MEMO
FROM : SF.GEN.MGR/INSP.GEN.MGR
TO : F.MAINT.GEN.MGR
: CORRDIV.MGR
CC : F.PROD.GEN.MGR./ONSHORE PROD.DIV.MGR
DATE :25/03/2023
REF. : 81/RACO.SEP./49/2023
SUB. : INSPECTION FOR RACO SEPERATOR 2nd STAGE (200-VS-l02) AND PIPING
Reference to the above mentioned, please be informed that visual inspection and
thickness measurements had been carried out for the leakage observed for RAeo SEP.
the results are as the technical report.
Thanks.i.,
IPagel
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
Table of content
6 THICKNESS MEASUREMENT 6
7 VISUAL INSPECTION EXAMINATION FOR EXTERNAL, INTERNAL AND PIPING 7-19
SYSTEM
IPage2
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
1. SEPARATOR DATA:
LOCATION PETRECO
ORIENTATION HORIZONTAL
MATERIAL C.S
DIAMETER 4000mm
LENGTH 18000mm
OPERATING TEMPRETURE 65 ·C
P&ID 1910-01-CPFM-00114
IPage3
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
2. Introduction:
• A cylindrical or spherical vessel used to separate oil, gas and water from the total fluid stream
produced by a well. Separators can be either horizontal or vertical. Separators can be classified
into two-phase and three-phase separators (commonly called free-water knockout). The two-
phase type deals only with oil and gas, while the three-phase type handles oil, water and gas, this
type (RACO SEP.200-VS-102).
1) To determine the physical condition of the vessel and to determine the type, rate, and causes of
damage mechanisms and associated deterioration.
2) To determine the work necessary to restore a vessel to a condition suitable for safe operation at the
design conditions.
4. Inspection Register:
IPage4
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
IPageS
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
12
Description O'CLOCK 5 O'CLOCK 6 O'CLOCK 7 O'CLOCK Remarks
O'CLOCK
27.93 29.02
Head-2 28.43 28.01
Location
COURSE 1
COURSE 2 SEE
DRAWING
OF RAeo
SEP.
-5
Section
-6
Section
-7
COURSE 3
Section
-8
Section
-9
COURSE 4 Section
-10
IPage6
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
IPage7
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
IPage8
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
IPage9
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
A2- Significant Fault (welded patch plate was installed) on shell B- Less Significant Fault ( found rusted at shell Sep. and soil at
plates Be side weld course shell weld course shell )
A2- Significant Fault (missing bolts and nuts for inlet line 12") A2- Significant Fault (soil corrosion at two flanges inlet line
12"
I P age 10
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
A2- Significant Fault (soil corrosion at two flanges drain 8- less Significant Fault (Supports steel and concrete)
nozzle.)
Photo No.13 Photo No.14
Shall be check and test Shall be check and test by instrumentation div.
Photo No.IS Photo No.16
IPagell
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
Photo No.2l
I P age 12
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
I P age 13
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
section -1 after baffles corroded corrosion at A2- Significant Fault ( section -1 after baffles corroded corrosion at 5
6 o'clock) o'clock)
A2- Significant Fault Some pits corrosion at internal Sep. from 5 A2- Significant Fault Cathodic protection anode are fully depleted at
0' clock to 7 0' clock section-l. And section-2)
I P age 14
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
A2- Significant Fault Some pits corrosion at internal Se A2- Significant Fault Some pits corrosion at internal Sep, at 6
o'clock o'clock and undercut for weld shell Sep.
A2- Significant Fault Some sour water corrosion reduction A2- Significant Fault Some sour water corrosion reduction l4mm
IOmm at 7 o'clock During thickness measurements at 6 o'clock During thickness measurements
I P age 15
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
I P age 16
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
A2- Significant Fault cutting in steps for internal ladder for oil
IPage17
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
Photo No.8
I P age 18
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
B- Less Significant Fault ( was found rusted and the valves During apply UT thickness at piping system
shall be check
Photo No.13 Photo No.14
I P age 19
PETROBEL
BELAYIM PETROLEUM COMPANY
SINAI FIELDS
INSPECTION DIVISION
1) One fillet-welded patch was installed on shell plates (circumference weld between 1't course and 2nd
course from inlet nozzle side) but internal baffles covers its location from inside. See photo no.9 (part
external insp.)
2) Two drain nozzles found in bad condition including found clamp around the nozzle N-5. See photo nO.7
(part external insp.)
3) Manhole (head) found corroded and projection is rusted. See photo nO.10 (part external insp.).
