0% found this document useful (0 votes)
46 views51 pages

Daily WAPDA Meter Reading

Done

Uploaded by

Muhammad Arshad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views51 pages

Daily WAPDA Meter Reading

Done

Uploaded by

Muhammad Arshad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 51

The Indus Hospital, QFNST SMP

Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

Main KWH Meter Units(KWH) Back Up KWH Meter Units(KWH)


Present Difference Multiply TOTAL unit Previous Present Difference Multiply TOTAL unit
Date Factor (KWH) Factor (KWH) Technican
Time Previous

1-Dec 9:21 498.7 500.4 1.73 8,000 13,840 501.3 502.7 1.5 8,000 11,680
2-Dec 9:10 500.4 501.9 1.45 8,000 11,600 502.7 504.2 1.5 8,000 11,760
3-Dec 9:15 501.9 503.5 1.57 8,000 12,560 504.2 505.7 1.5 8,000 12,320
4-Dec
5-Dec 8:50 503.5 506.2 2.73 8,000 21,840 505.7 508.5 2.8 8,000 22,240
6-Dec 9:10 506.2 507.8 1.58 8,000 12,640 508.5 510.1 1.6 8,000 12,480
7-Dec 9:04 507.8 509.2 1.40 8,000 11,200 510.1 511.5 1.4 8,000 11,440
8-Dec 8:26 509.2 510.6 1.47 8,000 11,760 511.5 513.0 1.5 8,000 11,760
9-Dec 9:10 510.6 512.2 1.58 8,000 12,640 513.0 514.6 1.6 8,000 12,720
10-Dec 8:20 512.2 513.8 1.54 8,000 12,320 514.6 516.1 1.5 8,000 12,320
11-Dec 8:20 513.8 515.4 1.61 8,000 12,880 516.1 517.7 1.6 8,000 12,960
12-Dec 9:15 515.4 516.8 1.43 8,000 11,440 517.7 519.2 1.4 8,000 11,520
13-Dec 8:16 516.8 518.3 1.48 8,000 11,840 519.2 520.6 1.5 8,000 11,920
14-Dec 8:14 518.3 519.8 1.54 8,000 12,320 520.6 522.2 1.6 8,000 12,400
15-Dec 8:09 519.8 521.3 1.52 8,000 12,160 522.2 523.1 0.9 8,000 7,440
16-Dec 7:29 521.3 522.8 1.47 8,000 11,760 523.1 524.8 1.6 8,000 13,200
17-Dec 7:30 522.8 524.1 1.30 8,000 10,400 524.8 526.5 1.7 8,000 13,920
18-Dec 8:10 524.1 525.6 1.53 8,000 12,240 526.5 528.0 1.5 8,000 12,240
19-Dec 8:09 525.6 527.0 1.41 8,000 11,280 528.0 529.5 1.4 8,000 11,440
20-Dec 8:18 527.0 528.5 1.47 8,000 11,760 529.5 531.0 1.5 8,000 11,840
21-Dec 8:09 528.5 530.0 1.44 8,000 11,520 531.0 532.4 1.4 8,000 11,600
22-Dec 8:32 530.0 531.3 1.36 8,000 10,880 532.4 533.8 1.4 8,000 10,960
23-Dec 8:06 531.3 532.4 1.10 8,000 8,800 533.8 534.9 1.1 8,000 8,800
24-Dec 8:20 532.4 533.8 1.42 8,000 11,360 534.9 536.3 1.5 8,000 11,760
25-Dec 8:25 533.8 535.0 1.21 8,000 9,680 536.3 537.6 1.2 8,000 9,760
26-Dec 7:56 535.0 536.1 1.10 8,000 8,800 537.6 538.6 1.1 8,000 8,560
27-Dec 7:55 536.1 537.1 0.98 8,000 7,840 538.6 539.6 1.0 8,000 7,920
28-Dec 7:44 537.1 538.1 0.98 8,000 7,840 539.6 540.6 1.0 8,000 7,920
29-Dec 8:02 538.1 539.3 1.20 8,000 9,600 540.6 541.8 1.2 8,000 9,760
30-Dec 7:24 539.3 540.7 1.42 8,000 11,360 541.8 543.3 1.4 8,000 11,360
31-Dec 7:29 540.7 542.0 1.30 8,000 10,400 543.3 544.6 1.3 8,000 10,480
Total Units Generated 346,560 346,480

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

Main KWH Meter Units(KWH) Back Up KWH Meter Units(KWH)


Present Difference Multiply TOTAL unit Previous Present Difference Multiply TOTAL unit
Date Factor (KWH) Factor (KWH) Technican
Time Previous

1-Jan
2-Jan 8:00 542.0 544.8 2.74 8,000 21,920 544.6 547.3 2.8 8,000 22,000
3-Jan 7:34 544.8 546.1 1.38 8,000 11,040 547.3 548.7 1.4 8,000 11,120
4-Jan 7:46 546.1 547.1 0.95 8,000 7,600 548.7 549.7 1.0 8,000 7,680
5-Jan
6-Jan 7:51 547.1 549.7 2.59 8,000 20,720 549.7 552.3 2.6 8,000 20,720
7-Jan 7:45 549.7 551.0 1.30 8,000 10,400 552.3 553.6 1.3 8,000 10,480
8-Jan 8:05 551.0 552.3 1.28 8,000 10,240 553.6 554.9 1.3 8,000 10,320
9-Jan 8:07 552.3 553.5 1.25 8,000 10,000 554.9 556.1 1.3 8,000 10,080
10-Jan 7:47 553.5 554.9 1.36 8,000 10,880 556.1 557.5 1.4 8,000 10,880
11-Jan 7:32 554.9 556.2 1.32 8,000 10,560 557.5 558.8 1.3 8,000 10,560
12-Jan 7:29 556.2 557.5 1.34 8,000 10,720 558.8 560.1 1.4 8,000 10,800
13-Jan 7:52 557.5 558.9 1.41 8,000 11,280 560.1 561.6 1.4 8,000 11,360
14-Jan 9:05 558.9 560.4 1.50 8,000 12,000 561.6 563.1 1.5 8,000 12,080
15-Jan
16-Jan 7:29 560.4 562.8 2.39 8,000 19,120 563.1 565.5 2.4 8,000 19,120
17-Jan 7:40 562.8 564.1 1.23 8,000 9,840 565.5 566.7 1.2 8,000 9,920
18-Jan
19-Jan 7:30 564.1 566.6 2.57 8,000 20,560 566.7 569.3 2.6 8,000 20,640
20-Jan
21-Jan
22-Jan
23-Jan 7:38 566.6 571.8 5.13 8,000 41,040 569.3 574.4 5.1 8,000 41,200
24-Jan 7:30 571.8 572.4 0.59 8,000 4,720 574.4 575.0 0.6 8,000 4,720
25-Jan 6:53 572.4 573.4 1.09 8,000 8,720 575.0 576.1 1.1 8,000 8,720
26-Jan 7:06 573.4 574.5 1.06 8,000 8,480 576.1 577.2 1.1 8,000 8,560
27-Jan 10:25 574.5 575.4 0.85 8,000 6,800 577.2 578.0 0.9 8,000 6,800
28-Jan 7:39 575.4 576.0 0.66 8,000 5,280 578.0 578.7 0.7 8,000 5,360
29-Jan 7:51 576.0 576.7 0.72 8,000 5,760 578.7 579.4 0.7 8,000 5,840
30-Jan 7:36 576.7 577.5 0.73 8,000 5,840 579.4 580.2 0.7 8,000 5,840
31-Jan 7:56 577.5 578.4 0.90 8,000 7,200 580.2 581.1 0.9 8,000 7,200
Total Units Generated 290,720 292,000

