STRUCTURAL ANALYSES OF DR ANNE ENANGA LIWONJO KAI DESIGN CENTER COMPANY LTD

BOVA VILLAGE, BUEA SUB-DIVISION-SWR Calc. By: ENGR NDIFOR


Checked By: KDC

TABLE OF CONTENT
A. INTRUDTION…………………………….

B. HYPOTHESIS AND BASES OF CALCULATIONS……………….

I. HYPOTHESIS OF CALCULATIONS……………………

II. BASIC CALCULATION LOADS…………………………

III. DESIGN OF STRUCTURE……………….

IV. PRE-ANALYSIS CHECKS………………

V. POST ANALYSES…………………………

C. LOADS EVALUATION……………………………………………….

D. FOOTING DESIGN………………………………………………………

E. COLUMN DESIGN………………………………………………….....

F. BEAMS DESIGN……………………………………………………….

G. STAIR CASE DESIGN…………………………………………………

H. STRUCTURE PLANS…………………………………………………

ProtaStructure v5.1.252 Page 1


STRUCTURAL ANALYSES OF DR ANNE ENANGA LIWONJO KAI DESIGN CENTER COMPANY LTD

BOVA VILLAGE, BUEA SUB-DIVISION-SWR Calc. By: ENGR NDIFOR


Checked By: KDC

INSTRUCTION
The structural analyses are the true results. Of a G+2 and extension residential building for DR
ANNE ENANGA LIWONJO in BOVA VILLAGE, BUEA SUB-DIVISION-SWR. This structure
has as Total Design Axial Loads at Critical Combination of 30456.5KN after calculation and
simulation. All the hypotheses and analyses are seen below. GUIDED BY PROTASTRUCTURE
V5.0.4 TO FIX THE HYPOTHESES.

HYPOTHESIS OF CALCULATIONS
1.1 CONCRETE

We have taken into considerations that:


- The diameters of the biggest grains is D=25mm
- The density of concrete is ρ=25KN/m³
- The resistance of concrete to compression after 28 days fc28=20Mpa
- The resistance of concrete to tension after 28days ft28=1,8MPa
- The coefficient of security of concrete γb=1,5
- Cracking is permissible
- The time of application of loads t≥24hrs;θ=1
1.2 REINFORCEMENT BARS

- The main reinforcements are of high adherence (HA) with an elastic limit of
Fe=500MPa
- The stirrups are smooth bars with an elastic limit of Es=235 MPa
- Concrete cover is C=5cm for footings, ground beam, basement pillars, and
2.5cm for all other concrete works.
1.3 SOIL (Geotechnical results) The results use for these analyses was
gotten from a nearby site of plot 17
 DEPTH OF FOUNDATION=1.20m
 SOIL RESISTANCE = 3.13 BARS

1.4 PRE-ANALYSIS CHECKS


ProtaStructure v5.1.252 Page 2
STRUCTURAL ANALYSES OF DR ANNE ENANGA LIWONJO KAI DESIGN CENTER COMPANY LTD

BOVA VILLAGE, BUEA SUB-DIVISION-SWR Calc. By: ENGR NDIFOR


Checked By: KDC

2 Pre-analysis Checks
3 Building Data
Number of Storeys =4
Number of Effective Storeys =4
Number of Rigid Basements =0

4
Storey Level
Store Live Load Participation Live Load Reduction
Height (mm
y Factor Factor
(mm) )
12000.0
4 3000.00 0.00 0.000
0
9000.0
3 3000.00 0.00 0.000
0
6000.0
2 3000.00 0.00 0.000
0
3000.0
1 3000.00 0.00 0.000
0

5 Analysis Parameters
Analysis Type = Static Analysis

Storey Degrees of Freedom = X, Y and Torsion


Rigid Zones at Joints = NONE

Seismic Code =

6 Soil Subgrade Reaction Coefficient = 50000.000 kN/m3


Allowable Soil Pressure = 313.00 kN/m2

7 Load Combinations
No Combination G Gp1 Gp2 Q Qp1 Qp2 Nx Ny
1 G+Q 1.40 .00 .00 1.60 .00 .00 .00 .00
2 (G+Q)p1 1.00 0.40 .00 .00 1.60 .00 .00 .00
3 (G+Q)p2 1.00 .00 0.40 .00 .00 1.60 .00 .00
4 G+Q+Nx 1.20 .00 .00 1.20 .00 .00 1.00 .00
5 G+Q-Nx 1.20 .00 .00 1.20 .00 .00 - 1.00 .00
6 G+Q+Ny 1.20 .00 .00 1.20 .00 .00 .00 1.00
7 G+Q-Ny 1.20 .00 .00 1.20 .00 .00 .00 - 1.00

8 Bottom Part load case results are combined with the Upper Part results automatically. Therefore, they are not included in the combinations.
9 Vertical Load Cases
G = Dead Loads
Gp1 = Pattern Dead Loads 1
Gp2 = Pattern Dead Loads 2
Q = Live Loads
Qp1 = Pattern Live Loads 1
Qp2 = Pattern Live Loads 2
10 Lateral Load Cases
Nx = Notional Loads X
Ny = Notional Loads Y

11 Gc and Qc load cases uses cracked sections for being combined with seismic load cases.
G and Q load cases usesow uncracked sections for being combined with vertical load combinations.

12 Materials:
13 Concrete Grades:
Fcu E
(N/mm2) (N/mm2)
Columns C20/25 25.00 25000.0
Walls C25/30 30.00 26000.0
Beams C25/30 30.00 26000.0
Slabs C25/30 30.00 26000.0
Ribbed Slabs C20/25 25.00 25000.0
ProtaStructure v5.1.252 Page 3
STRUCTURAL ANALYSES OF DR ANNE ENANGA LIWONJO KAI DESIGN CENTER COMPANY LTD

BOVA VILLAGE, BUEA SUB-DIVISION-SWR Calc. By: ENGR NDIFOR


Checked By: KDC

Foundations C25/30 30.00 26000.0


14

15 Steel Grades:
Fyk E
(N/mm2) (N/mm2)
Columns Grade 500 (Type 2) 500.00 200000.0
Walls Grade 500 (Type 2) 500.00 200000.0
- Web Longitudinal Grade 500 (Type 2) 500.00 200000.0
- Web Horizontal Grade 500 (Type 2) 500.00 200000.0
Beams Grade 500 (Type 2) 500.00 200000.0
Slabs Grade 500 (Type 2) 500.00 200000.0
Ribbed Slabs Grade 500 (Type 2) 500.00 200000.0
Foundations Grade 500 (Type 2) 500.00 200000.0
Links Grade 250 (Plain) 250.00 200000.0
16

17 Filler Block Unit Weight: 4.500 kN/m3

18 Column and ShearWall Section Properties


Area : Gross Section Area
As : Section Shear Area
I11 : Moment of Inertia About Member Local Axis-1
I22 : Moment of Inertia About Member Local Axis-2
19
b1xb2 Area As I11 I22
Kesit
(mm) (m2) (m2) (m4) (m4)
300x300-C 300x300 0.090 0.075 0.000675 0.000675
400x200-C 400x200 0.080 0.067 0.000267 0.001067
150x550-C 150x550 0.083 0.069 0.002080 0.000155
550x150-C 550x150 0.083 0.069 0.000155 0.002080
200x200-C 200x200 0.040 0.033 0.000133 0.000133
2350x200-W 2350x200 0.470 0.392 0.001567 0.216298
2300x200-W 2300x200 0.460 0.383 0.001533 0.202783

20 Beam Section Properties


Area : Gross Section Area
As : Section Shear Area
I : Moment of Inertia About Horizontal Axis

21 (Rectangular beam sections are used in analysis.)

bwxh Area As I
Section
(mm) (m2) (m2) (m4)
200x500-B 200x500 0.100 0.083 0.002083
200x450-B 200x450 0.090 0.075 0.001519

22 Calculation of the Column and Wall Inertia Center


23 Coordinates of Center of Rigidity (x-R and y-R) is based on the coordinates of lower left column on the plan.
Ixx : Moment of Inertia About Global X-Axis
Iyy : Moment of Inertia About Global Y-Axis
x R , yR : Rigidity Center Coordinates based on column and wall inertia
24
Iyy-Column Iyy-Wall Iyy-Total Ixx-Column Ixx-Wall Ixx-Total xR yR
Storey
(m4) (m4) (m4) (m4) (m4) (m4) (m) (m)
Storey: 4 0.007425 0.205917 0.213342 0.007425 0.434129 0.441554 10.809075 8.269411
Storey: 3 0.025138 0.205917 0.231054 0.035088 0.434129 0.469217 13.731061 15.383501
Storey: 2 0.025138 0.205917 0.231054 0.035088 0.434129 0.469217 13.731061 15.383501
Storey: 1 0.022775 0.205917 0.228692 0.020375 0.434129 0.454504 13.840422 14.598940

2 PROJECT DURING ANALYSES.

ProtaStructure v5.1.252 Page 4


STRUCTURAL ANALYSES OF DR ANNE ENANGA LIWONJO KAI DESIGN CENTER COMPANY LTD

BOVA VILLAGE, BUEA SUB-DIVISION-SWR Calc. By: ENGR NDIFOR


Checked By: KDC

2.1 3D VIEW OF ENTIRE PROJEC

2.2 LOADS SIMULATION

ProtaStructure v5.1.252 Page 5


STRUCTURAL ANALYSES OF DR ANNE ENANGA LIWONJO KAI DESIGN CENTER COMPANY LTD

BOVA VILLAGE, BUEA SUB-DIVISION-SWR Calc. By: ENGR NDIFOR


Checked By: KDC

2.3 REVIEW OF COLUMNS AND BEAMS

ProtaStructure v5.1.252 Page 6


STRUCTURAL ANALYSES OF DR ANNE ENANGA LIWONJO KAI DESIGN CENTER COMPANY LTD

BOVA VILLAGE, BUEA SUB-DIVISION-SWR Calc. By: ENGR NDIFOR


Checked By: KDC

ProtaStructure v5.1.252 Page 7


STRUCTURAL ANALYSES OF DR ANNE ENANGA LIWONJO KAI DESIGN CENTER COMPANY LTD

BOVA VILLAGE, BUEA SUB-DIVISION-SWR Calc. By: ENGR NDIFOR


Checked By: KDC

2.4 POST ANALYSES LOADS DEPLAY

ProtaStructure v5.1.252 Page 8


STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

2.5 DESIGN OF FOOTINGS

3 POST-ANALYSIS CHECKS

RELATIVE STOREY DRIFT CHECK:


ht : Total height up to particular storey
h : Storey Height
δ : Maximum Absolute Storey Drift
Δ : Relative Storey Drift (δcolumn,top - δcolumn,bottom)
δ (eff) : Effective Relative Storey Drift

LOADING DIRECTION: 1 (Angle From X 0.000 Deg)

Load Case: Nx
ht δMax ΔMax
Storey δMax / ht ΔMax / h
(m) (m) (m)
Storey: 4 12.000000 0.001747 0.00015 ≤ 0.00100 √ -0.000308 -0.00010 ≤ 0.00200 √
Storey: 3 9.000000 0.002055 0.00023 ≤ 0.00100 √ 0.000378 0.00013 ≤ 0.00200 √
Storey: 2 6.000000 0.001677 0.00028 ≤ 0.00100 √ 0.000723 0.00024 ≤ 0.00200 √
Storey: 1 3.000000 0.000954 0.00032 ≤ 0.00100 √ 0.000954 0.00032 ≤ 0.00200 √
ProtaStructure v5.1.252 Page 9
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Dir 1... Relative Storey Drifts satisfies the Limits. √

LOADING DIRECTION: 2 (Angle From X 90.000 Deg)

Load Case: Ny
ht δMax ΔMax
Storey δMax / ht ΔMax / h
(m) (m) (m)
Storey: 4 12.000000 0.001740 0.00015 ≤ 0.00100 √ 0.000110 0.00004 ≤ 0.00200 √
Storey: 3 9.000000 0.001631 0.00018 ≤ 0.00100 √ 0.000419 0.00014 ≤ 0.00200 √
Storey: 2 6.000000 0.001212 0.00020 ≤ 0.00100 √ 0.000575 0.00019 ≤ 0.00200 √
Storey: 1 3.000000 0.000637 0.00021 ≤ 0.00100 √ 0.000637 0.00021 ≤ 0.00200 √

Dir 2... Relative Storey Drifts satisfies the Limits. √

SLAB/WALL IN-PLANE SHEAR STRESS CHECKS:


SLAB IN-PLANE STRESS CHECKS:
MEMBER EFFECTIVE SECTION STIFFNESS FACTORS
Elasticity Axial Bending Shear Torsional
Member Type
Module Area Stiffness Area Stiffness
Walls (Shell) 1.000 1.000 In-Plane 1.000 1.000 1.000
Out-Of-
1.000 1.000
Plane
Walls (Frame) 1.000 1.000 Major Dir 1.000 1.000 1.000
Minor Dir 1.000 1.000
Basement Walls 1.000 1.000 In-Plane 1.000 1.000 1.000
Out-Of-
1.000 1.000
Plane
Slabs 1.000 1.000 In-Plane 1.000 1.000 1.000
Out-Of-
1.000 1.000
Plane
Columns 1.000 1.000 1.000 1.000 1.000
Beams 1.000 1.000 1.000 1.000 0.010
Coupling Beams 1.000 1.000 1.000 1.000 0.010

STOREY MASSES:
h : Storey Height
m, mr2 : Storey Mass and Mass Moment of Inertia
G, Q : Sum of Dead and Live Loads in Storey
W : Storey Seismic Weight (W = G + nQ)

Slab
h m mr2 G Q W Storey Storey Stiffness
Storey
(m) (t) (t.m) (kN) (kN) (kN) Diaphragm FE Mesh In/Out-of-
Plane
4 3.000 104.144 3379.032 972.6 163.6 1021.7 Rigid None
3 3.000 440.811 36772.117 4163.3 537.0 4324.4 Rigid None
2 3.000 560.566 47523.901 5339.2 533.1 5499.2 Rigid None
1 3.000 565.239 45771.215 5383.9 537.1 5545.0 Rigid None
Total 15859.0 1770.7 16390.2

STOREY CENTER OF GRAVITY TABLE


B x, B y : Plan Width of Storeys
Xg, Yg : Story Center of Gravity Coordinates
ex, ey : Eccentricities (Percent of Plan Width)

Bx Xg ex By Yg ey
Storey
(m) (m) (%) (m) (m) (%)
ProtaStructure v5.1.252 Page 10
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH
4 13.150000 11.260124 5.00 9.350000 13.168017 5.00
3 20.900000 10.528226 5.00 18.400002 9.647627 5.00
2 20.900000 10.325899 5.00 18.400002 9.456931 5.00
1 20.900000 10.430558 5.00 17.400001 9.443586 5.00

EARTHQUAKE DYNAMIC INERTIA FORCES:


EARTHQUAKE DIRECTION: 1 (Angle From X 0.00 Deg)

R(1)= 0.0 Earthquake forces are calculated using this response reduction factor value.

