Work Program - RIVER - Kurigram

asda

Uploaded by

lidora6251
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views1 page

Work Program - RIVER - Kurigram

asda

Uploaded by

lidora6251
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Construction of Primary School cum Flood Shelter with Solar PV Nano Grid, Street Light, tightening Protection &

Connecting Roads, Bridge/Culvert at Kurigram District.


Package No. :: LGED/RJVER/KURI/21-22/NW-011
ID Task Name Duration Start Finish Predecessors Half 1, 2024 Half 2, 2024 Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026
J M M J S N J M M J S N J M M J S
0 Summary of Work Plan PS cum FS Kurigram_RIVER 900 days Sun 3/3/24 Thu 8/27/26
1 Pre-construction and Substructure works 355 days Sun 3/3/24 Fri 2/28/25
2 Site Development 90 days Sun 3/3/24 Wed 6/5/24
3 Layout 75 days Thu 6/6/24 Thu 8/22/24 2
4 Materials equipment mobilization stacking Works90 days Thu 6/6/24 Fri 9/6/24 2
5 Earth Works 120 days Sat 8/3/24 Sat 11/30/24 3FS-20 days
6 Foundation works 200 days Tue 8/13/24 Fri 2/28/25 5SS+10 days
7 Super Structure Works (55 nos. Shelter) 510 days Thu 9/12/24 Tue 2/3/26
8 RCC Works 390 days Thu 9/12/24 Mon 10/6/25
9 RCC Ground Floor 90 days Thu 9/12/24 Tue 12/10/24 6SS+30 days
10 RCC 1st Floor 90 days Wed 12/11/24 Mon 3/10/25 9
11 RCC 2nd Floor 90 days Tue 3/11/25 Sun 6/8/25 10
12 RCC 3rd Floor 60 days Mon 6/9/25 Thu 8/7/25 11
13 RCC Roof Floor 60 days Fri 8/8/25 Mon 10/6/25 12
14 Brick Work (55 nos. Shelter) 465 days Sun 10/27/24 Tue 2/3/26
15 Brick work Ground Floor 180 days Sun 10/27/24 Thu 4/24/25 9FS-45 days
16 Brick work 1st Floor 60 days Mon 6/9/25 Thu 8/7/25 15,11
17 Brick work 2nd Floor 60 days Fri 8/8/25 Mon 10/6/25 12,16
18 Brick work 3rd Floor 60 days Tue 10/7/25 Fri 12/5/25 17
19 Brick work Roof Floor 60 days Sat 12/6/25 Tue 2/3/26 18
20 Electrical & Mechanical Works (Electric Works, 800 days Sun 3/3/24 Tue 5/19/26
Solar Power and lightning Arrester)
21 Finishing Works (55 nos. Shelter) 145 days Wed 2/4/26 Sun 6/28/26
22 MS & SS work 40 days Wed 2/4/26 Sun 3/15/26 19
23 Plaster works 60 days Wed 2/4/26 Sat 4/4/26 22SS
24 Tiles works 60 days Sat 2/14/26 Tue 4/14/26 23SS+10 days
25 Wooden 60 days Wed 2/4/26 Sat 4/4/26 22SS
26 Aluminium works 45 days Thu 2/19/26 Sat 4/4/26 22SS+15 days
27 Roof Top works 30 days Wed 2/4/26 Thu 3/5/26 23FS-60 days
28 Sanitary & Plumbing pipe works 60 days Wed 2/4/26 Sat 4/4/26 22SS
29 Painting 60 days Sun 4/5/26 Wed 6/3/26 27,28
30 Furniture and Misc. Items 25 days Thu 6/4/26 Sun 6/28/26 29
31 Connecting Roads, Culvert, Solar and Other 875 days Sun 3/3/24 Sun 8/2/26
32 Permanent Bench Mark (BM.) 200 days Sat 8/3/24 Tue 2/18/25 5SS
33 Internal Road 400 days Sat 8/3/24 Sat 9/6/25 5SS
34 Electric Works, Solar Power and lightning Arrester 120 days Fri 3/6/26 Fri 7/3/26 27
35 Deep Tube well / Submersible Pump 90 days Fri 3/6/26 Wed 6/3/26 27
36 Environmental Enhancement Works 850 days Sun 3/3/24 Wed 7/8/26 2SS
37 Solar PV Nano Grid Power System 150 days Fri 3/6/26 Sun 8/2/26 27
38 Solar Street Light 200 days Sun 9/7/25 Wed 3/25/26 33
39 Connecting Road & Slope Protection Work 450 days Sat 8/3/24 Sun 10/26/25 5SS
40 RCC. Box Culvert 300 days Sat 8/3/24 Thu 5/29/25 39SS
41 Field Raising 600 days Sat 8/3/24 Wed 3/25/26 39SS
42 Site Cleaning & Handover 60 days Mon 6/29/26 Thu 8/27/26 21,20,7
43 Finish 0 days Thu 8/27/26 Thu 8/27/26 42 8/27

Submitted By: PE:Ptroject Director, LGED, RIVER


MJCL – STANDARD JV
Note: Starting Date shall varry upon NOA and Time for access to the site. During contract JV shall again provide a detailed Work Program with WBS considering all the issues said in Section III- EQC, Page-79 of Vol-1.