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

Main KWH Meter Units(KWH) Back Up KWH Meter Units(KWH)


Present Difference Multiply TOTAL unit Previous Present Difference Multiply TOTAL unit
Date Factor (KWH) Factor (KWH) Technican
Time Previous

1-Feb 7:54 578.4 579.3 0.97 8,000 7,760 581.1 582.1 1.0 8,000 8,320
2-Feb 7:59 579.3 580.4 1.02 8,000 8,160 582.1 583.1 1.0 8,000 7,760
3-Feb 8:09 580.4 581.3 0.92 8,000 7,360 583.1 584.0 0.9 8,000 7,360
4-Feb 8:07 581.3 582.2 0.93 8,000 7,440 584.0 584.9 0.9 8,000 7,520
5-Feb
6-Feb 7:45 582.2 583.9 1.68 8,000 13,440 584.9 586.6 1.7 8,000 13,520
7-Feb 7:36 583.9 584.9 0.99 8,000 7,920 586.6 587.6 1.0 8,000 7,920
8-Feb 7:52 584.9 585.8 0.97 8,000 7,760 587.6 588.6 1.0 8,000 7,840
9-Feb 7:32 585.8 586.8 0.91 8,000 7,280 588.6 589.5 0.9 8,000 7,280
10-Feb 7:38 586.8 587.7 0.96 8,000 7,680 589.5 590.5 1.0 8,000 7,760
11-Feb 7:39 587.7 588.6 0.92 8,000 7,360 590.5 591.4 0.9 8,000 7,440
12-Feb
13-Feb 7:36 588.6 590.1 1.42 8,000 11,360 591.4 592.8 1.4 8,000 11,360
14-Feb 7:37 590.1 591.0 0.93 8,000 7,440 592.8 593.8 0.9 8,000 7,520
15-Feb 7:21 591.0 591.9 0.92 8,000 7,360 593.8 594.7 0.9 8,000 7,440
16-Feb 9:15 591.9 593.0 1.08 8,000 8,640 594.7 595.8 1.1 8,000 8,640
17-Feb
18-Feb
19-Feb
20-Feb 7:45 593.0 596.0 3.01 8,000 24,080 595.8 598.8 3.1 8,000 24,400
21-Feb 7:30 596.0 597.1 1.05 8,000 8,400 598.8 599.9 1.0 8,000 8,400
22-Feb 7:38 597.1 598.0 0.91 8,000 7,280 599.9 600.8 0.9 8,000 7,360
23-Feb 7:36 598.0 599.1 1.09 8,000 8,720 600.8 601.9 1.1 8,000 8,720
24-Feb 7:58 599.1 600.4 1.31 8,000 10,480 601.9 603.2 1.3 8,000 10,480
25-Feb 7:33 600.4 601.6 1.18 8,000 9,440 603.2 604.4 1.2 8,000 9,520
26-Feb
27-Feb 8:56 601.6 603.1 1.51 8,000 12,080 604.4 606.0 1.6 8,000 12,560
28-Feb 7:44 603.1 604.2 1.07 8,000 8,560 606.0 607.0 1.1 8,000 8,560
Total Units Generated 206,000 207,680

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

Main KWH Meter Units(KWH) Back Up KWH Meter Units(KWH)


Present Difference Multiply TOTAL unit Previous Present Difference Multiply TOTAL unit
Date Factor (KWH) Factor (KWH) Technican
Time Previous

1-Mar 7:50 604.2 605.4 1.19 8,000 9,520 607.0 608.2 1.2 8,000 9,520
2-Mar 7:48 605.4 606.5 1.17 8,000 9,360 608.2 609.4 1.2 8,000 9,440
3-Mar 7:45 606.5 607.7 1.15 8,000 9,200 609.4 610.6 1.2 8,000 9,280
4-Mar 7:30 607.7 608.8 1.12 8,000 8,960 610.6 611.7 1.1 8,000 8,960
5-Mar 11:48 608.8 609.9 1.13 8,000 9,040 611.7 612.8 1.1 8,000 9,040
6-Mar 9:19 609.9 610.7 0.71 8,000 5,680 612.8 613.5 0.7 8,000 5,680
7-Mar 7:42 610.7 611.7 1.02 8,000 8,160 613.5 614.5 1.0 8,000 8,240
8-Mar 7:37 611.7 612.8 1.16 8,000 9,280 614.5 615.7 1.2 8,000 9,360
9-Mar 7:29 612.8 614.0 1.19 8,000 9,520 615.7 616.9 1.2 8,000 9,600
10-Mar 7:28 614.0 615.4 1.38 8,000 11,040 616.9 618.3 1.4 8,000 11,040
11-Mar 7:45 615.4 616.7 1.30 8,000 10,400 618.3 619.6 1.3 8,000 10,480
12-Mar 7:44 616.7 617.9 1.24 8,000 9,920 619.6 620.8 1.2 8,000 9,920
13-Mar 7:50 617.9 619.1 1.12 8,000 8,960 620.8 622.0 1.1 8,000 8,960
14-Mar 7:50 619.1 620.4 1.34 8,000 10,720 622.0 623.3 1.3 8,000 10,800
15-Mar 7:28 620.4 621.9 1.46 8,000 11,680 623.3 624.8 1.5 8,000 11,680
16-Mar 7:46 621.9 623.4 1.53 8,000 12,240 624.8 626.3 1.5 8,000 12,240
17-Mar 7:40 623.4 624.8 1.43 8,000 11,440 626.3 627.7 1.4 8,000 11,520
18-Mar 7:35 624.8 626.2 1.34 8,000 10,720 627.7 629.1 1.3 8,000 10,720
19-Mar 7:10 626.2 627.5 1.33 8,000 10,640 629.1 630.4 1.3 8,000 10,720
20-Mar 6:30 627.5 628.6 1.12 8,000 8,960 630.4 631.6 1.1 8,000 9,040
21-Mar 7:38 628.6 630.1 1.45 8,000 11,600 631.6 633.0 1.5 8,000 11,600
22-Mar 7:36 630.1 631.5 1.45 8,000 11,600 633.0 634.5 1.5 8,000 11,680
23-Mar 7:23 631.5 632.9 1.40 8,000 11,200 634.5 635.9 1.4 8,000 11,200
24-Mar 7:33 632.9 634.2 1.33 8,000 10,640 635.9 637.2 1.3 8,000 10,720
25-Mar 7:31 634.2 635.7 1.44 8,000 11,520 637.2 638.7 1.4 8,000 11,600
26-Mar 8:10 635.7 637.1 1.40 8,000 11,200 638.7 640.1 1.4 8,000 11,200
27-Mar 7:15 637.1 638.3 1.23 8,000 9,840 640.1 641.3 1.2 8,000 9,840
28-Mar 7:24 638.3 639.7 1.39 8,000 11,120 641.3 642.7 1.4 8,000 11,120
29-Mar 6:21 639.7 641.1 1.43 8,000 11,440 642.7 644.1 1.4 8,000 11,520
30-Mar 7:33 641.1 642.6 1.50 8,000 12,000 644.1 645.6 1.5 8,000 12,080
31-Mar 7:35 642.6 644.1 1.48 8,000 11,840 645.6 647.1 1.5 8,000 11,760
Total Units Generated 319,440 320,560

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

Main KWH Meter Units(KWH) Back Up KWH Meter Units(KWH)


Present Difference Multiply TOTAL unit Previous Present Difference Multiply TOTAL unit
Date Factor (KWH) Factor (KWH) Technican
Time Previous

1-Apr 7:29 644.1 645.6 1.44 8,000 11,520 647.1 648.5 1.4 8,000 11,600
2-Apr 7:28 645.6 646.9 1.38 8,000 11,040 648.5 649.9 1.4 8,000 11,120
3-Apr 7:31 646.9 648.2 1.28 8,000 10,240 649.9 651.2 1.3 8,000 10,240
4-Apr 7:39 648.2 649.6 1.35 8,000 10,800 651.2 652.6 1.3 8,000 10,800
5-Apr 7:12 649.6 650.9 1.34 8,000 10,720 652.6 653.9 1.4 8,000 10,800
6-Apr 7:40 650.9 652.2 1.26 8,000 10,080 653.9 655.2 1.3 8,000 10,080
7-Apr 7:27 652.2 653.5 1.31 8,000 10,480 655.2 656.5 1.3 8,000 10,480
8-Apr 8:15 653.5 654.8 1.36 8,000 10,880 656.5 657.8 1.4 8,000 10,880
9-Apr 7:48 654.8 656.2 1.38 8,000 11,040 657.8 659.2 1.4 8,000 11,040
10-Apr 7:51 656.2 657.5 1.27 8,000 10,160 659.2 660.5 1.3 8,000 10,240
11-Apr 7:18 657.5 659.0 1.51 8,000 12,080 660.5 662.0 1.5 8,000 12,160
12-Apr
13-Apr 7:33 659.0 662.3 3.33 8,000 26,640 662.0 665.4 3.3 8,000 26,720
14-Apr 7:50 662.3 664.0 1.68 8,000 13,440 665.4 667.1 1.7 8,000 13,520
15-Apr 7:35 664.0 665.7 1.65 8,000 13,200 667.1 668.7 1.7 8,000 13,200
16-Apr
17-Apr 7:30 665.7 668.8 3.11 8,000 24,880 668.7 671.8 3.1 8,000 24,880
18-Apr 8:16 668.8 670.4 1.61 8,000 12,880 671.8 673.4 1.6 8,000 12,880
19-Apr 7:14 670.4 671.9 1.51 8,000 12,080 673.4 674.9 1.5 8,000 12,080
20-Apr 7:29 671.9 673.5 1.64 8,000 13,120 674.9 676.6 1.6 8,000 13,120
21-Apr
22-Apr 6:56 673.5 676.6 3.04 8,000 24,320 676.6 679.6 3.0 8,000 24,400
23-Apr 5:39 676.6 677.6 1.00 8,000 8,000 679.6 680.6 1.0 8,000 8,000
24-Apr 5:56 677.6 678.9 1.37 8,000 10,960 680.6 682.0 1.4 8,000 11,040
25-Apr 5:33 678.9 680.3 1.38 8,000 11,040 682.0 683.4 1.4 8,000 11,040
26-Apr 7:35 680.3 681.8 1.45 8,000 11,600 683.4 684.8 1.5 8,000 11,680
27-Apr 7:35 681.8 683.5 1.77 8,000 14,160 684.8 686.6 1.8 8,000 14,080
28-Apr 7:26 683.5 685.2 1.67 8,000 13,360 686.6 688.3 1.7 8,000 13,440
29-Apr 7:01 685.2 687.0 1.77 8,000 14,160 688.3 690.1 1.8 8,000 14,160
30-Apr 7:41 687.0 688.7 1.76 8,000 14,080 690.1 691.8 1.8 8,000 14,080
Total Units Generated 356,960 357,760

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

Main KWH Meter Units(KWH) Back Up KWH Meter Units(KWH)


Present Difference Multiply TOTAL unit Previous Present Difference Multiply TOTAL unit
Date Factor (KWH) Factor (KWH) Technican
Time Previous

1-Jun 7:14 744.2 746.2 1.99 8,000 15,920


2-Jun 7:14 746.2 748.0 1.87 8,000 14,960
3-Jun 7:14 748.0 750.0 1.95 8,000 15,600 751.3 753.2 2.0 8,000 15,680
4-Jun 7:15 750.0 751.9 1.89 8,000 15,120 753.2 755.1 1.9 8,000 15,120
5-Jun 7:11 751.9 753.5 1.64 8,000 13,120 755.1 756.8 1.6 8,000 13,200
6-Jun 7:15 753.5 755.4 1.88 8,000 15,040 756.8 758.7 1.9 8,000 15,120
7-Jun 8:00 755.4 757.3 1.93 8,000 15,440 758.7 760.6 2.0 8,000 15,600
8-Jun 7:23 757.3 759.2 1.90 8,000 15,200 760.6 762.5 1.9 8,000 15,280
9-Jun 7:11 759.2 761.1 1.91 8,000 15,280 762.5 764.5 1.9 8,000 15,440
10-Jun 7:42 761.1 763.2 2.08 8,000 16,640 764.5 766.6 2.1 8,000 16,720
11-Jun 7:15 763.2 765.0 1.74 8,000 13,920
12-Jun 7:10 765.0 766.7 1.79 8,000 14,320 766.6 770.1 3.6 8,000 28,400
13-Jun 8:31 766.7 769.1 2.31 8,000 18,480 770.1 772.4 2.3 8,000 18,560
14-Jun 7:25 769.1 771.1 2.05 8,000 16,400 772.4 774.5 2.1 8,000 16,480
15-Jun 7:10 771.1 773.1 1.99 8,000 15,920
16-Jun 7:08 773.1 775.2 2.15 8,000 17,200
17-Jun 7:14 775.2 777.2 1.94 8,000 15,520 774.5 780.6 6.1 8,000 48,960
18-Jun
19-Jun 7:14 777.2 781.0 3.84 8,000 30,720 780.6 784.5 3.9 8,000 30,880
20-Jun 7:31 781.0 783.2 2.17 8,000 17,360 784.5 786.6 2.2 8,000 17,360
21-Jun 7:48 783.2 785.4 2.17 8,000 17,360 786.6 788.8 2.2 8,000 17,520
22-Jun 7:20 785.4 787.5 2.12 8,000 16,960 788.8 791.0 2.1 8,000 17,120
23-Jun 6:51 787.5 789.5 1.97 8,000 15,760 791.0 792.9 2.0 8,000 15,760
24-Jun
25-Jun
26-Jun
27-Jun
28-Jun
29-Jun
30-Jun
Total Units Generated 362,240 333,200

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

Main KWH Meter Units(KWH) Back Up KWH Meter Units(KWH)


Present Difference Multiply TOTAL unit Previous Present Difference Multiply TOTAL unit
Date Factor (KWH) Factor (KWH) Technican
Time Previous

