Ahrs

ahrs micropile

Uploaded by

chemindofazar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views6 pages

Ahrs

ahrs micropile

Uploaded by

chemindofazar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

ITEM PEMBAYARAN NO.

JENIS PEKERJAAN : pengeboran antara borefile


SATUAN PEMBAYARAN : M' URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang borefile
3 Bahan dasar diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.0 KM
5 Jam kerja efektif per-hari Tk 8.00 jam
Faktor pengembangan bahan Fk 1.20
6 Kadar Semen Minimum (Spesifikasi) Ks 340 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
9 Volume 1 m' t 0.0345 M3
10 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
11 Perbandingan Camp. : Semen Sm 410.0 Kg/M3 Berdasarkan
: Pasir Ps 0.0 Kg/M3 SNI 2023
: Agregat Kasar Kr 0.0 Kg/M3 dgn Spesifikasi
12 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3

II. URUTAN KERJA

1 Pekerjaan persiapan / Regreding


Borefile kerjakan dibersihkan dan diratakan
sesuai rencana menggunakan alat bantu

2 Penentuan titik lubang pengeboran berdasarkan gambar kerja,


selanjutnya dilakukan pengeboran dengan cara vertikal,
yaitu tegak lurus pada bidang permukaan.
dimasukkan ke dalam lubang hasil bor, untuk menjaga keruntuhan
atau perubahan lubang. Alat yang digunakan drilling machine yang
ringan dan mudah dipindah-pindah, tempat kedudukan drilling
machine menggunakan penyangga / perancah yang kuat dan
aman.

3 Bahan campuran sesuai proporsi (agregat halus, agregat kasar,


semen dan additive) dicampur kering menggunakan concrete mixer

4 Bahan campuran kering dimasukkan ke corong pengaduk, yang


sebelumnya telah diisi air dari water tank sesuai kebutuhan
campuran kering kemudian diaduk merata menjadi bahan grouting
5 Campuran atau bahan grouting masuk melalui pipa ke pompa
grouting, selanjutnya dipompa keluar melalui selang penghantar

6 Bahan grouting dari selang penghantar, dimasukkan ke dalam


lubang soil nailing melalui tremy pipa, supaya tidak terjadi segregasi
dan lubang terisi penuh / padat dengan materila grouting
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Beton K-250 0.0000 M3 gambar
Baja Tulangan 0.0000 Kg gambar
Additive 0.0000 Ltr gambar

2. ALAT
2.a. Concrete Mixer (E39)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.75 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 5.00 menit
- Mengaduk T2 7.00 menit
- Menuang T3 5.00 menit
- Tunggu, dll. T4 5.00 menit
Ts 22.00 menit

Kap. Prod. / jam = V x Fa x 60 Q1 29.610 M'/jam


1000 x Ts x t

Koefisien Alat / M' = 1 : Q1 (E39) 0.0338 jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. 0
JENIS PEKERJAAN : pengeboran antara borefile
SATUAN PEMBAYARAN : M' URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. Water Tank Truck (E23)


Volume Tanki Air V 4.0 M3
Kebutuhan air / M3 beton Wc 0.204 M3
Faktor Efisiensi Alat Fa 0.75 -
Pengisian Tanki / jam n 0.50 kali

Kap. Prod. / jam = V x Fa x n Q2 0.25 M'


Wc x t

Koefisien Alat / M' = 1 : Q2 (E23) 3.9375 jam

2.c. Driiling Machine (E20)

Kap. Prod. / jam = Q3 24.000 M'/hari

Koefisien Alat / M' = 1 : Q3 (E20) 0.0417 jam

2.d. Compressor

Kap. Prod. / Jam = Q4 29.610 M'/jam

Koef. Alat / M' = 1 : Q4 (E05) 0.0338 Jam

2.e. Generatorset (Genset) (E12)


Kap.Prod. / Jam Q5 29.610 M'/jam

Koefisien Alat/M' = 1 : Q5 (E12) 0.0338 Jam

2.f. PENGEBORAN
Grouting Pump/Shot Machine

Kap. Prod. / Jam = Q6 14.805 M'/jam

Koef. Alat / M' = 1 : Q6 (E05) 0.0675 Jam

2.g. Casing

Kap. Prod. / Jam = Q7 29.610 M'/jam

Koef. Alat / M' = 1 : Q7 0.0338 Jam

2.h. Tremy Pipe

Kap. Prod. / Jam = Q8 29.610 M'/jam

Koef. Alat / M' = 1 : Q8 0.0338 Jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. 0
JENIS PEKERJAAN : pengeboran antara borefile
SATUAN PEMBAYARAN : M' URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA ( untuk Concrete mixer, water tank truck, drilling machine, )


( compresor,genset )
Produksi dalam 1 hari = Tk x Q1 Qt 207.27 M'/hari

Kebutuhan tenaga : - Mandor M 1.00 orang


- Tukang Tb 3.00 orang
- Pekerja P 3.00 orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.0386 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1158 jam
- Pekerja = (Tk x P) : Qt (L01) 0.1158 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 407,483.51 /M

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : 0.80 bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 4,945.50 cm3
49.45 m3
8 TOTAL YANG DIPERLUKAN
Volume pekerjaan :

Kedalaman 7 m

TOTAL AKHIR Rp 20,150,060


FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PAKET :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : pengeboran antara borefile TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M' % THD. BIAYA PROYEK : -

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.1158 4,657.31 539.28


2. Tukang (L02) jam 0.1158 6,088.57 705.00
3. Mandor (L03) jam 0.0386 7,281.29 281.04

JUMLAH HARGA TENAGA 1,525.32


B. BAHAN
1 Beton K-250 M3 - 68,814.00 by Hki
tidak tercantum dlm
2 Baja Tulangan Kg - 8,500.00 gambar
3 Additive Ltr - 172,000.00 tidak menggunakan

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1 Concrete Mixer jam 0.0338 31,250.00 1,055.39


2 Water Tank Truck jam 3.9375 83,333.00 328,120.67
3 Driiling Machine jam 0.0417 66,000.00 2,750.00
4 Compressor jam 0.0338 82,035.29 2,770.53
5 Generatorset (Genset) jam 0.0338 39,583.00 1,336.81
6 Grouting Pump/Shot Machine jam 0.0675 177,941.83 12,019.06
7 Casing jam 0.0338 64,816.10 2,189.00
8 Tremy Pipe jam 0.0338 76,000.00 2,566.71
9 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 352,808.17

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 354,333.49


E. OVERHEAD & PROFIT 15.0 % x D 53,150.02
F. HARGA SATUAN PEKERJAAN ( D + E ) 407,483.51