0% found this document useful (0 votes)
26 views2 pages

Ex 4 (A) Dutta Mohsin

Estimation and costing Quantity surveying
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views2 pages

Ex 4 (A) Dutta Mohsin

Estimation and costing Quantity surveying
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Building Estimate (Long wall & Short wall method)

[Example-4(a), p-35 of B. N. Dutta]


R1&R2:
c/c of L-wall (front & back wall))=0.3/2+4.0+0.3+6.0+0.3/2=10.6 m, #02
c/c of S-wall (sides & interwall)=0.3/2+6.0+0.3/2=6.3m, #03
Table.1 Calculation of quantities of items (Ex-4a)
Item Details/Particulars of items Nos L B/W H/D Q Remarks/Explanatory notes
No. (m) (m) (m)
1 E/W in exvavation in foundations:
R1&R2:
L-wall 2 11.7 1.1 1.0 25.74 L=C/L+w=10.6+1.1=11.7 m
S-wall 3 5.2 1.1 1.0 17.16 L=C/L-w=6.3-1.1=5.2 m
Net Total= 42.90 m3
2 PCC (1:3:6) in foundation:
R1&R2:
L-wall 2 11.7 1.1 0.3 7.722 L same as in item no 1
S-wall 3 5.2 1.1 0.3 5.148
Net Total= 12.870 m3
3 I-class B/W with CM (1:6) in foundation &
plinth:
R1&R2:
L-wall-
I-footing 2 11.4 0.80 0.20 3.65 L=10.6+0.8=11.4m
II-footing 2 11.3 0.70 0.10 1.58 L=10.6+0.7=11.3m
III-footing 2 11.2 0.60 0.10 1.34 L=10.6+0.6=11.2m
IV-footing 2 11.1 0.50 0.10 1.11 L=10.6+0.5=11.1m
Plinth wall above footing 2 11.0 0.40 0.80 7.04 L=10.6+0.4=11.0m
S-wall-
I-footing 3 5.5 0.8 0.2 2.64 L=6.3-0.8=5.5m
II-footing 3 5.6 0.7 0.1 1.18 L=6.3-0.7=5.6m
III-footing 3 5.7 0.6 0.1 1.03 L=6.3-0.6=5.7m
IV-footing 3 5.8 0.5 0.1 0.87 L=6.3-0.5=5.8m
Plinth wall above footing 3 5.9 0.4 0.8 5.66 L=6.3-0.4=5.9m
Net Total= 26.10 m3
4 2.5cm thick DPC (1:1.5:3):
R1&R2:
L-wall 2 11 0.4 - 8.80 L=10.6+0.4=11.0m
S-wall 3 5.9 0.4 - 7.08 L=6.3-04=5.9m
Total= 15.88 m2
Deductions:
Sill of doors (D) 2 1.2 0.4 - 0.96
Total= 0.96 m2 (-ve)
Net Total= 14.92 m2
I-Class B/W with CM (1:5) in
5 superstructure:
R1&R2:
L-wall 2 10.9 0.3 4.2 27.47 L=10.6+0.3=10.9m
S-wall 3 6.0 0.3 4.2 22.68 L=6.3-0.3=6.0m
Deductions: Total= 50.15 m3
For openings of -
Doors, D (1.2x2.1m) 2 1.2 0.3 2.1 1.51
Windows, W (1.0x1.5m) 4 1.0 0.3 1.5 1.80
Shelves, S (1.0x1.5m) 2 1.0 0.2 1.5 0.60 10 cm thick back wall for shelve
Lintels over -
Doors, D (1.2x2.1m) 2 1.5 0.3 0.15 0.13 L=1.2+2xbearing=1.2+2x0.3/2=1.5m
Windows, W (1.0x1.5m) 4 1.3 0.3 0.15 0.23 L=1+0.3=1.3m
Shelves, S (1.0x1.5m) 2 1.3 0.3 0.15 0.12 L=1.0+0.3=1.3m
Total= 4.40 m3 (-ve)
Net Total= 45.75 m3