1-Jul
2-Jul
3-Jul
4-Jul
5-Jul
6-Jul
7-Jul 7:50 814.5 816.9 2.40 8,000 19,200 818.0 820.5 2.5 8,000 20,080
8-Jul 7:48 816.9 819.1 2.21 8,000 17,680 820.5 822.7 2.2 8,000 17,600
9-Jul 7:30 819.1 820.3 1.21 8,000 9,680 822.7 824.2 1.5 8,000 12,160
10-Jul 8:03 820.3 823.0 2.70 8,000 21,600 824.2 826.6 2.4 8,000 19,280
11-Jul 7:35 823.0 825.2 2.19 8,000 17,520 826.6 828.8 2.2 8,000 17,440
12-Jul 7:44 825.2 827.4 2.24 8,000 17,920 828.8 831.0 2.3 8,000 18,000
13-Jul 7:15 827.4 829.7 2.24 8,000 17,920 831.0 833.3 2.3 8,000 18,000
14-Jul 7:50 829.7 831.4 1.75 8,000 14,000 833.3 835.0 1.8 8,000 14,160
15-Jul 8:19 831.4 833.7 2.31 8,000 18,480 835.0 837.4 2.3 8,000 18,640
16-Jul
17-Jul 7:16 833.7 837.9 4.16 8,000 33,280 837.4 841.6 4.1 8,000 33,200
18-Jul 7:11 837.9 840.3 2.39 8,000 19,120 841.6 844.0 2.4 8,000 19,280
19-Jul
20-Jul 7:11 840.3 844.7 4.38 8,000 35,040 844.0 848.4 4.5 8,000 35,680
21-Jul 7:05 844.7 846.9 2.25 8,000 18,000 848.4 850.7 2.3 8,000 18,080
22-Jul 7:18 846.9 849.4 2.48 8,000 19,840 850.7 853.2 2.5 8,000 19,920
23-Jul
24-Jul 7:14 849.4 853.3 3.89 8,000 31,120 853.2 857.1 3.9 8,000 31,200
25-Jul 7:53 853.3 855.6 2.34 8,000 18,720 857.1 859.4 2.4 8,000 18,880
26-Jul 7:30 855.6 858.0 2.37 8,000 18,960 859.4 861.9 2.5 8,000 20,080
27-Jul 7:52 858.0 860.2 2.20 8,000 17,600 861.9 864.0 2.1 8,000 16,560
28-Jul 7:35 860.2 862.5 2.28 8,000 18,240 864.0 866.3 2.3 8,000 18,240
29-Jul 862.5 864.8 2.26 8,000 18,080 869 2.3 866.3 864.0 8,000
30-Jul 864.8 867.0 2.20 8,000 17,600
31-Jul 867.0 869.0 2.06
Total Units Generated 419,600 394,480

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

Main KWH Meter Units(KWH) Back Up KWH Meter Units(KWH)


Present Difference Multiply TOTAL unit Previous Present Difference Multiply TOTAL unit
Date Factor (KWH) Factor (KWH) Technican
Time Previous

1-Aug 7:09 869.0 870.7 1.65 8,000 13,200 866.3 874.5 8.2 8,000 65,520
2-Aug 7:12 870.7 872.9 2.23 8,000 17,840 874.5 876.3 1.8 8,000 14,640
3-Aug 7:45 872.9 875.4 2.50 8,000 20,000 876.3 879.3 3.0 8,000 23,680
4-Aug 7:16 875.4 877.7 2.31 8,000 18,480 879.3 881.6 2.3 8,000 18,560
5-Aug 7:42 877.7 880.2 2.46 8,000 19,680 881.6 884.1 2.5 8,000 19,760
6-Aug 7:11 880.2 882.5 2.36 8,000 18,880 884.1 886.4 2.4 8,000 18,880
7-Aug 7:10 882.5 884.8 2.31 8,000 18,480 886.4 888.7 2.3 8,000 18,480
8-Aug 7:12 884.8 887.2 2.32 8,000 18,560 888.7 891.1 2.3 8,000 18,640
9-Aug 7:55 887.2 889.6 2.49 8,000 19,920 891.1 893.6 2.5 8,000 20,080
10-Aug 7:20 889.6 891.8 2.14 8,000 17,120 893.6 895.8 2.3 8,000 18,080
11-Aug 7:36 891.8 894.6 2.85 8,000 22,800 895.8 898.6 2.8 8,000 22,000
12-Aug 7:19 894.6 897.2 2.52 8,000 20,160 898.6 901.1 2.5 8,000 20,240
13-Aug 7:30 897.2 899.3 2.19 8,000 17,520 901.1 903.8 2.7 8,000 21,840
14-Aug 7:35 899.3 901.6 2.21 8,000 17,680 903.8 905.5 1.7 8,000 13,520
15-Aug 7:47 901.6 903.7 2.13 8,000 17,040 905.5 907.7 2.1 8,000 17,120
16-Aug 7:53 903.7 906.1 2.37 8,000 18,960 907.7 910.1 2.4 8,000 19,040
17-Aug 7:32 906.1 908.4 2.37 8,000 18,960 910.1 912.4 2.4 8,000 19,040
18-Aug 7:10 908.4 910.7 2.32 8,000 18,560 912.4 914.7 2.3 8,000 18,480
19-Aug 7:18 910.7 913.2 2.50 8,000 20,000 914.7 917.3 2.5 8,000 20,160
20-Aug 7:27 913.2 915.6 2.40 8,000 19,200 917.3 919.7 2.4 8,000 19,200
21-Aug 7:32 915.6 917.9 2.22 8,000 17,760 919.7 921.9 2.2 8,000 17,840
22-Aug 7:43 917.9 920.4 2.54 8,000 20,320 921.9 924.5 2.6 8,000 20,480
23-Aug 7:18 920.4 922.8 2.42 8,000 19,360 924.5 926.9 2.4 8,000 19,520
24-Aug 7:23 922.8 925.2 2.39 8,000 19,120 926.9 929.3 2.4 8,000 19,200
25-Aug 8:13 925.2 927.6 2.40 8,000 19,200 929.3 931.7 2.4 8,000 19,360
26-Aug 7:10 927.6 929.7 2.11 8,000 16,880 931.7 933.8 2.1 8,000 16,960
27-Aug
28-Aug 7:03 929.7 933.6 3.88 8,000 31,040 933.8 937.7 3.9 8,000 31,280
29-Aug 7:49 933.6 935.8 2.22 8,000 17,760 937.7 940.0 2.2 8,000 17,920
30-Aug 7:31 935.8 937.9 2.11 8,000 16,880 940.0 942.1 2.1 8,000 16,960
31-Aug 7:15 937.9 940.2 2.24 8,000 17,920 942.1 944.3 2.2 8,000 17,360
Total Units Generated 569,280 623,840

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

Main KWH Meter Units(KWH) Back Up KWH Meter Units(KWH)


Present Difference Multiply TOTAL unit Previous Present Difference Multiply TOTAL unit
Date Factor (KWH) Factor (KWH) Technican
Time Previous