EARTHQUAKE DIRECTION: 2 (Angle From X 90.00 Deg)

R(2)= 0.0 Earthquake forces are calculated using this response reduction factor value.

Storey Displacements
Displacement-X Displacement-Y Rotation-Z
Load Case Storey Diaphragm
(mm) (mm) (Rad)
1G 1 D1-1 2.0677 E-02 -1.0692 E-01 4.2701 E-06
2 Gp1 1 D1-1 2.8265 E-02 -5.3678 E-02 2.8938 E-06
3 Gp2 1 D1-1 -3.5203 E-03 -5.9823 E-02 1.7713 E-06
4Q 1 D1-1 9.3772 E-05 -8.1717 E-03 1.9219 E-07
5 Qp1 1 D1-1 2.1289 E-03 -2.2001 E-03 1.2672 E-07
6 Qp2 1 D1-1 -2.0351 E-03 -5.9716 E-03 6.5467 E-08
7 Nx 1 D1-1 7.0238 E-01 -9.8804 E-02 2.9796 E-05
8 Ny 1 D1-1 -1.0060 E-01 3.4766 E-01 -2.9143 E-05
Free Nodes
1G 1 -1.1600 E-02 -8.0659 E-02 1.1616 E-05
(Average)
Free Nodes
1G 1 -3.8745 E-02 -9.3863 E-02 2.0674 E-05
(Max)
Free Nodes
1G 1 0.0000 E+00 -9.3863 E-02 2.0674 E-05
(Min)
Free Nodes
2 Gp1 1 1.3665 E-03 -3.6599 E-02 1.0569 E-05
(Average)
Free Nodes
2 Gp1 1 3.2876 E-02 -4.5260 E-02 1.9574 E-05
(Max)
Free Nodes
2 Gp1 1 0.0000 E+00 -4.5260 E-02 1.9574 E-05
(Min)
Free Nodes
3 Gp2 1 -1.2680 E-02 -4.8525 E-02 2.5651 E-06
(Average)
Free Nodes
3 Gp2 1 -1.9445 E-02 -5.4326 E-02 3.7998 E-06
(Max)
Free Nodes
3 Gp2 1 0.0000 E+00 -5.4326 E-02 3.7998 E-06
(Min)
Free Nodes
4Q 1 -1.8183 E-03 -6.8406 E-03 7.5424 E-07
(Average)
Free Nodes
4Q 1 -3.5619 E-03 -7.4734 E-03 1.5252 E-06
(Max)
Free Nodes
4Q 1 0.0000 E+00 -7.4734 E-03 1.5252 E-06
(Min)
Free Nodes
5 Qp1 1 4.1851 E-04 -1.4102 E-03 7.4181 E-07
(Average)
Free Nodes
5 Qp1 1 2.3308 E-03 -1.7853 E-03 1.4728 E-06
(Max)
Free Nodes
5 Qp1 1 0.0000 E+00 -1.7853 E-03 1.4728 E-06
(Min)
Free Nodes
6 Qp2 1 -2.2368 E-03 -5.4304 E-03 1.2434 E-08
(Average)
Free Nodes
6 Qp2 1 -2.9153 E-03 -5.6881 E-03 -2.1879 E-07
(Max)
Free Nodes
6 Qp2 1 0.0000 E+00 -5.6881 E-03 -2.1879 E-07
(Min)
Free Nodes
7 Nx 1 4.3608 E-01 7.3841 E-02 1.1018 E-04
(Average)
Free Nodes
7 Nx 1 7.4987 E-01 2.2804 E-01 2.0970 E-04
(Max)
Free Nodes
7 Nx 1 0.0000 E+00 2.2804 E-01 2.0970 E-04
(Min)
Free Nodes
8 Ny 1 -1.2212 E-02 1.7489 E-01 -8.8016 E-06
(Average)
Free Nodes
8 Ny 1 -1.4705 E-01 2.5248 E-01 -3.5123 E-05
(Max)
ProtaStructure v5.1.252 Page 11
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH
Free Nodes
8 Ny 1 0.0000 E+00 2.5248 E-01 -3.5123 E-05
(Min)
1G 2 D2-1 -1.1607 E-02 -4.4171 E-01 2.6673 E-05
2 Gp1 2 D2-1 6.0935 E-03 -2.3087 E-01 1.7242 E-05
3 Gp2 2 D2-1 -1.2757 E-02 -2.4396 E-01 1.2454 E-05
4Q 2 D2-1 -6.1942 E-03 -3.3803 E-02 1.5812 E-06
5 Qp1 2 D2-1 2.9032 E-04 -1.0589 E-02 9.6970 E-07
6 Qp2 2 D2-1 -6.4845 E-03 -2.3214 E-02 6.1153 E-07
7 Nx 2 D2-1 1.2106 E+00 -1.5325 E-01 4.9316 E-05
8 Ny 2 D2-1 -1.6022 E-01 7.6209 E-01 -4.5753 E-05
Free Nodes
1G 2 -9.0529 E-02 -2.8218 E-01 8.5225 E-06
(Average)
Free Nodes
1G 2 -1.3607 E-01 -3.5414 E-01 3.2589 E-05
(Max)
Free Nodes
1G 2 0.0000 E+00 -3.5414 E-01 3.2589 E-05
(Min)
Free Nodes
2 Gp1 2 -4.7411 E-02 -1.2791 E-01 6.9018 E-06
(Average)
Free Nodes
2 Gp1 2 -7.7373 E-02 -1.7500 E-01 2.1200 E-05
(Max)
Free Nodes
2 Gp1 2 0.0000 E+00 -1.7500 E-01 2.1200 E-05
(Min)
Free Nodes
3 Gp2 2 -4.7693 E-02 -1.6940 E-01 2.8235 E-06
(Average)
Free Nodes
3 Gp2 2 -6.8303 E-02 -2.0249 E-01 1.5107 E-05
(Max)
Free Nodes
3 Gp2 2 0.0000 E+00 -2.0249 E-01 1.5107 E-05
(Min)
Free Nodes
4Q 2 -1.0519 E-02 -2.4179 E-02 3.4354 E-07
(Average)
Free Nodes
4Q 2 -1.3459 E-02 -2.8389 E-02 1.9566 E-06
(Max)
Free Nodes
4Q 2 0.0000 E+00 -2.8389 E-02 1.9566 E-06
(Min)
Free Nodes
5 Qp1 2 -2.6053 E-03 -4.7146 E-03 3.5554 E-07
(Average)
Free Nodes
5 Qp1 2 -4.4915 E-03 -7.3943 E-03 1.2424 E-06
(Max)
Free Nodes
5 Qp1 2 0.0000 E+00 -7.3943 E-03 1.2424 E-06
(Min)
Free Nodes
6 Qp2 2 -7.9139 E-03 -1.9465 E-02 -1.2006 E-08
(Average)
Free Nodes
6 Qp2 2 -8.9674 E-03 -2.0995 E-02 7.1412 E-07
(Max)
Free Nodes
6 Qp2 2 0.0000 E+00 -2.0995 E-02 7.1412 E-07
(Min)
Free Nodes
7 Nx 2 8.2326 E-01 1.3834 E-01 1.5553 E-04
(Average)
Free Nodes
7 Nx 2 1.2899 E+00 3.9288 E-01 2.8529 E-04
(Max)
Free Nodes
7 Nx 2 0.0000 E+00 3.9288 E-01 2.8529 E-04
(Min)
Free Nodes
8 Ny 2 -1.2507 E-02 4.8878 E-01 -1.9763 E-05
(Average)
Free Nodes
8 Ny 2 -2.3374 E-01 6.1260 E-01 -5.5152 E-05
(Max)
Free Nodes
8 Ny 2 0.0000 E+00 6.1260 E-01 -5.5152 E-05
(Min)
1G 3 D3-1 -3.1673 E-02 -8.2879 E-01 4.0386 E-05
2 Gp1 3 D3-1 -7.1349 E-03 -4.2181 E-01 2.6437 E-05
3 Gp2 3 D3-1 -1.9849 E-02 -4.6478 E-01 1.8973 E-05
4Q 3 D3-1 -1.0353 E-02 -6.6153 E-02 2.3337 E-06
5 Qp1 3 D3-1 8.7842 E-04 -1.9708 E-02 1.4157 E-06
6 Qp2 3 D3-1 -1.1231 E-02 -4.6445 E-02 9.1804 E-07
7 Nx 3 D3-1 1.4534 E+00 -1.6274 E-01 6.2314 E-05
8 Ny 3 D3-1 -1.8189 E-01 1.1163 E+00 -5.1292 E-05
Free Nodes
1G 3 6.0557 E-02 -5.4069 E-01 3.0596 E-05
(Average)
Free Nodes
1G 3 3.5796 E-01 -7.1071 E-01 4.6753 E-05
(Max)
Free Nodes
1G 3 0.0000 E+00 -7.1071 E-01 4.6753 E-05
(Min)
Free Nodes
2 Gp1 3 5.5717 E-02 -2.3287 E-01 1.8587 E-05
(Average)
Free Nodes
2 Gp1 3 2.4792 E-01 -3.4421 E-01 3.1998 E-05
(Max)
ProtaStructure v5.1.252 Page 12
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH
Free Nodes
2 Gp1 3 0.0000 E+00 -3.4421 E-01 3.1998 E-05
(Min)
Free Nodes
3 Gp2 3 2.2287 E-02 -3.2953 E-01 1.5076 E-05
(Average)
Free Nodes
3 Gp2 3 1.6319 E-01 -4.0902 E-01 2.0861 E-05
(Max)
Free Nodes
3 Gp2 3 0.0000 E+00 -4.0902 E-01 2.0861 E-05
(Min)
Free Nodes
4Q 3 -5.3257 E-03 -4.9666 E-02 2.0137 E-06
(Average)
Free Nodes
4Q 3 -2.3343 E-02 -5.9745 E-02 2.7795 E-06
(Max)
Free Nodes
4Q 3 0.0000 E+00 -5.9745 E-02 2.7795 E-06
(Min)
Free Nodes
5 Qp1 3 4.0461 E-03 -9.6784 E-03 1.1143 E-06
(Average)
Free Nodes
5 Qp1 3 1.4537 E-02 -1.5816 E-02 1.7565 E-06
(Max)
Free Nodes
5 Qp1 3 0.0000 E+00 -1.5816 E-02 1.7565 E-06
(Min)
Free Nodes
6 Qp2 3 -9.3718 E-03 -3.9987 E-02 8.9948 E-07
(Average)
Free Nodes
6 Qp2 3 -1.6982 E-02 -4.3929 E-02 1.0230 E-06
(Max)
Free Nodes
6 Qp2 3 0.0000 E+00 -4.3929 E-02 1.0230 E-06
(Min)
Free Nodes
7 Nx 3 1.4953 E+00 2.8402 E-01 1.0627 E-04
(Average)
Free Nodes
7 Nx 3 2.0551 E+00 5.1474 E-01 2.3129 E-04
(Max)
Free Nodes
7 Nx 3 0.0000 E+00 5.1474 E-01 2.3129 E-04
(Min)
Free Nodes
8 Ny 3 -2.9424 E-01 7.4827 E-01 -4.1001 E-05
(Average)
Free Nodes
8 Ny 3 -6.7674 E-01 9.6211 E-01 -5.7398 E-05
(Max)
Free Nodes
8 Ny 3 0.0000 E+00 9.6211 E-01 -5.7398 E-05
(Min)
1G 4 D4-1 -1.9534 E-01 -1.2915 E+00 5.1448 E-05
2 Gp1 4 D4-1 -1.0519 E-01 -6.0546 E-01 2.7208 E-05
3 Gp2 4 D4-1 -9.9151 E-02 -7.5313 E-01 2.8540 E-05
4Q 4 D4-1 -1.8446 E-02 -1.2366 E-01 5.4810 E-06
5 Qp1 4 D4-1 -3.0388 E-03 -3.4778 E-02 1.8211 E-06
6 Qp2 4 D4-1 -1.5407 E-02 -8.8885 E-02 3.6598 E-06
7 Nx 4 D4-1 1.2855 E+00 -1.5899 E-01 8.6715 E-05
8 Ny 4 D4-1 -1.2334 E-02 1.3916 E+00 -4.5805 E-05
Free Nodes
1G 4 -2.6901 E-01 -1.6830 E+00 5.1448 E-05
(Average)
Free Nodes
1G 4 -2.6901 E-01 -1.6830 E+00 5.1448 E-05
(Max)
Free Nodes
1G 4 0.0000 E+00 -1.6830 E+00 5.1448 E-05
(Min)
Free Nodes
2 Gp1 4 -1.4416 E-01 -8.1252 E-01 2.7208 E-05
(Average)
Free Nodes
2 Gp1 4 -1.4416 E-01 -8.1252 E-01 2.7208 E-05
(Max)
Free Nodes
2 Gp1 4 0.0000 E+00 -8.1252 E-01 2.7208 E-05
(Min)
Free Nodes
3 Gp2 4 -1.4002 E-01 -9.7032 E-01 2.8540 E-05
(Average)
Free Nodes
3 Gp2 4 -1.4002 E-01 -9.7032 E-01 2.8540 E-05
(Max)
Free Nodes
3 Gp2 4 0.0000 E+00 -9.7032 E-01 2.8540 E-05
(Min)
Free Nodes
4Q 4 -2.6295 E-02 -1.6537 E-01 5.4810 E-06
(Average)
Free Nodes
4Q 4 -2.6295 E-02 -1.6537 E-01 5.4810 E-06
(Max)
Free Nodes
4Q 4 0.0000 E+00 -1.6537 E-01 5.4810 E-06
(Min)
Free Nodes
5 Qp1 4 -5.6466 E-03 -4.8637 E-02 1.8211 E-06
(Average)
Free Nodes
5 Qp1 4 -5.6466 E-03 -4.8637 E-02 1.8211 E-06
(Max)
Free Nodes
5 Qp1 4 0.0000 E+00 -4.8637 E-02 1.8211 E-06
(Min)
ProtaStructure v5.1.252 Page 13
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH
Free Nodes
6 Qp2 4 -2.0648 E-02 -1.1674 E-01 3.6598 E-06
(Average)
Free Nodes
6 Qp2 4 -2.0648 E-02 -1.1674 E-01 3.6598 E-06
(Max)
Free Nodes
6 Qp2 4 0.0000 E+00 -1.1674 E-01 3.6598 E-06
(Min)
Free Nodes
7 Nx 4 1.1615 E+00 -8.1890 E-01 8.6370 E-05
(Average)
Free Nodes
7 Nx 4 1.1615 E+00 -8.1890 E-01 8.6370 E-05
(Max)
Free Nodes
7 Nx 4 0.0000 E+00 -8.1890 E-01 8.6370 E-05
(Min)
Free Nodes
8 Ny 4 5.3258 E-02 1.7402 E+00 -4.5805 E-05
(Average)
Free Nodes
8 Ny 4 5.3258 E-02 1.7402 E+00 -4.5805 E-05
(Max)

