PROJECT

CONTRACT NUMBER :

CALCULATION NOTE OF
POWER HOUSE NEUCENTRIX DATA CENTER BUILDING FOUNDATIONS

DRAWING NUMBER : REV: 01


PLN DRAWING NUMBER :
DRAWING CLASSIFICATION : COMMON DRAWING

A APPROVED
STATUS

B APPROVED WITH COMMENTS AS NOTE

C NOT APPROVED

D RE-SUBMIT
ACTION

E FINAL

Receive. Return.
ACKNOWLEDGE APPROVE CHECK

PROJECT MANAGER LEAD ENGINEER ENGINEERING IN CHARGE

A 1/25/2023 Issue for Comment DD DD DNS

REV. DATE DESCRIPTION REVISED BY CHECKED BY APPROVED BY

CONTRACTOR:

CONTRACTOR FILE :
DRAWING REFFERENCE :

APPROVED BY CUSTOMER
REVIEW BY: APPROVED BY:

SIGNATURE :………………………………………………………. SIGNATURE :……………………………………………………….


DATE :………………………………………………………. DATE :……………………………………………………….
ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
POWER HOUSE GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN : DATA REAKSI PERLETAKAN BANGUNAN GEDUNG REV :

1. REAKSI PERLTAKAN BANGUNAN

Berikut ini nilai masimum dari rekasi perletakan bangunan terfaktor untuk dijadikan sebagai data dalam perhitungan desain dan analisa struktur pondasi
bangunan. Kombinasi Beban yang umumnya digunakan untuk melakukan perhitungan desain pondasi, sesuai dengan Standar ASCE 7 adalah:

COMB: 1.2D + 1.6L + 0.5(Lr or S or R) Diambil beban yang paling maximum


COMB: 1.2D +1.6(Lr or S or R) + (L or 0.5W)
COMB: 1.2D +1.0W + L + 0.5(Lr or S or R)
COMB: 1.2D +1.0E + L+ 0.2S.

PONDASI TIPE 1

FX -31.721 kN
FY 2.458 kN
FZ 2485.224 kN
MX 4.997 kN.m
MY -0.054 kN.m
MZ 0.408 kN.m Reaksi Perletakan Untuk pengecekan daya dukung pondasi Vertikal

FX 21.884 kN
FY -38.867 kN
FZ 1531.107 kN
MX 42.383 kN.m
MY 15.142 kN.m
MZ -0.145 kN.m Reaksi Perletakan Untuk pengecekan daya dukung pondasi Horizontal
"PILEGRP.xls" Program
Version 3.5

ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG DATA CENTER NEUCENTRIX


PILE GROUP ANALYSIS FOR RIGID PILE CAP
Using the Elastic Method for up to 25 Total Piles Pile Dist. to X,Y axis:
PROYEK DATE : dy
NAMA DOK PERHITUNGAN DISTRIBUSI BEBAN DALAM PILE GROUP REV : ###
###
Input Data: ###
Results: ###
Number of Piles, Np = 5 ###
PILE GROUP PLAN
8.0
Pile Coordinates: Pile Reactions (kN)
Xo (m) Yo (m) Vert. Rz Horiz. Rh 7.0
#1: -1.000 1.000 #1: 481.19 6.41
#2: 1.000 1.000 #2: 512.94 6.42 6.0

#3: -1.000 -1.000 #3: 481.15 6.31


5.0
#4: 1.000 -1.000 #4: 512.90 6.32
#5: 0.000 0.000 #5: 497.04 6.36 4.0

Y - AXIS (m)
3.0

2.0

1.0

0.0
-1.5 -1.0 -0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
-1.0

-2.0

X - AXIS (m)

Pile Group Properties:


Xc = 0.000 m
Yc = 0.000 m
Ix = 4.00 ###
m^2
Iy = 4.00 ###
m^2
J= 8.00 ###
m^2
Ixy = 0.00 ###
m^2
q = 0.000 deg.
###
###
Number of Piers, N = 1 S Pier Loads @ C.G. of Group: ###
S Pz = -2485.22 kN ###
Pier/Loading Data: Pier #1 S Hx = 31.72 kN ###
X-Coordinate (m) = 0.000 S Hy = -2.46 kN
Y-Coordinate (m) = 0.000 S Mx = -0.08 kN-m
Dist. to T/Piles, h (m) = 2.000 S My = 63.50 kN-m S Pz =
Vertical Load, Pz (kN) = -2485.22 S Mz = -0.41 kN-m S Hx =
Horiz. Load, Hx (kN) = 31.721 S Hy =
Horiz. Load, Hy (kN) = -2.46 Pile Reaction Summary:S Mx =
Moment, Mx (kN-m) = -5.00 Rz(max) = 512.94 kN S My =
Moment, My (kN-m) = 0.05 Rz(min) = 481.15 kN S Mz =
Moment, Mz (kN-m) = -0.41 Rh(max) = 6.42 kN

3 of 18 10/06/2024 00:41:16
ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN : PERHITUNGAN DAYA DUKUNG PONDASI TIANG (BORE PILE) REV :

Depth of Soil Pile Length Bore Hole Location Average Pile Skin Friction N60 Correction Fs Fb 〖 10𝑁 〗 _60 𝐿/𝐷≤1
Bore Hole Type Interval 1 2 3 4 N Value Diameter Area (As) N60 SPT Skin Friction End Bearing
1.00 Silty Clay 1.00 6.00 6.00 0.40 1.26 5.95 5.95 7.14 595.00
2.00 Silty Clay 1.00 8.00 8.00 0.40 1.26 7.93 6.94 8.33 694.17
3.00 Silty Clay 1.00 7.00 7.00 0.40 1.26 6.94 7.44 8.92 743.75
4.00 Silty Clay 1.00 7.00 7.00 0.40 1.26 6.94 6.94 8.33 694.17
5.00 Silty Clay 1.00 4.00 4.00 0.40 1.26 3.97 5.45 6.55 545.42
6.00 Silty Clay 1.00 33.00 33.00 0.40 1.26 32.73 18.35 22.02 1834.58
7.00 Silty Clay 1.00 43.00 43.00 0.40 1.26 42.64 37.68 45.22 3768.33
8.00 Silty Clay 1.00 34.00 34.00 0.40 1.26 33.72 38.18 45.82 3817.92
9.00 Silty Clay 1.00 58.00 58.00 0.40 1.26 57.52 45.62 54.74 4000.00
10.00 Silty Clay 1.00 63.00 63.00 0.40 1.26 62.48 60.00 72.00 4000.00
11.00 Silty Clay 1.00 65.00 65.00 0.40 1.26 64.46 63.47 76.16 4000.00
12.00 Silty Clay 1.00 63.00 63.00 0.40 1.26 62.48 63.47 76.16 4000.00
13.00 Silty Clay 1.00 65.00 65.00 0.40 1.26 64.46 63.47 76.16 4001.00
14.00 Silty Clay 1.00 71.00 71.00 0.40 1.26 70.41 67.43 80.92 4002.00
15.00 Silty Clay 1.00 65.00 65.00 0.40 1.26 64.46 67.43 80.92 4003.00
16.00 Silty Clay 1.00 71.00 71.00 0.40 1.26 70.41 67.43 80.92 4004.00
17.00 Silty Clay 1.00 79.00 79.00 0.40 1.26 78.34 74.38 89.25 4005.00
18.00 Silty Clay 1.00 78.00 78.00 0.40 1.26 77.35 77.85 93.41 4006.00
19.00 Silty Clay 1.00 83.00 83.00 0.40 1.26 82.31 79.83 95.80 4007.00
20.00 Silty Clay 1.00 88.00 88.00 0.40 1.26 87.27 84.79 101.74 4008.00
21.00 Silty Clay 1.00 83.00 83.00 0.40 1.26 82.31 84.79 101.74 4009.00
22.00 Silty Clay 1.00 79.00 79.00 0.40 1.26 78.34 80.33 96.39 4010.00
23.00 Silty Clay 1.00 79.00 79.00 0.40 1.26 78.34 78.34 94.01 4011.00
24.00 Silty Clay 1.00 88.00 88.00 0.40 1.26 87.27 82.80 99.37 4012.00
25.00 Silty Clay 1.00 71.00 71.00 0.40 1.26 70.41 78.84 94.61 4013.00
26.00 Silty Clay 1.00 83.00 83.00 0.40 1.26 82.31 76.36 91.63 4014.00
27.00 Silty Clay 1.00 88.00 88.00 0.40 1.26 87.27 84.79 101.74 4015.00
28.00 Silty Clay 1.00 83.00 83.00 0.40 1.26 82.31 84.79 101.74 4016.00
29.00 Silty Clay 2.00 88.00 88.00 0.40 2.51 87.27 84.79 101.74 4017.00
31.00 Silty Clay 2.00 88.00 88.00 0.40 2.51 87.27 87.27 104.72 4018.00
33.00 Silty Clay 3.00 79.00 79.00 0.40 3.77 78.34 82.80 99.37 4019.00
36.00 Silty Clay 3.00 94.00 94.00 0.40 3.77 93.22 85.78 102.94 4020.00
39.00 Silty Clay 3.00 94.00 94.00 0.40 3.77 93.22 93.22 111.86 4021.00