4) There is spot rusted and soil at shell separator. See photo no.11 (part external insp.).
5) There is soil corrosion at tow flange inlet line 12". See photo no.12 (part external insp.).
6) There is cutting in ladder with handrail, see photo nO.8 (part external insp.)
1) There are piping system observer oil around pipes and sludge. See photo no.8 (part piping system insp.)
2) There are some pipes without painting. See photo no.7. 10 (part piping system insp.).
3) There are rusted of pipes attached top shell Separator. See photos (5-11-12-13) part piping system.
1) Many pits & sour water corrosion area observed inside surface of shell and head. See photos part interior
shell
2) Reduction of the thickness more than 3mm to 14mm. according of fitness of services calculation.
19.20mm with corrosion allowance. See photos part interior shell
3) The weld for shell courses a bad condition. See photos part interior shell
4) The weld for internal nozzles (drains and instruments) nozzles a bad condition. See photos part interior
shell
5) The Cathodic protection anode are fully depleted at section-l & section -3 and bottom Sep. See photos
part interior shell
6) There is the intemalladder a cutting for last 4 steps and not fixed with bolts. See photos part interior shell
7) There is the ladder for oil room a cutting for last 3 steps and not weld with bottom. See photos part interior
shell
I P age 20
PETROBEL ~.Jfo.
BELAYIM PETROLEUMCOMPANY ~r ----.!lp~~ J.Jfo. 4.sJ.l---'~.
SINAI FIELDS ~~Jjb
INSPECTION DIVISION
~~I ul'.;'iii'l elb!
a. The minimum required thickness for shells under pressure shall not be less than that
computed by the following formula:
t=PR/ (SE-O.6P)
E = Joint efficiency =1.0-RT-2
P = Design pressure = 12.24 Bar=177.53 PSI
R = Radius of the shell = 2000 mm = 78.74 In.
S = Maximum allowable stress value (ASTM A516 G,7D S=22000 PSI),
t = Minimum required thickness of shell =0.638 in = 16,20 mm without corrosion allowance,
_ 0 638' - 16 20
t -- 177,53 X 78,74
-. In - . mm.-__ __. 16.20 + C.A ()3mm = 19.20mm.
22000.1-0,6.177.53
t = 0.88SPL r
I. SE-O,lP
I P age 21
PETROBEL
BELAYIM PETROLEUMCOMPANY
SINAI FIELDS
INSPECTION DIVISION
8. Recommendation:
~ Exterior vessel:
a) According to API 510 The fillet welded patch plate shall be removed and repair its location by
insert weld patch plate as following:-
• Shape: rectangular shape have a rounded corner (2in) radius (R) except when intersect
with circumference weld shall have right-angle.
• Thickness: not less than 20mm.
• Should have good fit-up and root pass (if the back weld is impossible).
b) Replace drain nozzle (N-5) 6" which include the clamp (See table of nozzles).
c) The weld ladder with handrail beside head-1 shell of Sep.
d) Deposited weld metal for manway (M-1) the sea beside. (See table of nozzles).
e) Apply Paint system for shell vessel.
~ Interior vessel:
a) Thickness of the (pits-sour water-hydrogen) corroded portions (internal) shall be restored by
deposited weld metal, thickness shall be not less than 19.00mm. (See table thicker.).
b) solution for shell and internal baffles plates due to exist patch on external separator
• Dismantles baffles plates for cleaningto increase efficiency of separator and checkshell of
separator under baffle (ifthe baffle in bad condition should be replace by new one)
• Any defect appear in shell of separator after dismantle the baffle should be repair by
deposited weld metal from 30'clock to 90'clock, thickness shall be not less than
19.00mm.
c) Re-weld internal instruments nozzles.
d) Re-welding longitudinal circumference of separator as possible
e) Re-weld internal drains nozzles.
f) Re-weld the internal ladder
g) Installing cathodic protection anode by corrosion.div.
h) Repair internal two ladder and fixed or replaced.
i) Repair and fixed mix extractor outlet gas (see pic. 28 at interior inspection)
j) Repair procedure (WPS, PREHEAT NDT AND HYDROTEST) as referred in ASME VIII, SECTION.IX.
k) Apply internal Paint system for shell vessel.
Apply (UT)
INSPECTION PIPING SYSTEM /INSP.MECH.ENG INSP.ENG.API510 INSP.GEN.MGR.
THICKNESS
RABEAI
ELSAYED
KARIM ATTEF I MAHMOUD MEGAHED ABDHAMEED HASSAN / ALHASSAN ISAMAEL SAID SAKR