3.1 Sway Classification Report

Sway Classification Report


Lc : Storey Height
Δd : Average Relative Storey Drift (Δd = di - di-1)
ΣPu : Total Design Axial Loads at Critical Combination
Cmb : Maximum Q value at Critical Combination
ΣVus : Total Design Shear Forces at Critical Combination
βs : Magnification Factor for Storey
Q : Stability Coefficient Q=(ΣPu * Δd)(ΣVus * Lc)

Dir: 1 - STOREY SWAY CHECK


Lc Δd ΣPu ΣVus
Storey Comb βs Q Status
(mm) (mm) (kN) (kN)
1 3000 0.58 21111.5 237.9 4 1.017 0.017014≤ 0.05 Non-Sway
2 3000 0.49 14023.6 157.1 4 1.015 0.014554≤ 0.05 Non-Sway
3 3000 0.26 6992.0 77.0 4 1.008 0.007806≤ 0.05 Non-Sway
4 3000 0.15 1368.7 14.6 4 1.005 0.004771≤ 0.05 Non-Sway

Dir: 2 - STOREY SWAY CHECK


Lc Δd ΣPu ΣVus
Storey Comb βs Q Status
(mm) (mm) (kN) (kN)
1 3000 0.33 21111.5 237.9 6 1.010 0.009837≤ 0.05 Non-Sway
2 3000 0.40 14023.6 157.1 6 1.012 0.011930≤ 0.05 Non-Sway
3 3000 0.36 6992.0 77.0 6 1.011 0.010924≤ 0.05 Non-Sway
4 3000 0.31 1368.7 14.6 6 1.010 0.009607≤ 0.05 Non-Sway

Beam Loads
4B2
(200.0x500.0 mm L= 4650.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
4R28 x= 0.00 0.00 1.19 1.69 3.69 4.55 4.55
g= 0.00 7.98 5.32 2.10 7.98 7.98 0.00
q= 0.00 2.14 1.43 0.56 2.14 2.14 0.00
Reactions: GI= 18.9 kN QI= 4.1 kN GJ= 20.4 kN QJ= 4.5 kN

4B3
(200.0x500.0 mm L= 4650.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
ProtaStructure v5.1.252 Page 14
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH
4R24 x= 0.00 0.00 4.65 4.65
g= 0.00 8.42 8.42 0.00
q= 0.00 2.14 2.14 0.00
Reactions: GI= 25.9 kN QI= 5.7 kN GJ= 25.9 kN QJ= 5.7 kN

4B4
(200.0x500.0 mm L= 3850.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
4R23 x= 0.00 0.00 3.85 3.85
g= 0.00 8.42 8.42 0.00
q= 0.00 2.14 2.14 0.00
Reactions: GI= 21.4 kN QI= 4.7 kN GJ= 21.4 kN QJ= 4.7 kN

4B19
(200.0x500.0 mm L= 4650.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
4R11 x= 0.00 0.00 4.47 4.47
g= 0.00 5.20 5.20 0.00
q= 0.00 1.35 1.35 0.00
4R10 x= 0.00 0.00 4.47 4.47
g= 0.00 13.33 13.33 0.00
q= 0.00 3.34 3.34 0.00
Reactions: GI= 49.4 kN QI= 11.6 kN GJ= 46.1 kN QJ= 10.8 kN

4B20
(200.0x500.0 mm L= 4700.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.47 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
Reactions: GI= 6.4 kN QI= 0.7 kN GJ= 6.4 kN QJ= 0.7 kN

4B38
(200.0x500.0 mm L= 4650.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
4R26 x= 0.00 0.00 1.19 1.69 4.55 4.55
g= 0.00 4.13 4.11 4.13 4.13 0.00
q= 0.00 1.09 1.08 1.09 1.09 0.00
Reactions: GI= 15.9 kN QI= 3.2 kN GJ= 15.5 kN QJ= 3.1 kN

4B40
(200.0x500.0 mm L= 3850.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
4R33 x= 0.00 0.00 3.85 3.85
g= 0.00 4.13 4.13 0.00
q= 0.00 1.09 1.09 0.00
Reactions: GI= 13.1 kN QI= 2.7 kN GJ= 13.1 kN QJ= 2.7 kN

4B45
(200.0x500.0 mm L= 4650.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
4R10 x= 0.00 0.00 4.47 4.47
g= 0.00 13.33 13.33 0.00
q= 0.00 3.34 3.34 0.00
Reactions: GI= 37.3 kN QI= 8.5 kN GJ= 35.0 kN QJ= 7.9 kN

4B51
(200.0x500.0 mm L= 2050.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.47 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
4R27 x= 0.00 0.00 2.05 2.05
g= 0.00 5.51 5.51 0.00
q= 0.00 1.43 1.43 0.00
4R26 x= 0.00 0.00 0.34 2.05 2.05
g= 0.00 4.11 4.13 4.13 0.00
q= 0.00 1.08 1.09 1.09 0.00
Reactions: GI= 12.6 kN QI= 2.9 kN GJ= 12.6 kN QJ= 2.9 kN
ProtaStructure v5.1.252 Page 15
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

4B52
(200.0x500.0 mm L= 1350.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.47 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
4R28 x= 0.00 0.00 1.35 1.35
g= 0.00 7.98 5.32 0.00
q= 0.00 2.14 1.43 0.00
4R26 x= 0.00 0.00 1.19 1.35 1.35
g= 0.00 4.13 4.11 4.11 0.00
q= 0.00 1.09 1.08 1.08 0.00
Reactions: GI= 9.3 kN QI= 2.2 kN GJ= 8.6 kN QJ= 2.0 kN

4B57
(200.0x500.0 mm L= 2000.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
4R11 x= 0.00 0.00 2.00 2.00
g= 0.00 5.20 5.20 0.00
q= 0.00 1.35 1.35 0.00
Reactions: GI= 7.9 kN QI= 1.7 kN GJ= 7.9 kN QJ= 1.7 kN

4B58
(200.0x500.0 mm L= 2650.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.47 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
4R11 x= 0.00 0.00 2.47 2.47
g= 0.00 5.20 5.20 0.00
q= 0.00 1.35 1.35 0.00
Reactions: GI= 10.5 kN QI= 2.2 kN GJ= 9.6 kN QJ= 1.9 kN

4B61
(200.0x500.0 mm L= 2650.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
4R20 x= 0.00 0.00 2.65 2.65
g= 0.00 5.20 5.20 0.00
q= 0.00 1.35 1.35 0.00
Reactions: GI= 10.5 kN QI= 2.2 kN GJ= 10.5 kN QJ= 2.2 kN

4B62
(200.0x500.0 mm L= 2000.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
Reactions: GI= 2.6 kN QI= 0.3 kN GJ= 2.6 kN QJ= 0.3 kN

4B63
(200.0x500.0 mm L= 4650.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
Reactions: GI= 6.3 kN QI= 0.7 kN GJ= 6.3 kN QJ= 0.7 kN

4B69
(200.0x500.0 mm L= 3050.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.47 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
Reactions: GI= 4.1 kN QI= 0.5 kN GJ= 4.1 kN QJ= 0.5 kN

4B70
(200.0x500.0 mm L= 1650.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.47 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
Reactions: GI= 2.1 kN QI= 0.2 kN GJ= 2.1 kN QJ= 0.2 kN

4B71
(200.0x500.0 mm L= 2650.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
Reactions: GI= 3.6 kN QI= 0.4 kN GJ= 3.6 kN QJ= 0.4 kN

ProtaStructure v5.1.252 Page 16


STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH
4B72
(200.0x500.0 mm L= 2000.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
Reactions: GI= 2.6 kN QI= 0.3 kN GJ= 2.6 kN QJ= 0.3 kN

4B89
(200.0x500.0 mm L= 2650.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
4R21 x= 0.00 0.00 2.65 2.65
g= 0.00 7.19 7.19 0.00
q= 0.00 1.84 1.84 0.00
4R20 x= 0.00 0.00 2.65 2.65
g= 0.00 5.20 5.20 0.00
q= 0.00 1.35 1.35 0.00
Reactions: GI= 20.0 kN QI= 4.6 kN GJ= 20.0 kN QJ= 4.6 kN

4B50
(200.0x500.0 mm L= 1250.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.47 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
4R28 x= 0.00 0.00 1.15 1.15
g= 0.00 7.98 7.98 0.00
q= 0.00 2.14 2.14 0.00
4R26 x= 0.00 0.00 1.15 1.15
g= 0.00 4.13 4.13 0.00
q= 0.00 1.09 1.09 0.00
Reactions: GI= 9.1 kN QI= 2.2 kN GJ= 7.9 kN QJ= 1.9 kN

4B53
(200.0x500.0 mm L= 3850.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.47 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
4R23 x= 0.00 0.00 3.85 3.85
g= 0.00 8.42 8.42 0.00
q= 0.00 2.14 2.14 0.00
4R33 x= 0.00 0.00 3.85 3.85
g= 0.00 4.13 4.13 0.00
q= 0.00 1.09 1.09 0.00
Reactions: GI= 29.4 kN QI= 6.8 kN GJ= 29.4 kN QJ= 6.8 kN

4B94
(200.0x500.0 mm L= 4650.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
4R24 x= 0.00 0.00 4.65 4.65
g= 0.00 8.42 8.42 0.00
q= 0.00 2.14 2.14 0.00
4R25 x= 0.00 0.00 2.84 4.65 4.65
g= 0.00 4.20 4.49 4.49 0.00
q= 0.00 1.09 1.16 1.16 0.00
Reactions: GI= 36.1 kN QI= 8.3 kN GJ= 36.4 kN QJ= 8.4 kN

4B39
(200.0x500.0 mm L= 2000.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.24 kN/m q= 0.15 kN/m
Partial Distributed Loads (m, kN/m):
4R25 x= 0.00 0.00 0.19 2.00 2.00
g= 0.00 4.47 4.49 4.49 0.00
q= 0.00 1.16 1.16 1.16 0.00
Reactions: GI= 6.9 kN QI= 1.3 kN GJ= 6.9 kN QJ= 1.3 kN

4B95
(200.0x500.0 mm L= 2650.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.24 kN/m q= 0.15 kN/m
Partial Distributed Loads (m, kN/m):
4R25 x= 0.00 0.00 2.65 2.65
g= 0.00 4.20 4.47 0.00
q= 0.00 1.09 1.16 0.00
4R21 x= 0.00 0.00 2.65 2.65
ProtaStructure v5.1.252 Page 17
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH
g= 0.00 7.19 7.19 0.00
q= 0.00 1.84 1.84 0.00
Reactions: GI= 18.5 kN QI= 4.1 kN GJ= 18.6 kN QJ= 4.1 kN

4B25
(200.0x500.0 mm L= 1650.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
Reactions: GI= 2.1 kN QI= 0.2 kN GJ= 2.1 kN QJ= 0.2 kN

4B96
(200.0x500.0 mm L= 450.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
Reactions: GI= 0.6 kN QI= 0.1 kN GJ= 0.6 kN QJ= 0.1 kN

4B97
(200.0x500.0 mm L= 2600.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
Reactions: GI= 3.6 kN QI= 0.4 kN GJ= 3.6 kN QJ= 0.4 kN

4B44
(200.0x500.0 mm L= 1650.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
Reactions: GI= 2.1 kN QI= 0.2 kN GJ= 2.1 kN QJ= 0.2 kN

4B98
(200.0x500.0 mm L= 3050.00 mm) Self Weight: g= 2.40 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
Reactions: GI= 4.1 kN QI= 0.5 kN GJ= 4.1 kN QJ= 0.5 kN

1B1
(200.0x500.0 mm L= 3900.00 mm) Self Weight: g= 2.40 kN/m
External Wall: g= 9.65 kN/m
Adjustment Loads: g= 0.47 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
1R29 x= 0.18 0.18 3.90 3.90
g= 0.00 2.76 2.76 0.00
q= 0.00 0.75 0.75 0.00
1R28 x= 0.00 0.00 3.90 3.90
g= 0.00 8.42 8.42 0.00
q= 0.00 2.14 2.14 0.00
Reactions: GI= 43.9 kN QI= 6.1 kN GJ= 44.4 kN QJ= 6.2 kN

1B2
(200.0x500.0 mm L= 4650.00 mm) Self Weight: g= 2.40 kN/m
External Wall: g= 9.65 kN/m
Reactions: GI= 26.2 kN QI= 0.0 kN GJ= 26.2 kN QJ= 0.0 kN

1B3
(200.0x500.0 mm L= 4650.00 mm) Self Weight: g= 2.40 kN/m
External Wall: g= 9.65 kN/m
Adjustment Loads: g= 0.47 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
1R30 x= 0.00 0.00 4.65 4.65
g= 0.00 2.76 2.76 0.00
q= 0.00 0.75 0.75 0.00
1R24 x= 0.00 0.00 4.65 4.65
g= 0.00 8.42 8.42 0.00
q= 0.00 2.14 2.14 0.00
Reactions: GI= 53.3 kN QI= 7.4 kN GJ= 53.3 kN QJ= 7.4 kN

1B4
(200.0x500.0 mm L= 3850.00 mm) Self Weight: g= 2.40 kN/m
External Wall: g= 9.65 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
ProtaStructure v5.1.252 Page 18
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH
1R31 x= 0.00 0.00 3.85 3.85
g= 0.00 2.76 2.76 0.00
q= 0.00 0.75 0.75 0.00
1R23 x= 0.00 0.00 3.85 3.85
g= 0.00 8.42 8.42 0.00
q= 0.00 2.14 2.14 0.00
Reactions: GI= 43.8 kN QI= 6.1 kN GJ= 43.8 kN QJ= 6.1 kN

1B5
(200.0x500.0 mm L= 3150.00 mm) Self Weight: g= 2.40 kN/m
External Wall: g= 9.65 kN/m
Adjustment Loads: g= 0.48 kN/m q= 0.30 kN/m
Partial Distributed Loads (m, kN/m):
Reactions: GI= 17.9 kN QI= 0.5 kN GJ= 17.9 kN QJ= 0.5 kN

3.2 Slab Additional Dead Loads

Slab Additional Dead Loads


Unit Weight Thickness Load
Flat Roof (kN/m3) (mm) (kN/m2)
------------------------------------------------------------------------------------------
Cement/Gypsum Floor Screed 20.000 50.0 1.000
------------------------------------------------------------------------------------------
Total Load: 1.000

Unit Weight Thickness Load


Room (kN/m3) (mm) (kN/m2)
------------------------------------------------------------------------------------------
Cement Grout (>= 2.5 MPa) 21.000 25.0 0.525
Ceiling Grout 21.000 20.0 0.420
Finishing Concrete 22.000 50.0 1.100
Mosaic Tiles 22.000 15.0 0.330
------------------------------------------------------------------------------------------
Total Load: 2.375

Unit Weight Thickness Load


Terrace/Balcony (kN/m3) (mm) (kN/m2)
------------------------------------------------------------------------------------------
Cement/Gypsum Floor Screed 20.000 40.0 0.800
Cement Grout (>= 2.5 MPa) 21.000 25.0 0.525
Ceiling Grout 21.000 20.0 0.420
Finishing Concrete 22.000 50.0 1.100
Mosaic Tiles 22.000 15.0 0.330
------------------------------------------------------------------------------------------
Total Load: 3.175

