected.
Note 5 - An ANF-PR user can request the feature again later in the event of failure. In the case of failure due to simultaneous requests, care should be taken
to avoid a repeat occurrence, e.g., by use of a random delay.
4
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
ANF-PR can apply to a call which has been transferred. The fact that transfer has occurred can be a reason for invoking
ANF-PR (see annex A).
6.3.10 Call Forwarding Unconditional (SS-CFU)
ANF-PR can apply to a call which has been forwarded.
6.3.11 Call Forwarding Busy (SS-CFB)
ANF-PR can apply to a call which has been forwarded.
6.3.12 Call Forwarding No Reply (SS-CFNR)
ANF-PR can apply to a call which has been forwarded.
6.3.13 Call Deflection (SS-CD)
ANF-PR can apply to a call which has been deflected.
6.4 Interworking considerations
The requirements below apply to both incoming calls and outgoing calls.
It shall be possible to use ANF-PR on the PISN part of the connection. The new connection through the PISN shall replace the
old connection through the PISN.
When interworking with another network which supports an equivalent feature, it may be possible to cooperate with the other
network in order to replace the entire connection.
6.5 Overall SDL
Figure 1 contains the dynamic description of ANF-PR using the Specification and Description Language (SDL) defined in
ITU-T Rec. Z.100. The SDL process represents the behaviour of the PISN in providing ANF-PR. Input signals from the left
and output signals to the left represent primitives from and to the ANF-PR user.
5
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
ID L E
I n it ia t e
A N F -P R
E s t a b lis h
new
c o n n e c t io n
N
S u c c e s f u l?
S w i tc h t o R e le a s e a n y
new re s o u rc e s fo r
c o n n e c tio n n e w c o n n e c t io n
R e le a s e o l d
c o n n e c tio n
A N F -P R
U n s u c c e s s fu l
A N F -P R
s u c c e s s fu l
ID L E
6
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
The following functional relationship shall exist between these FEs:
rx between FE1 and FE2
Figure 2 shows these FEs and this relationship.
PR PR
DESTINATION SOURCE
rx
FE1 FE2
r2
CC CC
Old Connection
r2 r2
r1 r2 r2 r2 r3
CCA CC CC CC CC CCA
New Connection
FE1 FE2
rx
Figure 3 - Example relationship between models for ANF-PR and basic call
7
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
7.2 Information flows
7.2.1 Definition of information flows
In the tables listing the service elements in information flows, the column headed "Request" indicates which of these service
elements are mandatory (M) and which are optional (O) in a request/indication information flow, and the column headed
"Confirm" indicates which of these service elements are mandatory (M) and which are optional (O) in a response/confirmation
information flow.
7.2.1.1 PRP (Path Replacement Propose)
PRP is an unconfirmed information flow across rx from FE1 to FE2 which proposes path replacement to FE2.
PRP request/indication is sent using the signalling path of the old connection.
Table 1 lists the service elements within the PRP information flow.
Table 1 - Content of PRP
Service element Request
Rerouteing Number (RN) M
Call Identity (CID) M
Service element RN shall always be included in the PRP request/indication information flow at rx. It shall contain a number
from one of the native numbering plans of the PISN (see ISO/IEC 11571). The number shall be suitable for use for routeing
the new connection to the physical location where FE1 resides.
Service element CID shall always be included in the PRP request/indication information flow at rx. It shall contain a number
which, in conjunction with the number in service element RN, identifies the particular FE1, and therefore the call on which
ANF-PR is being invoked. This number need not have significance outside the physical location where FE1 resides.
7.2.1.2 PRS (Path Replacement Setup)
PRS is a confirmed information flow across rx from FE2 to FE1 which indicates to FE1 that the new connection being
established is for the purpose of path replacement. The response indicates whether FE1 has successfully correlated the new
connection with the old connection and is prepared to switch to the new connection.
PRS request/indication and PRS response/confirmation are sent using the signalling path of the new connection at the time of
establishment of that connection.
Table 2 lists the service elements within the PRS information flow.
Table 2 - Content of PRS
Service element Request Confirm
Call Identity (CID) M -
PRS Result (PRSR) - M
Service element CID shall always be included in the PRS request/indication information flow at rx. It shall contain the value
received in the corresponding service element of the PRP request/indication information flow.
Service element PRSR shall always be included in the PRS response/confirmation information flow at rx. It indicates whether
the request was successful, and if not the reason for failure.
7.2.1.3 PRE (Path Replacement Error)
PRE is an unconfirmed information flow across rx from FE2 to FE1 which indicates to FE1 that path replacement has failed.
Table 3 lists the service element within the PRE information flow.
8
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
Table 3- Content of PRE
Service element Request
Reason for failure M
9
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
7.2.3.1 Normal operation of ANF-PR
Figure 4 shows the information flow sequence for normal operation of ANF-PR.
rx
FE1 FE2
r2 r2 r2
CC CC CC CC
O ld C onn ection O ld C o nn ectio n O ld C o nn ectio n
PR P
10 1 req/ind
r2 r2 r2
CC CC
N ew C o nn ectio n N ew C o nn ectio n N ew C o nn ectio n
SET U P SET U P
SET UP
20 1
req/ind req/ind
req/ind
PR S
10 2 req/ind
SET UP S ET UP SE T UP
PR S
res/con
20 2
r2 r2 r2
CC CC
O ld C onn ection O ld C o nn ectio n O ld C o nn ectio n
R E LE AS E R E LE AS E R E LE AS E
Note - For simplicity, basic call information flows Channel_Acknowledge request/indication and Release response/confirmation are not shown.
10
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
7.2.3.2 Failure to establish new connection
Figure 5 shows the information flow sequence when establishment of the new connection fails.
rx
FE1 FE2
r2 r2 r2
CC CC CC CC
O ld C o n n e c tio n O ld C o n n e c tio n
O ld C o n n e c tio n
PRP
re q /in d
101
r2
CC
N e w C o n n e c tio n
SET UP
201
re q /in d
PRS
re q /in d
(n o te )
R ELEASE
re q /in d
R ELEASE
re s /c o n
r2
CC r2 r2
CC
O ld C o n n e c tio n O ld C o n n e c tio n O ld C o n n e c tio n
PRE
203
104 re q /in d
Note - Because of failure to establish the new connection, the PRS request/-indication will not reach FE1.
11
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
7.3 Functional entity actions
The following FE actions shall occur at the points indicated in the figures of 7.2.3.
7.3.1 Functional entity actions of FE1
101 On receipt of a request from ANF-PR user, obtain Rerouteing Number and Call Identity, and include in PRP
request/indication to FE2.
102 On receipt of PRS request/indication (in conjunction with basic call Setup request/indication): correlate new
connection with old connection; switch over to the user information channel of the new connection; terminate the
user information channel of the old connection in a suitable manner (pending its release); stimulate the sending of a
basic call Setup response/confirmation; and return with it a PRS response/confirmation.
Note 7 - The method of terminating the old connection's user information channel is an implementation matter. See also annex B.
103 On receipt of an indication from the local CC that the old connection has been released, indicate successful
completion of ANF-PR to the ANF-PR user.
104 On receipt of PRE request/indication, terminate ANF-PR and retain the old connection. Depending on the reason
for failure, indicate to the ANF-PR user whether it is worthwhile invoking again later.
7.3.2 Functional entity actions of FE2
201 On receipt of PRP request/indication, check that ANF-PR is allowed and stimulate the establishment of a new
connection. In conjunction with basic call SETUP request/indication, send PRS request/indication to FE1.
Terminate the new connection's user information channel suitably.
Note 8 - The method of terminating the new connection's user information channel is an implementation matter. See also annex B.
202 On receipt of PRS response/confirmation indicating success (in conjunction with basic call Setup response/-
confirmation), switch over to the new connection. Disconnect the old user information channel and initiate release
of the old connection. Terminate ANF-PR.
203 On inability to accept the PRP request/indication, failure to establish the new connection, or receipt of PRS
response/confirmation indicating failure (in conjunction with basic call Release request/indication), send PRE
request/indication to FE1 and terminate ANF-PR.
7.4 Functional entity behaviour
The FE behaviours shown below are intended to illustrate typical FE behaviour in terms of information flows sent and
received.
The behaviour of each FE is shown using the Specification and Description Language (SDL) defined in ITU-T Rec. Z.100
(1993).
12
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
7.4.1 Behaviour of FE1
Figure 6 shows the normal behaviour of FE1. Input signals from the right and output signals to the right represent information
flows from and to FE2 and from the local basic call CC. Input signals from the left and output signals to the left represent
primitives from and to the ANF-PR user.
F E 1 - I d le
I n it ia t e
A N F -P R
O b t a in R N
a n d C ID
P R P r e q / in d
( o ld
c o n n e c tio n )
FE1-
P r o p o s in g
P R S r e q /in d P R E r e q /in d B a s ic c a ll
(n e w ( o ld r e le a s e d
c o n n e c tio n ) c o n n e c tio n )
A s s o c ia t e w it h
o ld c o n n e c tio n
N
O K?
S w it c h t o n e w
u s e r in f o r m a t io n R e le a s e n e w
channel c o n n e c tio n s
P R S re s /c o n
R e s u lt = P R S re s /c o n
s u c c e s s fu l R e s u lt = F a lle d
F E 1 - S w itc h e d F E 1 - R e je c tin g
O ld c o n n e c t io n P R E r e q /in d
r e le a s e d ( o ld c o n n e c tio n )
( fr o m lo c a l C C )
A N F -P R A N F -P R
S u c c e s s fu l U n s u c c e s s fu l
F E 1 - id le
13
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
7.4.2 Behaviour of FE2
Figure 7 shows the normal behaviour of FE2. Input signals from the left and output signals to the left represent information
flows from and to FE1. Input signals from the right represent indications from the local CC.
FE2-Idle
PRP req/ind
(old connection)
N
Able to
proceed?
e.g. because of collision
of ANF-PR requests
Y
PRS req/ind
(establish new
connection)
FE2-Routeing
Switch to new
user information
channel
PRE req/ind
Release old
connection
FE2-Idle
14
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
7.5 Allocation of functional entities to physical equipment
The allocations of FEs to physical equipment shown in table 4 shall apply.
FE1 shall be located at either End PINX, depending on where the need for invoking ANF-PR arises. This will depend on the
application.
In the case of a trombone connection, the Originating PINX or Incoming Gateway PINX will be the same PINX as the
Terminating PINX or Outgoing Gateway PINX. Therefore FE1 and FE2 will be collocated and the new connection and those
information flows sent using the signalling path of the new connection will be intra-PINX. Information flow PRP request/-
indication sent using the signalling path of the old connection will enable FE2 to determine that FE1 is collocated.
Table 4 - Scenarios for the allocation of FEs to physical equipment
FE1 FE2
Scenario 1 Originating PINX Terminating PINX
Scenario 2 Originating PINX Outgoing Gateway PINX (note)
Scenario 3 Incoming Gateway PINX Terminating PINX
(note)
Scenario 4 Incoming Gateway PINX Outgoing Gateway PINX (note)
(note)
Scenario 5 Terminating PINX Originating PINX
Scenario 6 Terminating PINX Incoming Gateway PINX (note)
Scenario 7 Outgoing Gateway PINX Originating PINX
(note)
Scenario 8 Outgoing Gateway PINX Incoming Gateway PINX (note)
(note)
Note - When interworking with another network which supports an equivalent feature, FE1 or FE2 may
be located in that other network, thereby permitting replacement of the entire connection.
15
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
PR PR PR PR
DESTINATION RE-USE RE-USE SOURCE
rz ry ry
FE1 FE3 FE3 FE2
rx
r2 r2
CC
New connection
r1 r2 r2 r2 r3
CCA CC CC CC CC CCA
r2 ry
FE1 FE3 FE2
rx
Figure 9 - Example relationship between models for ANF-PR and basic call - re-use of part of the old connection
16
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
8.2 Information flows
8.2.1 Definition of information flows
8.2.1.1 PRP (Path Replacement Propose)
7.2.1.1 shall apply.
8.2.1.2 PRS (Path Replacement Setup)
7.2.1.2 shall apply, with the exception that information flow PRS shall occur across relationship rz instead of rx.
8.2.1.3 PRE (Path Replacement Error)
7.2.1.4 shall apply.
8.2.1.4 PRR (Path Replacement Re-use)
PRR is a confirmed information flow across ry from FE2 or FE3 to the next FE3. It instructs the next FE3 to establish and
switch to a new connection, elements of the old connection as far as that next FE3 being re-used. The response indicates
whether a new connection has been successfully established and switched to.
PRR request/indication and PRR response/confirmation are sent using the signalling path of the old connection.
