M&CPCN0402020 (Rev - 2 - 0)
M&CPCN0402020 (Rev - 2 - 0)
0)
Government of India
Ministry of Railways
FOR
(Revision 2.0)
2020
Issued By
TABLE OF CONTENTS
1. FOREWORD
2. SCOPE
3. APPLICABLE/REFERENCE DOCUMENTS
4. TERMINOLOGY/ABBREVIATIONS
5. GENERAL REQUIREMENTS
6. M&P REQUIREMENTS
7. TESTING FACILITIES
8. QUALITY CONTROL REQUIREMENTS
9. REPAIR/SERVICE CENTRE
MAJOR STEPS INVOLVED IN GETTING THE FIRMS APPROVED/
10. REGISTERED
11. LIST OF PAINTS TO BE APPROVED
12. ANNEXURE-I & II
Page 1 of 14 Effective from March 2020 M&C/PCN/040/2020 (Rev 2.0)
1. FOREWORD
2. SCOPE
3. APPLICABLE/REFERENCE DOCUMENTS
(i) IS: 101
(ii) ASTM B117
(iii) ASTM D3359
(iv) ASTM G-154
(v) ASTM 4060
4. TERMINOLOGY
5. General Requirements
(i) shall possess valid ISO 9001 : 2015 or latest & ISO: 14000
Environmental maintenance system installation certificate for the
products for which approval is sought.
(ii) shall have minimum manufacturing experience of these paints for 2
years.
(iii) shall procure these resins from national or international sources
and shall produce bill of material.
(iv) shall have valid clearance from Pollution Control Board. (Proposed for
deletion)
(v) Shall have the record of supplying the products to the reputed
national and international organisation like defence, heavy &
earthmover industries like BEML, BHEL, railway and major
automotive industries. (Proposed for deletion)
(vi) Shall have minimum turnover of Rs. 1 Crore per annum for last 2
years. (Proposed for deletion) Proposed for modification as:
Shall have balance sheet for last 2 years.
(vii) Shall have ERP/SAP supported multimodule application software
for managing the important parts of business
(viii) Firm should have their own R&D facilities approved by Govt. Agency or
the firm should have tie up with Govt. R&D Laboratory/Deemed/Govt.
University. Valid certificate with clear date of validity on it should be
available with the firm and same need to be submitted to RDSO/Lucknow.
(Proposed for deletion)
(ix) The firm should have valid capacity certificate issued by NSIC
/Other approved agency for small scale industries.
(x) In case of medium & large scale industries, if capacity certification
is not possible by any approved agency, capacity shall be declared
by the firm itself detailing the points to arrive at the capacity and
subsequently assessing officer will verify the capacity during the
assessment of the firm.
The above information should be furnished by the firm in registration form.
5.2 The firm should have covered area with adequate space for the storage of
raw material, intermediate and finish products like pigments, extenders,
resins, hardeners, varnish, thinners, additives, paints etc. with the firm
which is free from dampness and humidity and all manufacturing facilities
should be available in same campus of factory. One bond room with lock
and key facility for keeping finished products should also be available.
5.3 Approval of a firm will be given as per laid down procedure given in ISO apex
document only after Inspection of the factory premises to assess the
capacity/capability of the firm and samples of paints drawn during inspection
Page 1 of 14 Effective from March 2020 M&C/PCN/040/2020 (Rev 2.0)
5.5 The Approval to the firm will be given for full paint system . The list of paint
items is furnished at Clause 11.0
Firm should possess the following minimum machines and plants for
manufacture paints based on Epoxy & Polyurethane resins with valid
calibration certificates of balances at S.No.7 & 8.
Table-I
Sl. Equipments Quantity
No. (min.)
1. High Speed Disburser/Pug mixer, min. capacity 500 kgs 3 Nos.
-3 nos. or the total capacity shall be 1500 Kgs/day min.
may be considered irrespective of no. of machines.
7. Testing facilities
7.1 The firm should have proper air conditioned laboratory to maintain lab test
conditions at 27 ± 2°C and 65 ± 5% relative humidity, for which suitable
indicating/measuring instruments will be available in the lab.
7.2 There should be full testing facilities with equipments which are covered as per
requirements of IS: 101 latest version or as per ASTM. Other equipments not
covered in IS /ASTM shall be of reputed make and these should have valid
calibration certificate. It is mandatory for a firm seeking approval of RDSO to
have equipments listed in table –II at their end.
Page 7 of 14 Effective from March 2020 M&C/PCN/040/2020 (Rev 2.0)
Table-II
Sl Name of the Equipment Quantity (min.)
No.