Based on thesilt
Non-plastic results of soil
/ Tanah provision,
lumpur the type
Non-plastic siltof/ soil used by silt
Non-plastic thesoils
project
haveis included in the category
a low plasticity index, whichNon-
meansPlastic
they Silt
do not deform or deform

when in contact with water. These soils have a higher percentage of silt particles and a lower percentage of clay particles compared to cohesive soils.

CALCULATION OF POLE CARIYING CAPACITY


Data
Bore Pile Construction Type : Cast in Situ
Pile Diameter : 0.40 m 400 mm
Pile Depth : 9.00 m

1. Allowable Pile Capacity Based on N SPT Value

𝑄_𝐴𝑙𝑙=𝑄_𝑈𝑙𝑡/𝑆𝐹
Dimana 𝑄_𝑢𝑙𝑡=𝑄_𝑠+𝑄_𝑏
SF = 2.5

As tot : Total pile skin area : 11.31 m2

𝑄_𝑆=𝐴_(𝑆 𝑡𝑜𝑡) × 𝑓_(𝑆 𝐴𝑣𝑔) :


Fs : Skin Friction Resistance : 35.95
Qs : Total skin friction 406.56 kN

Fb : End Bearing Resistance 〖 10𝑁 〗 _60 𝐿/𝐷≤100 𝑁_60≤4000 14056.88 ≤ 6247.50 ≤ 4000.00

𝐴_𝑏=0.25 𝜋.𝐷^2
: 4000.00

𝑄_𝑏=𝐴_𝑏 × 𝑓_𝑏
Ab : End of Pile Area : 0.126 m2
Qb : End Bearing Resistance : 502.65 kN

Wp : Weight of One Bore Pile : 27.143 kN

Q ult 𝑄_𝑢𝑙𝑡=𝑄_𝑠+𝑄_𝑏
: 909.22 kN

𝑄_𝐴𝑙𝑙=𝑄_𝑈𝑙𝑡/𝑆𝐹
Q All : 363.69 kN
ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN : PERHITUNGAN DAYA DUKUNG PONDASI TIANG (BORE PILE) REV :
Bore Pile Bearing Capacity Checking
Axial pile load Based on Pile Group Calculation 512.94 kN
Pz (Pile Axial Load) < Q all Bore Pile Capacity NOK !!

