Title Environmental Impact Assessment (EIA) Guidelines for oil palm plantation development, Sabah, Malaysia Published by The Environmental Conservation Department (ECD), Sabah, Malaysia Photos ECD photograph library, Chemsain Consult Printed Syarikat Bumi Yakin Edition First edition, 500 copies Publication contact The Environmental Conservation Department 2nd & 3rd floor, Wisma Budaya Jalan Tunku Abdul Rahman 88999 Kota Kinabalu Sabah, Malaysia Phone: 088 251 290 Fax: 088 238 120 E-mail: [email protected] Homepage: www.sabah.gov.my/jkas All rights reserved The publication can be quoted if reference is given. The publication of these guidelines has been approved by the Minister of Tourism, Environment, Science and Technology as required under Paragraph 5 of The Conservation of Environment (Prescribed Activities) Order 1999 Appreciation The Department appreciates the support from DANCED (Danish Cooperation for Environment and Development) in the preparation of these guidelines
Abbreviations
AEC ECD EIA ha TOR Agreement on Environmental Conditions Environmental Conservation Department (State of Sabah) Environmental Impact Assessment hectare Terms of Reference
Table of Contents
Preface 1 2
2.1 2.2 2.3 2.4
5 7 9 10 13 15 17 19 20 26 31 36 37 43 49 52 52 53 55 57 59 60 61 63 66 71
73 79 oil palm plantation
3
3.1 3.2 3.3 3.4 3.5 3.6 3.7
Environmental impacts
Environmental impacts Initial project description and assessment Key impact I: Ecological impacts Key impact II: Soil erosion Key impact III: Biomass disposal Key impact IV: Impact on human settlements Additional impacts
4
4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10
Mitigation measures
Key mitigation measures Key mitigation I: Match project boundary with water catchment boundary Key mitigation II: Zoning of high soil erosion areas Key mitigation III: Zoning of river reserves Key mitigation IV: Reducing soil erosion Key mitigation V: Zoning of flood prone areas Key mitigation VI: Buffer zones to protected areas Key mitigation VII: Zero burning Key mitigation VIII: Securing water supply Additional mitigation measures
5
5.1 5.2 Annex
Monitoring
Compliance Monitoring Impact monitoring
1: Application procedure for development in Sabah Annex 2: Impact assessment criteria Annex 3: Soil conservation approaches
82 83 84
Preface
In the state of Sabah, the cultivation of oil palm is an important economic activity which strongly influences the rate of land development in the state, which in turn is often the catalyst for regional infrastructure development, particularly the opening up of road networks within interior areas. Oil palm cultivation may, however, result in the destruction of important habitats, change the hydrological regime of a region, and contribute to waterway pollution in terms of increased suspended solids and elevated levels of agro-chemicals. As oil palm cultivation extends over large land areas, the impacts are regional in nature. In order to manage and reduce the environmental impacts related to plantation development implementation activities need to be subject to holistic planning In Sabah, the Environmental Conservation Department is charged with regulating the development of oil palm plantation effective September 1999 to ensure that plantation development takes place in an environmentally responsible manner. The guidelines are intended for use by project proponents, environmental consultants and approving authorities when initiating, assessing and approving Environmental Impact Assessments (EIA) for oil palm plantation development activities in the State of Sabah. The guidelines also provide direction as to the scope of environmental considerations required during the planning stage of plantation development. Early identification of potential environmental considerations will ensure that subsequent development will be carried out with minimal adverse environmental impacts. The Environmental Conservation Department would like to express their appreciation to the Danish Cooperation for Environment and Development (DANCED) for assistance in the preparation of these guidelines through the Departments Capacity Building Project. Appreciation is also extended to all government agencies, organisations and individuals that contributed towards the formulation of these guidelines. Eric Juin Director Environmental Conservation Department
Introduction
Oil palm plantation development is defined as opening up of land areas for the purpose of cultivating oil palm and carrying out other related activities such as land clearing, biomass management and disposal, earthworks, planting and re-planting activities. Throughout this guideline, oil palm plantation development is used as an abbreviated form to cover all of the above activities. The aim of these Environmental Impact Assessment (EIA) Guidelines is to provide a framework for the preparation of an EIA report for oil palm plantation development under the requirements specified in the Conservation of Environment Enactment 1996 and Conservation of Environment (Prescribed Activities) Order 1999. The guidelines provide an easy to follow and practical means for assessing environmental impacts, recommending mitigation measures and proposing monitoring programmes within the State of Sabah for:
Planning the actual extent and location of area to be planted Land clearing activities Biomass management and disposal
The guidelines may also be applied to replanting activities for palms that have exceeded their reproductive life span and conversion of other types of cultivation and crops into oil palm plantation. The guidelines should be used in conjunction with the Handbook for Environmental Impact Assessment (EIA) in Sabah, as well as the EIA Guidelines for logging and forest clearance activities published by the Environmental Conservation Department Sabah (ECD).
