NO URAIAN GAMBAR JUMLAH PANJANG (P) LEBAR(L) TINGGI(T)

1 PEMBERSIHAN LAHAN 12 9

2 PEKERJAAN BOWPLANK 7.7 6

A PEKRJAAN PONDASI

1 GALIAN TANAH 44.9 0.8 0.85

2 AANSTAMPING 44.9 0.8 0.1

LA+LB*1/2
3 PONDASI BATU KALI 44.9 0.7
0.45

4 LANTAI KERJA PONDASI 44.9 0.8 0.05

TOTAL VOLUME PONDASI

5 URUGAN TANAH

B PEKERJAAN LANTAI

LANTAI RUMAH
1 LANTAI TERAS 1.2 3 0.1
LANTAI RUMAH REAL 0.1
2 LANTAI WC 1.5 1.5 0.1
TOTAL VOLUME LANTAI

C PEKERJAAN BETON

1 SLOOF 44.9 0.15 0.2

2 KOLOM 14 0.125 0.125 3.5

3 RINGBALK 39.5 0.15 0.15


D PEKERJAAN DINDING

1 DINDING BUTA 40.7 0.125 3.5

1 5.5 0.125 1.5


2 DINDING GAWEL
2 6.5 0.125 2.1

TOTAL VOLUME GAWEL

3.LUBANG KUSEN PINTU DAN


JENDELA

3a PINTU UTAMA 2 0.125 0.88 2.14

PINTU BIASA 3 0.125 0.88 2.04

PINTU WC 1 0.125 0.78 2.04

3b JENDELA TYPE 1 1 0.125 0.68 1.58

JENDELA TYPE 2 1 0.125 1.5 1.28

JENDELA TYPE 3 3 0.125 1.32 1.28

3c VENTILASI 2 0.125 2 0.4

VENTILASI WC 1 0.125 0.68 0.38

TOTAL VOLUME LUBANG KUSEN

DINDING REAL

PEKERJAAN KUSEN
E
PINTU DAN JENDELA
1 PINTU UTAMA 2 0.88 0.12 2.14

2 PINTU BIASA 3 0.88 0.12 2.04

3 PINTU WC 1 0.78 0.12 2.04

4 JENDELA TYPE 1 1 0.68 0.12 1.58

5 JENDELA TYPE 2 1 1.5 0.12 1.28

6 JENDELA TYPE 3 3 1.32 0.12 1.28

7 VENTILASI 2 2 0.12 0.4

8 VENTILASI WC 1 0.68 0.12 0.38

PEKERJAAN RANGKA
F
KUDA-KUDA

1 BALOK TARIK 6.5 0.26 0.75

2 0.26 0.75

2 BALOK GANTUNG 2 1.45 0.26 0.75

2 0.758 0.26 0.75

3 KAKI KUDA KUDA 2 4.42 0.26 0.75

2 1.32 0.26 0.75


4 BALOK SOKONG
2 1.65 0.26 0.75
TOTAL VOLUME KUDA-
5 3 27.696 0.26 0.75
KUDA

1 BALOK TARIK 5.5 0.26 0.75

1.69 0.26 0.75

2 BALOK GANTUNG 2 1.45 0.26 0.75

2 0.758 0.26 0.75

3 KAKI KUDA KUDA 2 3.84 0.26 0.75

2 1.32 0.26 0.75


4 BALOK SOKONG
2 1.47 0.26 0.75

TOTAL VOLUME KUDA-


5 3 24.866 0.26 0.75
KUDA

TOTAL VOLUME KUDA KUDA

G PEKERJAAN PENOMPANG PENUTUP ATAP

10 7.15 0.7 0.41

1 RENG 10 3.5 0.7 0.41

14 4.15 0.7 0.41

TOTAL VOLUME

H PEKERJAAN PENUTUP ATAP


2 3.5 3.84
1 PENUTUP ATAP
2 4.15 4.42

TOTAL KELILING (M²)

I PEKERJAAN PLUMBING

1 SALURAN AIR BERSIH 10

2 SALURAN AIR KOTOR ø2 2.33

3 SALURAN AIR KOTOR ø4 1.21

4 HAND SHOWER 1

5 CLOSET DDUDUK 1

6 FLOOR DRAIN 1

7 POMPA AIR 1

J PEKERJAAN ELECTRICAL

1 MCB BOX 1

2 SAKLAL TUNGGAL 4

3 SAKLAR GANDA 1

4 STOPKONTAK 11

LAMPU DOWNLIGHT 6
5 15
WATT
LAMPU DOWNLIGHT 5
6 2
WATT
RUMUS
HASIL
KELILING (M) LUAS (M²) VOLUME (M³)