1-Sep
2-Sep 7:58 940.2 944.7 4.50 8,000 36,000 942.1 948.9 6.8 8,000 54,400
3-Sep
4-Sep 7:15 944.7 948.7 4.00 8,000 32,000 948.9 952.9 4.0 8,000 32,080
5-Sep 7:20 948.7 950.8 2.12 8,000 16,960 952.9 955.1 2.1 8,000 17,200
6-Sep 7:22 950.8 953.0 2.23 8,000 17,840 955.1 957.3 2.2 8,000 17,760
7-Sep 7:20 953.0 955.2 2.19 8,000 17,480 957.3 959.5 2.2 8,000 17,520
8-Sep 7:19 955.2 957.4 2.18 8,000 17,480 959.5 961.7 2.2 8,000 17,680
9-Sep 7:13 957.4 959.7 2.32 8,000 18,560 961.7 964.0 2.3 8,000 18,720
10-Sep 7:22 959.7 961.9 2.23 8,000 17,840 964.0 966.3 2.2 8,000 17,840
11-Sep 7:12 961.9 964.0 2.05 8,000 16,400 966.3 968.5 2.3 8,000 18,240
12-Sep 8:14 964.0 966.3 2.35 8,000 18,800 968.5 969.7 1.1 8,000 9,040
13-Sep 7:12 966.3 968.7 2.36 8,000 18,860
14-Sep 7:54 968.7 971.1 2.36 8,000 18,900 969.7 971.2 1.5 8,000 12,080
15-Sep 7:24 971.1 973.4 2.35 8,000 18,800 971.2 1,547.5 576.3 8,000 4,610,320
16-Sep 7:07 973.4 975.7 2.29 8,000 18,320 1,547.5 1,550.2 2.7 8,000 21,520
17-Sep 7:09 975.7 977.6 1.88 8,000 15,080 1,550.2 1,552.7 2.6 8,000 20,640
18-Sep 7:14 977.6 979.5 1.88 8,000 15,080 1,552.7 1,555.2 2.5 8,000 20,000
19-Sep 7:07 979.5 981.7 2.26 8,000 18,080 1,555.2 1,557.4 2.1 8,000 16,960
20-Sep 7:11 981.7 983.8 2.09 8,000 16,720 1,557.4 1,560.0 2.6 8,000 20,960
21-Sep 7:04 983.8 986.0 2.20 8,000 17,600 1,560.0 1,562.5 2.5 8,000 20,240
22-Sep 7:07 986.0 988.1 2.06 8,000 16,480 1,562.5 1,565.0 2.5 8,000 19,680
23-Sep 7:04 988.1 990.1 2.00 8,000 16,040 1,565.0 1,567.4 2.5 8,000 19,600
24-Sep 7:27 990.1 992.1 2.00 8,000 16,040 1,567.4 1,569.8 2.4 8,000 19,440
25-Sep 7:19 992.1 993.9 1.78 8,000 14,240 1,569.8 1,572.1 2.2 8,000 17,680
26-Sep 7:16 993.9 995.9 1.98 8,000 15,840 1,572.1 1,574.4 2.3 8,000 18,640
27-Sep 7:24 995.9 997.4 1.57 8,000 12,560 1,574.4 1,576.8 2.4 8,000 19,440
28-Sep 7:28 997.4 998.7 1.25 8,000 10,000 1,576.8 1,579.2 2.4 8,000 19,280
29-Sep 7:11 998.7 999.9 1.18 8,000 9,440 1,579.2 1,581.7 2.5 8,000 20,160
30-Sep 7:01 999.9 1,000.9 1.08 8,000 8,640 1,581.7 1,584.1 2.3 8,000 18,480
Total Units Generated 486,080 5,135,600

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

October-23
Main KWH Meter Units(KWH)
Date Time Present Difference Multiply TOTAL unit
Previous Factor (KWH)
(am)
1-Oct 7:13 1000.93 1002.85 1.92 8000 15360
2-Oct 7:23 1002.85 1004.54 1.69 8000 13520
3-Oct 7:21 1004.54 1006.65 2.11 8000 16880
4-Oct 7:22 1006.65 1008.79 2.14 8000 17120
5-Oct 7:36 1008.79 1010.86 2.07 8000 16560
6-Oct 7:26 1010.86 1012.88 2.02 8000 16160
7-Oct 7:17 1012.88 1014.96 2.08 8000 16640
8-Oct 7:26 1014.96 1017.04 2.08 8000 16640
9-Oct 7:06 1017.04 1018.81 1.77 8000 14160
10-Oct 7:36 1018.81 1021.07 2.26 8000 18080
11-Oct 7:43 1021.07 1023.16 2.09 8000 16720
12-Oct 7:32 1023.16 1025.19 2.03 8000 16240
13-Oct 7:20 1025.19 1027.06 1.87 8000 14960
14-Oct 7:29 1027.06 1029.05 1.99 8000 15920
15-Oct 7:35 1029.05 1030.89 1.84 8000 14720
16-Oct 7:33 1030.89 1032.55 1.66 8000 13280
17-Oct 8:30 1032.55 1034.44 1.89 8000 15120
18-Oct 7:51 1034.44 1036.24 1.8 8000 14400
19-Oct 7:31 1036.24 1037.57 1.33 8000 10640
20-Oct 7:56 1037.57 1039.36 1.79 8000 14320
21-Oct 7:27 1039.36 1041.12 1.76 8000 14080
22-Oct 8:03 1041.12 1042.74 1.62 8000 12960
23-Oct 7:53 1042.74 1043.97 1.23 8000 9840
24-Oct 7:25 1043.97 1045.68 1.71 8000 13680
25-Oct 7:28 1045.68 1047.41 1.73 8000 13840
26-Oct 7:48 1047.41 1048.82 1.41 8000 11280
27-Oct 7:46 1048.82 1050.62 1.8 8000 14400
28-Oct 7:42 1050.62 1052.45 1.83 8000 14640
29-Oct 7:30 1052.45 1053.17 0.72 8000 5760
30-Oct 7:33 1053.17 1055.89 2.72 8000 21760
31-Oct 7:31 1055.89 1057.75 1.86 8000 14880
Total Units Generated 454,560

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

November-23
Main KWH Meter Units(KWH)
Date Time Present Difference Multiply TOTAL unit
Previous Factor (KWH)
(am)
1-Nov 7:32 1057.75 1059.63 1.88 8000 15040
2-Nov 7:31 1059.63 1061.5 1.87 8000 14960
3-Nov 7:29 1061.5 1062.76 1.26 8000 10080
4-Nov 7:12 1062.76 1064.61 1.85 8000 14800
5-Nov 7:21 1064.61 1066.42 1.81 8000 14480
6-Nov 7:20 1066.42 1068.03 1.61 8000 12880
7-Nov 7:25 1068.03 1069.82 1.79 8000 14320
8-Nov 7:36 1069.82 1071.63 1.81 8000 14480
9-Nov 6:56 1071.63 1072.98 1.35 8000 10800
10-Nov 7:56 1072.98 1074.11 1.13 8000 9040
11-Nov 7:39 1074.11 1075.71 1.6 8000 12800
12-Nov 7:27 1075.71 1076.92 1.21 8000 9680
13-Nov 7:31 1076.92 1078.27 1.35 8000 10800
14-Nov 7:34 1078.27 1079.97 1.7 8000 13600
15-Nov 7:28 1079.97 1081.68 1.71 8000 13680
16-Nov 7:25 1081.68 1083.5 1.82 8000 14560
17-Nov 7:34 1083.5 1085.32 1.82 8000 14560
18-Nov 7:41 1085.32 1087.08 1.76 8000 14080
19-Nov 7:25 1087.08 1089.01 1.93 8000 15440
20-Nov 9:19 1089.01 1090.06 1.05 8000 8400
21-Nov 7:24 1090.06 1091.59 1.53 8000 12240
22-Nov 7:24 1091.59 1093.01 1.42 8000 11360
23-Nov 7:37 1093.01 1094.35 1.34 8000 10720
24-Nov 7:45 1094.35 1095.87 1.52 8000 12160
25-Nov 7:17 1095.87 1097.2 1.33 8000 10640
26-Nov 7:15 1097.2 1098.51 1.31 8000 10480
27-Nov 7:00 1098.51 1099.62 1.11 8000 8880
28-Nov 7:20 1099.62 1100.84 1.22 8000 9760
29-Nov 7:08 1100.84 1101.99 1.15 8000 9200
30-Nov 7:13 1101.99 1103.13 1.14 8000 9120
Total Units Generated 363,040

