0% found this document useful (0 votes)
250 views4 pages

Combined Example

Combined example

Uploaded by

Mulualem Berhanu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
250 views4 pages

Combined Example

Combined example

Uploaded by

Mulualem Berhanu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

12/17/2016

1200kN
• Example 800kN
350m

• Given Column 1 size 30x 30


Reinf. 422
Column 2 size 40x 40cm
Reinf. 424

Property line
Ultimate soil bearing pressure , qult = 150kPa
• fyk = 300MPa fyd = 300/1.15 = 260.87 MPa

• C25 fck= 20MPafctk = 1.5 MPa, b

• Required:- Design of rectangular combined footing

• SOLUTION
• Proportioning of footing • qult = R/A = 2000/ (4.50*b)
800kN
R
1200kN • 150 = 2000/(4.50 *b)  b =2.96m
X’ • Take b =3.00m
15cm 350cm
• Actual contact pressure
•  = R/ab = 2000/ (4.50*3.00) = 148.15kPa < qult ……….. ok
a
• Shear force and bending moment diagrams

• R = 800 +1200 = 2000kN


• RX’ = 1200 *350  X’ = (1200 *350)/2000 = 210cm
• a = 2 ( X’ + 15) = 450 cm

0.30m 3.15m 0.40m 0.65m


800kN 1200kN • Thickness of the footing
• Wide beam shear
• The magnitude of the wide beam shear is read off from the shear
822.24kN 148.15*3=444.45kN/m force diagram at a distance of d from the face of the column.
1.65m d
• V = 444.45 (3.45 –d) -800 =733.35-444.45d
66.67kN • Take d= 0.60m and  = min = 0.5/fyk = 0.5 /300 = 0.0017
• Then, V =466.68kN
• The wide beam shear resistance according to EBCS-2 is given
by
377.76kN
Vud = 0.25fctd k1k2 bwd (MN)
599.99kN-m
733.33kN k1 = ( 1+50) = (1 +50*0.0017) =1.085
k2 = 1.6 – d =1.6 -0.6 = 1
Vud = 0.25 *1*1.085*1*3.0*0.60 =0.488MN =488kN>V …OK!

5.00kN-m
160.59kN-m

1
12/17/2016

• Net shear force developed under column 1


• Punching shear
V1= 800 -148.15*(1.2*2.1) =426.66kN
• Net shear force developed under column 2
1.5d +0.30 =1.2 1.5d +0.40 +0.65=1.95 V2 = 1200-148.15* (1.95*2.2)=564.43kN
• Punching shear resistance
3d+0.3=2.1

3d+0.4=2.2
Vup = 0.25fctd k1k2ud (MN)
300cm

d= 0.60m and  = min = 0.5/fyk = 0.5 /300 = 0.0017


k1 = ( 1+50) = (1 +50*0.0017) =1.085
1.5d +0.30 =1.2 1.5d +0.40 +0.65=1.95 k2 = 1.6 – d =1.6 -0.6 = 1
450cm u1 = Pr1 =4.5m , u2 = Pr1 = 6.1m
• Punching shear resistance under column 1
• Perimeters Pr1 =1.2+1.2+2.1 =4.5m • Vup = 0.25 *1000* 1.085*1*4.5*0.6=732.38kN > V1…… ok!
Pr2 =1.95+1.95+2.2=6.1m

• Punching shear resistance under column 2


f cd  2M 
• Vup = 0.25 *1000* 1.085*1*6.1*0.6=992.78kN > V2………… ok!  1  1  
f yd  f cd bd 2 
• Moment capacity of concrete
11.33  2  599.99 
M  0.32  f cd  bd 2  1  1    0.0022   min
11.33  103  3.0  0.6 
2
260.87  
 0.32 11.3310  3.00  0.6 3 2
As  bd  0.0022 300  60  39.6cm 2

 3915.65kN  m  M max ....Ok!