L=PXL 108

K=2*(P+L) 27.4

N PONDASI

30.532

3.592

14.1435

1.796

19.5315

GALIAN TANAH -
11.0005
VOLUME PONDASI

AN LANTAI

0.36
36 (VRL+VLT)-VWC 3.735
0.225
3.735

AN BETON

V=P*L*T 1.347

V=P*L*T 0.765625

V=P*L*T 0.88875
V=P*L*T 17.80625

4.125 V=P*L*T 0.515625

6.825 V=P*L*T 1.70625

2.221875

V=P*L*T 0.4708

V=P*L*T 0.6732

V=P*L*T 0.1989

V=P*L*T 0.1343

V=P*L*T 0.24

V=P*L*T 0.6336

V=P*L*T 0.2

V=P*L*T 0.0323

N 2.5831

17.445025
V=P*L*T 0.451968

V=P*L*T 0.646272

V=P*L*T 0.190944

V=P*L*T 0.128928

V=P*L*T 0.2304

V=P*L*T 0.608256

V=P*L*T 0.192

V=P*L*T 0.031008

2.479776

PANJANG TOTAL 6.5

PANJANG TOTAL 2

PANJANG TOTAL 2.9

PANJANG TOTAL 1.516

PANJANG TOTAL 8.84

PANJANG TOTAL 2.64

PANJANG TOTAL 3.3


83.088

PANJANG TOTAL 5.5

PANJANG TOTAL 1.69

PANJANG TOTAL 2.9

PANJANG TOTAL 1.516

PANJANG TOTAL 7.68

PANJANG TOTAL 2.64

PANJANG TOTAL 2.94

74.598

157.686

PANG PENUTUP ATAP

V=P*L*T 20.5205

V=P*L*T 10.045

V=P*L*T 16.6747

47.2402

ENUTUP ATAP
PXL 26.88

PXL 36.686

63.566

PLUMBING

10

2.33

1.21

ELECTRICAL

11

15
2
NO URAIAN SATUAN HARGA
1 TUKANG BERSIH BERSIH OH Rp 125,000
2 PEKERJA OH Rp 100,000
3 TUKANG OH Rp 150,000
4 KEPALA TUKANG OH Rp 150,000
5 TUKANG LISTRIK OH Rp 40,000
6 PEKERJA LISTRIK OH Rp 30,000
DAFTAR BAHAN
NO URAIAN SAT HARGA
1 BAJA RINGAN CANAL C 75X26 MM M³ Rp 100,000
2 KAYU BEKISTING M³ Rp 1,000,000
3 RENG M³ Rp 75,000
4 PAKU KG Rp 20,000
5 BESI HOLLOW 40X40 BTG Rp 98,000
6 BESI HOLLOW 20X40 BTG Rp 79,000
7 PLAFON GYPSUM 10MM LMBR Rp 55,000
8 PASIR M³ Rp 162,500
9 PASIR BETON M³ Rp 200,000
10 KERIKIL/KORAL M³ Rp 150,000
11 SEMEN PC 3 RODA KG Rp 2,650
12 SEMEN PC 3 RODA ZAK Rp 66,000
13 BESI BETON KG Rp 7,500
14 KAWAT BETON KG Rp 18,000
15 KERAMIK 60/60 M³ Rp 98,000
16 KERAMIK WC 20/20 M³ Rp 60,000
17 BATU KALI M³ Rp 200,000
18 BATA RINGAN M³ Rp 850,000
19 CAT ZOTUN KG Rp 45,000
20 CAT DASAR KG Rp 10,000
CAT KILAP/CAT MINYAK KG Rp 75,000
21 THINNER LITER Rp 20,000
22 AMPLAS LMBR Rp 1,500
23 DEMPUL KG Rp 10,000
24 MULTIROOF M³ Rp 80,000
25 KACA BENING 5MM M³ Rp 70,000
26 PAKU SCRUP PASANG ENGSEL BIJI Rp 500
27 ENGSEL 4 INCH UNTUK PINTU PSG Rp 70,000
28 ENGSEL 3 INCH UNTUK JENDELA PSG Rp 50,000
29 KUNCI TANAM 2 SLAAG SET Rp 125,000
30 GRENDEL BUAH Rp 25,000
31 KAIT ANGIN BUAH Rp 15,000
32 HANDLE JENDELA BUAH Rp 15,000
33 KAYU BOWPLANK M³ Rp 12,500
34 PAPAN BOWPLANK M³ Rp 17,000
35 KUSEN PINTU POLOS BUAH Rp 275,000
36 KUSEN JENDELA BUAH Rp 275,000
37 DAUN PINTU BUAH Rp 350,000
38 KUSEN VENTILASI BUAH Rp 80,000
39 DAUN JENDELA BUAH Rp 250,000
40 PIPA PVC 2ø M Rp 57,250
41 PIPA PVC 0,5ø M Rp 33,125
42 PIPA PVC 4ø M Rp 71,125
43 HANDSHOWER BUAH Rp 160,000
44 CLOSET DUDUK BUAH Rp 800,000
45 FLOOR DRAIN BUAH Rp 100,000
46 MCB BOX BUAH Rp 85,000
47 SAKLAR TUNGGAL BUAH Rp 11,000
48 SAKLAR GANDA BUAH Rp 15,500
49 STOPKONTAK BUAH Rp 12,000
50 LAMPU DOWNLIGHT 5 WATT BUAH Rp 8,000
51 LAMPU DOWNLIGHT 6 WATT BUAH Rp 20,000
52 BAUT KG Rp 65,000
53 SEKRUP GYPSUM KG Rp 47,000
54
55
56
A.1.1.1. PEMBERSIHAN LAHAN
NO MACAM PEKERJAAN KODE SATUAN
A TENAGA
TUKANG LS