Unit Weight Thickness Load


Lowered Slab (kN/m3) (mm) (kN/m2)
------------------------------------------------------------------------------------------
Cement/Gypsum Floor Screed 20.000 40.0 0.800
Cement Grout (>= 2.5 MPa) 21.000 25.0 0.525
Ceiling Grout 21.000 20.0 0.420
Finishing Concrete 22.000 50.0 1.100
Mosaic Tiles 22.000 18.0 0.396
Lightweight Concrete with Perlite 8.000 200.0 1.600
------------------------------------------------------------------------------------------
Total Load: 4.841

Self Weight Add'l Dead Load Live Load


Ribbed Slab (kN/m2) (kN/m2) (kN/m2)
----------------------------------------------------------------------------------
Storey: 1
1R1 3.780 (Room) 2.375 1.500
1R2 3.780 (Room) 2.375 1.500
1R3 3.780 (Room) 2.375 1.500
ProtaStructure v5.1.252 Page 19
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH
1R4 3.780 (Room) 2.375 1.500
1R5 3.780 (Room) 2.375 1.500
1R6 3.780 (Room) 2.375 1.500
1R7 3.780 (Room) 2.375 1.500
1R8 3.780 (Room) 2.375 1.500
1R9 3.780 (Room) 2.375 1.500
1R10 3.780 (Room) 2.375 1.500
1R11 3.780 (Room) 2.375 1.500
1R12 3.780 (Room) 2.375 1.500
1R13 3.780 (Room) 2.375 1.500
1R14 3.780 (Room) 2.375 1.500
1R15 3.780 (Room) 2.375 1.500
1R16 3.780 (Room) 2.375 1.500
1R17 3.780 (Room) 2.375 1.500
1R18 3.780 (Room) 2.375 1.500
1R19 3.780 (Room) 2.375 1.500
1R20 3.780 (Room) 2.375 1.500
1R21 3.780 (Room) 2.375 1.500
1R22 3.780 (Room) 2.375 1.500
1R23 3.780 (Room) 2.375 1.500
1R24 3.780 (Room) 2.375 1.500
1R25 3.780 (Room) 2.375 1.500
1R26 3.780 (Room) 2.375 1.500
1R27 3.780 (Room) 2.375 1.500
1R28 3.780 (Room) 2.375 1.500
1R29 3.780 (Room) 2.375 1.500
1R30 3.780 (Room) 2.375 1.500
1R31 3.780 (Room) 2.375 1.500
1R32 3.780 (Room) 2.375 1.500
1R33 3.780 (Room) 2.375 1.500
1R34 3.780 (Room) 2.375 1.500
1R35 3.780 (Room) 2.375 1.500
1R36 3.780 (Room) 2.375 1.500
1R37 3.780 (Room) 2.375 1.500
1R38 3.780 (Room) 2.375 1.500
1R39 3.780 (Room) 2.375 1.500
1R40 3.780 (Room) 2.375 1.500
1R41 3.780 (Room) 2.375 1.500
----------------------------------------------------------------------------------
Storey: 2
2R1 3.780 (Room) 2.375 1.500
2R2 3.780 (Room) 2.375 1.500
2R3 3.780 (Room) 2.375 1.500
2R4 3.780 (Room) 2.375 1.500
2R5 3.780 (Room) 2.375 1.500
2R6 3.780 (Room) 2.375 1.500
2R7 3.780 (Room) 2.375 1.500
2R8 3.780 (Room) 2.375 1.500
2R9 3.780 (Room) 2.375 1.500
2R10 3.780 (Room) 2.375 1.500
2R11 3.780 (Room) 2.375 1.500
2R12 3.780 (Room) 2.375 1.500
2R13 3.780 (Room) 2.375 1.500
2R14 3.780 (Room) 2.375 1.500
2R15 3.780 (Room) 2.375 1.500
2R16 3.780 (Room) 2.375 1.500
2R17 3.780 (Room) 2.375 1.500
2R18 3.780 (Room) 2.375 1.500
2R19 3.780 (Room) 2.375 1.500
2R20 3.780 (Room) 2.375 1.500
2R21 3.780 (Room) 2.375 1.500
2R22 3.780 (Room) 2.375 1.500
2R23 3.780 (Room) 2.375 1.500
2R24 3.780 (Room) 2.375 1.500
2R25 3.780 (Room) 2.375 1.500
2R26 3.780 (Room) 2.375 1.500
2R27 3.780 (Room) 2.375 1.500
2R28 3.780 (Room) 2.375 1.500
2R29 3.780 (Room) 2.375 1.500
2R30 3.780 (Room) 2.375 1.500
2R31 3.780 (Room) 2.375 1.500
ProtaStructure v5.1.252 Page 20
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH
2R32 3.780 (Room) 2.375 1.500
2R33 3.780 (Room) 2.375 1.500
2R34 3.780 (Room) 2.375 1.500
2R35 3.780 (Room) 2.375 1.500
2R36 3.780 (Room) 2.375 1.500
2R37 3.780 (Room) 2.375 1.500
2R38 3.780 (Room) 2.375 1.500
2R40 3.780 (Room) 2.375 1.500
2R41 3.780 (Room) 2.375 1.500
----------------------------------------------------------------------------------
Storey: 3
3R1 3.780 (Room) 2.375 1.500
3R2 3.780 (Room) 2.375 1.500
3R3 3.780 (Room) 2.375 1.500
3R4 3.780 (Room) 2.375 1.500
3R5 3.780 (Room) 2.375 1.500
3R6 3.780 (Room) 2.375 1.500
3R7 3.780 (Room) 2.375 1.500
3R8 3.780 (Room) 2.375 1.500
3R9 3.780 (Room) 2.375 1.500
3R10 3.780 (Room) 2.375 1.500
3R11 3.780 (Room) 2.375 1.500
3R12 3.780 (Room) 2.375 1.500
3R13 3.780 (Room) 2.375 1.500
3R14 3.780 (Room) 2.375 1.500
3R15 3.780 (Room) 2.375 1.500
3R16 3.780 (Room) 2.375 1.500
3R17 3.780 (Room) 2.375 1.500
3R18 3.780 (Room) 2.375 1.500
3R19 3.780 (Room) 2.375 1.500
3R20 3.780 (Room) 2.375 1.500
3R21 3.780 (Room) 2.375 1.500
3R22 3.780 (Room) 2.375 1.500
3R23 3.780 (Room) 2.375 1.500
3R24 3.780 (Room) 2.375 1.500
3R25 3.780 (Room) 2.375 1.500
3R26 3.780 (Room) 2.375 1.500
3R27 3.780 (Room) 2.375 1.500
3R28 3.780 (Room) 2.375 1.500
3R29 3.780 (Room) 2.375 1.500
3R30 3.780 (Room) 2.375 1.500
3R31 3.780 (Room) 2.375 1.500
3R32 3.780 (Room) 2.375 1.500
3R33 3.780 (Room) 2.375 1.500
3R34 3.780 (Room) 2.375 1.500
3R35 3.780 (Room) 2.375 1.500
3R36 3.780 (Room) 2.375 1.500
3R37 3.780 (Room) 2.375 1.500
3R38 3.780 (Room) 2.375 1.500
3R39 3.780 (Room) 2.375 1.500
3R40 3.780 (Room) 2.375 1.500
3R41 3.780 (Room) 2.375 1.500
----------------------------------------------------------------------------------
Storey: 4
4R10 3.780 (Room) 2.375 1.500
4R11 3.780 (Room) 2.375 1.500
4R20 3.780 (Room) 2.375 1.500
4R21 3.780 (Room) 2.375 1.500
4R23 3.780 (Room) 2.375 1.500
4R24 3.780 (Room) 2.375 1.500
4R25 3.780 (Room) 2.375 1.500
4R26 3.780 (Room) 2.375 1.500
4R27 3.780 (Room) 2.375 1.500
4R28 3.780 (Room) 2.375 1.500
4R33 3.780 (Room) 2.375 1.500

ProtaStructure v5.1.252 Page 21


STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

RESULTS OF ANALYSES

ProtaStructure v5.1.252 Page 22


STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

A. FOOTINGS DESIGN

ProtaStructure v5.1.252 Page 23


STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

AFTER THE DESIGN OF THE FOOTING, WE HAD A VARIATION OF FOOTING


SEIZES AND SUGGEST THEY ARE MAINTAINED. WE SHALL WORK ON TWO BUT
ALL DETAILS OF FOOTINGS ARE FOUND ON THE PAD FOOTING SHEET

Pad Footing Report

F-1C13 Design Summary


Footing Materials
Concrete Material C25/30
Rebar Material Grade 500 (Type 2)

Geometric Properties
BX 2200.00 mm
BY 2200.00 mm
Height 650.00 mm
Taper Height 0.00 mm

Corner Stresses
Lower-Left Corner 380.41 kN/m2
Lower-Right Corner 378.95 kN/m2
Upper-Right Corner 376.81 kN/m2
Upper-Left Corner 378.27 kN/m2

Loading Info
Combinations N Vx Vy Mx My
Comb #1 1709.1 kN 4.0 kN 3.6 kN -3.9 kN.m -4.3 kN.m
Comb #2 1384.9 kN 1.0 kN 2.5 kN -0.9 kN.m -3.0 kN.m
Comb #3 1402.6 kN 5.5 kN 3.4 kN -5.4 kN.m -3.9 kN.m
Comb #4 1442.6 kN -0.5 kN 4.2 kN 2.8 kN.m -5.4 kN.m
Comb #5 1441.4 kN 7.2 kN 1.9 kN -9.3 kN.m -1.8 kN.m
Comb #6 1441.4 kN 3.4 kN 0.5 kN -3.4 kN.m 0.5 kN.m
Comb #7 1442.6 kN 3.3 kN 5.6 kN -3.2 kN.m -7.7 kN.m

Soil Stress Check


N : Axial Load Of Combination
∑N : Total Axial Load
TW : Total Weight of Footing
h : Footing Depth
htaper : Taper Height
Ecc1 : Column Eccentricity in X Direction
Ecc2 : Column Eccentricity in Y Direction
∑Mx : Total Moment in X Direction
∑My : Total Moment in Y Direction

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH
Total footing, soil and pedestal weight is calculated.

Member Volume (m3) Unit Weight (kN/m3) Weight (kN)


Pad Footing : 3.146 24 75.504
Soil : 2.662 18 47.916
Total : 123.42

ΣN = N + TW

ΣMx=Mx + Vx (h - htaper) + Ecc1 N

ΣMy=My + Vy (h - htaper) + Ecc2 N

Corner stresses,

σ1 = ΣN / LxLy - 6 ΣMx / (LxLy²) - 6 ΣMy / (Lx²Ly)

σ2 = ΣN / LxLy + 6 ΣMx / (LxLy²) - 6 ΣMy / (Lx²Ly)

σ3 = ΣN / LxLy + 6 ΣMx / (LxLy²) + 6 ΣMy / (Lx²Ly)

σ4 = ΣN / LxLy - 6 ΣMx / (LxLy²) + 6 ΣMy / (Lx²Ly)

ΣMx ΣMy σ1 σ2 σ3 σ4
Comb ΣN (kN)
(kN.m) (kN.m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
Comb #1 1832.47 -1.29 -1.90 380.41 378.95 376.81 378.27
Comb #2 1508.35 -0.26 -1.39 312.58 312.28 310.71 311.01
Comb #3 1525.98 -1.84 -1.72 317.29 315.22 313.28 315.35
Comb #4 1566.00 2.48 -2.69 323.67 326.47 323.44 320.64
Comb #5 1564.81 -4.67 -0.52 326.23 320.97 320.38 325.64
Comb #6 1564.83 -1.16 0.87 323.47 322.17 323.15 324.46
Comb #7 1565.98 -1.03 -4.08 326.43 325.27 320.67 321.83

Demand Capacity Status


Maximum Soil Stress: 380.41 Allowable Maximum Soil Stress:

kN/m2 438.20 kN/m2

Eccentricity Check
Moment Axial Load Eccentricity
Comb Direction Limit (L/6) Status
(kN.m) (kN) (M/N)
Comb #1 X -1.29 1832.47 0.71 mm 366.67 mm ✓
Y -1.9 1832.47 1.04 mm 366.67 mm ✓
Comb #2 X -0.26 1508.35 0.17 mm 366.67 mm ✓
Y -1.39 1508.35 0.92 mm 366.67 mm ✓
Comb #3 X -1.84 1525.98 1.2 mm 366.67 mm ✓
Y -1.72 1525.98 1.13 mm 366.67 mm ✓
Comb #4 X 2.48 1566 1.59 mm 366.67 mm ✓
Y -2.69 1566 1.72 mm 366.67 mm ✓
Comb #5 X -4.67 1564.81 2.98 mm 366.67 mm ✓
Y -0.52 1564.81 0.33 mm 366.67 mm ✓
Comb #6 X -1.16 1564.83 0.74 mm 366.67 mm ✓
Y 0.87 1564.83 0.56 mm 366.67 mm ✓
Comb #7 X -1.03 1565.98 0.65 mm 366.67 mm ✓
Y -4.08 1565.98 2.61 mm 366.67 mm ✓

Punching Check
Vpd : Punching Demand
Vpc : Punching Capacity
Vpd-cf : Punching Demand(On Column Face)
Vpc-cf : Punching Capacity(On Column Face)
Vpd-ep : Punching Demand(On Effective Perimeter)
Vpc-ep : Punching Capacity(On Effective Perimeter)
σsoil : Soil Stress
up : Effective Perimeter
BEPx : Width of effective perimeter in X direction
BEPy : Width of effective perimeter in X direction
dsect : Distance from column face to effective perimeter edge
d : Effective Depth

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH
Punching force will be calculated according to EN 1992-1-1:2004 (6.4.3)

Vpd = σsoil * Aeff * β

σsoil = ΣN / Lx Ly

Aeff = LxLy - BxBy

β = 1.128

Punching capacity will be calculated according to EN 1992-1-1:2004 (6.4.4)

(6.47) vRd,c1 = CRd,c k (100 ρl fck)^(1/3) + k1 σcp

k = 1 + (200/d)^(1/2)

k = 1.58,

ρl = (ρlx ρly)^(1/2) * ρf , ρlmin = 0.02

ρlx = 0.0016, ρly = 0.0016, ρf = 1,

ρl = 0.0016,

σcp = ΣN / LxLy = 0.32 N/mm²

CRd,c = 0.12, k1 = 0.10

vRd,c1 = 0.35 N/mm²

vmin = 0.035 k^(3/2) fck^(1/2) + k1 σcp

vmin = 0.41 N/mm²

vRd,c = Max(vRd,c1, vmin) = 0.41 N/mm²

vRdmax = 0.5 (0.6 (1 - (fck / 250))) fcd

Vpc-cf = vRdmax up d,

Vpc-ep = vRd,c up d,

up = 2(BEPx + BEPy) = 10736

BEPx = Bx + 2dsect = 2684

BEPy = By + 2dsect = 2684

dsect = 2deff = 1192

Vpc-cf = 3776 kN

Vpc-ep = 2881 kN

Punching check is performed for each column on footing. The column having minimum capacity/demand ratio is considered for each combination.