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

December-23
Main KWH Meter Units(KWH)
Date Time Present Difference Multiply TOTAL unit
Previous Factor (KWH)
(am)
1-Dec 7:29 1103.13 1104.24 1.11 8000 8880
2-Dec 7:22 1104.24 1105.37 1.13 8000 9040
3-Dec 7:28 1105.37 1106.49 1.12 8000 8960
4-Dec 7:29 1106.49 1107.5 1.01 8000 8080
5-Dec 7:35 1107.5 1108.67 1.17 8000 9360
6-Dec 9:05 1108.67 1109.93 1.26 8000 10080
7-Dec 8:56 1109.93 1111.14 1.21 8000 9680
8-Dec 9:01 1111.14 1112.35 1.21 8000 9680
9-Dec 8:55 1112.35 1113.47 1.12 8000 8960
10-Dec 7:31 1113.47 1114.28 0.81 8000 6480
11-Dec 9:03 1114.28 1115.31 1.03 8000 8240
12-Dec 9:16 1115.31 1116.51 1.2 8000 9600
13-Dec 9:36 1116.51 1117.37 0.86 8000 6880
14-Dec 8:51 1117.37 1118.21 0.84 8000 6720
15-Dec 9:00 1118.21 1119.47 1.26 8000 10080
16-Dec 8:53 1119.47 1120.7 1.23 8000 9840
17-Dec 8:03 1120.7 1121.84 1.14 8000 9120
18-Dec 7:45 1121.84 1122.81 0.97 8000 7760
19-Dec 8:14 1122.81 1123.87 1.06 8000 8480
20-Dec 8:20 1123.87 1124.94 1.07 8000 8560
21-Dec 7:27 1124.94 1125.96 1.02 8000 8160
22-Dec 7:51 1125.96 1126.85 0.89 8000 7120
23-Dec 7:26 1126.85 1127.95 1.1 8000 8800
24-Dec 7:37 1127.95 1129.01 1.06 8000 8480
25-Dec 7:23 1129.01 1130.03 1.02 8000 8160
26-Dec 8:43 1130.03 1131.01 0.98 8000 7840
27-Dec 8:45 1131.01 1132.12 1.11 8000 8880
28-Dec 8:54 1132.12 1133.2 1.08 8000 8640
29-Dec 7:53 1133.2 1134.21 1.01 8000 8080
30-Dec 7:40 1134.21 1135.31 1.1 8000 8800
31-Dec 7:53 1135.31 1136.35 1.04 8000 8320
Total Units Generated 265,760

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

January-24
Main KWH Meter Units(KWH)
Date Time Present Difference Multiply TOTAL unit
Previous Factor (KWH)
(am)
1-Jan 7:40 1136.35 1137.32 0.97 8000 7760
2-Jan 7:46 1137.32 1138.41 1.09 8000 8720
3-Jan 8:31 1138.41 1139.57 1.16 8000 9280
4-Jan 8:06 1139.57 1140.63 1.06 8000 8480
5-Jan 8:06 1140.63 1141.25 0.62 8000 4960
6-Jan 8:06 1141.25 1143 1.75 8000 14000
7-Jan 8:02 1143 1144.12 1.12 8000 8960
8-Jan 8:59 1144.12 1145.11 0.99 8000 7920
9-Jan 9:18 1145.11 1146.33 1.22 8000 9760
10-Jan 9:01 1146.33 1147.6 1.27 8000 10160
11-Jan 7:47 1147.6 1148.72 1.12 8000 8960
12-Jan 7:55 1148.72 1150.04 1.32 8000 10560
13-Jan 8:18 1150.04 1151.39 1.35 8000 10800
14-Jan 7:45 1151.39 1152.16 0.77 8000 6160
15-Jan 7:03 1152.16 1153.67 1.51 8000 12080
16-Jan 9:02 1153.67 1154.98 1.31 8000 10480
17-Jan 7:57 1154.98 1156.23 1.25 8000 10000
18-Jan 7:23 1156.23 1157.53 1.3 8000 10400
19-Jan 8:58 1157.53 1158.9 1.37 8000 10960
20-Jan 8:03 1158.9 1160.21 1.31 8000 10480
21-Jan 8:05 1160.21 1161.67 1.46 8000 11680
22-Jan 7:50 1161.67 1162.84 1.17 8000 9360
23-Jan 7:24 1162.84 1164.1 1.26 8000 10080
24-Jan 7:24 1164.1 1165.32 1.22 8000 9760
25-Jan 7:45 1165.32 1166.56 1.24 8000 9920
26-Jan 8:03 1166.56 1167.79 1.23 8000 9840
27-Jan 8:52 1167.79 1169.07 1.28 8000 10240
28-Jan 8:40 1169.07 1170.35 1.28 8000 10240
29-Jan 7:13 1170.35 1171.08 0.73 8000 5840
30-Jan 7:28 1171.08 1172.1 1.02 8000 8160
31-Jan 8:56 1172.1 1173.33 1.23 8000 9840
Total Units Generated 295,840

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

February-24
Main KWH Meter Units(KWH)
Date Time Present Difference Multiply TOTAL unit
Previous Factor (KWH)
(am)
1-Feb 7:46 1173.33 1174.65 1.32 8000 10560
2-Feb 7:30 1174.65 1175.32 0.67 8000 5360
3-Feb 8:05 1175.32 1176.43 1.11 8000 8880
4-Feb 7:45 1176.43 1177.59 1.16 8000 9280
5-Feb 7:55 1177.59 1178.38 0.79 8000 6320
6-Feb 7:46 1178.38 1179.32 0.94 8000 7520
7-Feb 8:50 1179.32 1180.46 1.14 8000 9120
8-Feb 7:45 1180.46 1181.68 1.22 8000 9760
9-Feb 8:06 1181.68 1182.29 0.61 8000 4880
10-Feb 7:50 1182.29 1183.27 0.98 8000 7840
11-Feb 7:40 1183.27 1184.24 0.97 8000 7760
12-Feb 8:44 1184.24 1184.84 0.6 8000 4800
13-Feb 7:44 1184.84 1185.79 0.95 8000 7600
14-Feb 7:20 1185.79 1186.76 0.97 8000 7760
15-Feb 7:26 1186.76 1187.72 0.96 8000 7680
16-Feb 7:43 1187.72 1188.66 0.94 8000 7520
17-Feb 7:40 1188.66 1189.58 0.92 8000 7360
18-Feb 8:04 1189.58 1190.55 0.97 8000 7760
19-Feb 8:10 1190.55 1191.49 0.94 8000 7520
20-Feb 7:13 1191.49 1192.4 0.91 8000 7280
21-Feb 7:37 1192.4 1193.33 0.93 8000 7440
22-Feb 7:16 1193.33 1194.29 0.96 8000 7680
23-Feb 7:15 1194.29 1195.09 0.8 8000 6400
24-Feb 8:00 1195.09 1196.07 0.98 8000 7840
25-Feb 7:45 1196.07 1197.01 0.94 8000 7520
26-Feb 7:26 1197.01 1198 0.99 8000 7920
27-Feb 8:04 1198 1199.03 1.03 8000 8240
28-Feb 7:45 1199.03 1200.07 1.04 8000 8320
29-Feb 8:46 1200.07 1201.11 1.04 8000 8320
Total Units Generated 222,240

