A Project by Rama Email Me at For This Project Diagrams and More
A Project by Rama Email Me at For This Project Diagrams and More
ROBOTICS
INTRODUCTION
PROBLEM DESCRIPTION
of life.
Example:
Now must fall down which is the chief aim of the project.
solution.
related to it.
by imposing constraints.
through signals.
checks.
MISSION
To enhance credibility and to promote this concept which is
probe control.
quality.
software.
To specify user requirement and develop accordingly.
SYSTEM STUDY
able to reboot.
The data is entirely lost and the purpose of the mission fails.
functioning.
PROPOSED SYSTEM WITH OBJECTIVES :
implementations dynamically.
ready.
• The concept of data abstraction is clearly implemented
to flexibility in software.
FEATURES:
- Latest Technology
- Modular
- Integrated
- User friendly
- Graphic User Interface
- Easy to Customize
- Secured
- Online Help
- Easy to install
SYSTEM OVERVIEW :
The system has gone through lot of check points during its
every situation.
The system has gone through rigorous checks including black box
and white box checking which are two essential testing methods
MODULES :
1. SAFETY MODULE
2. SENSOR MODULE
3. EQUIPMENT MODULE
4. ADMINISTRATION MODULE
5. TRAJECTORY MODULE
6. USER MODULE
1. SAFETY MODULE :
of the probe.
2. SENSOR MODULE :
We know that a sensor is an interface between
3. EQUIPMENT MODULE :
There are lot of instrumentations on board of a probe.
4. TRAJECTORY MODULE :
We need to establish a path to a probe which is either
module.
5. ADMINISTRATION MODULE :
This module is used by the Project Director to
that exists.
6. USER MODULE :
This is the module which has been developed
temperature etc.
a safe condition.
FEASIBILITY STUDY :
As this system has been developed using wide variety of
independent nature.
date.
ADMINISTRATOR USER
E-R DIAGRAMS
REPORT LOGOUT
LOCK VIEW MODIFY
ROUTE REPORT DETACH CONNECT CONNECT
DECIDE CHECK INITIALIZE VERIFY VERIFY
TRAJECTO SAFETY EQUIPMENT USER ADMINISTRATOR
RY
LOGIN PAGE
HOME PAGE
ROBOTICS
SYSTEM FLOWCHARTS
III SYSTEM ANALYSIS
PERMISSIONS
SENSOR
CONTROL
ACTIVATE DEACTIVATE
EQUIPMENT
Data Flow
Processing Node
Source or Destination
Data Store
LEVEL – 0
MEASURE
Administration
CONTROL TAKE IMAGES
CONTROL EQUIPMENT
DECIDE
GUIDE
INSPECT ROBOTICS
RECEIVE INFORMATION
REPORT
ENA BLE
MODIFY
SAFETY
REDIRECT
DISABLE
LEVEL – 1
LOAD
INITIALIZE
TAKE DECISION
REPORT
STORE DATA
CONNECT EQUIPMENT
SEND TO EARTH
VISUALIZE
LOG OUT
LEVEL – 2
CALCULATE
DECIDE CALIBRATE
ROUTE
SAVE
TRAJECTORY
FINALIZE
COMPARE
REPORT
EXECUTE
LEVEL – 3
LOG IN
VIEW
CHECK INITIALIZE
USER
LOGOUT
REPORT
REQUIREMENT SPECIFICATIONS
this can include data flow analysis and data modeling. These
documentation process.
DATA FLOW ANALYSIS:
1. PROCESS:
data flow(s).
2. EXTERNAL ENTITY:
software.
3. DATA STORE:
DATA MODELING:
the insight into data and the relationship that governs the
data.
given below:
- ENTITY:
model.
- ATTRIBUTE
- RELATIONSHIP
this can include data flow analysis and data modeling. These
number of users.
NORMALIZATION
key of the record, but the data item, and then it is removed
with its key to form another record. This is done until each
created record.
DATA DICTIONARY
USERS
SENSOR
SENSOR
INPUT DESIGN
processing.
The goal of designing input data is to make data entry as
validating.
OUTPUT DESIGN
SYSTEM TESTING
by the users. If the design fails to specify them and permit the
development.
TESTING
analysts can not prove that software is free from all possible
testing verifies that all elements mesh properly and that overall
INTEGRATION TESTING:
structure has been dedicated by the design there are two types
BOTTOM UP INTEGRATION
development
VALIDATION TESTING
SYSTEM TESTING
SECURITY TESTING
STRESS TESTING
PERFORMANCE TESTING
quality assurance.
TESTING :
VALIDATION :
environment.
CERTIFICATION :
standards.
VI SYSTEM SECURITY
PHYSICAL SECURITY:
many cases. Apart from all these Win NT has its own kernel
LIMITATIONS:
internet
customers.
this limitations.
SCOPE FOR FUTURE WORK
future: