1.1 INTRODUCTION
Wachemo University Dormitory management system is one of the great service systems which
found in our campus .This service system needs computerized and modernize to give quality
and brief service for users or students .so; it is redesigned and analyzed in this Dormitory service
management system. This project contains and solves problems in Dormitory service
management area step by step. In general problem is raised and the solution overcomes the
problem.
1.2 BACKGRUOND
Wachemo university Dormitory management system is starting its service when Wachemo
university is established in 2004 E.C at Southern Ethiopia. At the begging, there were 10 blocks.
It starts giving different service to student such as dorm, key, clearances services form and bed
for regular students. This service is managed by dormitory manager .Now a days the service
gives access around 5000 students, 20 blocks and 32 dormitories. Manual system creates
complex & complicated system when entering and clearing student to university. The problems
that are identified are discussed on the next tittles.
1
1.4 Objective of the Projects
1.4.1 General objectives
The main objective of this project is to convert or change the manual system to
computerized system to solve the above stated problems.
2
Assign the block of the student
Assign the dorm accordingly
Enable students view their dormitory information easily and quickly
Generate report.
Manage dormitory related information
It works for the one who understand English language (we have not used other
language).
It serves only students who are Undergraduates regular student in WCU.
Our system does not support to give a clearance to students.
Platform Ms windows
Memory 4.0 GB
3
REQUIREMENT DESIGN EXECUTION
TESTING
RELEASE
Figure 1: modified waterfall model
1.8.1 Data source and Data collection methods
4
Developing students’ effective communication with the university
To minimize the work load of the employees (proctors)...
To assign the dorm to the students without any fault.
5
1.11.3 Operational Feasibility study
The system is operational in way that we have decided to work by effort and in collaboration
with WCU ICT office. This includes giving training to users.
1.11.4 Legal feasibility study
Our project to prepare or completed in a given time of period property using some
methods like payback period (I.e. is concerned method of analysis with serious
limitations and qualification for its use.
Project team will develop the new system in the given period of time for the
industrial project.
6
R Security and Safety procedure
E 5 System Modeling 4 weak 4 All
S Use case diagram, and there
description
Object Model
Dynamic model
6 Implementation 13 weak 3,4 All
Designing
Coding
Testing
Table-1 Work Break down Structure
1. Resource plan
We used computer lab and the computers, laptop, disks (CD, flash), paper for
layout and properly using them and protecting these resources from damage.
2. Communication plan
First communicating with every team member and then communicate with our
advisors by respecting time of our appointment.
3. Time schedule
Time duration regarding our project is scheduled follows:
Gant Chart
ID Task Name Start End Duration Decembe Janua Febru March Apr May
r ry ary il
1 Project initiation and planning 21- 28- 1W
Dec- Dec-21
21
2 Gathering information 3- 10-Jan- 1W
Jan- 22
22
3 Description of the project 15- 25-Jan- 1.5 W
Introduction: Jan- 22
- Background 22
information
- Statement of the
problem
- Objective of the
problem
- Scope and limitation
of the problem
- Methodology
- Feasibility study
- Project plan activity
4 Current system: 26- 3-Feb- 1W
- Description of Jan- 22
current system 22
- Practice to be
preserved from the
7
existing system
- Players in the
existing system
- Business rules