RA - Plastering Works
RA - Plastering Works
CA-HSSE-HSE-FRM-011-02 (G)
Rev. 02/03-Jan-2022
Risk Assessment
PTW shall be
followed.
OSHAD approved third PTW shall be
party certificates required obtained only by
for equipment and competent and
operator authorized person.
Road Safety Procedure Only approved
to be strictly adhered. /certified vehicles and
Appropriate PPE shall be equipment shall be
worn by all personnel used
Unauthorized
Appropriate Fire All the vehicles in the
entry (PTW has
not obtained) Extinguisher (DCP) shall working area shall
Unsafe driving be available on all have reverse alarm.
Speeding vehicles/equipment and Tool Box Talks to be
Poor road in site in an easily conducted prior to
Fatigue condition start the job
Mobilization accessible location.
Fall of load Untrained/ Additional Riskbe
equipment, Injury/ Fatality Softeners to be used Vehicles should
No. Hazard Title Run
Hazardover Detail Unlicensed
Causes Consequences Existing Controls Controlsone Planned/
1. Transporting Incident/Accident while securing the load entering by one
Vehicle collision drivers 3C 2C - 3C Required 1C 1C - 1C
of Materials Asset / Equipment damage to avoid damage. to the location
Falling into Inexperienced/
to Site excavations Untrained Competent Vehicle in good
workers drivers/operators shall be mechanical condition.
Materials not assigned for the task. Ensure load is
properly loaded/ Ensure effective properly secured with
secured slings/chains
supervision and conduct
Absence of
inspection. Approach ways to be
guide/escort
Vehicle to be inspected maintained in good
for safety. conditions and traffic
Do not over speed and warning signs to be
sudden breaks. posted.
All loads shall be All
properly secured. vehicles/equipment
Ensure road worthiness entering the work
and sufficient room for area to be monitored /
operating. marshaled by trained
banks-man
CA-HSSE-HSE-FRM-011-02 (G)
Rev. 02/03-Jan-2022
Risk Assessment
CA-HSSE-HSE-FRM-011-02 (G)
Rev. 02/03-Jan-2022
Risk Assessment
1. Property Damage.
•Application of Poor planning 2. Injury • Ensure awareness • No aluminum
plaster. Taking 3. Fatality. training shall be scaffold is allowed
shortcuts. conducted with workers to use on slab
• Chemical
handling regarding chemical edges and
hazards. balconies.
• Dusty • All the chemicals to • All guards of the
environment be used as per the mechanical mixer
during surface SDS and briefed to must be properly
cleaning prior to workers. secured and
plaster and • Guidance of safe functional.
mixing the handling method shall • Do not clean the
cement. be give prior to use. machines without
• Do Not kept bulk disconnecting the
Chemical material in the site area power from source.
exposure. • Appropriate PPE shall • Cables must be
• Working on be used for the kept away from wet
aluminum workers. (Mask, areas.
scaffold goggles & rubber • Proper
gloves ) housekeeping must
• Usage of Hand Additional
be done onRisk
No. Blasting
Hazard Title Hazard
• Competent daily
4. tools. Detail Causes Consequences Existing
employees Controls
shall be Controls
basis. Planned/
and Coating Use of power
2C 2C - 3C Required 1C 1C - 1C
involved in this task. • Aluminum
Works. tools (Grinder) • Ensure all the scaffold must be
activities done under supported properly.
the close supervision.
• Dispose the waste
properly on daily basis.
• Housekeeping to be
maintained regularly
• Hard hand gloves to
be worn while handling
sharp hand tools.
Ensure power tools are
in safe working
condition prior to issue
for use at site.
Only use industrial
socket for power
connection,
Power tool inspection &
color codding shall be
done.
CA-HSSE-HSE-FRM-011-02 (G)
Rev. 02/03-Jan-2022
Risk Assessment
CA-HSSE-HSE-FRM-011-02 (G)
Rev. 02/03-Jan-2022
Risk Assessment
Loose clothing,
Hot Work Permit should
dangling earrings,
be in place
rings; bracelets and
Only competent/ trained
other jewelries are
and certified person shall
not being worn.
operate machine/ tool
All electrical tools
Damaged, fabricated,
must be check by
modified tools/ machines
competent electrician
shall not be used
and color code
Machines/ power and
accordingly.
hand tools shall be in
Injuries Damage tools
Lack of PPE good condition and
Burn, Electrocution equipment must be
Hot Work Entanglement adherence inspected by user before Additional Risk
removed
No.
6. Hazard Title Hazard Detail Causes
Driving error
Fire
Consequences Existing
use Controls Controlsfrom site
Planned/
Activity Electrocution Cutting 3C 3C - 3C immediately.
Required 1C 1C - 1C
Bad weather Puncture Suitable PPE shall be
(Cutting, grinding, Fire and color coded.
welding) Blind spot Burns worn including face
explosion Fire extinguishers
shield and goggles.
CO2, DCP shall be
Safety guards and safety
provided closed to the
devices shall be in place.
proximity but not less
All electrical cables and
than 10-meter
extensions are in proper
distance.
condition.
Use only machines/
Suitable and sufficient
tools that are in
fire- fighting equipment
compliance to
shall be in place.
standards, double
Refresher training to be
insulated or grounded
provide if required.