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

March-24
Main KWH Meter Units(KWH)
Date Time Present Difference Multiply TOTAL unit
Previous Factor (KWH)
(am)
1-Mar 7:41 1201.11 1201.78 0.67 8000 5360
2-Mar 7:25 1201.78 1202.9 1.12 8000 8960
3-Mar 7:35 1202.9 1203.97 1.07 8000 8560
4-Mar 7:25 1203.97 1204.98 1.01 8000 8080
5-Mar 7:16 1204.98 1206.03 1.05 8000 8400
6-Mar 8:49 1206.03 1207.32 1.29 8000 10320
7-Mar 7:08 1207.32 1208.32 1 8000 8000
8-Mar 7:00 1208.32 1209.42 1.1 8000 8800
9-Mar 7:16 1209.42 1210.6 1.18 8000 9440
10-Mar 7:21 1210.6 1211.87 1.27 8000 10160
11-Mar 7:45 1211.87 1212.94 1.07 8000 8560
12-Mar 7:30 1212.94 1214.12 1.18 8000 9440
13-Mar 7:45 1214.12 1215.24 1.12 8000 8960
14-Mar 7:20 1215.24 1216.51 1.27 8000 10160
15-Mar 8:25 1216.51 1218.3 1.79 8000 14320
16-Mar 7:12 1218.3 1219.44 1.14 8000 9120
17-Mar 7:40 1219.44 1220.88 1.44 8000 11520
18-Mar 7:25 1220.88 1221.99 1.11 8000 8880
19-Mar 7:30 1221.99 1223.91 1.92 8000 15360
20-Mar 7:35 1223.91 1226.02 2.11 8000 16880
21-Mar 7:26 1226.02 1227.69 1.67 8000 13360
22-Mar 7:20 1227.69 1228.89 1.2 8000 9600
23-Mar 7:10 1228.89 1231.07 2.18 8000 17440
24-Mar 7:30 1231.07 1232.96 1.89 8000 15120
25-Mar 7:15 1232.96 1234.42 1.46 8000 11680
26-Mar 7:25 1234.42 1236.4 1.98 8000 15840
27-Mar 7:45 1236.4 1238.45 2.05 8000 16400
28-Mar 7:10 1238.45 1240.02 1.57 8000 12560
29-Mar 7:16 1240.02 1241.31 1.29 8000 10320
30-Mar 7:14 1241.31 1243.26 1.95 8000 15600
31-Mar 7:18 1243.26 1244.75 1.49 8000 11920
Total Units Generated 349,120

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

April-24
Main KWH Meter Units(KWH)
Date Time Present Difference Multiply TOTAL unit
Previous Factor (KWH)
(am)
1-Apr 7:15 1244.75 1246.46 1.71 8000 13680
2-Apr 7:07 1246.46 1248.08 1.62 8000 12960
3-Apr 7:06 1248.08 1249.83 1.75 8000 14000
4-Apr 7:14 1249.83 1251.64 1.81 8000 14480
5-Apr 7:10 1251.64 1253.48 1.84 8000 14720
6-Apr 7:25 1253.48 1255.47 1.99 8000 15920
7-Apr 9:06 1255.47 1257.42 1.95 8000 15600
8-Apr 7:33 1257.42 1258.98 1.56 8000 12480
9-Apr 7:42 1258.98 1260.91 1.93 8000 15440
10-Apr 7:25 1260.91 1262.63 1.72 8000 13760
11-Apr 8:14 1262.63 1264.16 1.53 8000 12240
12-Apr 8:10 1264.16 1265.62 1.46 8000 11680
13-Apr 7:38 1265.62 1267.05 1.43 8000 11440
14-Apr 7:32 1267.05 1268.32 1.27 8000 10160
15-Apr 9:04 1268.32 1270.41 2.09 8000 16720
16-Apr 9:04 1270.41 1272.31 1.9 8000 15200
17-Apr 9:38 1272.31 1274.27 1.96 8000 15680
18-Apr 8:46 1274.27 1275.76 1.49 8000 11920
19-Apr 9:10 1275.76 1277.73 1.97 8000 15760
20-Apr 8:17 1277.73 1279.61 1.88 8000 15040
21-Apr 7:58 1279.61 1281.42 1.81 8000 14480
22-Apr 7:55 1281.42 1283.02 1.6 8000 12800
23-Apr 8:48 1283.02 1285.06 2.04 8000 16320
24-Apr 7:25 1285.06 1286.79 1.73 8000 13840
25-Apr 7:09 1286.79 1288.73 1.94 8000 15520
26-Apr 7:18 1288.73 1290.73 2 8000 16000
27-Apr 7:01 1290.73 1292.95 2.22 8000 17760
28-Apr 7:26 1292.95 1295.3 2.35 8000 18800
29-Apr 7:16 1295.3 1297.14 1.84 8000 14720
30-Apr 7:17 1297.14 1299.03 1.89 8000 15120
Total Units Generated 434,240

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

May-24
Main KWH Meter Units(KWH)
Date Time Present Difference Multiply TOTAL unit
Previous Factor (KWH)
(am)
1-May 7:01 1299.03 1300.76 1.73 8000 13840
2-May 7:14 1300.76 1302.38 1.62 8000 12960
3-May 7:42 1302.38 1304.26 1.88 8000 15040
4-May 7:26 1304.26 1306.16 1.9 8000 15200
5-May 7:09 1306.16 1308.15 1.99 8000 15920
6-May 7:43 1308.15 1309.99 1.84 8000 14720
7-May 7:45 1309.99 1311.95 1.96 8000 15680
8-May 7:45 1311.95 1313.88 1.93 8000 15440
9-May 7:36 1313.88 1315.99 2.11 8000 16880
10-May 7:33 1315.99 1388.07 72.08 8000 576640
11-May 7:27 1388.07 1319.93 -68.14 8000 -545120
12-May 7:47 1319.93 1322.04 2.11 8000 16880
13-May 8:26 1322.04 1323.83 1.79 8000 14320
14-May 8:13 1323.83 1325.86 2.03 8000 16240
15-May 7:09 1325.86 1327.7 1.84 8000 14720
16-May 6:55 1327.7 1329.72 2.02 8000 16160
17-May 7:22 1329.72 1332.12 2.4 8000 19200
18-May 8:39 1332.12 1331.83 -0.29 8000 -2320
19-May 7:19 1331.83 1335.54 3.71 8000 29680
20-May 7:20 1335.54 1336.92 1.38 8000 11040
21-May 8:57 1336.92 1339.19 2.27 8000 18160
22-May 7:08 1339.19 1341.22 2.03 8000 16240
23-May 7:15 1341.22 1343.49 2.27 8000 18160
24-May 7:29 1343.49 1345.81 2.32 8000 18560
25-May 7:19 1345.81 1348.01 2.2 8000 17600
26-May 7:00 1348.01 1350.16 2.15 8000 17200
27-May 7:14 1350.16 1352.03 1.87 8000 14960
28-May 7:14 1352.03 1354.1 2.07 8000 16560
29-May 7:08 1354.1 1356.21 2.11 8000 16880
30-May 7:19 1356.21 1358.5 2.29 8000 18320
31-May 7:09 1358.5 1360.59 2.09 8000 16720
Total Units Generated 492,480