2. Tensile Strength of Single Bore Pile

𝑄_𝑠 =[(𝐹_𝑠.𝐾_𝑝)/𝑆_𝐹2 ]+𝑊_𝑝


Dimana 𝑊_𝑃=(1⁄4.𝜋.𝐷^2 ).𝐿 × 𝛾_𝑐 189.77 kN

3. Kukuatan Beban Lateral Satu Pile

E Pile 20314 Mpa


I Pile : (p.r4)/4 1.26E+09 mm4
k1 20
B : Pile Diameter 400 mm

𝑅=∜((𝐸.𝐼)/(𝐾.𝐵))
K : (0.3 k1)/(1.5 B) 0.01

R : 1589.41 mm
1.59 m
L1 1.00
L1/R 0.63
Lf/R 2.15
Lf 3.42 m

y 4 mm

𝐻=(𝑦(12.𝐸.𝐼))/(𝐿_1+𝐿_𝑓 )^3
H : 3.07E+04 N
3.128 Ton
H all : H/SF 1.251 Ton 12.27 kN

3. Effisiensi Tiang Dalam Kelompok (Eg)

𝐸_𝑔=1−[((𝑛−1)𝑚+(𝑚−1)𝑛)/(90.𝑛𝑚)] 〖 tan 〗 ^(−1)⁡〖𝐷 /((𝑟)) 〗m


n : Number of Pile in Row 3.00
: Number of Pile in col 3.00
r : Pile Spacing 2.00
Eg 0.8
ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN ANALISA PERHITUNGAN FEM PONDASI TIANG (BORE PILE) REV :

PEMERIKSAAN KAPASITAS PILE (SINGLE PILE)

1 Total Displacement Ujung Tiang Bore Pile


Pemeriksaan Pile Displacement dengan beban berdasarkan kapasita satu pile Bersarkan Hitungan kapasitas daya dukung ijin tiang (pile),
Beban Pile
Axial Load : 363.69 kN
Lateral Load : 37.60 kN

Max Horizontal Dispacement 1.43 mm Max Vertical Displacement 5.48 mm


Allowable Hor Displacement 5 mm 1% of Pile Diameter Allowable Vertical Displacement 25.4 mm OK !!

2 Load Transfer
ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN ANALISA PERHITUNGAN FEM PONDASI TIANG (BORE PILE) REV :
PEMERIKSAAN KAPASITAS PILE (PILE GROUP)

Total Displacement Ujung Tiang Bore Pile


Pemeriksaan Pile Displacement dengan beban Ultimate berdasarkan load combination 1.2D + 1.6L + 0.5(Lr or S or R)
Beban Foundation
Axial Load : -2485.22 kN
Lateral Load (X) : 31.72 kN Lateral Load (Y) : -2.46 kN

Max Vertical Displacement 12.16 mm Dalam kondisi beban ultimate (Beban Terfaktor)

Allowable Vertical Displacement 25.50 mm Untuk Beban Service Berdasarkan Iternational Buiding Code (IBC)
Allowable Vertical Displacement 50.80 mm Untuk Beban Ultimate Berdasarkan Iternational Buiding Code (IBC)
ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN : PERHITUNGAN STRUKTUR PONDASI (BORE PILE & PILE CAP) REV :

1 FOUNDATION STRUCTURE MODELING

Bot. Pesedtal 850x850 mm


1.0 m

0.85 m

18.0 m

1.1 Structural Member Properties

Section name Member list AX (mm2) AY (mm2) AZ (mm2) IX (mm4) IY (mm4) IZ (mm4)
B-Pile_50 Bore Pile 13to37By6 1.96E+05 1.66E+05 1.66E+05 4.30E+09 2.15E+09 2.15E+09
PED_85 Pedestal 8.00 7.23E+05 6.02E+05 6.02E+05 5.14E+10 3.05E+10 3.05E+10

Thickness na Panel list Material Thickness typThickness (mTh1 (mm) Th2 (mm) Th3 (mm) KZ (kN/m3)
PC_850 7 CONCR Fc36 constant 8.50E+02 N/A N/A N/A 0.00E+00

1.2 Material Specifications

Material E (MPa) G (MPa) NI LX (1/°C) RO (kN/m3) Re (MPa)


