NATIONAL UNIVERSITY OF ENGINEERING
TECHNICAL DRAWING
PLANT DESIGN PROJECT
2
Main Plant:
3
APPENDIX A: TECHNICAL DRAWINGS
A2 I PLOT PLAN
A2 IV CRUSHING CIRCUIT
A2 V GAVIMETRIC CIRCUIT
A2 IX GRAVIMETRY CONCENTRATE
A2 XI FLOTATION CONCENTRATE
4
REAGENT SECTION
REAGENT
GRAVITY SECTION
SAMPLER
CRUSHING
FLOTATION SECTION
CRUSHING SECTION
CASSITERITE
GRINDING SULFIDE FLOTATION
SECTION FLOTATION
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED ACCORDING THIS PLAN AND THE PROYECT B: TIN PLANT PROYECT B: TIN PLANT
INFORMATION CONTAINED
TO THE INFORMATION OBTAINED ARE THE PROPERTY OF
APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT A, THEIR USE
PROYECT A.
WITHOUT PRIOR CLIENT. DESIGNED BY:
CLIENT.
AUTHORIZATION IS
PROHIBITED, ANY GTE. ING: DREW BY:
MODIFICATION OR
GTE. PROY: REVIEWED BY:
MAIN FLOOR PROYECT B
ADAPTATION OF THE DATA
PLOT PLAN
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE
RESPONSABILITY OF USER GTE. ING:
WITHOUT ANY LEGAL COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LIABILITY OF PROYECT A.
S/E R
1 LINE SYMBOLS 4 CLASSIFIERS EQUIPMET SYMBOLS 7 GRAVIMETRY EQUIPMET SYMBOLS 8 FLOTATION EQUIPMET SYMBOLS
Line of Reagents
Flotation Cells
Conditioner Tank
HIDROCYCLON
Transporter Truck
Pile/ Concentrate
Jaw Crusher
Inline Pressure Jig(IPJ)
Ball Mill
Cone Crusher
Rod Mill
Spiral concentrator
Jig Bendelari
Feed Box
Filter
Intermediate Hopper
Gravimetry Table
Thickener
Fine Hopper
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED ACCORDING THIS PLAN AND THE PROYECT B: TIN PLANT PROYECT B: TIN PLANT
INFORMATION CONTAINED
TO THE INFORMATION OBTAINED ARE THE PROPERTY OF
APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT A, THEIR USE
PROYECT A.
WITHOUT PRIOR CLIENT. DESIGNED BY:
CLIENT.
AUTHORIZATION IS
PROHIBITED, ANY GTE. ING: DREW BY:
MODIFICATION OR
GTE. PROY: REVIEWED BY: MAIN FLOOR PROYECT B
ADAPTATION OF THE DATA
INSTRUMENT AND EQUIPMENT SYMBOLS
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE
RESPONSABILITY OF USER GTE. ING:
WITHOUT ANY LEGAL COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LIABILITY OF PROYECT A.