Table 5 lists the service elements within the PRR information flow. The column headed "Request" indicates which of these
service elements are mandatory (M) and which are optional (O) in a PRR request/indication information flow. The column
headed "Confirm" indicates which of these service elements are mandatory (M) and which are optional (O) in a PRR
response/confirmation information flow.
Table 5 - Content of PRR
Service element Request Confirm
Rerouteing Number (RN) M -
Call Identity (CID) M -
PRR Result (PRRR) - M
Service element RN shall always be included in the PRR request/indication information flow at ry. It shall contain the number
sent to FE2 in service element RN of the PRP request/indication information flow.
Service element CID shall always be included in the PRR request/indication information flow at ry. It shall contain the value
received in the corresponding service element of the PRP request/indication information flow.
Service element PRRR shall always be included in the PRR response/confirmation information flow at ry. It indicates whether
the request was successful, and if not the reason for failure.
8.2.2 Relationship of information flows to basic call information flows
7.2.2 shall apply.
8.2.3 Examples of information flow sequences
Below are examples of typical sequences of information flows. In addition to providing signalling procedures in support of
these sequences, a stage 3 standard shall also cover other sequences arising from error situations, interactions with basic call,
interactions with other supplementary services, different topologies, etc..
In the figures, ANF-PR information flows are represented by solid arrows and basic call information flows are represented by
broken arrows. An ellipse embracing two information flows indicates that the two information flows occur simultaneously.
Within a column representing an ANF-PR functional entity, the numbers refer to functional entity actions listed in 8.3.
8.2.3.1 Normal operation of ANF-PR with re-use of part of old connection
Figure 10 shows the information flow sequence for normal operation of ANF-PR when that part of the old connection up to
the first Transit CC is re-used. The new connection starts at the first Transit CC, at which an instance of FE3 is located.
17
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
rx
rz ry
FE1 FE3 FE2
r2 r2 r2
CC CC CC CC
Old Connection Old Connection
PRP
101 req/ind
r2 r2
CC
New Connection New Connection
PRS
301
req/ind
102
SET UP SET UP
res/con res/con
PRS
res/con
r2 r2 PRR
CC 302
Old Connection Old Connection res/con 205
RELEASE RELEASE
103 req/ind req/ind
Note - For simplicity, basic call information flows Channel_Acknowledge request/indication and Release response/confirmation are not shown.
Figure 10 - Information flow sequence - normal operation of ANF-PR with re-use of part of old connection
18
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
8.2.3.2 Failure to establish new connection to replace part of old connection
Figure 11 shows the information flow sequence when establishment of a new connection to replace part of the old connection
fails. The new connection attempt is from the first Transit CC, at which an instance of FE3 is located.
rx
rz ry
FE1 FE3 FE2
r2 r2 r2
CC CC CC CC
Old Connection Old Connection
PRP
101 req/ind
r2 r2
New Connection
CC New Connection 204
PRR
req/ind
SET UP
301
req/ind
PRS
req/ind
(note 1)
R ELEAS E
req/ind
R E LE ASE
res/con
303
PRR
res/con
r2 r2
Old Connection CC Old Connection
PRE 206
104 req/ind
(note 2)
Note 1 - Because of failure to establish the new connection, the PRS request/indication will not reach FE1.
Note 2 - Because of failure to establish the new connection, PRE request/indication is sent . Alternatively FE2 may revert to basic operation and attempt to
establish a new connection without re-use of part of the old connection.
Figure 11 - Information flow sequence - failure to establish new connection to replace part of old connection
19
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
8.2.3.3 Retention of all of the old connection
Figure 12 shows the information flow sequence for operation of ANF-PR when an attempt is made to re-use the old
connection as far as the CC where FE1 is located. This can arise only if the old connection already meets the criteria for the
new connection. The old connection is retained and ANF-PR is deemed to have terminated successfully. An FE3 occurs at
each Transit CC and at the CC where FE1 is located.
rx
ry ry ry
FE1 FE3 FE3 FE3 FE2
r2 r2 r2
CC CC CC CC
Old Connection Old Connection
PRP
101 req/ind
PRR 204
req/ind
PRR
304
req/ind
304
PRR
req/ind
306
PRR
res/con
305 PRR
res/con
305 PRR
res/con 205
20
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
8.3 Functional entity actions
The following FE actions shall occur at the points indicated in the figures of 8.2.3.
8.3.1 Functional entity actions of FE1
7.3.1 shall apply.