JUMLAH HARGA

A.2.1.1. Pengukuran dan Pemasanngan Bowplank


NO MACAM PEKERJAAN SATUAN KOEFISIEN
A TENAGA
1 TUKANG OH 0.3
2 PEKERJA OH 0.5
JUMLAH HARGA
B BAHAN
1 KAYU BOWPLANK M³ 0.4
2 PAPAN BOWPLANK M³ 0.4
3 PAKU KG 1
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.3.1.1. Pekerjaan Pondasi


NO MACAM PEKERJAAN KOEFISIEN SATUAN
A TENAGA
1 TUKANG 1.2 OH
2 PEKERJA 3.6 OH
JUMLAH HARGA
B BAHAN
1 SEMEN (PC) 3.357 ZAK
2 BATU KALI 1.2 M³
3 PASIR 0.522 M³
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.4.1.1. Pekerjaan Sloof 15/20


NO MACAM PEKERJAAN KOEFISIEN SATUAN
1 M³ BETON 1:2:3
A TENAGA
1 TUKANG 1 OH
2 PEKERJA 6 OH
JUMLAH HARGA
B BAHAN
1 SEMEN PC 6.8 ZAK
2 PASIR BETON 0.54 M³
3 SPLIT/KERIKIL 0.82 M³
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

1KG PEMBESIAN BESI POLOS ULIR


A TENAGA
1 PEKERJA 1 OH
2 TUKANG 0.5 OH
JUMLAH HARGA
B BAHAN
1 BESI BETON 1.05 KG
2 KAWAT BETON 0.015 KG
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

1 M² PASANG BEKISTING
A TENAGA
1 PEKERJA 0.3 KG
2 TUKANG 0.26 KG
JUMLAH HARGA
B BAHAN
1 KAYU BEKISTINNG 0.4 M³
2 PAKU 4 KG
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌
TOTAL KESELURUHAN

A.5.1.1. Pekerjaan Kolom 12,5/12,5


NO MACAM PEKERJAAN KOEFISIEN SATUAN
1 M³ BETON 1:2:3
A TENAGA
1 TUKANG 1 OH
2 PEKERJA 6 OH
JUMLAH HARGA
B BAHAN
1 SEMEN PC 6.8 ZAK
2 PASIR BETON 0.54 M³
3 SPLIT/KERIKIL 0.82 M³
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

1KG PEMBESIAN BESI POLOS ULIR


A TENAGA
1 PEKERJA 1 OH
2 TUKANG 0.5 OH
JUMLAH HARGA
B BAHAN
1 BESI BETON 1.05 KG
2 KAWAT BETON 0.015 KG
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

1 M² PASANG BEKISTING
A TENAGA
1 PEKERJA 0.3 KG
2 TUKANG 0.26 KG
JUMLAH HARGA
B BAHAN
1 KAYU BEKISTINNG 0.4 M³
2 PAKU 4 KG
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌
TOTAL KESELURUHAN

A.5.1.1. Pekerjaan Ringbalk 15/15


NO MACAM PEKERJAAN KOEFISIEN SATUAN
1 M³ BETON 1:2:3
A TENAGA
1 TUKANG 1 OH
2 PEKERJA 6 OH
JUMLAH HARGA
B BAHAN
1 SEMEN PC 6.8 ZAK
2 PASIR BETON 0.54 M³
3 SPLIT/KERIKIL 0.82 M³
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

1KG PEMBESIAN BESI POLOS ULIR


A TENAGA
1 PEKERJA 1 OH
2 TUKANG 0.5 OH
JUMLAH HARGA
B BAHAN
1 BESI BETON 1.05 KG
2 KAWAT BETON 0.015 KG
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

1 M² PASANG BEKISTING
A TENAGA
1 PEKERJA 0.3 KG
2 TUKANG 0.26 KG
JUMLAH HARGA
B BAHAN
1 KAYU BEKISTINNG 0.4 M³
2 PAKU 4 KG
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌
TOTAL KESELURUHAN

A.7.1.1. Pekerjaan Dinding 1:4


NO MACAM PEKERJAAN KOEFISIEN SATUAN
A TENAGA
1 TUKANG 0.1 OH
2 PEKERJA 0.32 OH
JUMLAH HARGA
B BAHAN
1 SEMEN (PC) 2.533 ZAK
2 BATA RINGAN 1.54 M³
3 PASIR 0.403 M³
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.8.1.1. Pekerjaan Plasteran 1:4