S/E R
Bulk
Hopper
Fines
3000 Tn/d
Hopper
2500 Tn/d
Jaw crusher
Metso C80 Tertiary Conic
Crusher LINES DESCRIPTION
METSO HP300
LINE OF MAIN PROCESS
Double Deck Screen GRAVIMETRY TAILS
JinPeng Ya1224
Secundary Conic
Crusher
METSO GP300S
Intermediate
Hopper
3000 Tn/d
Single Deck
Screen
METSO 5 x 14
Fines
Inline Pressure Jig Hopper
J2400 3000 Tn/d Thickener
Metso
Hydrosit
Metso
Jig
Bendelari
Cleaner Sulfide
Metso RCS5
FEED BOX FEED BOX
PULP PUMP
Thickener
Hydrosit PULP PUMP
Spiral TAILINGS
Concentrator Falcon C4000
Screen
Humphrey Derrick
D.M.S
Ball mill
Comesa 4 12' x 9'
Metso
D.M.S
THICKENER
Screen
Derrick
Metso
Ball mill
Comesa 8'x11'
Hydrocyclon Metso
FILTER
Sulfide Flotation
Metso RCS10
Cleaner 1 Cassiterite PULP PUMP
FEED BOX Metso RCS5 Metso
Hydrocyclon
Hydrocyclon
Sulfide Flotation FALCON
Metso RCS10 PULP PUMP C4000 Cleaner 2 Cassiterite
Metso RCS5
Falcon
UF 1500
Hydrocyclon Metso
Fines Gravimetry
Table Deister
Cassiterite
Falcon Flotation
MGS
UF 1500 Metso
Thickener FILTER Cleaner 3 Cassiterite Concentrate
Hydrosit Metso RCS5
Thickener
Cassiterite NZY 6 -Hydrosit
PULP PUMP Gravimetry
Concentrate
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED ACCORDING THIS PLAN AND THE PROYECT B: TIN PLANT PROYECT B: TIN PLANT
TOHydrocyclon
THE INFORMATION OBTAINED INFORMATION CONTAINED
ARE THE PROPERTY OF
APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT A, THEIR USE
PROYECT A.
WITHOUT PRIOR CLIENT. DESIGNED BY:
CLIENT.
AUTHORIZATION IS
PROHIBITED, ANY GTE. ING: DREW BY: MAIN FLOOR PROYECT B
MODIFICATION OR
GTE. PROY: REVIEWED BY:
ADAPTATION OF THE DATA GENERAL DIAGRAM
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE
RESPONSABILITY OF USER GTE. ING: PROCESS FLOWSHEET
WITHOUT ANY LEGAL COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LIABILITY OF PROYECT A.
S/E R
Bulk Hopper
3000 Tn/d
Jaw Crusher
Metso C80
Fines
Hopper
Intermediate 2500 Tn/d
Hopper
3000 Tn/d
Tertiary Conic
Crusher
LINES DESCRIPTION Double Deck Screen METSO HP300
LINE OF MAIN PROCESS JinPeng Ya1224
Secundary Conic
Crusher
METSO GP300S
LIST OF EQUIPMET
ITEM EQUIPMENT MODEL
1 Jaw Crusher METSO C80
Single Deck Screen
2 Double Deck Screen JinPeng Ya1224 METSO 5 x 14
3 Secondary Conic Crusher METSO GP300S
4 Tertiary Conic Crusher METSO HP300
5 Secondary Cone Crusher METSO GP300S
6 Single Deck Screen METSO 5x14
7 Bulk Hopper - Fines
Intermediate Hopper Hopper
8 -
3000 Tn/d
9 Fines Hopper -
TO GRAVIMETRIC
CONCENTRATION
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED ACCORDING THIS PLAN AND THE PROYECT B: TIN PLANT PROYECT B: TIN PLANT
INFORMATION CONTAINED
TO THE INFORMATION OBTAINED ARE THE PROPERTY OF
APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT B, THEIR USE
PROYECT B
WITHOUT PRIOR CLIENT. DESIGNED BY:
CLIENT.
AUTHORIZATION IS
PROHIBITED, ANY GTE. ING: DREW BY: MAIN FLOOR PROYECT B
MODIFICATION OR
GTE. PROY: REVIEWED BY:
ADAPTATION OF THE DATA CRUSHING DIAGRAM
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE
RESPONSABILITY OF USER GTE. ING:
WITHOUT ANY COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LEGALLIABILITY OF
S/E R
PROYECT B.