8.3.2 Functional entity actions of FE2
7.3.2 shall apply. In addition, the following actions shall apply.
204 On receipt of PRP request/indication, check that ANF-PR is allowed and discover that the old connection can be
re-used as far as the next CC. Send PRR request/indication to FE3.
205 On receipt of PRR response/confirmation indicating success, terminate ANF-PR.
206 On inability to accept the PRP request/indication or receipt of PRR response/confirmation indicating failure, send
PRE request/indication to FE1 and terminate ANF-PR. Alternatively, on receipt of PRR response/confirmation
indicating failure, attempt path replacement without re-use of elements of the old connection (action 201).
8.3.3 Functional entity actions of FE3
301 On receipt of PRR request/indication from FE2 or the previous FE3, check that ANF-PR is allowed and initiate
the establishment of a new connection. In conjunction with basic call SETUP request/indication, send PRS
request/indication to FE1. Terminate the new connection's user information channel suitably.
Note 9 - The method of terminating the new connection's user information channel is an implementation matter. See also annex B.
302 On receipt of PRS response/confirmation indicating success (in conjunction with basic call Setup
response/confirmation), switch over to the new connection and send a PRR response/confirmation to FE2 or the
previous FE3. Initiate release of the unwanted part of the old connection and terminate ANF-PR.
303 On inability to accept the PRR request/indication, failure to establish the new connection, or receipt of PRS
response/confirmation indicating failure (in conjunction with basic call Release request/indication), send PRR
response/confirmation indicating failure to FE2 or the previous FE3 and terminate ANF-PR.
304 On receipt of PRR request/indication from FE2 or the previous FE3, check that ANF-PR is allowed and discover
that the old connection can be re-used as far as the next CC. Send PRR request/indication to the next FE3.
305 On receipt of PRR response/confirmation from the next FE3, send PRR response/confirmation indicating success to
FE2 or the previous FE3
306 On receipt of a PRR request/indication from FE2 or a previous FE3, if this FE3 is collocated with FE1 (i.e., the old
connection has been found to satisfy the given criteria) send a PRR response/confirmation indicating success to
FE2 or the previous FE3 and terminate ANF-PR.
8.4 Functional entity behaviour
The FE behaviours shown below are intended to illustrate typical FE behaviour in terms of information flows sent and
received.
The behaviour of each FE is shown using the Specification and Description Language (SDL) defined in ITU-T Rec. Z.100
(1993).
8.4.1 Behaviour of FE1
7.4.1 is applicable.
21
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
8.4.2 Enhanced behaviour of FE2
Figure 13 shows the enhanced behaviour of FE2. Input signals from the left and output signals to the left represent information
flows from and to FE3 (where stated) and FE1 (otherwise). Input signals from the right represent indications from the local
CC.
FE2-Idle
PRP req/ind
(old connection)
N
Able to
proceed?
Y Able to re-use
old connection to
next CC?
N
Switch to new
user information
channel PRE req/ind
PRE req/ind
Release old
connection
FE2-Idle
22
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
8.4.3 Behaviour of FE3
Figure 14 shows the behaviour of FE3. Input signals from the left and output signals to the left represent information flows
from and to the next FE3 (where stated) and FE1 (otherwise). Input signals from the right and output signals to the right
represent information flows from and to FE2 or the previous FE3 and indications from the local CC.
FE3-Idle
PRR req/ind
Able to N
proceed?
Able
Y to re-use
old connection
to next CC?
N
Release old
connection
Basic call PRR res/con PRR res/con
released Result= Result=failed
failed
PRR res/con
Result=
successful
FE3-Idle
23
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
8.5 Allocation of functional entities to physical equipment
7.5 shall apply with the following enhancement.
An instance of FE3 shall be located at the Transit PINX at which the new connection starts and at each Transit PINX between
that PINX and FE2.
8.6 Interworking considerations
7.6 shall apply. If FE2 is located in another network which supports the re-use of elements of the old connection, an FE3 can
be located at the Gateway PINX.
Figure 2
24
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
− FE2 shall be collocated with the Terminating CC if FE1´ is collocated with the Originating CC, or with the Originating CC
if FE1´ is collocated with the Terminating CC.
− FE4 may be collocated with any CC in the connection.
Figure 16 shows an example of the relationship between the model for ANF-PR and the model for the basic call. This example
is used as the basis of the information flow sequences in 9.2.3.