CONCR Fc36 25949.47 1.08E+04 2.00E-01 0.00E+00 2.40E+01 3.60E+01
CONCR Fc30 24419.38 1.02E+04 2.00E-01 0.00E+00 2.40E+01 3.00E+01

2 DESIGN LOAD

The design load taken from building structural support reaction based on max ULS Load Combination
1.2D + 1.6L + 0.5(Lr or S or R)

1:DL1_Self Weight self-weight 1 10to64 Whole structure =-Z Factor=1.00 Normal MEMO:
2:DL2_Bulding Support Renodal force 1 FX= 31.721 kN
FY= -2.46 kN
FZ= -2485.22 kN
CX= -5 kN.m
CY= 0.05 kN.m
CZ= -0.41 kN.m
ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN : PERHITUNGAN STRUKTUR PONDASI (BORE PILE & PILE CAP) REV :
3 GEOTECHNICAL DESIGN CALCULATION

Calculation of Soil Spring Resistance as according to Soil Investigation Data

4 FOUNDATION STRUCTURE DESIGN CALCULATION NOTE

4.1 Bored Pile Structure Design


ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN : PERHITUNGAN STRUKTUR PONDASI (BORE PILE & PILE CAP) REV :
ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN : PERHITUNGAN STRUKTUR PONDASI (BORE PILE & PILE CAP) REV :

4.2 Bored Pile Structure Design Calculation Note

1 Level:

⦁ Name :
⦁ Reference level : -3.000 (m)
⦁ Fire rating : 0 (h)
⦁ Environment class : W0

2 Column: Column13 OK
f *Sn/U = 6.19 > 1.00
f *Mn/Mu = 41.00 > 1.00
f *Pn/Pu = 6.19 > 1.00

U, Mu, Pu - required strength

2.1 Material properties:

⦁ Concrete : CONCR Fc36 fc' = 36.000 (MPa)


Unit weight : 2447.319 (kG/m3)
⦁ Longitudinal reinforcement : Grade 420 fy = 420.000 (MPa)
⦁ Transversal reinforcement : Grade 300 fy = 300.000 (MPa)
⦁ b1 : 0.79
b1 = a/c, factor relating depth of equivalent rectangular compressive stress block a to depth of neutral axis c
b1 = <0,65-0,85>

2.2 Geometry:

Number of identical elements: 1

2.2.1 C
Diameter = 500.00 (mm)
2.2.2 Height: L = 3.425 (m)
2.2.3 Slab thickness = 0.850 (m)
2.2.4 Beam height = 0.850 (m)
2.2.5 Cover = 50.80 (mm)

2.3 Calculation options:

⦁ Calculations according to : ACI 318-14


⦁ Slenderness taken into account :Y
⦁ Non-sway structure :Y
⦁ Ties : to slab
⦁ Story number (counted from top to : n = 1
⦁ Seismic design category : SDC A

2.4 Loads:

Case Nature Group N MyA MyB MyC MzA MzB MzC b


(kN) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m)
COMB1 design 13 569.789 0.381 5.428 3.409 0.408 -0.335 0.111 1

b = <0,1> , manually defined sustained axial loads part


bdns, ratio for reduction of columns stiffness due to sustained axial loads

2.5 Calculation results:

2.5.1 ULS Analysis

Design combination: COMB1 (B)

Section classification: Compression-controlled


f = 0.65 - strength reduction factor, f=<0,65-0,90>
ec (*1000) =- strain in concrete
et (*1000) =- the extreme tensile strain in reinforcement

Internal forces:
N = 569.789My = 5.428 Mz = -0.335 (kN*m)