Rod Mill
Comesa 9 21'x13' Jig
Bendelari
CRUSHING STAGE PRODUCT FEED BOX Ball Mill
PULP PUMP Comesa 9'x9'
WATER FLOW 2
PULP PUMP
WATER FLOW 3
WATER RECIRCULATION
Spiral
LINES DESCRIPTION Concentrator Falcon C4000
Humphrey
Line of Main Process
Screen
Water Flow Thickener Derrick
Hydrosit
Gravimetry Tails
LIST OF EQUIPMET
D.S.M
ITEM EQUIPMENT MODEL Ball mill
1 Jig J2400 Comesa 4 21' x 9'
Inline pressure Jig
2 Rod Mill Comesa 9 21' x13'
D.S.M
3 Jig Bendelari
4 Ball Mill Comesa 9'x9'
5 Screen Derrick
Ball mill
6 Falcon C C4000 Screen Comesa 8'x11'
Derrick Hydrocyclon
7 Spiral Concentrator Humphrey
Sulfide Flotation Hydrocyclon
8 Ball Mill Comesa 8'x11' Metso RCS10
CASSITERITE GRAVIMETRIC
CONCENTRATE
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED ACCORDING THIS PLAN AND THE PROYECT B: TIN PLANT PROYECT B: TIN PLANT
INFORMATION CONTAINED
TO THE INFORMATION OBTAINED ARE THE PROPERTY OF
APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT B, THEIR USE
PROYECT B
WITHOUT PRIOR CLIENT. DESIGNED BY:
CLIENT.
AUTHORIZATION IS
GTE. ING: DREW BY:
PROHIBITED, ANY
MODIFICATION OR MAIN FLOOR PROYECT B
ADAPTATION OF THE DATA
GTE. PROY: REVIEWED BY:
GRAVIMETRY DIAGRAM
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE
RESPONSABILITY OF USER GTE. ING:
WITHOUT ANY COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LEGALLIABILITY OF
S/E R
PROYECT B.
Inline Pressure Jig
J2400
COARSE TAILINGS
CRUSHING STATE PRODUCT
Jig
Bendelari
42x42
LINES DESCRIPTION
Water Flow
Gravimetry Tails COARSE CONCENTRATE
LIST OF EQUIPMET
ITEM EQUIPMENT MODEL
1 Inline pressure Jig Jig J2400
2 Jig Bendelari 42x42
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED ACCORDING THIS PLAN AND THE PROYECT B: TIN PLANT PROYECT B: TIN PLANT
INFORMATION CONTAINED
TO THE INFORMATION OBTAINED ARE THE PROPERTY OF
APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT A, THEIR USE
PROYECT A.
WITHOUT PRIOR CLIENT. DESIGNED BY:
CLIENT.
AUTHORIZATION IS
PROHIBITED, ANY GTE. ING: DREW BY:
MODIFICATION OR
GTE. PROY: REVIEWED BY:
MAIN FLOOR PROYECT B
ADAPTATION OF THE DATA
GRAVIMETRY OF COARSE PARTICLES
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE
RESPONSABILITY OF USER GTE. ING:
WITHOUT ANY LEGAL COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LIABILITY OF PROYECT A.
S/E R
COARSE TAILINGS
Rod Mill
Comesa 9 21' x13'
Jig Triplex
Bendelari
42x42
INTERMEDIATE CONCENTRATE
LINES DESCRIPTION
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED ACCORDING THIS PLAN AND THE PROYECT B: TIN PLANT PROYECT B: TIN PLANT
INFORMATION CONTAINED
TO THE INFORMATION OBTAINED ARE THE PROPERTY OF
APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT A, THEIR USE
PROYECT A.
WITHOUT PRIOR CLIENT. DESIGNED BY:
CLIENT.
AUTHORIZATION IS
PROHIBITED, ANY
MODIFICATION OR
GTE. ING: DREW BY: MAIN FLOOR PROYECT B
GTE. PROY: REVIEWED BY:
ADAPTATION OF THE DATA
GRAVIMETRY OF INTERMEDIATE
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE
RESPONSABILITY OF USER GTE. ING: PARTICLES
WITHOUT ANY LEGAL COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LIABILITY OF PROYECT A.