NO MACAM PEKERJAAN KOEFISIEN SATUAN
A TENAGA
1 TUKANG BATU 0.2 OH
2 PEKERJA 0.4 OH
JUMLAH HARGA
B BAHAN
1 SEMEN (PC) 0.163 ZAK
2 PASIR (PP) 0.0194 M³
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.9.1.1. Pekerjaan Aci 1:2


NO MACAM PEKERJAAN KOEFISIEN SATUAN
A TENAGA
1 TUKANG BATU 0.2 OH
2 PEKERJA 0.4 OH
JUMLAH HARGA
B BAHAN
1 SEMEN (PC) 0.163 ZAK
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.10.1.1. Pekerjaan Kusen


NO MACAM PEKERJAAN KOEFISIEN SATUAN
A TENAGA
1 TUKANG KAYU 0.2 OH
2 PEKERJA 0.4 OH
JUMLAH HARGA
B BAHAN
1 KUSEN PINTU 6 BUAH
2 KUSEN JENDELA 4 BUAH
3 KUSEN VENTILASI 3 BUAH
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.10.2.1. Pekerjaan Daun Pintu Jendela


NO MACAM PEKERJAAN KOEFISIEN SATUAN
A TENAGA
1 TUKANG KAYU 0.2 OH
2 PEKERJA 0.4 OH
JUMLAH HARGA
B BAHAN
1 DAUN PINTU 6 BUAH
2 KUNCI TANAM 2 SLAAG 6 BUAH
3 ENGSEL 4 INCH 32 PSG
4 GRENDEL 10 BUAH
5 KAIT ANGIN 8
6 DAUN JENDELA 4 BUAH
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.11.1.1. Pengecoran Lantai


NO MACAM PEKERJAAN KOEFISIEN SATUAN
A TENAGA
1 TUKANG BATU 0.5 OH
2 PEKERJA 3 OH
JUMLAH HARGA
B BAHAN
1 SEMEN (PC) 4.54 ZAK
2 PASIR (PP) 0.54 M³
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.12.1.1.Pekerjaan Keramik
NO MACAM PEKERJAAN KOEFISIEN SATUAN
A TENAGA
1 TUKANG KERAMIK 0.25 M
2 PEKERJA 0.5 M
JUMLAH HARGA
B BAHAN
1 KERAMIK 60/60 1 M³
2 SEMEN (PC) 0.139 ZAK
3 PASIR (PP) 0.23 M³
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.12.2.1. Pekerjaan Keramik WC


NO MACAM PEKERJAAN KOEFISIEN SATUAN
A TENAGA
1 TUKANG KERAMIK 0.25 M
2 PEKERJA 0.5 M
JUMLAH HARGA
B BAHAN
1 KERAMIK 20/20 1 M³
2 SEMEN (PC) 0.139 KG
3 PASIR (PP) 0.23 M³
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.13.1.1. Pekerjaan Plafond


NO MACAM PEKERJAAN KOEFISIEN SATUAN
RANGKA PLAFON
A TENAGA
1 TUKANG 0.5 OH
2 PEKERJA 0.28 OH
JUMLAH HARGA
B BAHAN
1 BESI HOLLOW 40X40 6 BTG
2 BESI HOLLOW 20X40 31 BTG
3 BAUT 0.2 KG
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

PEMASANGAN PLAFOND
A TENAGA
1 TUKANG 0.5 OH
2 PEKERJA 0.2 OH
JUMLAH HARGA
B BAHAN
1 GYPSUM 10MM 0.364 LMBR
2 SEKRUP GYPSUM 0.15 KG
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌
TOTAL KESELURUHAN

A.14.1.1. Pekerjaan Kuda-kuda


NO MACAM PEKERJAAN KOEFISIEN SATUAN
A.14.2.1.RANGKA KUDA-KUDA
A TENAGA
1 TUKANG 0.2
2 PEKERJA 0.4
JUMLAH HARGA
B BAHAN
1 BAJA RINGAN CANAL C 75 1.2 M³
2 BAUT 0.6 KG
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.14.2.1.RENG
1 TUKANG 0.1
2 PEKERJA 0.1
JUMLAH HARGA
B BAHAN
1 RENG 1.2 M³
2 BAUT 0.25 KG
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.15.1.1.1. Pekerjaan Atap


NO MACAM PEKERJAAN KOEFISIEN SATUAN
A TENAGA
1 TUKANG 0.2
2 PEKERJA 0.15
JUMLAH HARGA
B BAHAN
1 MULTIROOF 1.01 LBR
2 PAKU 2 KG
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.16.1.1. Pekerjaan Cat


NO MACAM PEKERJAAN KOEFISIEN SATUAN
A.16.2.1. MELABUR TEMBOK BARU
A TENAGA
1 TUKANG CAT 0.75
2 PEKERJA 0.5
JUMLAH HARGA
B BAHAN
1 CAT ZOTUN 4 KG
2 CAT DASAR 1.5 KG
3 DEMPUL 0.8 KG
4 AMPLAS 2 LBR
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.16.2.1. KUSEN DAUN PINTU JENDELA VENTILASI