CA-HSSE-HSE-FRM-011-02 (G)
Rev. 02/03-Jan-2022
Risk Assessment
CA-HSSE-HSE-FRM-011-02 (G)
Rev. 02/03-Jan-2022
Risk Assessment
Rest Area
Cool Drinking water
Mid-Day Break Rule
implemented
Heat stroke.
Ensure all operatives are
Confusion.
acclimatized of the
Heat Stress
working environment.
Nausea
Drinking water
Stroke
availability and Appropriate training
Dehydration. Exhaustion
operatives to drink water Additional Risk
shall be given to all
No. Hazard Burns. Collapse Heat Stroke
8. WorkingTitle
in hot Hazard Detail Causes Consequences Existing Controls
as frequently as Controls
employeesPlanned/
working in
Falling Rapid weak Fatality 3C 2C - 3C Required 1C 1C - 1C
weather possible. high temperature.
Fall of person pulse Heat related illness
Take regular breaks in Medical assistance
Head ache.
hot weather. ORS to be utilized
Weakness
When feel unwell, inform
Mussels
to supervisor.
Cramps
Appropriate training shall
Vomiting
be given to all
Unconscious
employees working in
high temperature.
Medical assistance ORS
to be utilized
CA-HSSE-HSE-FRM-011-02 (G)
Rev. 02/03-Jan-2022
Risk Assessment
Daily clean-up is to be
performed
Slips and Trips Walkways will be kept
Waste Sharp-edge Injuries clear at all times Personnel will wear
10. Housekeeping &
Managemen waste disposal cuttings Cut 3C 2C 3C 3C Proper disposal of suitable PPE at all 1C 1C - 1C
t Accumulation of Broken bone wastes as per contractor times
waste
Waste Management
Plan.
CA-HSSE-HSE-FRM-011-02 (G)
Rev. 02/03-Jan-2022
Risk Assessment
CA-HSSE-HSE-FRM-011-02 (G)
Rev. 02/03-Jan-2022
Risk Assessment
Risk control-1 TBT should be conducted prior to the star of the activity Date 25/09/2022 Implemented by PM/HSE
Risk control-2 Competent and trained operators to be deployed at site. Date 25/09/2022 Implemented by PM/HSE
It is important to monitor risk controls and review risk assessments regularly. Review is required when there is a change in the process, relevant legal changes, and where a cause
for concern has arisen. Reviews could be scheduled on an annual basis. If the risk assessment has substantially changed a new risk assessment is warranted.
Notes: Include legal and advisory documentation that supports this risk assessment be listed. Such documentation includes Acts, Regulations, Standards, where applicable. If the risk assessment for an
identified hazard is ranked ’Low’ but the regulatory requirements have not been complied to while establishing and/or implementing controls, the ranking for the assesses risk shall be considered ‘Very
High’
Risk Assessment Steps:
Step 1: Identify Hazards Title (e.g. Physical Hazard, Fire Hazard, and Electrical Hazards).
Step 2: List Hazards Details identified (e.g. Tripping Hazard, Flammable Materials stored, Working in
Electrical Cabinets).
Step 3: List Causes of Hazard (e.g. Untidy workplace, Hot work, un-isolated electrical supply). Descriptor to assist in Qualitative Assessment of Likelihood/ Frequency of
Step 4: List Consequences of Hazard (e.g. Personnel Injury, Fire, electric shock). Likelihood Occurrence.
Step 5: Determine Likelihood and Consequences to People, Assets, Environment, and Reputation from
attached Risk Assessment Matrix (Page 2) (this should be the most probable outcome without controls and
should be listed as 2A, 3D etc.).
A Has occurred within port industry worldwide.
Step 6. Calculate the Risk Index using the Qualitative or Semi-Quantitative Risk Assessment Matrix as
deemed appropriate. This is a product of Likelihood and Consequence and should be stated Low, Medium,
B Has occurred regionally within port industry or judged likely to have occurred.
High or Very High).
Step 7. List Existing Controls. (e.g. Tidy Site Policy, Hot Work Permit, Isolation of Electrical Supply). C Has occurred in port industry within UAE or judged likely to have occurred.
Step 8. List Safety Critical Activities and Additional Controls that may be deemed necessary to reduce risk
level to ALARP. D Has occurred in port industry within UAE on an annual basis or judged likely to have
Step 9: Recalculate Likelihood and Consequences to People, Assets, Environment, and Reputation from occurred.
attached Risk Assessment Matrix. E May occur in UAE port industry multiple times annually.
Step 10. Recalculate the Risk Index.
Step 11. If residual risk deemed to be High or Very High then risk must be reduced further before
proceeding, if risk is medium then note that risk reduction must be planned, monitored and documented, if
risk is low then risk is acceptable without required further action.
CA-HSSE-HSE-FRM-011-02 (G)
Rev. 02/03-Jan-2022
Risk Assessment
ALARP
Consequences P= People A= Assets E= Environment R= Reputation A B C D E
Extensive VERY
5- Catastrophic Multiple fatalities Massive effect International impact
damage HIGH
Single fatality or
4 - Severe permanent Major damage Major effect National impact HIGH
disability
Major injury or
3 – Critical Localized effect Localized effect Considerable impact MEDIUM
health effects
Minor injury or
2 – Marginal Minor effect Minor effect Minor impact
health effects
Slight injury or
1 - Negligible Slight effect Slight effect Slight impact LOW
health effects
For additional information refer to HSE-COR-PRC-SYS-11 HSE Risks & Opportunities Management
CA-HSSE-HSE-FRM-011-02 (G)
Rev. 02/03-Jan-2022