S/E R
LIST OF EQUIPMET
ITEM EQUIPMENT MODEL
Hydrocyclon
Ball Mill
Molsey
Comesa 8'x11'
Feed Box
WATER FLOW 3
Falcon C4000
Pulp Pump
Hydrocyclon
Molsey
Hydrocyclon
Molsey
Fines Gravimetry
Table Diester
FLOTATION FEED
ULTRAFINE FEED
INTERMEDIATE TAILINGS
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED ACCORDING THIS PLAN AND THE PROYECT B: TIN PLANT PROYECT B: TIN PLANT
INFORMATION CONTAINED
TO THE INFORMATION OBTAINED ARE THE PROPERTY OF
APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT A, THEIR USE
PROYECT A.
WITHOUT PRIOR CLIENT. DESIGNED BY:
CLIENT.
AUTHORIZATION IS
PROHIBITED, ANY GTE. ING: DREW BY:
MODIFICATION OR
GTE. PROY: REVIEWED BY:
MAIN FLOOR PROYECT B
ADAPTATION OF THE DATA
GRAVIMETRY OF FINES PARTICLES
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE
RESPONSABILITY OF USER GTE. ING:
WITHOUT ANY LEGAL COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LIABILITY OF PROYECT A.
S/E R
ULTRAFINE FEED
Hydrocyclon
LINES DESCRIPTION
LIST OF EQUIPMET
ITEM EQUIPMENT MODEL
1 Falcon UF UF 1500
2 Falcon UF UF 1500 Falcon UF 1500
3 Falcon UF UF 1500 ULTRAFINE TAILINGS
ULTRAFINE CONCENTRATE
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED ACCORDING THIS PLAN AND THE PROYECT B: TIN PLANT PROYECT B: TIN PLANT
INFORMATION CONTAINED
TO THE INFORMATION OBTAINED ARE THE PROPERTY OF
APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT A, THEIR USE
PROYECT A.
WITHOUT PRIOR CLIENT. DESIGNED BY:
CLIENT.
AUTHORIZATION IS
PROHIBITED, ANY GTE. ING: DREW BY:
MODIFICATION OR
GTE. PROY: REVIEWED BY: MAIN FLOOR PROYECT B
ADAPTATION OF THE DATA
GRAVIMETRY OF ULTRAFINES PARTICLES
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE
RESPONSABILITY OF USER GTE. ING:
WITHOUT ANY LEGAL COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LIABILITY OF PROYECT A.
S/E R
LINES DESCRIPTION
COARSE CONCENTRATE LINE OF MAIN PROCESS
GRAVIMETRY TAILS
WATER FLOW
INTERMEDIATE CONCENTRATE
LIST OF EQUIPMET
FINE CONCENTRATE
ITEM EQUIPMENT MODEL
1 Ball Mill Comesa 4 21' x9'
2 Screen Derrick
Thickener Hydrosit 3 Jig Kelsey J1300
4 D.S.M
5 Float Cells Metso RCS10
6 Thickener Hydrosit
7 D.S.M
Pulp pump
8 Filter
DMS
Ball Mill
Comesa 4 21' x9' WATER RECOVERY
Screen Derrick
Sulfide Flotation
Metso RCS10
FLOTATION FEED
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED ACCORDING THIS PLAN AND THE PROYECT B: TIN PLANT PROYECT B: TIN PLANT
INFORMATION CONTAINED
TO THE INFORMATION OBTAINED ARE THE PROPERTY OF
APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT A, THEIR USE
PROYECT A.
WITHOUT PRIOR CLIENT. DESIGNED BY:
CLIENT.
AUTHORIZATION IS
PROHIBITED, ANY GTE. ING: DREW BY:
MODIFICATION OR
GTE. PROY: REVIEWED BY:
MAIN FLOOR PROYECT B
ADAPTATION OF THE DATA
GRAVIMETRY CONCENTRATE
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE
RESPONSABILITY OF USER GTE. ING:
WITHOUT ANY LEGAL COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LIABILITY OF PROYECT A.