A TENAGA
1 TUKANG 1
2 PEKERJA 1
JUMLAH HARGA
B BAHAN
1 CAT KILAP/ CAT MINYAK 1.2 KG
2 CAT DASAR 1.5 KG
3 DEMPUL 0.26 KG
4 AMPLAS 1 LBR
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌
TOTAL KESELURUHAN

A.17.1.1. Pekerjaan Plumbing


NO MACAM PEKERJAAN KOEFISIEN SATUAN
A.17.1.1. SALURAN AIR KOTOR
A TENAGA
1 TUKANG 0.135
2 PEKERJA 0.081
JUMLAH HARGA
B BAHAN
1 PIPA PVC 4ø 1.21 M
2 PIPA PVC 2ø 2.33 M
3 PERLENGKAPAN 35% -
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.17.1.2. SALURAN AIR BERSIH


A TENAGA
1 TUKANG 0.81
2 PEKERJA 0.135
JUMLAH HARGA
B BAHAN
1 PIPA PVC 0,5ø 10 M
2 PERLENGKAPAN 35%
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.17.1.3. PEMASANGAN HANDSHOWER


A TENAGA
1 TUKANG 0.1
JUMLAH HARGA
B BAHAN
1 HANDSHOWER 1 BUAH
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.17.1.4. PEMASANGAN CLOSET DUDUK


A TENAGA
1 TUKANG 1
JUMLAH HARGA
B BAHAN
1 CLOSET DUDUK 1 BUAH
2 SEMEN (PC) 4.16 KG
3 PASIR (PP) 0.01 M³
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.17.1.5. PEMASANGAN FLOOR DRAIN


A TENAGA
1 TUKANG BESI 0.1
JUMLAH HARGA
B BAHAN
1 FLOOR DRAIN 1 BUAH
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.18.1.1. Pekerjaan Elektrikal


NO MACAM PEKERJAAN KOEFISIEN SATUAN
A.18.1.1. PEMASANGAN MCB BOX
A TENAGA
1 TUKANG LISTRIK 0.02
2 PEKERJA 0.2
JUMLAH HARGA
B BAHAN
1 MCB BOX 1 BUAH
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.18.1.2. PEMASANGAN SAKLAR TUNGGAL


A TENAGA
1 TUKANG LISTRIK 0.04
2 PEKERJA 0.4
JUMLAH HARGA
B BAHAN
1 SAKLAR TUNGGAL 4 BUAH
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.18.1.3. PEMASANGAN SAKLAR GANDA


A TENAGA
1 TUKANG LISTRIK 0.04
2 PEKERJA 0.4
JUMLAH HARGA
B BAHAN
1 SAKLAR GANDA 1 BUAH
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.18.1.4. PEMASANGAN LAMPU


A TENAGA
1 TUKANG LISTRIK 0.02
2 PEKERJA 0.2
JUMLAH HARGA
B BAHAN
1 LAMPU DOWNLIGHT 5 WATT 2 BUAH
2 LAMPU DOWNLIGHT 6 WATT 16 BUAH
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌

A.18.1.5. PEMASANGAN STOPKONTAK


1 TUKANG LISTRIK 0.02
2 PEKERJA 0.2
JUMLAH HARGA
B BAHAN
1 STOPKONTAK 11 BUAH
JUMLAH HARGA
JUMLAH HARGA TOTAL BAHAN DAN UPAH TUKANG
͌
EMBERSIHAN LAHAN
KOEFISIEN HARGA SATUAN JUMLAH HARGA

1 Rp 150,000 Rp 150,000

Rp 150,000

dan Pemasanngan Bowplank


HARGA SATUAN JUMLAH HARGA

Rp 150,000 Rp 45,000
Rp 100,000 Rp 50,000
Rp 95,000

Rp 12,500 Rp 5,000
Rp 17,000 Rp 6,800
Rp 20,000 Rp 20,000
Rp 31,800
UPAH TUKANG Rp 126,800
Rp 127,000

Pekerjaan Pondasi
HARGA SATUAN JUMLAH HARGA

Rp 150,000 Rp 180,000
Rp 100,000 Rp 360,000
Rp 540,000

Rp 66,000 Rp 221,562
Rp 200,000 Rp 240,000
Rp 162,500 Rp 84,825
Rp 546,387
UPAH TUKANG Rp 1,086,387
Rp 1,088,000

ekerjaan Sloof 15/20


HARGA SATUAN JUMLAH HARGA
³ BETON 1:2:3

Rp 150,000 Rp 150,000
Rp 100,000 Rp 600,000
Rp 750,000

Rp 66,000 Rp 448,800
Rp 200,000 Rp 108,000
Rp 150,000 Rp 123,000
Rp 679,800
UPAH TUKANG Rp 1,429,800
Rp 1,430,000