Design forces:
Lower node
Pu = 569.78Myu = 5.42Mzu = -0.33Mu = 5.438 U = 0.12

Safety factors:
U, Mu, Pu - required strength

f *Sn/U = 6.19 > 1.00


f *Mn/Mu = 41.00 > 1.00
f *Pn/Pu = 6.19 > 1.00
ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN : PERHITUNGAN STRUKTUR PONDASI (BORE PILE & PILE CAP) REV :
f *Sn = 0.77
ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN : PERHITUNGAN STRUKTUR PONDASI (BORE PILE & PILE CAP) REV :
f *Mn = 222.945 (kN*m)
f *Pn = 3526.626 (kN)

2.5.1.1 Detailed analysis-Direction Y:

2.5.1.1.1 Critical force

Pc = 13958. (6.6.4.4.2)
k*lu = 3.000 (m)
EI = 12728. (6.6.4.4.4b)
bdns = 1.00
Ec = 31047.677 (MPa)
Es = 199948.024 (MPa)
Ig = 3067961575.77 (mm4)
Ise = 32045074.22 (mm4)

2.5.1.1.2 Slenderness analysis

Non-sway structure
lu (m) k k*lu (m)
3 1 3
k*luy/ry = 2Short colu (6.2.5b)(6.2.5c)

2.5.1.1.3 Buckling analysis

MA = 0.381 MB = 5.428 (kN*m)


Case: Cross-section at the column end (Lower node), Slenderness not taken into account
M = 5.428 (kN*m)
Mc = M = 5.428 (kN*m)

2.5.1.2 Detailed analysis-Direction Z:

MA = 0.408 MB = -0.335 (kN*m)


Case: Cross-section at the column end (Lower node), Slenderness not taken into account
M = -0.335 (kN*m)
Mc = M = -0.335 (kN*m)

2.6 Reinforcement:

Reinforcement area: 19.847 (cm21.017 (%)


Minimum re19.635 (cm21.006 (%)
Maximum re156.072 (cm8.000 (%)

Main bars (Grade 420):


⦁ 7 19 l = 3.374 (m)

Transversal reinforcement (Grade 300):


stirrups: 18 10 l = 1.395 (m)

3 rial survey:

⦁ ete volume = 0.506 (m3)


⦁ Formwork = 4.045 (m2)

⦁ l Grade 420
⦁ otal weight = 52.588 (kG)
⦁ Density = 104.010 (kG/m3)
⦁ge diameter = 19.0 (mm)
⦁ ent survey:

Diameter Length Weight Number Total weight


(m) (kG) (No.) (kG)
19 3.374 7.513 7 52.588

⦁ l Grade 300
⦁ otal weight 15.481 (kG)
⦁ Density = 30.619 (kG/m3)
⦁ge diameter = 10.0 (mm)
⦁ ent survey:

Diameter Length Weight Number Total weight


(m) (kG) (No.) (kG)
10 1.395 0.86 18 15.481

Diameter Length Weight Number otal weight


(m) (kG) (No.) (kG)
10 2.113 1.303 128 166.776
ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN : PERHITUNGAN STRUKTUR PONDASI (BORE PILE & PILE CAP) REV :
4.3 Structure Displacement Check

Table. Max Node Displacement ULS Load Combination


1.2D + 1.6L + 0.5(Lr or S or R)

NODE UX (cm) UY (cm) UZ (cm) RX (Rad) RY (Rad) RZ (Rad)

MAX 0.154 0.004 -0.883 0 0 -0.007


Node 63 30 62 18 46 66
Case 3 (C) 3 (C) 3 (C) 3 (C) 3 (C) 3 (C)

MIN -0.004 -0.006 -1.079 0 0 -0.007


Node 58 63 63 8 40 63
Case 3 (C) 3 (C) 3 (C) 3 (C) 3 (C) 3 (C)

Allowable Vertical Displacement 25.50 mm Untuk Beban Service


Allowable Vertical Displacement 50.80 mm Untuk Beban Ultimate

4.3 Pile Cap Design

As according to pile cap design calculation note for top Re-Bar Required Top Re-Bar (X-Direction) 16 bar of D-19
As according to pile cap design calculation note for top Re-Bar Required Top Re-Bar (Y-Direction) 16 bar of D-19
ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN : PERHITUNGAN STRUKTUR PONDASI (BORE PILE & PILE CAP) REV :