Check Annex 1 to see if the project is required to undertake an EIA Consult the ECD as to whether the project should undertake an EIA
Project proponent:
EIA consultant:
Undertake scoping activities and present the results to ECD Prepare a draft TOR Undertake the public hearing activities required for Special-EIA Finalise the TOR and obtain final approval from ECD
Step 5: Preparation of the EIA report
EIA consultant:
Adhere to the ECD requirements and standard table of content in the preparation of the EIA report Prepare the EIA report in line with the ECD chapter-by-chapter recommendations
EIA consultant:
Submit the EIA report to ECD Undertake the public hearing activities required for Special-EIA Participate in review meetings Submit additional information if required and finalise the EIA report
Project proponent:
Review the draft Agreement of Environmental Conditions prepared by ECD Co-sign the Agreement of Environmental Conditions (AEC) Implement mitigation measures and monitoring programmes.
Sabah context
Sabah context
2
2.1
Sabah context
Geographical overview
As of December 1999, the area of land in Sabah planted with oil palm far exceeded that of other states in Malaysia (Table 2.1). The Division and District planted with the largest area of oil palm is Sandakan (464,038 ha) and Kinabatangan (265,111 ha) respectively (Table 2.2).
Table 2.1: Distribution of oil palm planted areas by State in Malaysia [as of December 1999] State Total oil palm planted Area ha % Johor 612,708 (18.5) 52,558 (1.6) Kedah 80,407 (2.4) Kelantan Melaka 39,596 (1.2) Negeri Sembilan 118,781 (3.6) 542,855 (16.4) Pahang Pulau Pinang 13,968 (0.4) Perak 303,089 (9.1) Selangor 132,149 (4.0) 155,484 (4.7) Terengganu 941,322 (28.4) Sabah 320,476 (9.7) Sarawak 3,313,393 (100.0) Malaysia Source: Palm Oil Registration and Licensing Authority (PORLA) (http://161.142.157.2/home2/home)
Table 2.2: Distribution of oil palm planted areas by Division and District in Sabah, Malaysia [as of December 1997] Division Tawau District Tawau Semporna Lahad Datu Kunak Total Sandakan Kinabatangan Tongod Beluran Telupid Area, ha 85,410 32,777 188,826 51,385 358,398 85,788 265,111 474 78,322 34,343 Area percentage (%) Divisional Sabah 23.8 9.1 52.7 14.3 100.0 18.5 57.1 0.1 16.9 7.4 10.1 3.9 22.4 6.1 42.5 10.2 31.4 0.1 9.3 4.1
Sandakan
10
Total Kudat Kudat Pitas Kota Marudu Total Kota Belud Ranau Tuaran Kota Kinabalu Penampang Papar Total Beaufort Sipitang Kuala Penyu Tenom Keningau Sook Tambunan Pensiangan Total
464,038 1,440 1,725 3,625 6,790 46 144 413 0 0 2,630 3,233 10,543 20 113 34 374 405 0 4 11,493 843,952
100.0 21.2 25.4 53.4 100.0 1.4 4.5 12.8 0.0 0.0 81.3 100.0 91.7 0.2 1.0 0.3 3.3 3.5 0.0 0.0 100.0
55.0 0.2 0.2 0.4 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.4 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 100.0
Pantai Barat
Pedalaman
Sabah
Source: Report on Crop Hectareages in Sabah 1997 (Department of Agriculture 99/1) Although the conversion of land for agricultural activities is a necessary component of social-economic development, the impacts associated with the conversion are severe and irreversible and therefore require an appropriate amount of consideration and planning.