1. Humidity Chamber as per IS : 101 1 No.
2. Salt Fog Test Cabinet as per ASTM B117 or equivalent 1 No.
3. Gas Liquid Chromatograph 1 No.
4. Cross cut adhesion tester as per ASTM D3359 1 No.
5. Sagging index as per IS : 101 1 No.
6. Gloss-O-Meter of 600 angle of incidence as per IS : 101
1 No.
7. Abel’s Flash Point Apparatus as per IS : 101 1 No.
8. Cryptometer or Black & White Charts as per IS : 101 1 No. or Black and
White Charts in
adequate quantity
9. Flexibility & Adhesion Apparatus as per IS : 101 1 No.
10. Scratch Hardness Tester as per IS : 101 1 No.
11. Flow Cup (Ford Cup No. 4) as per IS : 101 1 No.
12. Stormer/Brooke Field Viscometer as per IS : 101 1 No.
13. Weight/10 Litre Cup as per IS : 101 1 No.
14. Hegman Gauge as per IS : 101 1 No.
15. Centrifuge as per IS : 101 1 No.
16. Dry Film Thickness Measuring Equipment as per IS :101 1 No.
17. Dean & Stark Apparatus as per IS : 101 / Carl Fischer 1 No.
apparatus
18. Lovibond Tintometer as per IS : 101 1 No.
19. Accelerated Weathering Tester viz QUV to ASTM G-53 1 No.
20. Taber Abrasion tester as per ASTM D 4060 1 No.
21. Color Spectrophotometer as per IS:101/ASTM 1 No.
22. Chemical Balance upto 4 decimal places (in gms.) 1 No.
23. Physical Balance upto 2 decimal places (in gms.) 1 No.
24. Hot Air Electric Oven 1 No.
25. Distillation Plant 1 No.
26. Hydrometer of different ranges 1No.of each range
27. Hygrometer 1 No.
28. Drying time recorder as per ASTM D 5895 1 No
29. Air & Air less spray gun 1 No each
30. Hot Plates 3 Nos.
Page 8 of 14 Effective from March 2020 M&C/PCN/040/2020 (Rev 2.0)
• Organisation chart
• Write up on manufacturing process of paints
• Process flow chart for paints
• Traceability of various products.
• Inspection and testing plan for all the products starting from raw
materials, in process and final product.
• Details of non-conformity
• Details of customer complaints and warranty failures/In service failures.
• M&P/T&P as per specification/STR/IS
10. Major steps involved in getting the firms approval / registration as per
latest ISO apex documents:
10.1 The firm shall apply online for vendor registration on RDSO website.
10.2 The application form and other relevant documents shall be scrutinized at M&C
Dte and if any deficiencies are found, the firm shall be asked to comply the
deficiencies as per latest ISO apex guidelines.
10.3 After all deficiencies are complied by the firm, the capacity, capability and STR
verification of the firm shall be assessed by nominated official. Samples shall
also be drawn from the firms premises after satisfactory compliance of STR
and shall be tested at RDSO/National Test House (Lab which is accredited by
an accrediting agency which meets the criteria laid down in QO-D-8.1-11
{Latest version}) and if test facility for any of parameter is not available either at
RDSO/NTH/as specified in QO-D-8.1-11 then it may be referred to Govt
lab/University/any other NABL accredited lab, where it exist.
10.4 If all the test results are satisfactory and all other requirements are
Page 10 of 14 Effective from March 2020 M&C/PCN/040/2020 (Rev 2.0)
11. The list of paints based on epoxy and polyurethane resins which may be used for
painting, coaches, diesel and electric locomotives as per RDSO Specn.
M&C/PCN/100/2018 etc. in Indian Railways and Production Units is furnished
below:
ANNEXURE –I
SN Description of Machine Capacity Total No. of Operation to Capacity of Year & Present
/Equipment/ Manpower Make
requirement/ requirement Machines be performed available of Status—
by Machine/
Qualification available Equipment Machine Machine Working/
Under
Commencing
/Not working
1 2 3 4 5 6 7 8 9
1 Highspeed Disburser/ 500 kg. 3 Nos.
Pug Mixer
2 Sand Mill/LMZ Sand 2000 lit. /day 2Nos.
Mill(chambercap.10lit.)
3 Bead/Dyno Mill/LMZ Sand 3000 lit. /day 3 Nos.
Mill
4 Paint Mixer 2K lit.each 5 Nos.
5 Thinning Pump 6 Nos.
6 Automatic Filling Machine 3No.
7 WeighingMachine,LC=0.1 300 kg 2 Nos.
00 kg
8 WeighingMachine 60 kg 2 Nos.
LC=0.050 kg
9 WeighingMachine 10 kg 2 Nos.
LC=25.0 gm
10 Electronic Balance 1.0 kg 3 Nos.
LC=10.0 gm
11 Industrial Vibrator or 3 Nos.
Agitator
12 Solvent Pump 3 Nos.
13 Unloading Pump 5 Nos.
14 Slow /High/Variable speed 3 Nos.
premixer each
Resin Transfer Pump 2 Nos.
15
1 2 3 4 5 6 7 8 9
54 Manpower— The 1 No.
technical supervisors/ each
managers responsible for
for production & quality Product
control activities related ion &
to manufacturing of Quality
subject paint item Control
should have the respect
minimum qualification ively.
of B.E. / B.Tech (Paint
/Polymer
Technology/Chemical
Engg.) with a minimum
of 3 years experience
or M.Sc. (Chemistry)
with a minimum of 7
years experience in
relevant fields to look
after the production,
quality control and
testing activities and
should have knowledge
of paint manufacturing,
testing of raw materials
etc.
ANNEXURE –II
Statement of supplies during the duration between two periodic quality audits
as per QO-D- 8.1-13 (Latest version)
Name of the Vendor:
S.No. Period Full Item Supplied to P.O No. Quan Inspecting Performance Whether Any
detail with Zonal Rly/ and date tity Agency Report of supplied other
specification PU/ Inspecting within information
Wagon Builder Agency D.P or
extension
of
D.P
Taken
(Informa
tion to
be given
in detail)