As according to pile cap design calculation note for top Re-Bar Required Bottom Re-Bar (X-Direction) 17 bar of D-19
As according to pile cap design calculation note for top Re-Bar Required Bottom Re-Bar (Y-Direction) 17 bar of D-19
Punching Shear Re-Bar D-19
ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN : PERHITUNGAN STRUKTUR PONDASI (BORE PILE & PILE CAP) REV :

4.4 Pile Cap Structure Design Calculation Note

1 Slab: Slab7 - Panel no. 7

1.1. Reinforcement:

⦁ Type : RC Pile Cap


⦁ Main reinforcement direction : 0°
⦁ Main reinforcement grade : Grade 420; Characteristic strength = 420.000 MPa
⦁ Bar diameters bottom d1 = 19.00d2 = 19.00 (mm)
top d1 = 19.00d2 = 19.00 (mm)
⦁ Cover bottom c1 = 50.00 (mm)
top c2 = 50.00 (mm)

1.2. Concrete

⦁ Class : CONCR Fc36; Characteristic strength = 36.000 MPa


⦁ Density : 2447.319 (kG/m3)

1.3. Hypothesis

⦁ Calculations for required reinfor : ACI 318-14


⦁ Calculations for provided reinfor : ACI 318-14
⦁ Method of reinforcement area cal: analytical
⦁ Allowable deflection : 1.675 (cm)
⦁ Verification of punching : yes
⦁ Calculation type : bending + compression/tension

1.4. Slab geometry

Thickness 0.850 (m)

Contour:
edge beginning end length
x1 y1 x2 y2 (m)
1 0 3 3 3 3
2 3 3 3 0 3
3 3 0 0 0 3
4 0 0 0 3 3

Support:
n° Name dimensionscoordinates edge
(m) x y
11 point 0.5 1.5 1.5 —
11 point 0.850 / 0.850 1.5 1.5 —
* - head present

1.5. Calculation results:

1.5.1. Maximum moments + reinforcement for bending, compression/tension

Ax(+) Ax(-) Ay(+) Ay(-)

Provided reinforcement (cm2/m):


15.122 36.35 15.122 32.403
Modified required reinforcement (cm2/m):
15.07 25.728 15.07 26.314
Original required reinforcement (cm2/m):
15.07 25.728 15.07 26.314
Coordinates (m):
0.000;2.000.500;1.500.500;2.500.500;1.500

1.5.2. Maximum moments + reinforcement for bending, compression/tension

Ax(+) Ax(-) Ay(+) Ay(-)

Symbol: required area/provided area


Ax(+) (cm2/m) 15.070/15.122 0.000/15.122 15.070/15.122 0.000/15.122
Ax(-) (cm2/m) 15.070/16.202 25.728/36.350 15.070/16.202 25.728/36.350
Ay(+) (cm2/m) 0.000/15.122 0.000/15.122 15.070/15.122 0.000/15.122
Ay(-) (cm2/m) 15.070/16.202 26.314/32.403 15.070/16.202 26.314/32.403

Coordinates (m) 0.000;2.000 1.500;1.500 2.500;2.500 1.500;1.500


Coordinates* (m) 1.500;-0.500;0.000 0.000;0.000;0.000 -1.000;-1.000;0.000 0.000;0.000;0.000
* - Coordinates in the structure global coordinate system

1.5.3. Two-way shear

Support no. / Point Location (m) Geometry: (m) h


x y a b d h -
S1 (11) 1.5 1.5 Column - - 0.5 -
ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN : PERHITUNGAN STRUKTUR PONDASI (BORE PILE & PILE CAP) REV :
S2 (11) 1.5 1.5 Column 0.85 0.85 - -
f*Vn / Vu
Support no. / Point Loads: (kN)section (m) 1.00 > 1
Vu f*Vn bo f*Vn / Vu
S1 (11) 9.226 4930.814 4.224 534.43 > 1
S2 (11) 2048.685 5405.773 4.631 2.64 > 1