2.2
Effective September 1999, Environmental Impact Assessment (EIA) is a mandatory requirement for agricultural development activities in Sabah under the Conservation of Environment Enactment 1996 and the Conservation of Environment (Prescribed Activities) Order 1999. Oil palm plantation development is a Prescribed Activity included under the following section: Section 1: Agricultural Development Paragraph (i): development of agricultural estates or plantations covering an area of 500 hectares or more (a) from land under secondary or primary forests; (b) which would involve the resettlement of 100 families or more; or (c) which would involve modification in the use of the land; Paragraph (ii): conversion of mangrove swamps and other wetland areas into agricultural estates having an area of 50 hectares or more; or Paragraph (iii): development of agricultural area adjacent to any conservation area, park or sanctuary declared under any written law.
11
Failure to observe this directive, the authority, body or person in default shall be guilty of an offence and shall, on conviction, be liable to a term of imprisonment for 5 (five) years and a fine of Ringgit 50,000.00 (Malaysian Ringgit fifty thousand only). Any person who intends to undertake oil palm plantation development activities in the State of Sabah shall submit to the Director of the Environmental Conservation Department (ECD) an EIA Report for approval. The Department contact is: The Director Environmental Conservation Department Tingkat 2 & 3, Wisma Budaya 88000 Kota Kinabalu, Sabah Attention: Tel: Fax: E-mail: Homepage: Environmental Assessment Section 088-251290/1 088-238120 [email protected] www.sabah.gov.my/jkas
Oil palm plantation in the State of Sabah is carried out mainly for production of high quality fresh fruit bunches (FFB) for the purpose of producing crude palm oil (CPO), palm kernel oil (PKO) and other products that generate income for the developer, the state of Sabah and Malaysia as a whole. The Sabah Agricultural Policy (19922010) states that: Section 10. Commodity Policy. Item 10.1.1 Oil Palm To maximise returns from palm oil, production will be increased through expansion, productivity improvement, and upgraded efficiency particularly in the smallholder sub-sector. The adoption of automation and intensified mechanisation will be encouraged to increase productivity and efficiency and as a long-term solution to the problem of labour shortage. Milling, bulking installation and refining facilities will be upgraded, expanded and increased to cater for increased production. Downstream processing to produce locally manufactured value-added palm oil products, such as oleochemicals, will be encouraged to ensure a balanced and sustained growth of the industry. Environmentally friendly methods of oil palm cultivation, production and processing will be promoted. Responsible development of oil palm cultivation should not only meet the needs of investors and developers but also compliment in a broader sense the States socio-economic interests. Environmentally friendly methods of oil palm cultivation are clearly emphasised in the current Sabah Agricultural Policy. Effective September 1999, land applications for oil palm plantation development activities in the State of Sabah are subject to the requirements of an EIA. The procedure for developing an oil palm plantation begins with the application for land (Figure 2.1). The procedure is summarised as follows:
Application shall be made in writing to the Assistant Collector of Land Revenue (ACLR)
12
The Assistant Collector of Land Revenue shall refer the application to the Land Utilisation Committee (LUC) for technical comments. Permanent members of the Land Utilisation Committee are the Director or Deputy Director of Lands and Survey Department (Chairperson), District Surveyor, Department of Agriculture, Forestry Department, Department of Irrigation and Drainage, Fishery Department and community leaders. Community leaders and surveyors will ensure that the land is available and unencumbered. The Department of Agriculture provide technical comments in terms of land suitability and will also consider the proposed Agriculture Development Plan and make recommendations to the Assistant Collector of Land Revenue. The recommendations do not bear any regulatory weight but if applied by the Enforcement Section of the Lands and Survey Department under the regulations stipulated in the Land Code, the recommendations may be used to prosecute any breach of the requirements under the Code
The application is then forwarded to the Director of Lands and Survey Department who will then forward it to the Secretary of Natural Resources for approval by the YAB Chief Minister An approved application is returned to the Director of Lands and Survey Department who will direct the Assistant Collector of Land Revenue to make an offer to the applicant and a Draft Land Title is subsequently issued