SIAN BESI POLOS ULIR

Rp 100,000 Rp 100,000
Rp 150,000 Rp 75,000
Rp 175,000

Rp 7,500 Rp 7,875
Rp 18,000 Rp 270
Rp 8,145
UPAH TUKANG Rp 183,145
Rp 185,000

ASANG BEKISTING

Rp 100,000 Rp 30,000
Rp 150,000 Rp 39,000
Rp 69,000

Rp 1,000,000 Rp 400,000
Rp 20,000 Rp 80,000
Rp 480,000
UPAH TUKANG Rp 549,000
Rp 549,000
Rp2,164,000

erjaan Kolom 12,5/12,5


HARGA SATUAN JUMLAH HARGA
³ BETON 1:2:3

Rp 150,000 Rp 150,000
Rp 100,000 Rp 600,000
Rp 750,000

Rp 66,000 Rp 448,800
Rp 200,000 Rp 108,000
Rp 150,000 Rp 123,000
Rp 679,800
UPAH TUKANG Rp 1,429,800
Rp 1,430,000

SIAN BESI POLOS ULIR


Rp 100,000 Rp 100,000
Rp 150,000 Rp 75,000
Rp 175,000

Rp 7,500 Rp 7,875
Rp 18,000 Rp 270
Rp 8,145
UPAH TUKANG Rp 183,145
Rp 185,000

ASANG BEKISTING

Rp 100,000 Rp 30,000
Rp 150,000 Rp 39,000
Rp 69,000

Rp 1,000,000 Rp 400,000
Rp 20,000 Rp 80,000
Rp 480,000
UPAH TUKANG Rp 549,000
Rp 549,000
Rp2,164,000

erjaan Ringbalk 15/15


HARGA SATUAN JUMLAH HARGA
³ BETON 1:2:3

Rp 150,000 Rp 150,000
Rp 100,000 Rp 600,000
Rp 750,000

Rp 66,000 Rp 448,800
Rp 200,000 Rp 108,000
Rp 150,000 Rp 123,000
Rp 679,800
UPAH TUKANG Rp 1,429,800
Rp 1,430,000

SIAN BESI POLOS ULIR

Rp 100,000 Rp 100,000
Rp 150,000 Rp 75,000
Rp 175,000

Rp 7,500 Rp 7,875
Rp 18,000 Rp 270
Rp 8,145
UPAH TUKANG Rp 183,145
Rp 185,000

ASANG BEKISTING

Rp 100,000 Rp 30,000
Rp 150,000 Rp 39,000
Rp 69,000

Rp 1,000,000 Rp 400,000
Rp 20,000 Rp 80,000
Rp 480,000
UPAH TUKANG Rp 549,000
Rp 549,000
Rp2,164,000

ekerjaan Dinding 1:4


HARGA SATUAN JUMLAH HARGA

Rp 150,000 Rp 15,000
Rp 100,000 Rp 32,000
Rp 47,000

Rp 66,000 Rp 167,178
Rp 850,000 Rp 1,309,000
Rp 162,500 Rp 65,488
Rp 1,541,666
UPAH TUKANG Rp 1,588,666
Rp 1,600,000

kerjaan Plasteran 1:4


HARGA SATUAN JUMLAH HARGA

Rp 150,000 Rp 30,000
Rp 100,000 Rp 40,000
Rp 70,000

Rp 66,000 Rp 10,758
Rp 200,000 Rp 3,880
Rp 14,638
UPAH TUKANG Rp 84,638
Rp 85,000

Pekerjaan Aci 1:2


HARGA SATUAN JUMLAH HARGA
Rp 150,000 Rp 30,000
Rp 100,000 Rp 40,000
Rp 70,000

Rp 66,000 Rp 10,758
Rp 10,758
UPAH TUKANG Rp 80,758
Rp 81,000

. Pekerjaan Kusen
HARGA SATUAN JUMLAH HARGA

Rp 150,000 Rp 30,000
Rp 100,000 Rp 40,000
Rp 70,000

Rp 275,000 Rp 1,650,000
Rp 275,000 Rp 1,100,000
Rp 80,000 Rp 240,000
Rp 2,990,000
UPAH TUKANG Rp 3,060,000
Rp 3,060,000

rjaan Daun Pintu Jendela


HARGA SATUAN JUMLAH HARGA

Rp 150,000 Rp 30,000
Rp 100,000 Rp 40,000
Rp 70,000

Rp 350,000 Rp 2,100,000
Rp 125,000 Rp 750,000
Rp 70,000 Rp 2,240,000
Rp 25,000 Rp 250,000
Rp 15,000 Rp 120,000
Rp 250,000 Rp 1,000,000
Rp 6,460,000
UPAH TUKANG Rp 6,530,000
Rp 6,530,000

