TLE 5 4rth Midterm
TLE 5 4rth Midterm
Test I- Direction: Read each item carefully. Encircle the letter of the correct answer.
1. Which of the following is the list of all needed supplies to accomplish your project
along
with their corresponding amount?
A. procedure C. evaluation
B. materials D. tools needed
2. It is the list of the tools or materials that you already have and needed for the
project.
A. procedure C. project title
B. materials D. tools needed
4. Which of the following is the part where you list the instructions you must follow in
order
to accomplish your project?
A. procedure C. project title
B. materials D. tools needed
5. This is a strategy that outlines the manner or steps on how a person will achieve
the
goals objectives he or she had set.
A. objectives C. project title
B. project plan D. materials
7. This assesses the finished product using scoring rubric with a specific criterion.
A. procedure C. objective
B. evaluation D. project title
8. Which of the following states the goals that you aim to achieve in the project?
A. procedure C. project title
B. objective D. tools needed
9. It must be neat and should contain comments or specifications with regards to the
type
of fabric and stitches used, length, style, etc.
A. objective C. Drawing
B. evaluation D. project plan
10. It should be short and concise but must still be able to give the reader an idea of
what
the whole project is about.
A. sketch C. procedure
B. evaluation D. Project title
Test II-Direction: Read and identify the following sentences. Choose your answer
inside the box.
Part I
Word Bank
____________________7. It is the intervening step between the block and the final
pattern.
____________________9. This type of packaging allows you to stack your products easily,
while allowing others to see what the product inside looks like.
___________________10. It is made by drafting from the measurements which have been
carefully taken from an individual or from a model.
Arrange the following steps in drafting pattern for table runner number it from 1-6
Part II. Directions: Arrange the following steps in drafting pattern for table runner.
Number it from 1-6. Write your answer on a space provided.
_______ E. From point A measure 12” upward and mark point C as the width of table
runner.
_______ F. From point A measure 59” (150cm) going to the right and mark point B as
the
length of table runner.
Part III. Arrange the scrambled steps according to its proper procedure in sewing
table
runner. Write the letter from A-J
______1. To form the hem, fold the ½ inch allowance inward, then pin.
______4. From the edges of the pattern, mark with ½- inch allowance on the fabric.
______6. Lay the fabric on the table with the wrong side up.
Prepared by: