Arch and Lintel Building Construction Objectives
Arch and Lintel Building Construction Objectives
BUILDING CONSTRUCTION
PSC WINNER
Striking of
11. In the construction of arches, sand box method is used for centering
19. The depth of an arch at the crown is more than that at the
springing line and the shape of the intrados is a semi-
circle, then it is called : Florentine arch
20. The center of the arch lies above the springing line, the
arch is called : Horse shoe arch
24. Which one of the following is not a one centered arch ? Pointed
26. In ______ arch, the depth at crown is more than that at the
springing line. Venetian
30. _______ arch is built over a lintel or a flat arch to relieve the
latter of the super incumbent weight. Relieving arch
33. The type of lintel when the opening is small and the loads
are light : Brick lintel
Below the
45. In a segmental arch, the center of the arch lies : springing line
46. The lower half portion of the arch between the crown and
the skew back is called : Haunch
Three centered
49. Florentine arch is an example for : arch
50. The lower half portion of the arch between the crown and
skewback is : Haunch
Then