Comb ΣN (kN) σSoil(kN/m2) Vpc-cf (kN) Vpd-cf (kN) D/C-cf Vpc-ep (kN) Vpd-ep (kN) D/C-ep
Comb #1 1832.47 378.61 3776.26 2028.76 0.54 2919.27 1009.62 0.35
Comb #2 1508.35 311.64 3776.26 1669.92 0.44 2919.27 831.04 0.28
Comb #3 1525.98 315.29 3776.26 1689.44 0.45 2919.27 840.76 0.29
Comb #4 1566.00 323.55 3776.26 1733.74 0.46 2919.27 862.80 0.30
Comb #5 1564.81 323.31 3776.26 1732.43 0.46 2919.27 862.15 0.30
Comb #6 1564.83 323.31 3776.26 1732.45 0.46 2919.27 862.16 0.30
Comb #7 1565.98 323.55 3776.26 1733.72 0.46 2919.27 862.79 0.30

Comparison at Demand / Capacity Status


Effective Perimeter 1009.6 kN / 2919.3 kN √
Column Face 2028.8 kN / 3776.3 kN √

Shear Check
Vdx-cf : Shear Force On Column Face, X-Direction
Vdy-cf : Shear Force On Column Face, Y-Direction

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH
Vdx-d : Shear Force On Location d Away From Column Face, X-Direction
Vdy-d : Shear Force On Location d Away From Column Face, Y-Direction
dv1 : Distance from Column Face to Footing Edge
dv2 : Distance from Location d Away From Column Face to Footing Edge
σcf : Soil stress on column face
σc : Soil stress at nearest corner
σmax : Max. corner stress

Vdx-cf = σcf dvx1 Ly + ((σmax - σcf) dvx1 Ly / 2)

Vdy-cf = σcf dvy1 Lx + ((σmax - σcf) dvy1 Lx / 2)

Vdx-d = σcf dvx2 Ly + ((σmax - σcf) dvx2 Ly / 2)

Vdy-d = σcf dvy2 Lx + ((σmax - σcf) dvy2 Lx / 2)

On Column Face,
X-Direction Y-Direction
Comb Demand (kN) Capacity (kN) Status (kN) Demand (kN) Capacity (kN) Status (kN)
Comb #1 794.09 797.05 ✓ 794.40 797.05 ✓
Comb #2 652.57 797.05 ✓ 653.15 797.05 ✓
Comb #3 662.26 797.05 ✓ 662.20 797.05 ✓
Comb #4 680.95 797.05 ✓ 681.05 797.05 ✓
Comb #5 681.56 797.05 ✓ 679.45 797.05 ✓
Comb #6 677.67 797.05 ✓ 677.53 797.05 ✓
Comb #7 680.16 797.05 ✓ 681.71 797.05 ✓

On "d" Distance Away


From Column Face,
X-Direction Y-Direction
Comb Demand (kN) Capacity (kN) Status (kN) Demand (kN) Capacity (kN) Status (kN)
Comb #1 542.28 797.05 ✓ 548.28 797.05 ✓
Comb #2 445.62 797.05 ✓ 450.70 797.05 ✓
Comb #3 452.27 797.05 ✓ 457.12 797.05 ✓
Comb #4 465.13 797.05 ✓ 470.20 797.05 ✓
Comb #5 465.31 797.05 ✓ 469.33 797.05 ✓
Comb #6 462.70 797.05 ✓ 467.62 797.05 ✓
Comb #7 464.75 797.05 ✓ 470.49 797.05 ✓

Comparison at Demand / Capacity Status


Column Face in X-Direction 794.1 kN / 797.0 kN √
Column Face in Y-Direction 794.4 kN / 797.0 kN √
Effective Perimeter in X-Direction 542.3 kN / 797.0 kN √
Effective Perimeter in Y-Direction 548.3 kN / 797.0 kN √

Bending Reinforcement Check


Required Asx Required Asy
Comb Mdx (kN.m) Mdy (kN.m)
(mm2) (mm2)
Comb #1 3773.46 1744.60 3774.44 1744.60
Comb #2 3100.85 1744.60 3102.67 1744.60
Comb #3 3147.12 1744.60 3146.93 1744.60
Comb #4 3236.68 1744.60 3237.00 1744.60
Comb #5 3237.83 1744.60 3231.16 1744.60
Comb #6 3219.64 1744.60 3219.18 1744.60
Comb #7 3234.04 1744.60 3238.97 1744.60

Comparison of Design Moment Selected Rebar Required / Provided Status


Reinforcement Area in X-
377.4 kN.m 16ɸ14 / 150.0 mm 1744.60 mm2/2257.76 mm2 √
Direction
Reinforcement Area in Y-
377.3 kN.m 16ɸ14 / 150.0 mm 1744.60 mm2/2257.76 mm2 √
Direction

Pad Footing Report

F-1C8 Design Summary


ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Footing Materials
Concrete Material C25/30
Rebar Material Grade 500 (Type 2)

Geometric Properties
BX 1500.00 mm
BY 1500.00 mm
Height 350.00 mm
Taper Height 0.00 mm

Corner Stresses
Lower-Left Corner 424.28 kN/m2
Lower-Right Corner 418.44 kN/m2
Upper-Right Corner 385.48 kN/m2
Upper-Left Corner 391.33 kN/m2

Loading Info
Combinations N Vx Vy Mx My
Comb #1 857.7 kN 2.9 kN 13.4 kN -2.7 kN.m -13.9 kN.m
Comb #2 702.2 kN 1.5 kN 13.4 kN -1.3 kN.m -13.8 kN.m
Comb #3 691.0 kN 3.2 kN 8.5 kN -3.0 kN.m -9.0 kN.m
Comb #4 728.4 kN -2.8 kN 13.3 kN 6.2 kN.m -14.9 kN.m
Comb #5 716.6 kN 7.8 kN 9.3 kN -10.7 kN.m -8.7 kN.m
Comb #6 726.8 kN 4.0 kN 8.0 kN -4.7 kN.m -6.5 kN.m
Comb #7 718.2 kN 0.9 kN 14.6 kN 0.2 kN.m -17.1 kN.m

Soil Stress Check


N : Axial Load Of Combination
∑N : Total Axial Load
TW : Total Weight of Footing
h : Footing Depth
htaper : Taper Height
Ecc1 : Column Eccentricity in X Direction
Ecc2 : Column Eccentricity in Y Direction
∑Mx : Total Moment in X Direction
∑My : Total Moment in Y Direction

Total footing, soil and pedestal weight is calculated.

Member Volume (m3) Unit Weight (kN/m3) Weight (kN)


Pad Footing : 0.7875 24 18.9
Soil : 1.9125 18 34.425
Total : 53.325

ΣN = N + TW

ΣMx=Mx + Vx (h - htaper) + Ecc1 N

ΣMy=My + Vy (h - htaper) + Ecc2 N

Corner stresses,

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH
σ1 = ΣN / LxLy - 6 ΣMx / (LxLy²) - 6 ΣMy / (Lx²Ly)

σ2 = ΣN / LxLy + 6 ΣMx / (LxLy²) - 6 ΣMy / (Lx²Ly)

σ3 = ΣN / LxLy + 6 ΣMx / (LxLy²) + 6 ΣMy / (Lx²Ly)

σ4 = ΣN / LxLy - 6 ΣMx / (LxLy²) + 6 ΣMy / (Lx²Ly)

ΣMx ΣMy σ1 σ2 σ3 σ4
Comb ΣN (kN)
(kN.m) (kN.m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
Comb #1 910.98 -1.64 -9.27 424.28 418.44 385.48 391.33
Comb #2 755.56 -0.73 -9.15 353.38 350.77 318.23 320.84
Comb #3 744.35 -1.90 -6.04 344.93 338.19 316.71 323.45
Comb #4 781.76 5.17 -10.21 356.41 374.79 338.49 320.10
Comb #5 769.93 -7.94 -5.46 366.00 337.78 318.38 346.60
Comb #6 780.16 -3.28 -3.67 359.10 347.43 334.37 346.05
Comb #7 771.53 0.52 -12.00 363.31 365.15 322.50 320.66

Demand Capacity Status


Maximum Soil Stress: 424.28 Allowable Maximum Soil Stress:

kN/m2 438.20 kN/m2

Eccentricity Check
Moment Axial Load Eccentricity
Comb Direction Limit (L/6) Status
(kN.m) (kN) (M/N)
Comb #1 X -1.64 910.98 1.8 mm 250 mm ✓
Y -9.27 910.98 10.17 mm 250 mm ✓
Comb #2 X -0.73 755.56 0.97 mm 250 mm ✓
Y -9.15 755.56 12.11 mm 250 mm ✓
Comb #3 X -1.9 744.35 2.55 mm 250 mm ✓
Y -6.04 744.35 8.12 mm 250 mm ✓
Comb #4 X 5.17 781.76 6.61 mm 250 mm ✓
Y -10.21 781.76 13.06 mm 250 mm ✓
Comb #5 X -7.94 769.93 10.31 mm 250 mm ✓
Y -5.46 769.93 7.09 mm 250 mm ✓
Comb #6 X -3.28 780.16 4.21 mm 250 mm ✓
Y -3.67 780.16 4.71 mm 250 mm ✓
Comb #7 X 0.52 771.53 0.67 mm 250 mm ✓
Y -12 771.53 15.55 mm 250 mm ✓

Punching Check
Vpd : Punching Demand
Vpc : Punching Capacity
Vpd-cf : Punching Demand(On Column Face)
Vpc-cf : Punching Capacity(On Column Face)
Vpd-ep : Punching Demand(On Effective Perimeter)
Vpc-ep : Punching Capacity(On Effective Perimeter)
σsoil : Soil Stress
up : Effective Perimeter
BEPx : Width of effective perimeter in X direction
BEPy : Width of effective perimeter in X direction
dsect : Distance from column face to effective perimeter edge
d : Effective Depth

Punching force will be calculated according to EN 1992-1-1:2004 (6.4.3)

Vpd = σsoil * Aeff * β

σsoil = ΣN / Lx Ly

Aeff = LxLy - BxBy

β=1

Punching capacity will be calculated according to EN 1992-1-1:2004 (6.4.4)

(6.47) vRd,c1 = CRd,c k (100 ρl fck)^(1/3) + k1 σcp

k = 1 + (200/d)^(1/2)
ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH
k = 1.82,

ρl = (ρlx ρly)^(1/2) * ρf , ρlmin = 0.02

ρlx = 0.0029, ρly = 0.0029, ρf = 1,

ρl = 0.0029,

σcp = ΣN / LxLy = 0.34 N/mm²

CRd,c = 0.12, k1 = 0.10

vRd,c1 = 0.49 N/mm²

vmin = 0.035 k^(3/2) fck^(1/2) + k1 σcp

vmin = 0.51 N/mm²

vRd,c = Max(vRd,c1, vmin) = 0.51 N/mm²

vRdmax = 0.5 (0.6 (1 - (fck / 250))) fcd

Vpc-cf = vRdmax up d,

Vpc-ep = vRd,c up d,

up = 2(BEPx + BEPy) = 5936

BEPx = Bx + 2dsect = 1484

BEPy = By + 2dsect = 1484

dsect = 2deff = 592

Vpc-cf = 1875 kN

Vpc-ep = 1051 kN

Punching check is performed for each column on footing. The column having minimum capacity/demand ratio is considered for each combination.

Comb ΣN (kN) σSoil(kN/m2) Vpc-cf (kN) Vpd-cf (kN) D/C-cf Vpc-ep (kN) Vpd-ep (kN) D/C-ep
Comb #1 910.98 404.88 1875.46 874.54 0.47 1063.63 19.33 0.02
Comb #2 755.56 335.80 1875.46 725.34 0.39 1063.63 16.03 0.02
Comb #3 744.35 330.82 1875.46 714.57 0.38 1063.63 15.79 0.01
Comb #4 781.76 347.45 1875.46 750.49 0.40 1063.63 16.59 0.02
Comb #5 769.93 342.19 1875.46 739.13 0.39 1063.63 16.34 0.02
Comb #6 780.16 346.74 1875.46 748.95 0.40 1063.63 16.55 0.02
Comb #7 771.53 342.90 1875.46 740.67 0.39 1063.63 16.37 0.02

Comparison at Demand / Capacity Status


Effective Perimeter 19.3 kN / 1063.6 kN √
Column Face 874.5 kN / 1875.5 kN √

Shear Check
Vdx-cf : Shear Force On Column Face, X-Direction
Vdy-cf : Shear Force On Column Face, Y-Direction
Vdx-d : Shear Force On Location d Away From Column Face, X-Direction
Vdy-d : Shear Force On Location d Away From Column Face, Y-Direction
dv1 : Distance from Column Face to Footing Edge
dv2 : Distance from Location d Away From Column Face to Footing Edge
σcf : Soil stress on column face
σc : Soil stress at nearest corner
σmax : Max. corner stress

Vdx-cf = σcf dvx1 Ly + ((σmax - σcf) dvx1 Ly / 2)

Vdy-cf = σcf dvy1 Lx + ((σmax - σcf) dvy1 Lx / 2)

Vdx-d = σcf dvx2 Ly + ((σmax - σcf) dvx2 Ly / 2)

Vdy-d = σcf dvy2 Lx + ((σmax - σcf) dvy2 Lx / 2)


ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

On Column Face,
X-Direction Y-Direction
Comb Demand (kN) Capacity (kN) Status (kN) Demand (kN) Capacity (kN) Status (kN)
Comb #1 375.92 463.69 ✓ 380.80 463.69 ✓
Comb #2 312.19 463.69 ✓ 317.57 463.69 ✓
Comb #3 306.57 463.69 ✓ 309.23 463.69 ✓
Comb #4 330.78 463.69 ✓ 334.01 463.69 ✓
Comb #5 325.91 463.69 ✓ 324.32 463.69 ✓
Comb #6 320.84 463.69 ✓ 321.09 463.69 ✓
Comb #7 320.95 463.69 ✓ 328.30 463.69 ✓

On "d" Distance Away


From Column Face,
X-Direction Y-Direction
Comb Demand (kN) Capacity (kN) Status (kN) Demand (kN) Capacity (kN) Status (kN)
Comb #1 282.12 463.69 ✓ 289.28 463.69 ✓
Comb #2 234.46 463.69 ✓ 241.18 463.69 ✓
Comb #3 229.89 463.69 ✓ 234.98 463.69 ✓
Comb #4 248.49 463.69 ✓ 254.17 463.69 ✓
Comb #5 244.28 463.69 ✓ 247.14 463.69 ✓
Comb #6 240.27 463.69 ✓ 244.15 463.69 ✓
Comb #7 241.36 463.69 ✓ 249.30 463.69 ✓