The applicant shall approach the District Surveyor to establish the Registered Survey Paper through the service of a Registered Surveyor who will then produce a Draft Survey Plan The Draft Survey Plan will be reviewed and checked by the District Surveyor before the Plan an survey data are submitted to the Lands and Survey Department for official registration
Upon completion of the tasks required by Lands and Survey Department, the Land Registrar will issue the lease to the applicant and the Final Title is produced. Having obtained the Land Title, the applicant will then carry out an EIA (if it is a prescribed activity) for submission to the ECD. The EIA will assist in determining the final planted area of the plantation and the location of the boundary, which amongst other things will be included in the Agreement on Environmental Conditions (AEC) to be entered between the Project Proponent and the ECD
13
Applicant Assistant Collector of Land Revenue Land Utilisation Committee Director Lands and Survey Department Natural Resources Officer Director Lands and Survey Department / Assistant Collector of Land Revenue Draft Title Surveyor Director Lands and Survey Department / Assistant Collector of Land Revenue Land Title EIA
Fisheries Officer Department of Irrigation and Drainage Officer Other Government Departments (if necessary)
Figure 2.1: Application procedures for oil palm plantation development (details in Annex 1)
2.3
Typical activities associated with oil palm plantation development may be divided into six main stages, namely:
Pre-development. This stage involves feasibility studies, application/acquisition of land, preparation of EIA, and survey of boundary and plantation blocks Nursery establishment. Normally one ha nursery will cater for a planting area of 100 ha. This stage will prepare high quality seedlings for field planting when the plantation proper site has been developed
Site preparation. Existing vegetation is cleared and removed to enable earthworks (particularly terracing & drainage). Cover crops will be planted and maintained Field establishment. Field lining and holing will be carried out. Suitable seedlings from the nursery will be transplanted on prepared planting field Maintenance and harvesting. Planted palm trees are maintained by manuring and control of diseases, weed and pests. Harvesting will normally commence within 2.5 to 3 years after field planting
14
Re-planting/abandonment. After completion of the productive life span (20 to 25 years), decision will be made on either to replant or abandon the oil palm plantation.
A project flow diagram for a typical activities related to oil palm plantation development is shown (Figure 2.2). Nursery establishment Access road Base camp Site clearing - underbrushing & clear felling Biomass management & disposal Earthworks, drainage & irrigation Planting and maintenance of seedlings Site preparation Access road Base camp Utilities provision Site clearing - underbrushing & clear felling Biomass management & disposal Earthworks, drainage, infrastructure Cover crop establishment Field establishment Field lining & holing Final culling Transplanting Maintenance & harvesting Fertilizer application Use of control agro-chemicals General field upkeep Harvesting Transportation of fresh fruit bunches to oil mill
Replanting Nursery establishment Removal of old palm trees Biomass management & disposal Field lining and holing Transplanting of mature seedling Maintenance & field upkeep Harvesting & transportation of fresh fruit bunches
Abandonment Evacuation of plantation staff & workers Removal of equipment, machinery & structures Site restoration/ rehabilitation
Figure 2.2: Flow diagram of typical oil palm plantation development activities
15
2.4
Key stakeholders
Oil palm plantation developers - to carry out oil palm planting and to supply FFB (fresh fruit bunches) to palm oil mills, either as a company or private individual/smallholders Palm oil mill operators - to obtain Fresh fruit bunches from oil palm planters to produce palm oil Oil palm planters association - a group of oil palm cultivating companies and organisations for East Malaysia Department of Agriculture - to review and comment on the plantation development plan and land/soil suitability for oil palm cultivation Department of Irrigation and Drainage to comment on potential concern over hydrology and drainage issues in relation to the oil palm plantation development Environmental Conservation Department (ECD) to approve EIA to commence activities for oil palm plantation development within the State Land & Surveys Department to issue a Land Title to develop oil palm plantation within the State Malaysian Palm Oil Board a new statutory body established on 01
st
May 2000
pursuant to the Malaysian Palm Oil Board Act 1998 (Act 582). Palm Oil Registration and Licensing Authority and Palm Oil Research Institute of Malaysia have ceased to exist since then as the two bodies are merged into Malaysian Palm Oil Board. The main role of the Board is to promote and develop the oil palm industry in Malaysia as well as developing national objectives, policies and priorities for the orderly development of the industry.
