0% found this document useful (0 votes)
121 views1 page

Ventilation Plan Calculation Sheet Rev 1

Ventilation Plan Calculation Sheet Rev 1

Uploaded by

freetry205
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
121 views1 page

Ventilation Plan Calculation Sheet Rev 1

Ventilation Plan Calculation Sheet Rev 1

Uploaded by

freetry205
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Confined Space Entry Ventilation Plan

Asset/Equipment ID: 04 Cooling Tower ‐ Excavation


Location/Unit: 04 Plant
Date:

Cylindrical Shapes Cubodial Shapes


Diameter (D) in ft: Length (L) in ft 11
Height (H) in ft Height (H) in ft 16
Width (W) in ft 10

Dilution Ventilation Calculations


Air Mover Type Location Capacity in CFM(ft3/min)
TX‐6AM On Grade with Ducting to pit 3698
0
0
0
0
Total Air Flow for all Air Movers in ft3/min (sum of the capacity’s above): 3698

Max # of Welders/Personnel Creating a Potential Hazardous Atmosphere(Hot Work): 1

Required Ac ve Flow Rate in 3/min (Hot Work)(max # of Welders/Personnel x 2,000): 2000

Max # of Inspection/Helper Personnel (Cold Work): 2


Required Ac ve Flow Rate in 3/min (Cold Work)(max # of Cold Workers x 50): 100
Total Required Active Flow Rate in ft3/min (Cold Work + Hot Work) : 2100
Is Total Air Flow Rate > than Total Required Active Flow Rate: YES

Local Exhaust Ventilation Calculations


Cross Sectional Velocity(fpm) =
Fan Type Duct Length(ft) Duct Diameter(ft) Air Flow, Q (cfm) Location
Area (ft Sqrd) Q(cfm)/A(ft Sqrd)

TX‐6AM 25 0.67 0.35 3698 See DWG 10494.16


Is the calculated Face Velocity > 100fpm? YES

Volume of space in ft3: 1760


Target Flow Rate in min (Volume / Total Air Flow): 0.48
Is Target Flow Rate < than 6 minutes: YES
Ventilation Drawing Completed and Attached: YES

APPROVED BY:
Production
Orginator / Mechanical Eng.:
Superintendent

Superintendent
Industrial Hygienist :