Comparison at Demand / Capacity Status


Column Face in X-Direction 375.9 kN / 463.7 kN √
Column Face in Y-Direction 380.8 kN / 463.7 kN √
Effective Perimeter in X-Direction 282.1 kN / 463.7 kN √
Effective Perimeter in Y-Direction 289.3 kN / 463.7 kN √

Bending Reinforcement Check


Required Asx Required Asy
Comb Mdx (kN.m) Mdy (kN.m)
(mm2) (mm2)
Comb #1 1133.69 851.80 1143.45 844.53
Comb #2 942.42 851.80 953.19 844.53
Comb #3 923.58 851.80 928.89 844.53
Comb #4 998.87 851.80 1005.33 844.53
Comb #5 981.22 851.80 978.04 844.53
Comb #6 964.88 851.80 965.37 844.53
Comb #7 970.54 851.80 985.23 844.53

Comparison of Design Moment Selected Rebar Required / Provided Status


Reinforcement Area in X-
114.3 kN.m 11ɸ14 / 150.0 mm 851.80 mm2/1539.38 mm2 √
Direction
Reinforcement Area in Y-
113.4 kN.m 11ɸ14 / 150.0 mm 844.53 mm2/1539.38 mm2 √
Direction

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

B. COLUMNS DESIGN

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

C. BEAMS DESIGN

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Foundation Beam Reinforcement Design


Axis: J Storey: Foundation
Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 500 (Type 2)) Concrete Cover: 25.0 mm

Bending
FB55 L= 1349.2mm FB60 L= 3650.4mm FB59 L= 3651.1mm
Bw x H (mm) 200 x 400 200 x 400 200 x 400
Footing bxh
(mm)
--- --- ---
(Left)
(Right)
Bottom Edge
M (kN.m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
d (mm) 361.0 361.0 361.0 361.0 361.0 361.0 361.0 361.0 361.0
K/K' 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
x (mm) 40.1 40.1 40.1 40.1 40.1 40.1 40.1 40.1 40.1
As (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00
Top Edge
M (kN.m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
d (mm) 361.0 361.0 342.0 342.0 361.0 342.0 342.0 361.0 342.0
K/K' 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
x (mm) 40.1 40.1 38.0 38.0 40.1 38.0 38.0 40.1 38.0
As (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00

Shear And Torsion Design


Vd (kN)
v (MPa)
vc (MPa) 0.47 0.47 0.47 0.47 0.47 0.47
vMax (MPa) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 100.7 100.7 100.7
Td (kN.m) 0.0 0.0 0.0
vt (MPa) 0.00 0.00 0.00
vt,min (MPa) 0.00 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links 1R8-250 1R8-250 1R8-250 1R8-250 1R8-250 1R8-250 1R8-250 1R8-250 1R8-250

Deflection Check Steel Areas


L/d --- --- ---

(mm2)
Required
Top Edge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bottom Edge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplied
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars
Top.Sup.Bars
Top Bars 2H12 2H12 2H12
Top Bars
Bot.Sup.Bars 2H12 2H12 2H12 2H12 2H12
Bot.Sup.Bars
Bottom Bars 2H12 2H12 2H12
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: J Storey: Foundation ...


Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 500 (Type 2)) Concrete Cover: 25.0 mm

Bending
FB29 L= 1349.9mm FB28 L= 1353.6mm FB61 L= 3650.9mm
Bw x H (mm) 200 x 400 200 x 400 200 x 400
Footing bxh
(mm)
--- --- ---
(Left)
(Right)
Bottom Edge
M (kN.m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
d (mm) 361.0 361.0 361.0 361.0 361.0 361.0 361.0 361.0 361.0
K/K' 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
x (mm) 40.1 40.1 40.1 40.1 40.1 40.1 40.1 40.1 40.1
As (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00
Top Edge
M (kN.m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
d (mm) 342.0 361.0 342.0 342.0 361.0 342.0 342.0 361.0 342.0
K/K' 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
x (mm) 38.0 40.1 38.0 38.0 40.1 38.0 38.0 40.1 38.0
As (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00

Shear And Torsion Design


Vd (kN)
v (MPa)
vc (MPa) 0.47 0.47 0.47 0.47 0.47 0.47
vMax (MPa) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 100.7 100.7 100.7
Td (kN.m) 0.0 0.0 0.0
vt (MPa) 0.00 0.00 0.00
vt,min (MPa) 0.00 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links 1R8-250 1R8-250 1R8-250 1R8-250 1R8-250 1R8-250 1R8-250 1R8-250 1R8-250

Deflection Check Steel Areas


L/d --- --- ---

(mm2)
Required
Top Edge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bottom Edge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplied
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars
Top.Sup.Bars
Top Bars 2H12 2H12 2H12
Top Bars
Bot.Sup.Bars 2H12 2H12 2H12 2H12 2H12 2H12
Bot.Sup.Bars
Bottom Bars 2H12 2H12 2H12
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: J Storey: Foundation ...


Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 500 (Type 2)) Concrete Cover: 25.0 mm

Bending
FB62 L= 4976.7mm
Bw x H (mm) 200 x 400
Footing bxh
(mm)
---
(Left)
(Right)
Bottom Edge
M (kN.m) 0.0 0.0 0.0
d (mm) 361.0 361.0 361.0
K/K' 0.00 0.00 0.00
x (mm) 40.1 40.1 40.1
As (mm2) 0.00 0.00 0.00
As' (mm2) 0.00 0.00 0.00
As,min (mm2) 104.00 104.00 104.00
Top Edge
M (kN.m) 0.0 0.0 0.0
d (mm) 342.0 361.0 361.0
K/K' 0.00 0.00 0.00
x (mm) 38.0 40.1 40.1
As (mm2) 0.00 0.00 0.00
As' (mm2) 0.00 0.00 0.00
As,min (mm2) 104.00 104.00 104.00

Shear And Torsion Design


Vd (kN)
v (MPa)
vc (MPa) 0.47 0.47
vMax (MPa) 4.38 4.38
Vnom (kN) 100.7
Td (kN.m) 0.0
vt (MPa) 0.00
vt,min (MPa) 0.00
bsupport (mm) 0.0 0.0
Links 1R8-250 1R8-250 1R8-250

Deflection Check
L/d ---

Steel Areas (mm2)


Required
Top Edge 0.00 0.00 0.00
Bottom Edge 0.00 0.00 0.00
Supplied
Top Edge 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19
Steel Bars
Top.Sup.Bars
Top Bars 2H12
Top Bars
Bot.Sup.Bars 2H12
Bot.Sup.Bars
Bottom Bars 2H12
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Beam Reinforcement Design


Axis: L Storey: 2
Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Diagrams

Bending
2B1 L= 1349.2mm 2B2 L= 3650.4mm 2B3 L= 3651.1mm
Bw x H (mm) 200 x 400 200 x 400 200 x 400
Flange Bf x Hf
(Left) --- --- ---
(Right)
Top Edge
M (kN.m) 8.5 4.0 5.0 13.3 0.0 19.7 21.2 0.4 16.2
d (mm) 363.0 363.0 363.0 363.0 363.0 363.0 363.0 363.0 363.0
K/K' 0.07 0.03 0.04 0.11 0.00 0.16 0.17 0.00 0.13
x (mm) 40.3 40.3 40.3 40.3 40.3 40.3 40.3 40.3 40.3
As (mm2) 56.45 26.53 33.31 88.69 0.00 131.38 141.22 2.46 107.72
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00
Bottom Edge
M (kN.m) 0.0 0.3 0.0 3.1 11.8 2.0 0.1 9.3 0.1
d (mm) 363.0 363.0 344.0 344.0 363.0 344.0 344.0 363.0 344.0
K/K' 0.00 0.00 0.00 0.03 0.10 0.02 0.00 0.08 0.00
x (mm) 40.3 40.3 38.2 38.2 40.3 38.2 38.2 40.3 38.2
As (mm2) 0.20 1.67 0.00 21.97 78.58 14.35 0.77 62.23 0.78
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00

Shear And Torsion Design


Vd (kN) 13.2 10.8 26.4 28.5 28.3 26.6
v (MPa) 0.18 0.15 0.36 0.39 0.39 0.37
vc (MPa) 0.47 0.47 0.47 0.47 0.47 0.47
vMax (MPa) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 65.7 65.7 65.7
Td (kN.m) 0.0 0.0 0.0
vt (MPa) 0.00 0.00 0.00
vt,min (MPa) 0.00 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links 1R6-150 1R6-150 1R6-150 1R6-150 1R6-150 1R6-150 1R6-150 1R6-150 1R6-150

Deflection Check
3.72 ≤ 10.06 ≤ 10.06 ≤
L/d
56.89 √ 56.89 √ 56.89 √

Steel Areas (mm2)


Required

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Top Edge 56.45 26.53 33.31 88.69 0.00 131.38 141.22 2.46 107.72
Bottom Edge 0.20 1.67 0.00 21.97 78.58 14.35 0.77 62.23 0.78
Supplied
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars
Top Bars 2H12 2H12 2H12
Top.Sup.Bars 2H12 2H12 2H12 2H12 2H12
Top.Sup.Bars
Bottom Bars 2H12 2H12 2H12
Bottom Bars
Bot.Sup.Bars
Side Bars

Axis: L Storey: 2 ...


Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Diagrams

Bending
2B4 L= 1349.9mm 2B5 L= 1353.6mm 2B6 L= 3650.9mm
Bw x H (mm) 200 x 400 200 x 400 200 x 400
Flange Bf x Hf
(Left) --- --- ---
(Right)
Top Edge
M (kN.m) 17.0 6.5 0.0 0.0 9.4 20.8 24.3 0.4 33.9
d (mm) 363.0 363.0 363.0 363.0 363.0 363.0 363.0 363.0 362.0
K/K' 0.14 0.05 0.00 0.00 0.08 0.17 0.20 0.00 0.28
x (mm) 40.3 40.3 40.3 40.3 40.3 40.3 40.3 40.3 40.6
As (mm2) 113.54 43.20 0.00 0.00 62.87 138.54 162.27 2.35 227.16
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00
Bottom Edge
M (kN.m) 0.0 8.6 11.9 11.9 7.6 0.0 0.0 14.8 0.0
d (mm) 344.0 363.0 344.0 344.0 363.0 344.0 344.0 363.0 344.0
K/K' 0.00 0.07 0.11 0.11 0.06 0.00 0.00 0.12 0.00
x (mm) 38.2 40.3 38.2 38.2 40.3 38.2 38.2 40.3 38.2
As (mm2) 0.00 57.62 83.66 83.65 50.44 0.00 0.00 98.41 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00 104.00

Shear And Torsion Design


Vd (kN) 30.8 17.8 21.2 33.5 42.0 47.2
v (MPa) 0.42 0.24 0.29 0.46 0.58 0.65
vc (MPa) 0.47 0.47 0.47 0.47 0.47 0.59
vMax (MPa) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 65.7 65.7 65.7
Td (kN.m) 0.0 0.0 0.0

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

vt (MPa) 0.00 0.00 0.00


vt,min (MPa) 0.00 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links 1R6-150 1R6-150 1R6-150 1R6-150 1R6-150 1R6-150 1R6-150 1R6-150 1R6-150

Deflection Check
3.72 ≤ 3.73 ≤ 10.06 ≤
L/d
56.89 √ 56.89 √ 56.89 √

Steel Areas (mm2)


Required
Top Edge 113.54 43.20 0.00 0.00 62.87 138.54 162.27 2.35 227.16
Bottom Edge 0.00 57.62 83.66 83.65 50.44 0.00 0.00 98.41 0.00
Supplied
Top Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 461.81
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars
Top Bars 2H12 2H12 2H12
Top.Sup.Bars 2H12 2H12 2H12 2H12 2H12 3H14
Top.Sup.Bars
Bottom Bars 2H12 2H12 2H12
Bottom Bars
Bot.Sup.Bars
Side Bars

Axis: L Storey: 2 ...


Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Diagrams

Bending
2B7 L= 4976.7mm 2B8 L= 904.7mm
Bw x H (mm) 200 x 400 200 x 400
Flange Bf x Hf
(Left) --- ---
(Right)
Top Edge
M (kN.m) 53.3 0.0 51.8 30.7 17.4 6.2
d (mm) 362.0 363.0 362.0 362.0 363.0 363.0
K/K' 0.43 0.00 0.42 0.25 0.14 0.05
x (mm) 66.1 40.3 64.0 40.2 40.3 40.3
As (mm2) 369.29 0.00 357.68 204.99 116.01 41.35
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 104.00 104.00 104.00 104.00 104.00 104.00
Bottom Edge
M (kN.m) 0.0 31.0 2.6 0.0 0.0 3.5
d (mm) 344.0 363.0 344.0 344.0 363.0 363.0

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

K/K' 0.00 0.25 0.02 0.00 0.00 0.03


x (mm) 38.2 40.3 38.2 38.2 40.3 40.3
As (mm2) 0.00 206.87 18.56 0.00 0.00 23.60
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 104.00 104.00 104.00 104.00 104.00 104.00

Shear And Torsion Design


Vd (kN) 63.3 81.8 41.6 34.5
v (MPa) 0.87 1.13 0.57 0.48
vc (MPa) 0.59 0.59 0.59 0.47
vMax (MPa) 4.38 4.38 4.38 4.38
Vnom (kN) 65.7 65.7
Td (kN.m) 0.3 0.1
vt (MPa) 0.00 0.00
vt,min (MPa) 0.00 0.00
bsupport (mm) 0.0 1200.0 0.0 0.0
Links 1R6-150 1R6-150 1R6-100 1R6-150 1R6-150 1R6-150

Deflection Check
13.71 ≤ 2.5 ≤ 14.98
L/d
35.29 √ √

Steel Areas (mm2)


Required
Top Edge 369.29 0.00 357.68 204.99 116.01 41.35
Bottom Edge 0.00 206.87 18.56 0.00 0.00 23.60
Supplied
Top Edge 461.81 226.19 461.81 461.81 226.19 226.19
Bottom Edge 226.19 226.19 226.19 226.19 226.19 226.19
Steel Bars
Top Bars 2H12 2H12
Top.Sup.Bars 3H14 3H14 3H14
Top.Sup.Bars
Bottom Bars 2H12 2H12
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

D. SLAB DESIGN

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Rib Beam Reinforcement Design


Axis: Y4 Storey: 1
Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Bending
1R1 L= 3145.1mm 1R2 L= 4007.6mm 1R37 L= 1139.8mm
Bw x H (mm) 100 x 320 100 x 320 100 x 320
Flange Bf x Hf
(Left) --- --- ---
(Right)
Top Edge
M (kN.m) 0.0 0.0 4.8 4.8 0.0 3.8 3.8 0.0 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.00 0.15 0.15 0.00 0.12 0.12 0.00 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 0.00 41.24 41.24 0.00 32.18 32.18 0.00 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60
Bottom Edge
M (kN.m) 0.0 2.3 0.0 0.0 2.8 0.0 0.0 0.0 0.1
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.07 0.00 0.00 0.09 0.00 0.00 0.00 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 19.47 0.00 0.00 23.85 0.00 0.00 0.00 0.56
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60

Shear And Torsion Design


Vd (kN) 4.0 7.1 7.3 6.8 5.4 1.4
v (MPa) 0.14 0.25 0.26 0.24 0.19 0.05
vc (MPa) 0.49 0.49 0.49 0.49 0.49 0.49
vMax (MPa) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 46.6 46.6 46.6
Td (kN.m) 0.0 0.0 0.0
vt (MPa) 0.00 0.00 0.00
vt,min (MPa) 0.00 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200

Deflection Check
11.11 ≤ 14.16 ≤
L/d 57.51 √ 57.51 √ ---

Steel Areas (mm2)


Required
Top Edge 0.00 0.00 41.24 41.24 0.00 32.18 32.18 0.00 0.00
Bottom Edge 0.00 19.47 0.00 0.00 23.85 0.00 0.00 0.00 0.56
Supplied
Top Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Bottom Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Steel Bars
Top Bars 2H8 2H8 2H8
Top.Sup.Bars 2H8 2H8 2H8 2H8 2H8
Top.Sup.Bars
Bottom Bars 2H8 2H8 2H8
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: Y4 Storey: 1 ...


Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Bending
1R36 L= 1442.7mm
Bw x H (mm) 100 x 320
Flange Bf x Hf
(Left) ---
(Right)
Top Edge
M (kN.m) 0.0 0.0 0.0
d (mm) 283.0 283.0 283.0
K/K' 0.00 0.00 0.00
x (mm) 31.4 31.4 31.4
As (mm2) 0.00 0.00 0.00
As' (mm2) 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60
Bottom Edge
M (kN.m) 0.1 0.9 0.0
d (mm) 283.0 283.0 283.0
K/K' 0.00 0.03 0.00
x (mm) 31.4 31.4 31.4
As (mm2) 0.56 8.12 0.00
As' (mm2) 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60

Shear And Torsion Design


Vd (kN) 2.5 2.6
v (MPa) 0.09 0.09
vc (MPa) 0.49 0.49
vMax (MPa) 4.38 4.38
Vnom (kN) 46.6
Td (kN.m) 0.0
vt (MPa) 0.00
vt,min (MPa) 0.00
bsupport (mm) 0.0 0.0
Links 1R8-200 1R8-200 1R8-200

Deflection Check
5.1 ≤ 57.51
L/d

Steel Areas (mm2)


Required
Top Edge 0.00 0.00 0.00
Bottom Edge 0.56 8.12 0.00
Supplied
Top Edge 100.53 100.53 100.53
Bottom Edge 100.53 100.53 100.53
Steel Bars
Top Bars 2H8
Top.Sup.Bars 2H8
Top.Sup.Bars
Bottom Bars 2H8
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: X1 Storey: 1
Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Bending
1R12 L= 1349.2mm 1R2 L= 3650.4mm 1R3 L= 3651.1mm
Bw x H (mm) 100 x 320 100 x 320 100 x 320
Flange Bf x Hf
(Left) --- --- ---
(Right)
Top Edge
M (kN.m) 0.0 0.0 2.9 2.9 0.0 4.4 4.4 0.0 3.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.00 0.09 0.09 0.00 0.14 0.14 0.00 0.09
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 0.00 24.73 24.73 0.00 37.63 37.63 0.00 25.38
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60
Bottom Edge
M (kN.m) 0.0 0.0 0.0 0.0 2.2 0.0 0.0 2.2 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.00 0.00 0.00 0.07 0.00 0.00 0.07 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 0.07 0.00 0.00 19.17 0.00 0.00 18.86 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60

Shear And Torsion Design


Vd (kN) 0.2 4.5 6.0 6.8 6.8 6.0
v (MPa) 0.01 0.16 0.21 0.24 0.24 0.21
vc (MPa) 0.49 0.49 0.49 0.49 0.49 0.49
vMax (MPa) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 46.6 46.6 46.6
Td (kN.m) 0.0 0.0 0.0
vt (MPa) 0.00 0.00 0.00
vt,min (MPa) 0.00 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200

Deflection Check
4.77 ≤ 12.9 ≤ 12.9 ≤
L/d 57.51 √ 57.51 √ 57.51 √

Steel Areas (mm2)


Required
Top Edge 0.00 0.00 24.73 24.73 0.00 37.63 37.63 0.00 25.38
Bottom Edge 0.00 0.07 0.00 0.00 19.17 0.00 0.00 18.86 0.00
Supplied
Top Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Bottom Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Steel Bars
Top Bars 2H8 2H8 2H8
Top.Sup.Bars 2H8 2H8 2H8 2H8 2H8
Top.Sup.Bars
Bottom Bars 2H8 2H8 2H8
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: X1 Storey: 1 ...


Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Bending
1R8 L= 1349.9mm 1R9 L= 1353.6mm 1R29 L= 3650.9mm
Bw x H (mm) 100 x 320 100 x 320 100 x 320
Flange Bf x Hf
(Left) --- --- ---
(Right)
Top Edge
M (kN.m) 3.0 0.0 0.0 0.0 0.0 2.4 2.4 0.0 5.9
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.09 0.00 0.00 0.00 0.00 0.08 0.08 0.00 0.19
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 25.38 0.00 0.00 0.00 0.00 20.57 20.57 0.00 50.81
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60
Bottom Edge
M (kN.m) 0.0 0.0 0.5 0.5 0.5 0.0 0.0 1.8 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.00 0.02 0.02 0.02 0.00 0.00 0.06 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 0.00 4.60 4.60 4.66 0.00 0.00 15.62 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60

Shear And Torsion Design


Vd (kN) 5.0 0.2 0.2 4.6 5.5 7.4
v (MPa) 0.18 0.01 0.01 0.16 0.19 0.26
vc (MPa) 0.49 0.49 0.49 0.49 0.49 0.49
vMax (MPa) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 46.6 46.6 46.6
Td (kN.m) 0.0 0.0 0.0
vt (MPa) 0.00 0.00 0.00
vt,min (MPa) 0.00 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200

Deflection Check
4.78 ≤ 12.9 ≤
L/d --- 57.51 √ 57.51 √

Steel Areas (mm2)


Required
Top Edge 25.38 0.00 0.00 0.00 0.00 20.57 20.57 0.00 50.81
Bottom Edge 0.00 0.00 4.60 4.60 4.66 0.00 0.00 15.62 0.00
Supplied
Top Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Bottom Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Steel Bars
Top Bars 2H8 2H8 2H8
Top.Sup.Bars 2H8 2H8 2H8 2H8 2H8 2H8
Top.Sup.Bars
Bottom Bars 2H8 2H8 2H8
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: X1 Storey: 1 ...


Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Bending
1R30 L= 4686.8mm 1R16 L= 1194.7mm
Bw x H (mm) 100 x 320 100 x 320
Flange Bf x Hf
(Left) --- ---
(Right)
Top Edge
M (kN.m) 5.9 0.0 5.5 5.5 0.0 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.19 0.00 0.17 0.17 0.00 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 50.81 0.00 46.75 46.75 0.00 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60
Bottom Edge
M (kN.m) 0.0 4.0 0.0 0.0 0.0 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.13 0.00 0.00 0.00 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 33.92 0.00 0.00 0.00 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60

Shear And Torsion Design


Vd (kN) 8.4 8.1 6.7 2.5
v (MPa) 0.30 0.29 0.24 0.09
vc (MPa) 0.49 0.49 0.49 0.49
vMax (MPa) 4.38 4.38 4.38 4.38
Vnom (kN) 46.6 46.6
Td (kN.m) 0.0 0.0
vt (MPa) 0.00 0.00
vt,min (MPa) 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0
Links 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200

Deflection Check
16.56 ≤
L/d ---
57.51 √

Steel Areas (mm2)


Required
Top Edge 50.81 0.00 46.75 46.75 0.00 0.00
Bottom Edge 0.00 33.92 0.00 0.00 0.00 0.00
Supplied
Top Edge 100.53 100.53 100.53 100.53 100.53 100.53
Bottom Edge 100.53 100.53 100.53 100.53 100.53 100.53
Steel Bars
Top Bars 2H8 2H8
Top.Sup.Bars 2H8 2H8 2H8
Top.Sup.Bars
Bottom Bars 2H8 2H8
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: X2 Storey: 1
Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Bending
1R14 L= 1349.2mm 1R1 L= 3650.4mm 1R4 L= 3651.1mm
Bw x H (mm) 100 x 320 100 x 320 100 x 320
Flange Bf x Hf
(Left) --- --- ---
(Right)
Top Edge
M (kN.m) 0.0 0.0 2.9 2.9 0.0 4.4 4.4 0.0 3.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.00 0.09 0.09 0.00 0.14 0.14 0.00 0.09
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 0.00 24.73 24.73 0.00 37.63 37.63 0.00 25.38
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60
Bottom Edge
M (kN.m) 0.0 0.0 0.0 0.0 2.2 0.0 0.0 2.2 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.00 0.00 0.00 0.07 0.00 0.00 0.07 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 0.07 0.00 0.00 19.17 0.00 0.00 18.86 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60

Shear And Torsion Design


Vd (kN) 0.2 4.5 6.0 6.8 6.8 6.0
v (MPa) 0.01 0.16 0.21 0.24 0.24 0.21
vc (MPa) 0.49 0.49 0.49 0.49 0.49 0.49
vMax (MPa) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 46.6 46.6 46.6
Td (kN.m) 0.0 0.0 0.0
vt (MPa) 0.00 0.00 0.00
vt,min (MPa) 0.00 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200

Deflection Check
4.77 ≤ 12.9 ≤ 12.9 ≤
L/d 57.51 √ 57.51 √ 57.51 √

Steel Areas (mm2)


Required
Top Edge 0.00 0.00 24.73 24.73 0.00 37.63 37.63 0.00 25.38
Bottom Edge 0.00 0.07 0.00 0.00 19.17 0.00 0.00 18.86 0.00
Supplied
Top Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Bottom Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Steel Bars
Top Bars 2H8 2H8 2H8
Top.Sup.Bars 2H8 2H8 2H8 2H8 2H8
Top.Sup.Bars
Bottom Bars 2H8 2H8 2H8
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: X2 Storey: 1 ...


Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Bending
1R6 L= 1349.9mm 1R5 L= 1353.6mm 1R28 L= 3650.9mm
Bw x H (mm) 100 x 320 100 x 320 100 x 320
Flange Bf x Hf
(Left) --- --- ---
(Right)
Top Edge
M (kN.m) 3.0 0.0 0.0 0.0 0.0 2.4 2.4 0.0 5.9
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.09 0.00 0.00 0.00 0.00 0.08 0.08 0.00 0.19
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 25.38 0.00 0.00 0.00 0.00 20.57 20.57 0.00 50.81
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60
Bottom Edge
M (kN.m) 0.0 0.0 0.5 0.5 0.5 0.0 0.0 1.8 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.00 0.02 0.02 0.02 0.00 0.00 0.06 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 0.00 4.60 4.60 4.66 0.00 0.00 15.62 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60

Shear And Torsion Design


Vd (kN) 5.0 0.2 0.2 4.6 5.5 7.4
v (MPa) 0.18 0.01 0.01 0.16 0.19 0.26
vc (MPa) 0.49 0.49 0.49 0.49 0.49 0.49
vMax (MPa) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 46.6 46.6 46.6
Td (kN.m) 0.0 0.0 0.0
vt (MPa) 0.00 0.00 0.00
vt,min (MPa) 0.00 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200

Deflection Check
4.78 ≤ 12.9 ≤
L/d --- 57.51 √ 57.51 √

Steel Areas (mm2)


Required
Top Edge 25.38 0.00 0.00 0.00 0.00 20.57 20.57 0.00 50.81
Bottom Edge 0.00 0.00 4.60 4.60 4.66 0.00 0.00 15.62 0.00
Supplied
Top Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Bottom Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Steel Bars
Top Bars 2H8 2H8 2H8
Top.Sup.Bars 2H8 2H8 2H8 2H8 2H8 2H8
Top.Sup.Bars
Bottom Bars 2H8 2H8 2H8
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: X2 Storey: 1 ...


Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Bending
1R27 L= 4686.8mm 1R18 L= 1194.7mm
Bw x H (mm) 100 x 320 100 x 320
Flange Bf x Hf
(Left) --- ---
(Right)
Top Edge
M (kN.m) 5.9 0.0 5.5 5.5 0.0 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.19 0.00 0.17 0.17 0.00 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 50.81 0.00 46.75 46.75 0.00 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60
Bottom Edge
M (kN.m) 0.0 4.0 0.0 0.0 0.0 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.13 0.00 0.00 0.00 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 33.92 0.00 0.00 0.00 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60

Shear And Torsion Design


Vd (kN) 8.4 8.1 6.7 2.5
v (MPa) 0.30 0.29 0.24 0.09
vc (MPa) 0.49 0.49 0.49 0.49
vMax (MPa) 4.38 4.38 4.38 4.38
Vnom (kN) 46.6 46.6
Td (kN.m) 0.0 0.0
vt (MPa) 0.00 0.00
vt,min (MPa) 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0
Links 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200

Deflection Check
16.56 ≤
L/d ---
57.51 √

Steel Areas (mm2)


Required
Top Edge 50.81 0.00 46.75 46.75 0.00 0.00
Bottom Edge 0.00 33.92 0.00 0.00 0.00 0.00
Supplied
Top Edge 100.53 100.53 100.53 100.53 100.53 100.53
Bottom Edge 100.53 100.53 100.53 100.53 100.53 100.53
Steel Bars
Top Bars 2H8 2H8
Top.Sup.Bars 2H8 2H8 2H8
Top.Sup.Bars
Bottom Bars 2H8 2H8
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: X4 Storey: 1
Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Bending
1R23 L= 1263.8mm 1R31 L= 4686.8mm 1R22 L= 1194.7mm
Bw x H (mm) 100 x 320 100 x 320 100 x 320
Flange Bf x Hf
(Left) --- --- ---
(Right)
Top Edge
M (kN.m) 0.0 0.0 5.6 5.6 0.0 5.6 5.6 0.0 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.00 0.18 0.18 0.00 0.18 0.18 0.00 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 0.00 47.48 47.48 0.00 48.07 48.07 0.00 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60
Bottom Edge
M (kN.m) 0.0 0.0 0.0 0.0 4.1 0.0 0.0 0.0 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.00 0.00 0.00 0.13 0.00 0.00 0.00 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 0.00 0.00 0.00 34.91 0.00 0.00 0.00 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60

Shear And Torsion Design


Vd (kN) 2.2 6.6 8.2 8.3 6.8 2.6
v (MPa) 0.08 0.23 0.29 0.29 0.24 0.09
vc (MPa) 0.49 0.49 0.49 0.49 0.49 0.49
vMax (MPa) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 46.6 46.6 46.6
Td (kN.m) 0.0 0.0 0.0
vt (MPa) 0.00 0.00 0.00
vt,min (MPa) 0.00 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200