Note 10 - The number of Transit CCs on the new connection can differ from the number on the old connection.
r2
CC CC
New Connection
r2 r2
r1 r2 r2 r2 r3
CCA CC CC CC CC CCA
Old Connection
rw
FE1’ FE4 FE2
rx
Figure 3
Figure 16 - Example relationship between models for ANF-PR and basic call
25
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
Table 7 - Content of PRIF
Service element Request
Reason for failure M
26
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
9.2.3.1 Normal operation of ANF-PR
Figure 17 shows the information flow sequence for normal operation of ANF-PR.
rx
rw
FE1’ FE4 FE2
r2 r2 r2 r2
CC CC CC CC CC
Old Connection Old Old Connection Old Connection
Connection
PRI 401
req/ind
101
PRP
req/ind
r2 CC r2 CC r2
New Connection New Connection New Connection
PRS
102 req/ind
FE4
r2 r2 r2 r2
CC CC CC
Old Connection Old Connection Old Connection Old Connection
RELEASE
403
RELEASE req/ind
RELEASE req/ind
103 RELEASE
req/ind
req/ind
Note - For simplicity, basic call information flows Channel_Acknowledge request/indication and Release response/confirmation are not shown.
27
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
9.2.3.2 Failure to establish new connection - immediate rejection
Figure 18 shows the information flow sequence for immediate rejection of ANF-PR.
rx
rw
FE1´ FE4 FE2
r2 r2 r2
CC CC CC CC CC
Old Connection Old Old Connection Old Connection
Connection
PRI 401
req/ind
105
PRIF
req/ind 402
28
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
9.2.3.3 Failure to establish new connection - during ANF-PR execution
Figure 19 shows the information flow sequence when establishment of the new connection fails.
rx
rw
FE1´ FE4 FE2
r2 r2 r2
CC CC CC CC CC
Old Connection Old Old Connection Old Connection
Connection
PRI 401
req/ind
101
PRP
req/ind
r2
CC
New Connection
SETUP
201
req/ind
PRS
req/ind
(NOTE)
RELEASE
req/ind
RELEASE
res/con
r2 r2 r2
CC CC
Old Connection Old Connection Old Connection Old Connection
203
PRE
req/ind
104
PRIF
req/ind 402
Note - Because of failure to establish the new connection, the PRS request/-indication will not reach FE1´.
29
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
9.3 Functional entity actions
The following FE actions shall occur at the points indicated in the figures of 9.2.3.
9.3.1 Functional entity actions of FE1´
101 On receipt of a PRI request/-indication from FE4, obtain Rerouteing Number and Call Identity, and include in PRP
request/indication to FE2.
102 Procedure 102 in 7.3.1 and Note 7 shall apply.
103 On receipt of an indication from the local CC that the old connection has been released, treat ANF-PR as
successfully completed.
104 On receipt of PRE request/indication, terminate ANF-PR and retain the old connection. Depending on the reason
for failure optionally inform FE4 in a PRIF request/indication.
105 If FE1´ does not accept the invitation it may optionally inform FE4 about the reason by sending a PRIF
request/-indication.
Note 11 - One reason for rejection may be that ANF-PR is in progress already.
30
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
9.4.1 Behaviour of FE1´
Figure 20 shows the normal behaviour of FE1´. Input signals from the right and output signals to the right represent
information flows from and to FE2 and from the local basic call CC. Input signals from the left and output signals to the left
represent information flows from and to FE4.
FE1’-Idle
N
PR Possible PRI req/ind
? (old connection)
PRP req/ind
(old FE1’-Idle FE1’ Any
connection) except idle
FE1’-
Proposing
Associate with
old connection
N
OK?
Switch to new
user information Release new
channel connections
PRS res/con
Result = PRS res/con
successful Result=Failed
FE1’-Switched FE1’-Rejecting
PRIF req/ind
(old connection)
FE1’-idle
31
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
9.4.2 Behaviour of FE2
7.4.2 shall apply with the exception that input signals from the left and output signals to the left represent information flows
from and to FE1´.
9.4.3 Behaviour of FE4
Figure 21 shows the normal behaviour of FE4. Input signal from the left and output signals to the left represent primitives
from and to the ANF-PR user. Input signals from the right and output signals to the right represent information flows from and
to FE1´ and from and to the basic call CC.
