TYCS Sem5 SQA
TYCS Sem5 SQA
TYCS Sem5 SQA
m
3 the following. Simple Loops Nested Loops Loops above above
it may be
difficult to
un
What happened if an expected result is not we cannot determine if
specified then automate the the test has . it may . it may
we cannot user input passed or difficult to difficult to
ot
4 run the test values failed repeat the test repeat the test
Select the option which is not an appraisal in inter-process quality quality
es
5 SQA? inspection maintenance testing planning planning
Select the people who identify the document Project All of the
.in
6 and verifies the correctness of the software… manager SQA team Project team mentioned SQA team
A product which is manufactured by using the Quality of Quality Quality None of the Quality of
7 degree of the design specification… conformance Control Assurance above conformance
m
12 The order in which test levels are performed is System Acceptance Acceptance of a project of a project
A system is A system is
necessarily Undetected necessarily
un
In a system more reliable errors may more reliable
two different after lead to faults after
Which of the following is false? failures may A fault need debugging and debugging
ot
have not affect the for the eventually to for the
different reliability of a removal of a incorrect removal of a
es
13 severities. system fault. behavior. fault.
14 Test Conditions are derived from Test Design Test Data Test cases Specification Specification
.in
A deviation from the specified or expected
behavior that is visible to end-users is called
15 ______. errors faults defect failure failure
Whenever a
When should regression testing be When the After the software After the
performed?u2 project software has testing team None of the software has
16 manager says changed. gets the time above. changed.
Interface Procedure Interface
17 What is the main purpose of integration testing Design error error error none error
Which of the following is the form of Alpha Acceptance System Integration Acceptance
18 and Beta Testing? testing Testing Unit testing testing testing
19 What is another name for Bug ? errors Defect Mistake Incident Defect
Which of the following is the largest bug
20 producer? code design specification other specification
The ____ serves as the template for SQA SQA
21 activities planned for each software project. SQA analysis SQA report SQA plan document SQA plan
____ includes cost of training developers on Prevention Detection Internal External Prevention
22 wrting secure and easily maintainable code. costs costs Failure costs Failure costs costs
____ includes cost of creating test cases,
setting up testing environments, revisiting Prevention Detection Internal External Detection
23 testing requirement. costs costs Failure costs Failure costs costs
In ____ ,quality is in the terms of an end users
Transcedental
24 goals. User view Product Value-based User view
m
____ defines quality in terms of original Manufacturer' Manufacturer'
Transcedental
25 specification of the product. User view s view Value-based s view
un
ot
es
.in