Pengecoran Lantai
HARGA SATUAN JUMLAH HARGA

Rp 150,000 Rp 75,000
Rp 100,000 Rp 300,000
Rp 375,000

Rp 66,000 Rp 299,640
Rp 200,000 Rp 108,000
Rp 1,157,640
UPAH TUKANG Rp 1,532,640
Rp 1,535,000

Pekerjaan Keramik
HARGA SATUAN JUMLAH HARGA

Rp 150,000 Rp 37,500
Rp 100,000 Rp 50,000
Rp 87,500

Rp 98,000 Rp 98,000
Rp 66,000 Rp 9,174
Rp 200,000 Rp 46,000
Rp 290,674
UPAH TUKANG Rp 378,174
Rp 380,000

ekerjaan Keramik WC
HARGA SATUAN JUMLAH HARGA

Rp 150,000 Rp 37,500
Rp 100,000 Rp 50,000
Rp 87,500

Rp 60,000 Rp 60,000
Rp 66,000 Rp 9,174
Rp 200,000 Rp 46,000
Rp 252,674
UPAH TUKANG Rp 340,174
Rp 341,000

Pekerjaan Plafond
HARGA SATUAN JUMLAH HARGA

Rp 150,000 Rp 75,000
Rp 100,000 Rp 28,000
Rp 103,000
Rp 98,000 Rp 588,000
Rp 79,000 Rp 2,449,000
Rp 65,000 Rp 13,000
Rp 3,050,000
UPAH TUKANG Rp 3,153,000
Rp 3,153,000

Rp 150,000 Rp 75,000
Rp 100,000 Rp 20,000
Rp 95,000

Rp 55,000 Rp 20,020
Rp 47,000 Rp 7,050
Rp 27,070
UPAH TUKANG Rp 122,070
Rp 123,000
Rp 3,276,000

Pekerjaan Kuda-kuda
HARGA SATUAN JUMLAH HARGA

Rp 150,000 Rp 30,000
Rp 100,000 Rp 40,000
Rp 70,000

Rp 100,000 Rp 120,000
Rp 65,000 Rp 39,000
Rp 159,000
UPAH TUKANG Rp 229,000
Rp 230,000

Rp 150,000 Rp 15,000
Rp 100,000 Rp 10,000
Rp 25,000

Rp 75,000 Rp 90,000
Rp 65,000 Rp 16,250
Rp 106,250
UPAH TUKANG Rp 131,250
Rp 132,000

.1. Pekerjaan Atap


HARGA SATUAN JUMLAH HARGA

Rp 150,000 Rp 30,000
Rp 100,000 Rp 15,000
Rp 45,000

Rp 80,000 Rp 80,800
Rp 20,000 Rp 40,000
Rp 120,800
UPAH TUKANG Rp 165,800
Rp 170,000

.1. Pekerjaan Cat


HARGA SATUAN JUMLAH HARGA

Rp 150,000 Rp 112,500
Rp 100,000 Rp 50,000
Rp 162,500

Rp 45,000 Rp 180,000
Rp 10,000 Rp 15,000
Rp 10,000 Rp 8,000
Rp 1,500 Rp 3,000
Rp 206,000
UPAH TUKANG Rp 368,500
Rp 370,000

Rp 150,000 Rp 150,000
Rp 100,000 Rp 100,000
Rp 250,000

Rp 75,000 Rp 90,000
Rp 10,000 Rp 15,000
Rp 10,000 Rp 2,600
Rp 1,500 Rp 1,500
Rp 109,100
UPAH TUKANG Rp 359,100
Rp 360,000
Rp 730,000

Pekerjaan Plumbing
HARGA SATUAN JUMLAH HARGA
Rp 150,000 Rp 20,250
Rp 100,000 Rp 8,100
Rp 28,350

Rp 71,125 Rp 86,061
Rp 57,250 Rp 133,393
Rp 86,731 Rp 86,731
Rp 306,185
UPAH TUKANG Rp 334,535
Rp 335,000

Rp 150,000 Rp 121,500
Rp 100,000 Rp 13,500
Rp 135,000

Rp 33,125 Rp 331,250
Rp 163,188 Rp 163,188
Rp 494,438
UPAH TUKANG Rp 629,438
Rp 630,000

Rp 150,000 Rp 15,000
Rp 15,000

Rp 160,000 Rp 160,000
Rp 160,000
UPAH TUKANG Rp 175,000
Rp 175,000

Rp 150,000 Rp 150,000
Rp 150,000

Rp 800,000 Rp 800,000
Rp 2,650 Rp 11,024
Rp 200,000 Rp 2,000
Rp 813,024
UPAH TUKANG Rp 963,024
Rp 965,000
Rp 150,000 Rp 15,000
Rp 15,000

Rp 100,000 Rp 100,000
Rp 100,000
UPAH TUKANG Rp 115,000
Rp 115,000

HARGA SATUAN JUMLAH HARGA

Rp 40,000 Rp 800
Rp 30,000 Rp 6,000
Rp 6,800

Rp 85,000 Rp 85,000
Rp 85,000
UPAH TUKANG Rp 91,800
Rp 92,000

Rp 40,000 Rp 1,600
Rp 30,000 Rp 12,000
Rp 13,600

Rp 11,000 Rp 44,000
Rp 44,000
UPAH TUKANG Rp 57,600
Rp 58,000

Rp 40,000 Rp 1,600
Rp 30,000 Rp 12,000
Rp 13,600

Rp 15,500 Rp 15,500
Rp 15,500
UPAH TUKANG Rp 29,100
Rp 30,000

Rp 40,000 Rp 800
Rp 30,000 Rp 6,000
Rp 6,800

Rp 8,000 Rp 16,000
Rp 20,000 Rp 320,000
Rp 336,000
UPAH TUKANG Rp 342,800
Rp 345,000

Rp 40,000 Rp 800
Rp 30,000 Rp 6,000
Rp 6,800

Rp 12,000 Rp 132,000
Rp 132,000
UPAH TUKANG Rp 138,800
Rp 140,000
REKAPITULASI BIAYA

NO KODE PEKERJAAN & URAIAN PEKERJAAN SATUAN

1 A.1.1.1. PEMBERSIHAN LAHAN LS

2 A.2.1.1. Pengukuran dan Pemasanngan Bowplank M

3 A.3.1.1. Pekerjaan Pondasi M³

4 A.4.1.1. Pekerjaan Sloof 15/20 M³

5 A.5.1.1. Pekerjaan Kolom 12,5/12,5 M³

6 A.5.1.1. Pekerjaan Ringbalk 15/15 M³

7 A.7.1.1. Pekerjaan Dinding 1:4 M³

8 A.8.1.1. Pekerjaan Plasteran 1:4 M³

9 A.9.1.1. Pekerjaan Aci 1:2 M³

10 A.10.1.1. Pekerjaan Kusen LS

11 A.10.2.1. Pekerjaan Daun Pintu Jendela LS

12 A.11.1.1. Pengecoran Lantai M³

13 A.12.1.1.Pekerjaan Keramik M³

14 A.12.2.1. Pekerjaan Keramik WC M³

15 A.13.1.1. Pekerjaan Plafond M³

16 A.14.1.1. Pekerjaan Kuda-kuda M³

17 A.14.2.1.RENG M³

18 A.15.1.1.1. Pekerjaan Atap M³

19 A.16.1.1. Pekerjaan Cat M³

20 A.16.2.1. KUSEN DAUN PINTU JENDELA VENTILASI M³

21 A.17.1.1. SALURAN AIR KOTOR M

22 A.17.1.2. SALURAN AIR BERSIH M

23 A.17.1.3. PEMASANGAN HANDSHOWER BUAH

24 A.17.1.4. PEMASANGAN CLOSET DUDUK BUAH

25 A.17.1.5. PEMASANGAN FLOOR DRAIN BUAH


26 A.18.1.1. PEMASANGAN MCB BOX BUAH

27 A.18.1.2. PEMASANGAN SAKLAR TUNGGAL BUAH

28 A.18.1.3. PEMASANGAN SAKLAR GANDA BUAH

29 A.18.1.4. PEMASANGAN LAMPU BUAH

30 A.18.1.5. PEMASANGAN STOPKONTAK BUAH

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48
ASI BIAYA

AHS VOLUME JUMLAH

Rp 150,000 1 Rp 150,000

Rp 127,000 27.4 Rp 3,479,800

Rp 1,088,000 19.5315 Rp 21,250,272

Rp 2,164,000 1.347 Rp 2,914,908

Rp 2,164,000 0.765625 Rp 1,656,813

Rp 2,164,000 0.88875 Rp 1,923,255

Rp 1,600,000 17.445025 Rp 27,912,040

Rp 85,000 17.445025 Rp 1,482,827

Rp 81,000 17.445025 Rp 1,413,047

Rp 3,060,000 1 Rp 3,060,000

Rp 6,530,000 1 Rp 6,530,000

Rp 1,535,000 3.735 Rp 5,733,225

Rp 380,000 3.735 Rp 1,419,300

Rp 341,000 0.225 Rp 76,725

Rp 3,153,000 3.735 Rp 11,776,455

Rp 230,000 157.686 Rp 36,267,780

Rp 132,000 47.2402 Rp 6,235,706

Rp 170,000 63.566 Rp 10,806,220

Rp 370,000 17.445025 Rp 6,454,659

Rp 360,000 2.479776 Rp 892,719

Rp 335,000 3.54 Rp 1,185,900

Rp 630,000 10 Rp 6,300,000

Rp 175,000 1 Rp 175,000

Rp 965,000 1 Rp 965,000

Rp 115,000 1 Rp 115,000
Rp 92,000 1 Rp 92,000

Rp 58,000 1 Rp 58,000

Rp 30,000 1 Rp 30,000

Rp 28,000 1 Rp 28,000

Rp 140,000 1 Rp 140,000

Rp 160,524,652