Deflection Check
16.56 ≤
L/d --- 57.51 √ ---

Steel Areas (mm2)


Required
Top Edge 0.00 0.00 47.48 47.48 0.00 48.07 48.07 0.00 0.00
Bottom Edge 0.00 0.00 0.00 0.00 34.91 0.00 0.00 0.00 0.00
Supplied
Top Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Bottom Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Steel Bars
Top Bars 2H8 2H8 2H8
Top.Sup.Bars 2H8 2H8 2H8 2H8
Top.Sup.Bars
Bottom Bars 2H8 2H8 2H8
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: Y6 Storey: 1
Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Bending
1R27 L= 3145.1mm 1R30 L= 4007.6mm 1R32 L= 3173.2mm
Bw x H (mm) 100 x 320 100 x 320 100 x 320
Flange Bf x Hf
(Left) --- --- ---
(Right)
Top Edge
M (kN.m) 0.0 0.0 4.9 4.9 0.0 3.5 3.5 0.0 4.6
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.00 0.16 0.16 0.00 0.11 0.11 0.00 0.15
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 0.00 41.80 41.80 0.00 30.17 30.17 0.00 39.21
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60
Bottom Edge
M (kN.m) 0.0 2.3 0.0 0.0 2.9 0.0 0.0 0.4 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.07 0.00 0.00 0.09 0.00 0.00 0.01 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 19.27 0.00 0.00 24.62 0.00 0.00 3.34 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60

Shear And Torsion Design


Vd (kN) 4.0 7.1 7.4 6.7 5.3 5.9
v (MPa) 0.14 0.25 0.26 0.24 0.19 0.21
vc (MPa) 0.49 0.49 0.49 0.49 0.49 0.49
vMax (MPa) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 46.6 46.6 46.6
Td (kN.m) 0.0 0.0 0.0
vt (MPa) 0.00 0.00 0.00
vt,min (MPa) 0.00 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200

Deflection Check
11.11 ≤ 14.16 ≤ 11.21 ≤
L/d 57.51 √ 57.51 √ 57.51 √

Steel Areas (mm2)


Required
Top Edge 0.00 0.00 41.80 41.80 0.00 30.17 30.17 0.00 39.21
Bottom Edge 0.00 19.27 0.00 0.00 24.62 0.00 0.00 3.34 0.00
Supplied
Top Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Bottom Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Steel Bars
Top Bars 2H8 2H8 2H8
Top.Sup.Bars 2H8 2H8 2H8 2H8 2H8
Top.Sup.Bars
Bottom Bars 2H8 2H8 2H8
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: Y6 Storey: 1 ...


Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Bending
1R31 L= 3755mm
Bw x H (mm) 100 x 320
Flange Bf x Hf
(Left) ---
(Right)
Top Edge
M (kN.m) 4.6 0.0 0.0
d (mm) 283.0 283.0 283.0
K/K' 0.15 0.00 0.00
x (mm) 31.4 31.4 31.4
As (mm2) 39.21 0.00 0.00
As' (mm2) 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60
Bottom Edge
M (kN.m) 0.0 4.1 0.0
d (mm) 283.0 283.0 283.0
K/K' 0.00 0.13 0.00
x (mm) 31.4 31.4 31.4
As (mm2) 0.00 35.28 0.00
As' (mm2) 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60

Shear And Torsion Design


Vd (kN) 7.8 5.4
v (MPa) 0.28 0.19
vc (MPa) 0.49 0.49
vMax (MPa) 4.38 4.38
Vnom (kN) 46.6
Td (kN.m) 0.0
vt (MPa) 0.00
vt,min (MPa) 0.00
bsupport (mm) 0.0 0.0
Links 1R8-200 1R8-200 1R8-200

Deflection Check
13.27 ≤
L/d
57.51 √

Steel Areas (mm2)


Required
Top Edge 39.21 0.00 0.00
Bottom Edge 0.00 35.28 0.00
Supplied
Top Edge 100.53 100.53 100.53
Bottom Edge 100.53 100.53 100.53
Steel Bars
Top Bars 2H8
Top.Sup.Bars 2H8
Top.Sup.Bars
Bottom Bars 2H8
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: Y5 Storey: 1
Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Bending
1R28 L= 3145.1mm 1R29 L= 4007.6mm 1R33 L= 3173.2mm
Bw x H (mm) 100 x 320 100 x 320 100 x 320
Flange Bf x Hf
(Left) --- --- ---
(Right)
Top Edge
M (kN.m) 0.0 0.0 4.6 4.6 0.0 4.6 4.6 0.0 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.00 0.15 0.15 0.00 0.15 0.15 0.00 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 0.00 39.17 39.17 0.00 39.57 39.57 0.00 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60
Bottom Edge
M (kN.m) 0.0 2.4 0.0 0.0 2.5 0.0 0.0 2.4 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.08 0.00 0.00 0.08 0.00 0.00 0.08 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 20.22 0.00 0.00 21.10 0.00 0.00 20.70 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60

Shear And Torsion Design


Vd (kN) 4.1 7.0 7.0 7.1 7.0 4.1
v (MPa) 0.14 0.25 0.25 0.25 0.25 0.15
vc (MPa) 0.49 0.49 0.49 0.49 0.49 0.49
vMax (MPa) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 46.6 46.6 46.6
Td (kN.m) 0.0 0.0 0.0
vt (MPa) 0.00 0.00 0.00
vt,min (MPa) 0.00 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200

Deflection Check
11.11 ≤ 14.16 ≤ 11.21 ≤
L/d 57.51 √ 57.51 √ 57.51 √

Steel Areas (mm2)


Required
Top Edge 0.00 0.00 39.17 39.17 0.00 39.57 39.57 0.00 0.00
Bottom Edge 0.00 20.22 0.00 0.00 21.10 0.00 0.00 20.70 0.00
Supplied
Top Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Bottom Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Steel Bars
Top Bars 2H8 2H8 2H8
Top.Sup.Bars 2H8 2H8 2H8 2H8
Top.Sup.Bars
Bottom Bars 2H8 2H8 2H8
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: X3 Storey: 1
Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Bending
1R36 L= 3650.4mm 1R34 L= 5001mm 1R35 L= 1353.6mm
Bw x H (mm) 100 x 320 100 x 320 100 x 320
Flange Bf x Hf
(Left) --- --- ---
(Right)
Top Edge
M (kN.m) 0.0 0.0 7.2 7.2 0.0 5.7 5.7 2.5 2.5
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.00 0.23 0.23 0.00 0.18 0.18 0.08 0.08
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 0.00 61.39 61.39 0.00 49.11 49.11 21.54 21.54
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60
Bottom Edge
M (kN.m) 0.0 2.8 0.0 0.0 4.6 0.0 0.0 0.0 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.09 0.00 0.00 0.15 0.00 0.00 0.00 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 24.15 0.00 0.00 38.99 0.00 0.00 0.00 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60

Shear And Torsion Design


Vd (kN) 4.5 8.4 9.1 8.5 4.8 0.0
v (MPa) 0.16 0.30 0.32 0.30 0.17 0.00
vc (MPa) 0.49 0.49 0.49 0.49 0.49 0.49
vMax (MPa) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 46.6 46.6 46.6
Td (kN.m) 0.0 0.0 0.0
vt (MPa) 0.00 0.00 0.00
vt,min (MPa) 0.00 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200

Deflection Check
12.9 ≤ 17.67 ≤
L/d 57.51 √ 57.51 √ ---

Steel Areas (mm2)


Required
Top Edge 0.00 0.00 61.39 61.39 0.00 49.11 49.11 21.54 21.54
Bottom Edge 0.00 24.15 0.00 0.00 38.99 0.00 0.00 0.00 0.00
Supplied
Top Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Bottom Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Steel Bars
Top Bars 2H8 2H8 2H8
Top.Sup.Bars 2H8 2H8 2H8 2H8 2H8
Top.Sup.Bars
Bottom Bars 2H8 2H8 2H8
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: X3 Storey: 1 ...


Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Bending
1R33 L= 3650.9mm 1R24 L= 1736.2mm 1R32 L= 2950.6mm
Bw x H (mm) 100 x 320 100 x 320 100 x 320
Flange Bf x Hf
(Left) --- --- ---
(Right)
Top Edge
M (kN.m) 2.5 0.0 3.3 3.3 1.0 1.6 1.6 0.0 2.4
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.08 0.00 0.11 0.11 0.03 0.05 0.05 0.00 0.08
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 21.54 0.00 28.23 28.23 8.18 13.28 13.28 0.00 20.15
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60
Bottom Edge
M (kN.m) 0.0 3.0 0.0 0.0 0.0 0.0 0.0 1.9 0.0
d (mm) 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0 283.0
K/K' 0.00 0.09 0.00 0.00 0.00 0.00 0.00 0.06 0.00
x (mm) 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4
As (mm2) 0.00 25.35 0.00 0.00 0.00 0.00 0.00 16.15 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60 41.60

Shear And Torsion Design


Vd (kN) 6.2 6.6 4.1 2.0 4.9 5.5
v (MPa) 0.22 0.23 0.14 0.07 0.17 0.19
vc (MPa) 0.49 0.49 0.49 0.49 0.49 0.49
vMax (MPa) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 46.6 46.6 46.6
Td (kN.m) 0.0 0.0 0.0
vt (MPa) 0.00 0.00 0.00
vt,min (MPa) 0.00 0.00 0.00
bsupport (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200 1R8-200

Deflection Check
12.9 ≤ 10.43 ≤
L/d 57.51 √ --- 57.51 √

Steel Areas (mm2)


Required
Top Edge 21.54 0.00 28.23 28.23 8.18 13.28 13.28 0.00 20.15
Bottom Edge 0.00 25.35 0.00 0.00 0.00 0.00 0.00 16.15 0.00
Supplied
Top Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Bottom Edge 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53 100.53
Steel Bars
Top Bars 2H8 2H8 2H8
Top.Sup.Bars 2H8 2H8 2H8 2H8 2H8 2H8
Top.Sup.Bars
Bottom Bars 2H8 2H8 2H8
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Axis: X3 Storey: 1 ...


Materials: C25/30 / Grade 500 (Type 2) (Links: Grade 250 (Plain)) Concrete Cover: 25.0 mm

Bending
1R19 L= 1194.7mm
Bw x H (mm) 100 x 320
Flange Bf x Hf
(Left) ---
(Right)
Top Edge
M (kN.m) 2.4 0.0 0.0
d (mm) 283.0 283.0 283.0
K/K' 0.08 0.00 0.00
x (mm) 31.4 31.4 31.4
As (mm2) 20.15 0.00 0.00
As' (mm2) 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60
Bottom Edge
M (kN.m) 0.0 0.0 0.0
d (mm) 283.0 283.0 283.0
K/K' 0.00 0.00 0.00
x (mm) 31.4 31.4 31.4
As (mm2) 0.00 0.02 0.00
As' (mm2) 0.00 0.00 0.00
As,min (mm2) 41.60 41.60 41.60

Shear And Torsion Design


Vd (kN) 4.1 0.1
v (MPa) 0.14 0.00
vc (MPa) 0.49 0.49
vMax (MPa) 4.38 4.38
Vnom (kN) 46.6
Td (kN.m) 0.0
vt (MPa) 0.00
vt,min (MPa) 0.00
bsupport (mm) 0.0 0.0
Links 1R8-200 1R8-200 1R8-200

Deflection Check
4.22 ≤
L/d
57.51 √

Steel Areas (mm2)


Required
Top Edge 20.15 0.00 0.00
Bottom Edge 0.00 0.02 0.00
Supplied
Top Edge 100.53 100.53 100.53
Bottom Edge 100.53 100.53 100.53
Steel Bars
Top Bars 2H8
Top.Sup.Bars 2H8
Top.Sup.Bars
Bottom Bars 2H8
Bottom Bars
Bot.Sup.Bars
Side Bars

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

E. STAIRWAY DESIGN

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

STAIR AT THE MIDDLE


Stairs With a Landing Supported By 2 Outer Edges
Stair Parameters:
Storey Height (h): : 2800.0 mm
Stair Width (b): : 1250.0 mm
Storey Landing Width (bSK): : 1250.0 mm
Intermediate Landing Width (bSA): : 1250.0 mm
Number of Steps (n): : 18
Step Width (a): : 280.0 mm
Step Height (Rise) (s): : 140.0 mm
Stair Hole Width (bK): : 250.0 mm
Plate Thickness (Stair) (dK): : 180.0 mm
Plate Thickness (Landing) (dS): : 180.0 mm
Stair Plate Angle : 0 deg
Support Width (bM): : 300.0 mm
Concrete Cover : 30.0 mm
Loads
Shell Weight Additional Dead Live Load (Q): Step Weight
Load (G):
kN/m2 kN/m2 kN/m2 kN/m2
At The Stair Arms: 4.830 1.500 3.500 1.680
At The Landings: 4.320 1.500 3.500
Design Calculations
Folded plate effect has been taken into account in the model.
Landings are assumed to be simply supported by the beams.
Stair Plates are fixed supported by the landings.

Axial Stiffness (KD) 0.03


Relative Axial Stiffness (C/Co) 0.5
Elastic Anchorage Moment Factor (X1) -0.05
Resultant Normal Force (NL) 39.5 kN
Unit Normal Force (NL1) 31.61 kN/m
mxr1 1.1 kN.m/m
mxm 2.2 kN.m/m
mym 3.2 kN.m/m
mxy1 -0.1 kN.m/m
mxy2 7.5 kN.m/m
Maximum Landing Span Moment 5.0 kN.m/m
Maximum Stair Span Moment 8.4 kN.m/m

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

Reinforcement Design
# Moment (kN.m) Steel Area (mm2) Selected Steel Bars
1 1st Sloped Plate - Distribution Rebar (Bot) 0.0 0.00 18T12-230
1 1st Sloped Plate - Distribution Rebar (Top) 0.0 0.00 18T12-230
2 1st Sloped Plate - Primary Rebar (Bottom) 0.1 184.10 6T12-230
3 1st Sloped Plate - Primary Rebar (Top) 0.0 0.00 6T12-230
4 Bottom Landing Additional Support Rebar (Top) 0.0 41.45 6T12-230
4 Bottom Landing Additional Support Rebar (Bot) 0.0 41.45 6T12-230
6 Hanging Region Additional Rebar (Top) 0.0 55.90 3T12-130
7 Landing Plate Lateral Rebar (Top) 0.0 25.15 7T12-200
7 Landing Plate Lateral Rebar (Bot) 0.0 25.15 7T12-200
8 Landing Plate Longitudinal Rebar (Top) 0.0 69.36 6T12-230
8 Landing Plate Longitudinal Rebar (Bot) 0.0 69.36 6T12-230

ProtaStructure v5.0.4
STRUCTURAL ANALYSES OF CHING TOM NGONG UNITED ARCHITECURAL HOME

PLOT 4, BLOCK VI BOKOKO COMMUNITY LAYOUT MILE 18, BUEA SUB-DIVISION Calc. By: ENGR BUKUKA BETRAND
Checked By: UAH

A. STRUCTURE PLANS

ProtaStructure v5.0.4