FE4_Idle PR_invite
old connection
PRIF
PR req/ind req/ind
released (from
local CC)
To ANF-PR User
32
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
Table 8 - Scenarios for the allocation of FEs to physical equipment
FE1´ (note 2) FE2 FE4 (note 2)
Scenario 1 Originating PINX Terminating PINX any PINX in the
connection
Scenario 2 Originating PINX Outgoing Gateway PINX any PINX in the
(note 1) connection
Scenario 3 Incoming Gateway PINX Terminating PINX any PINX in the
(note 1) connection
Scenario 4 Incoming Gateway PINX Outgoing Gateway PINX any PINX in the
(note 1) (note 1) connection
Scenario 5 Terminating PINX Originating PINX any PINX in the
connection
Scenario 6 Terminating PINX Incoming Gateway PINX any PINX in the
(note 1) connection
Scenario 7 Outgoing Gateway PINX Originating PINX any PINX in the
(note 1) connection
Scenario 8 Outgoing Gateway PINX Incoming Gateway PINX any PINX in the
(note 1) (note 1) connection
Note 1 - When interworking with another network which supports an equivalent feature, FE1´, FE2 or FE4 may be located in
that other network, thereby permitting replacement of the entire connection.
Note 2 - When FE1´ and FE4 are collocated the functionality is equivalent with FE1 of clause 7.
33
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
Annex A
(informative)
ANF-PR can be used either to replace a connection which is no longer suitable or to obtain an improved connection. This
annex describes some of the reasons why such situations can arise.
In some cases a separate ANF is used to provide criteria governing the routeing of the new connection. In the absence of
specific criteria, the new connection will be established using the routeing rules which apply to basic call establishment.
34
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
obtain a new connection providing the bearer capabilities required. Failure to obtain a new path with the required bearer
capabilities should result in abandonment of the attempt to change to the new basic service.
Because the flow of user information is interrupted during a change of basic service, there is no need in this case for ANF-PR
to take steps to minimise disruption.
35
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
Annex B
(informative)
Disruption to the flow of user information will occur if there is a difference in transmission delay between the new connection
and the old connection. This source of disruption, which is unavoidable, will result in a number of consecutive bits being lost
or received twice. The effect will be similar in each direction.
Disruption can also occur because FE1 (or FE1´) and FE2 switch over to the new connection at different times, owing to
signalling delays. Whether this second source of disruption occurs and what its effect will be depend on the method of
handling the user information channels at the two FEs.
36
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
− allowing users to request, on a per call basis, that ANF-PR be prevented.
37
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
OOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID
SUPPLIED BY BOOK SUPPLY BUREAU UNDER THE LICENSE FROM BIS FOR INDIAN INSTITUTE OF TECHNOLOGY - ROORKEE ON 11/10/2024 12:31:25 (103.37.201.177) VALID UPTO24/01/2025
BIS is a statutory institution established under the Bureau of Indian Standards Act, 2016 to promote
harmonious development of the activities of standardization, marking and quality certification of goods
and attending to connected matters in the country.
Copyright
BIS has the copyright of all its publications. No part of these publications may be reproduced in any form
without the prior permission in writing of BIS. This does not preclude the free use, in the course of
implementing the standard, of necessary details, such as symbols and sizes, type or grade designations.
Enquiries relating to copyright be addressed to the Director (Publications), BIS.
Amendments are issued to standards as the need arises on the basis of comments. Standards are also reviewed
periodically; a standard along with amendments is reaffirmed when such review indicates that no changes are
needed; if the review indicates that changes are needed, it is taken up for revision. Users of Indian Standards
should ascertain that they are in possession of the latest amendments or edition by referring to the latest issue of
‘BIS Catalogue’ and ‘Standards : Monthly Additions’.
This Indian Standard has been developed from Doc. No : LTD 13 (3505).
Eastern : 1/14 C.I.T. Scheme VII M, V. I. P. Road, Kankurgachi 2337 8499, 2337 8561
KOLKATA 700054 2337 8626, 2337 9120
Northern : Plot No. 4-A, Sector 27-B, Madhya Marg, CHANDIGARH 160019 26 50206
265 0290
Southern : C.I.T. Campus, IV Cross Road, CHENNAI 600113 2254 1216, 2254 1442
2254 2519, 2254 2315
Western : Manakalaya, E9 MIDC, Marol, Andheri (East) 2832 9295, 2832 7858
MUMBAI 400093 2832 7891, 2832 7892