S/E R
LINES DESCRIPTION
LIST OF EQUIPMET
Line of Main Process
GRAVIMETRY TAILS
ITEM EQUIPMENT MODEL
Water Flow
Gravimetry Tails 1 Rougher Sulfide Metso RCS10
2 Cleaner Sulfide Metso RCS5
Rougher Sulfide
3 Scavenger Sulfide Metso RCS10
Metso RCS10 Scavenger Sulfide
Metso RCS10 4 Conditioner Tank Metso
WATER FLOW 1
5 Rougher Cassiterite Metso RCS10
6 Cleaner Cassiterite Metso RCS5
Metso 7 Scavenger Cassiterite Metso RCS10
WATER FLOW 2
8 MGS C-902
Cleaner Sulfide 9 Thickener NZY6-Hydrosit
Metso RCS5
TO GENERAL TAILS
WATER FLOW 3
Rougher Cassiterite Scavenger Cassiterite FLOTATION CONCENTRATE
Metso RCS10 Metso RCS10
Metso
Metso
Metso
Metso RCS5
Metso
Thickener
NZY 6 -Hydrosit
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED ACCORDING THIS PLAN AND THE PROYECT B: TIN PLANT PROYECT B: TIN PLANT
INFORMATION CONTAINED
TO THE INFORMATION OBTAINED ARE THE PROPERTY OF
APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT A, THEIR USE
PROYECT A.
WITHOUT PRIOR CLIENT. DESIGNED BY:
CLIENT.
AUTHORIZATION IS
PROHIBITED, ANY GTE. ING: DREW BY:
MODIFICATION OR
GTE. PROY: REVIEWED BY:
MAIN FLOOR PROYECT B
ADAPTATION OF THE DATA
FLOTATION CIRCUIT
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE
RESPONSABILITY OF USER GTE. ING:
WITHOUT ANY LEGAL COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LIABILITY OF PROYECT A.
S/E R
WATER RECOVERY
THICKENER
FLOTATION TAILS
CONDITIONER
TANK FILTER
PULP PUMP
LINES DESCRIPTION
WATER FLOW
LIST OF EQUIPMET
ITEM MODEL EQUIPMENT
1 CONDITIONER TANK
2 PULP PUMP CASSITERITE
THICKENER CONCENTRATE
3
4 FILTER
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED ACCORDING THIS PLAN AND THE PROYECT B: TIN PLANT PROYECT B: TIN PLANT
INFORMATION CONTAINED
TO THE INFORMATION OBTAINED ARE THE PROPERTY OF
APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT A, THEIR USE
PROYECT A.
WITHOUT PRIOR CLIENT. DESIGNED BY:
CLIENT.
AUTHORIZATION IS
PROHIBITED, ANY GTE. ING: DREW BY:
MODIFICATION OR
ADAPTATION OF THE DATA
GTE. PROY: REVIEWED BY: MAIN FLOOR PROYECT B
FLOTATION CONCENTRATE
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE
RESPONSABILITY OF USER GTE. ING:
WITHOUT ANY LEGAL COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LIABILITY OF PROYECT A.
S/E R
FLOCCULANT RENAFLOC 1120
WATER RECOVERY
THICKENER
FLOTATION TAILS
CONDITIONER
TANK FILTER
PULP PUMP
LINES DESCRIPTION
WATER FLOW
LIST OF EQUIPMET
ITEM MODEL EQUIPMENT
TAILING PILE
1 CONDITIONER TANK TAILINGS
2 PULP PUMP
3 THICKENER
4 FILTER
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED ACCORDING THIS PLAN AND THE PROYECT B: TIN PLANT PROYECT B: TIN PLANT
INFORMATION CONTAINED
TO THE INFORMATION OBTAINED ARE THE PROPERTY OF
APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT A, THEIR USE
PROYECT A.
WITHOUT PRIOR CLIENT. DESIGNED BY:
CLIENT.
AUTHORIZATION IS
PROHIBITED, ANY GTE. ING: DREW BY:
MODIFICATION OR
ADAPTATION OF THE DATA
GTE. PROY: REVIEWED BY: MAIN FLOOR PROYECT B
GENERAL TAILINGS
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE
RESPONSABILITY OF USER GTE. ING:
WITHOUT ANY LEGAL COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LIABILITY OF PROYECT A.
S/E R
H2SO4 AREA
AP-845 AREA
STORAGE
SODIUM FLUOROSILICATE AREA
STORAGE
MIBC AREA
LIME AREA
SIPX AREA
PREPARATION STORAGE PREPARATION STORAGE PREPARATION PREPARATION STORAGE PREPARATION PREPARATION STORAGE
FLOTATION SECTION
SULFIDE CASSITERITE
FLOTATION FLOTATION
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED THIS PLAN AND THE
INFORMATION CONTAINED
ACCORDING TO THE INFORMATION ARE THE PROPERTY OF
OBTAINED APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT A, THEIR USE
WITHOUT PRIOR CLIENT. DESIGNED BY:
AUTHORIZATION IS
PROHIBITED, ANY GTE. ING: DREW BY:
MODIFICATION OR MAIN PLANT
ADAPTATION OF THE DATA
GTE. PROY: REVIEWED BY:
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE BLOCKS DIAGRAM
RESPONSABILITY OF USER GTE. ING:
WITHOUT ANY LEGAL COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LIABILITY OF PROYECT A.
S/E R
E D C B A
GRAVIMETRY TAILS
SIPX
MIBC
H2SO 4
CONDITIONER
ROUGHER SCAVENGER
SULFIDE SULFIDE
H2SO 4
CLEANER
SULFIDE
CONDITIONER
AP - 845
ROUGHER SCAVENGER
CASSITERITE CASSITERITE
H2SO 4
CONDITIONER
AP - 845
LIME
CLEANER 1 CONDITIONER
CASSITERITE
H2 SO4
CONDITIONER
Sodium Fluorosilicate
LIME
CASSITERITE
Sodium Fluorosilicate
LIME
CASSITERITE
ESPESADOR
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED THIS PLAN AND THE
INFORMATION CONTAINED
ACCORDING TO THE INFORMATION ARE THE PROPERTY OF
OBTAINED APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT A, THEIR USE
WITHOUT PRIOR CLIENT. DESIGNED BY:
AUTHORIZATION IS
PROHIBITED, ANY GTE. ING: DREW BY:
MODIFICATION OR MAIN PLANT
ADAPTATION OF THE DATA
GTE. PROY: REVIEWED BY:
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE BLOCKS DIAGRAM
RESPONSABILITY OF USER GTE. ING:
WITHOUT ANY LEGAL COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LIABILITY OF PROYECT A.
S/E R
E D C B A
DIMENSIONS
PERIMETER 0.7 Km
TAILINGS HEIGHT 10 m
VOLUME 34 MM3
CONFIDENCIAL:
1. THIS DIAGRAM WAS PREPARED ACCORDING THIS PLAN AND THE PROYECT B: TIN PLANT PROYECT B: TIN PLANT
INFORMATION CONTAINED
TO THE INFORMATION OBTAINED ARE THE PROPERTY OF
APPROVAL: DATE FIRM NAME: DATE FIRM
- -
PROYECT B, THEIR USE
PROYECT B
WITHOUT PRIOR CLIENT. DESIGNED BY:
CLIENT.
AUTHORIZATION IS
PROHIBITED, ANY GTE. ING: DREW BY: MAIN FLOOR PROYECT B
MODIFICATION OR
GTE. PROY: REVIEWED BY:
ADAPTATION OF THE DATA TAILINGS DISPOSAL
- -
ON THE PLAN WILL BE THE APPROVED BY:
EXCLUSIVE
RESPONSABILITY OF USER GTE. ING:
WITHOUT ANY COD. PROY.: FLAT PROY.: SCALE: COD. PROY. CLIENT.: REV.:
GENERAL NOTES REFERENCE PLANS DATE REVIEW INFORMATION DIS. DIB. REV. APR. CLIENT. LEGALLIABILITY OF
S/E R
PROYECT B.