Use  = 20, as = 3.14cm2
No. of bars , n= 39.6/3.14 =12.6 , use 13 bars
• Calculation of reinforcement Spacing = (300-2*5)/ (n-1) =24.2cm
– Long direction
The reinforcement shall be calculated for the maximum moment Use 13  20 c/c 240mm
Mmax = 599.99kN-m

– Short direction • Contact pressure under columns 1 and 2


800
 
1  444.44kN / m 2
l1 = (3-0.3)/2 = 1.35m l2 = (3-0.4)/2
3.00 X 0.60
, = 1.30m
1200
2   400kN / m 2
3.00 X 1.00

• Bending moment
a’+d/2= 2.55 m a’+d= 0 .35 m • M1 =444.44 *1.35*0.60*1.35/2 = 243kN-m
0.3+0.3=0.60m 0.4+0.6=1.0m

Effective width at exterior and interior columns being a+d/2 and • M2 = 400 * 1.30 *1.00 * 1.30/2 = 338kN-m
a+d, respectively

2
12/17/2016

• Calculation of Reinforcements Use  = 20, as = 3.14cm


– Under column 1 No. of bars , n= 17.05/3.14 =5.4 , use 6 bars
Moment capacity of concrete Spacing = (60-5)/ (n-1) =9.2cm
Use 6  20 c/c 90mm
M  0.32  f cd  bd 2
 0.32 11.33103  0.60  0.58
2
– Under column 2
 731.79kN  m  M 1....Ok! Moment capacity of concrete
M  0.32  f cd  bd 2
 0.32 11.33103 1.00  0.58
2
f cd  2M 
 1  1  
f yd  f cd bd 2   1219.65kN  m  M 2 ....Ok!
11.33  2  243 
 1  1  2 
 0.0049   min ....ok!
260.87  11.33 103  0.60  0.58 
As  bd  0.0049 60  58  17.05cm 2

 Use  = 20, as = 3.14cm


f cd 2M 
 1  1   No. of bars , n= 25.14/3.14 = 8 , use 8 bars
f yd
 f cd bd 2 
Spacing = (245)/ (7)
11.33  2  338 
 1  1  2 
 0.0040   min ....ok! =35cm < 400mm (smax for secondary bars)……. ok
260.87  11.33  103 1  0.58 
Use 8  20 c/c 350mm
As  bd  0.0040100  58  23.20cm 2
•Long direction
Asmin = min bd = 0.0017 *300 *60 =30.60cm2
Use  = 20, as = 3.14cm
No. of bars , n= 30.16/3.14 = 9.7 , use 10 bars
No. of bars , n= 23.20/3.14 =7.4 , use 8 bars Spacing = (300-10)/ (9)
Spacing = (100)/ (n-1) =14.3cm
=32.2cm < 400mm (smax for secondary bars)……. ok
Use 8  20 c/c 140mm
Use 10  20 c/c 320mm
• The reinforcement between the two strips will be nominal
reinforcement to prevent shrinkage cracks
• Short direction
• Asmin = min bd = 0.0017 *255 *58 =25.14cm2

•Cantilever portion
–Bottom reinforcement , long direction
Short direction
–Critical moment from bending moment diagram is M =160.59kN-m
Provide minimum reinforcement
f cd  2M 
 1  1   • Asmin = min bd = 0.0017 *35 *58 =3.45cm2
f yd  f cd bd 2 
• No. of bars , n= 3.45/3.14 =1.1 , use 2 bars
11.33  2 160.59  Spacing = (25)/ 2 =12.5cm
 1  1  2 
 0.00057   min
260.87  11.33103  3  0.60  Use 2  20 c/c 125mm
As   minbd  0.0017 300  60  30.60cm 2
• Development length
Use  = 20, as = 3.14cm • Short direction
No. of bars , n= 30.6/3.14 =9.7 , use 10 bars • Under column 1
Spacing = (300-2*5)/ 9 =32.22cm
 f yd 2  260.87
Use 10  20 c/c 320mm ld    130.44cm
4 f bd 4 1

3
12/17/2016

• Available development length, la =135-5=130cm < ld


Bend the bars upward with a minimum length of 10cm
• Under column 2

 f yd 2  260.87
ld    130.44cm
4 f bd 4 1

• Available development length, la =130-5=125cm < ld


Bend the bars upward with a minimum length of 10cm