0% found this document useful (0 votes)
119 views6 pages

With Material - Quotation

MATERIAL QUOTATION

Uploaded by

Er Mosin Shaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
119 views6 pages

With Material - Quotation

MATERIAL QUOTATION

Uploaded by

Er Mosin Shaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

REF: ______________ Date: 30 Nov.

2020

Kind Attn.: - Bhole Bhaiya

Subject: -Rate quotation for construction (with material semi furnished)

Respected Sir,
This is in reference with the discussion we had with you regarding the construction
of the above-mentioned subject at Sahjanwa. As per your request we are
submitting the rate quotation to you as follows: -

SCOPE FOR WORK


 Plain cement concrete
 Reinforced cement concrete
 Footing
 Column and beam casting
 Slab casting
 Brick work
 Door and windows - accessories and labor charge only
 Plaster both side
 Painting Work – Putti / 2coat Primer / 2coat Paint
 Washroom and Kitchen Shelves
 Shuttering
 Steel binding
 Plumbing or sanitary work with All Pipe Fittings
 Kitchen and Toilet Tiling work (interior part)
 Electrical conduce – Lighting / Wiring / Switch boards
 Flooring – Pakka Flooring on Ground Floor & Tile on First Floor
 Water Proofing
 Bathroom/ Toilet fixture (interior part)
 Elevation Work
 Staircase – With Railing and Pakka Flooring

under the direction of the Client approved Architect.


TYPE OF CONTRACT : With Material up to
Finishing
MODE OF CONTRACT : Covered Area Basis

 FOUNDATION - Rs 200 @sqft X 1800 = 3,60,000


Note: this rate not for pile or raft foundation
Only included stich slab or columns

 GROUND FLOOR - Rs 1300 @sqft X 1800 = 23,40,000


Note: this only for semi furnished work
And please review scope of work

 FIRST FLOOR - Rs 1300 @sqft X 1800 = 23,40,000


Note: 5% charge will be extra
Rate for lifting material floor to floor in this rate

 MUMTY - Rs 480 @sqft X 250 = 1,20,000

 BRICK COBA - Rs 130 @sqft


Note: this work for water proofing used in Terrace

 SEPTIC TANK - Rs 1,00,000 (lump sum amount)


Note: with water proofing. (included in ground floor amount)

GRAND TOTAL = 51,60,000


INETERIOR WORK (semi furnished)
Interior works-
Ceiling lighting with Switch Boards
Toilet Fixtures
Kitchen and Toilet Tiling Work
Tile Flooring on 1st Floor and Pakka Flooring on Ground Floor
Shower panel as/drawing
Door Fittings- as/drawing
Door closer
Locks of any kind
Chaukhat beading

Below given works included in this Amount:


1- Structure Work:
a) R.C.C Structure, Tie beams, Plinth Beam
b) R.C.C. Slab (slab thickness & steel as per structure drawing)
c) Super structure brickwork 9” or 4½” where required.
2- Internal Electrification Work:
a) Conduit PVC Pipe + Band medium grade of ISI make, V.K. Gold, A.K.G., Plaza.
b) Juction Box, Fan box - Iron, Deep box – C.I.
c) Wire of Seiko, Harvell’s make and Modular Switches of Anchor, Polar or
equivalent.
3- Internal Plumbing/drainage Work:
a) Drainage/down pipes of PVC (supreme, finolex or equivalent) of 4”/6” as per required.
b) CPVC (supreme, or equivalent) pipes for water supply as per specified.
c) Inspection chambers, manholes and gully traps etc as per drawing.
e) Toilet seat fixtures of Hindware make and C P VC fittings of jacuzzi (provided by client)
economical range
4- Plaster Work:
Inside / out side plaster on walls.
5- Steel:
Reinforcement steel as per structure drawing
6- Civil Material Specification:
Bajri & Bazarfoot –First quality, Sand – Local, CEMENT - ACC, My Cement, Birla plus, ultra
tech. Buland, BRICK 1ST Class, Iron – Kamdhenu, etc.
7- Flooring:
As per specification chart (interior work)
8- Door and windows:
As per specification chart
9- Chaukhat:
As per specification chart(wooden)
10- Painting:
For interior Oil bound distemper of Asian paints and for exterior royal shine & DULUX
paints. Color as per architect and client’s choice.
11- Iron works:
GRILL WORK on windows as per design specified by the architect.
Railing to be made in S.S., MS or glass
12- Mixing Ratio:
P.C.C. 1:4:8 (1 Part Cement: 4 Part Coarse sand: 8 brick blast 40 Mm)
R.C.C. Work 1:2:4(1 Part Cement: 1.5 Parts Coarse Sand: 3 Part
Corsages) in slab and beam
1:1.5:3(1 Part Cement: 1.5 Parts Coarse Sand: 3 Part
Corsages) in column
Masonry 9” thick 1:6 (1 Part Cement: 3 Part Crasher Coarse Sand +3 Part
Sand)
Masonry 4.5” thick 1:4 (1Part Cement: 4 Part Crasher Coarse Sand)
Plaster (12mm thick) 1:6 (1 Part Cement: 6 Part Fine Sand)

Payment schedule Amount advance Time schedule FEB


STAGE :1 RS------------/- 20 Days
STAGE :2 RS------------/- 20 Days
STAGE :3 RS------------/- 20 Days
STAGE :4 RS------------/- 20 Days
STAGE :5 RS------------/- 20 Days
STAGE :6 RS------------/- 20 Days
STAGE :7 RS------------/- 20 Days
STAGE :8 RS------------/- 30 Days
STAGE :9 RS------------/- 30 Days
STAGE :10
Terms & Condition :-
Note: -
1- Measurement – the areas given in agreement are the approx areas based on proposal
drawings, final covered area will be measured outer to outer of roof & including cantilever chajja
till Porch except open courtyard area.
2- Outside extra work on the covered area will be calculated item rate.
3- Arrangement of water & light on the site by Owner.
4- Following items will be charged extra if required by client. The costs of these items are not
included in the covered area rates: -

Extra works-
Exterior tile work
Paving or any landscape work
Main gate
*If the above mentioned are being desired by the client then they shall be charged extra as
per the market rates

THANK YOU (Owner)

You might also like