Expected results OK if phi*vn >= vu or phi*vnr >= vur


vu, vn - stress for a cross-section calculated without considering punching reinforcement
vur, vnr - stress for a cross-section calculated with considering punching reinforcement

Support no. / Point: S1 (11)


V= 9.226 (kN)
Mscx = -0.000 (kN*m)
Mscy = -0.000 (kN*m)
A= 3.299 (m2)
gfx = 0.4
gfy = 0.4
Cmaxx = 1.58
Cmaxy = 0.53
Cminx = -0.53
Cminy = -1.58
Jx = 1616789916201.86 (mm4)
Jy = 1616789916201.80 (mm4)
bc = 1
l= 1
as = 20
f= 0.75
S1 = 6
heff = 781.00 (mm)
f*vn = 1.495 (MPa)
vu = 0.003 (MPa)
A= 3.299 (m2)

Support no. / Point: S2 (11)


V= 1973.475 (kN)
Mscx = -0.328 (kN*m)
Mscy = 63.111 (kN*m)
A= 3.617 (m2)
gfx = 0.4
gfy = 0.4
Cmaxx = 1.74
Cmaxy = 1.74
Cminx = -0.58
Cminy = -0.58
Jx = 2111887834884.49 (mm4)
Jy = 2111887834884.49 (mm4)
bc = 1
l= 1
as = 20
f= 0.75
S1 = 6
heff = 781.00 (mm)
f*vn = 1.495 (MPa)
vu = 0.566 (MPa)
A= 3.617 (m2)

1.5.4. Deflection
|f(+)| = 0.000 (cm) <= fdop(+) = 1.675 (cm)
|f(-)| = 0.000 (cm) <= fdop(-) = 1.675 (cm)

2 Loads:

Case Type List Value


1 self-weight 1to4 6to8 PZ Negative
2 nodal force 63 FX=31.721(kN) FY=-2.460(kN) FZ=-2485.220(kN) CX=-5.000(kNm) CY=0.050(kNm) CZ=-0.410(kNm)

Combinati Definition

3 Results - detailing

List of solutions:
Reinforcement: bars
Solution noReinforcemTotal weight
Diameter / (kG)
1- 468.193

Results for the solution no. 1


Reinforcement zones

Bottom reinforcement
Name coordinate Provided r At Ar
ALANISA STRUKTUR PONDASI BANGUNAN GEDUNG PIC :
GEDUNG DATA CENTER NEUCENTRIX CHECK :
PROYEK DATE :
NAMA DOKUMEN : PERHITUNGAN STRUKTUR PONDASI (BORE PILE & PILE CAP) REV :
x1 y1 x2 y2 f / (mm) (cm2/m) (cm2/m)
1/1-(1/2-) 1 1 2 2 19.0 / 87.525.728 < 32.403
1/2- Ax Ma0 0 3 3 19.0 / 175.15.070 < 16.202
1/3-(1/4-) 1 1 2 2 19.0 / 87.526.314 < 32.403
1/4- Ay Pe0 0 3 3 19.0 / 175.15.070 < 16.202

Top reinforcement
Name coordinate Provided r At Ar
x1 y1 x2 y2 f / (mm) (cm2/m) (cm2/m)
1/1+ Ax M0 0 3 3 19.0 / 187.15.070 < 15.122
1/2+ Ay P 0 0 3 3 19.0 / 187.15.070 < 15.122

4 Material survey

⦁ Concrete v= 7.650 (m3)


⦁ Formwork = 9.000 (m2)
⦁ Slab circu = 12.000 (m)
⦁ Area of op = 0.000 (m2)

⦁ Steel Grade 420


⦁ Total weight = 562.469 (kG)
⦁ Density = 73.525 (kG/m3)
⦁ Average diameter = 19.0 (mm)
⦁ Survey according to diameters:

Diameter Length Number of identical elements:


(m)
19 2.281 12
19 3.413 66