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

June-24
Main KWH Meter Units(KWH)
Date Time Present Difference Multiply TOTAL unit
Previous Factor (KWH)
(am)
1-Jun 7:09 1360.59 1362.96 2.37 8000 18960
2-Jun 7:10 1362.96 1365.13 2.17 8000 17360
3-Jun 7:14 1365.13 1367.31 2.18 8000 17440
4-Jun 7:19 1367.31 1369.59 2.28 8000 18240
5-Jun 8:39 1369.59 1372.1 2.51 8000 20080
6-Jun 8:44 1372.1 1374.12 2.02 8000 16160
7-Jun 8:43 1374.12 1376.34 2.22 8000 17760
8-Jun 8:06 1376.34 1378.49 2.15 8000 17200
9-Jun 7:04 1378.49 1380.65 2.16 8000 17280
10-Jun 8:34 1380.65 1382.78 2.13 8000 17040
11-Jun 7:12 1382.78 1385.05 2.27 8000 18160
12-Jun 8:06 1385.05 1387.52 2.47 8000 19760
13-Jun 7:09 1387.52 1389.86 2.34 8000 18720
14-Jun 7:15 1389.86 1392.25 2.39 8000 19120
15-Jun 7:06 1392.25 1394.63 2.38 8000 19040
16-Jun 7:15 1394.63 1396.82 2.19 8000 17520
17-Jun 6:51 1396.82 1398.74 1.92 8000 15360
18-Jun 7:11 1398.74 1400.75 2.01 8000 16080
19-Jun 7:10 1400.75 1402.75 2 8000 16000
20-Jun 7:12 1402.75 1404.76 2.01 8000 16080
21-Jun 7:01 1404.76 1406.85 2.09 8000 16720
22-Jun 7:23 1406.85 1409.17 2.32 8000 18560
23-Jun 7:11 1409.17 1411.46 2.29 8000 18320
24-Jun 7:11 1411.46 1413.21 1.75 8000 14000
25-Jun 7:22 1413.21 1415.59 2.38 8000 19040
26-Jun 7:25 1415.59 1417.46 1.87 8000 14960
27-Jun 7:09 1417.46 1419.38 1.92 8000 15360
28-Jun 7:40 1419.38 1422.62 3.24 8000 25920
29-Jun 7:57 1422.62 1425.37 2.75 8000 22000
30-Jun 7:23 1425.37 1427.9 2.53 8000 20240
Total Units Generated 538,480

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

July-24
Main KWH Meter Units(KWH)
Date Time Present Difference Multiply TOTAL unit
Previous Factor (KWH)
(am)
1-Jul 8:41 1427.9 1430.35 2.45 8000 19600
2-Jul 7:24 1430.35 1432.67 2.32 8000 18560
3-Jul 7:52 1432.67 1435.16 2.49 8000 19920
4-Jul 7:50 1435.16 1437.39 2.23 8000 17840
5-Jul 7:30 1437.39 1439.52 2.13 8000 17040
6-Jul 7:15 1439.52 1442.03 2.51 8000 20080
7-Jul 7:59 1442.03 1444.45 2.42 8000 19360
8-Jul 7:22 1444.45 1446.69 2.24 8000 17920
9-Jul 7:24 1446.69 1449.29 2.6 8000 20800
10-Jul 7:35 1449.29 1451.51 2.22 8000 17760
11-Jul 7:00 1451.51 1453.93 2.42 8000 19360
12-Jul 7:39 1453.93 1456.28 2.35 8000 18800
13-Jul 7:35 1456.28 1458.8 2.52 8000 20160
14-Jul 8:15 1458.8 1461.22 2.42 8000 19360
15-Jul 7:15 1461.22 1463.31 2.09 8000 16720
16-Jul 7:09 1463.31 1465.11 1.8 8000 14400
17-Jul 7:16 1465.11 1468.16 3.05 8000 24400
18-Jul 7:34 1468.16 1470.46 2.3 8000 18400
19-Jul 7:40 1470.46 1472.8 2.34 8000 18720
20-Jul 7:28 1472.8 1475.14 2.34 8000 18720
21-Jul 7:32 1475.14 1477.38 2.24 8000 17920
22-Jul 7:25 1477.38 1479.52 2.14 8000 17120
23-Jul 7:18 1479.52 1482.04 2.52 8000 20160
24-Jul 7:36 1482.04 1484.38 2.34 8000 18720
25-Jul 7:20 1484.38 1486.68 2.3 8000 18400
26-Jul 7:21 1486.68 1489.3 2.62 8000 20960
27-Jul 7:30 1489.3 1491.91 2.61 8000 20880
28-Jul 7:47 1491.91 1494.51 2.6 8000 20800
29-Jul 7:24 1494.51 1496.65 2.14 8000 17120
30-Jul 7:30 1496.65 1499.29 2.64 8000 21120
31-Jul 7:28 1499.29 1501.93 2.64 8000 21120
Total Units Generated 592,240

Head of Department: _______________________________


The Indus Hospital, QFNST SMP
Jubilee Town, Lahore

DEPARTMENT: ELECTRICAL
Daily Meter Reading WAPDA/LESCO Panel
Tarrif A-3 General Services

August-24
Main KWH Meter Units(KWH)
Date Time Present Difference Multiply TOTAL unit
Previous Factor (KWH)
(am)
1-Aug 8:41 1501.93 1504.41 2.48 8000 19840
2-Aug 7:24 1504.41 1506.92 2.51 8000 20080
3-Aug 7:52 1506.92 1509.72 2.8 8000 22400
4-Aug 7:50 1509.72 1512.08 2.36 8000 18880
5-Aug 7:30 1512.08 1514.4 2.32 8000 18560
6-Aug 7:15 1514.4 1517.07 2.67 8000 21360
7-Aug 7:59 1517.07 1519.77 2.7 8000 21600
8-Aug 7:22 1519.77 1521.88 2.11 8000 16880
9-Aug 7:24 1521.88 1525.14 3.26 8000 26080
10-Aug 7:35 1525.14 1527.88 2.74 8000 21920
11-Aug 7:00 1527.88 1530.64 2.76 8000 22080
12-Aug 7:39 1530.64 1532.77 2.13 8000 17040
13-Aug 7:35 1532.77 1535.23 2.46 8000 19680
14-Aug 8:15 1535.23 1537.99 2.76 8000 22080
15-Aug 7:15 1537.99 1540.11 2.12 8000 16960
16-Aug 7:09 1540.11 1542.78 2.67 8000 21360
17-Aug 7:16 1542.78 1545.36 2.58 8000 20640
18-Aug 7:34 1545.36 1547.86 2.5 8000 20000
19-Aug 7:40 1547.86 1549.96 2.1 8000 16800
20-Aug 7:28 1549.96 1552.58 2.62 8000 20960
21-Aug 7:32 1552.58 1555.11 2.53 8000 20240
22-Aug 7:25 1555.11 1557.55 2.44 8000 19520
23-Aug 7:18 1557.55 1559.99 2.44 8000 19520
24-Aug 7:36 1559.99 1562.42 2.43 8000 19440
25-Aug 7:20 1562.42 1564.59 2.17 8000 17360
26-Aug 7:21 1564.59 1566.93 2.34 8000 18720
27-Aug 7:30 1566.93 1569.36 2.43 8000 19440
28-Aug 7:47 1569.36 1571.77 2.41 8000 19280
29-Aug 7:24 1571.77 1574.29 2.52 8000 20160
30-Aug 7:30 1574.29 1576.6 2.31 8000 18480
31-Aug 7:28 1576.6 1578.97 2.37 8000 18960
Total Units Generated 616,320