16
17
Environmental impacts
18
Environmental impacts
19
3
Steps Step 1
Environmental impacts
Activities Assessment of impacts Issues Key environmental impacts include:
Ecological impacts due to land development Soil erosion and water pollution due to land clearing Disposal of biomass and air pollution Land ownership and water supply issues
Step 2 Step 3
The purpose of this chapter is to outline procedures that can help identify the environmental impacts associated with the development of an oil palm plantation. Methodologies are suggested for evaluating the scale and extent of the impact. If the project location was subject to an EIA for Logging and Forest Clearance activities then this document should be referred to as many of the assessments and proposed mitigation measures should already be in place, or if additional measures are required, they should compliment existing ones
3.1
Environmental impacts
The key adverse environmental impacts of oil palm plantation development are:
Ecological impacts due to destruction of habitats for flora and fauna as a result of land development Soil erosion and water pollution due to land clearing and development Disposal of biomass and air pollution due to open burning Local water supply issues from encroachment into catchment for water supply.
Development on river floodplain leading to loss of riparian habitat and function Over abstraction of water resources Water pollution due to usage of agro-chemicals Land and water pollution from hazardous materials
20
3.2
In order to be able to propose realistic mitigation measures, the following initial information should be obtained prior to embarking on any field surveys or assessments. This information has to be included in the scoping note and the draft Terms of Reference submitted to the ECD and will provide the basic framework for the assessments made in the EIA report.
Initial data I: Clearly identify the geographical location and area of the project. Depending on the size of the project area, the EIA study may extend well beyond the project boundary and should include an assessment of downstream, adjacent and coastal impacts (Figure 3.1, also refer to ECD EIA Handbook)
Initial data II: Description of the project site, including maps. It is imperative that the all maps include an indication of scale and a clearly marked coordinate system (e.g. longitude and latitude). One of the location maps should also clearly identify and describe neighbouring land-use which should include the nearest protected area, other sensitive habitats including position in relation to river system. All text presented on the map should be readable. It should be borne in mind that duplicate copies of reports will be required and provision should be made so that all maps remain legible (Figures 3.2 and 3.3)
Initial data III: Description of river systems. River systems and catchment areas as represented on the National 1:50,000 maps should be digitally presented (Figures 3.4 & 3.5). This information should be taken as indicative and not absolute (Figure 3.5 & th 3.6). All 4 order rivers and higher must be clearly identified and marked. In part this matches the requirements of the Water Resource Enactment (1998), i.e. to provide a th 20 m river reserve for rivers wider than 3 metres, as most 4 order rivers are at least this size Using the river drainage system data, the project area should then be classified into individual catchment areas (Figure 3.6). Photographic information can provide useful supplementary information (Plate 3.1) Water quality samples/measurement can be taken in order to indicate the general condition of rivers in the project area. Total suspended solids would normally be the parameter of interest, however, the number of parameters may vary depending upon site-specific requirements. An interpretation of the data needs to be clearly presented
Initial data IV: Provide details on agreements governing the initiation of the project. This includes for example the project status in relation to approvals (received/applied) and other comments from official authorities
Initial data V: Listing all main project activities. This includes the timing of the planned project activities, proposed clearance system and activities, road plan, machineries to be used, transportation routes, proposed layout plan, phase of development and schedule of activities under each phase.
21
To Kota Kinabalu
To Telupid
Keningau
Sg s da Pa
DISTRICT OF KENINGAU
DISTRICT OF SOOK
Sg Milian
lan
Jala
ega
Tenom
Sg P
Nabawan
Kg Takul
Kemabong
ng ah
Kg Pemunterian Kg Nakuyung Kg Salarom Baru Kg Tiang Kg Pandiwan A Kg Ulu Mosopoh Kg Pandiwan B Kg Tumalasak Baru Kg Tataluan
Kg Nahanakan
Sg Mesopo
DISTRICT OF TONGOD
DISTRICT OF TENOM
Sg P adas
Sapulut
mpango n
Sg Pa
Sg P ena
wan
Sg
Pensiangan
DISTRICT OF PENSIANGAN
Pi na
Sg
Sap ulu t
To Kalabakan
LEGEND
KALIMANTAN (I N D O N E S I A)
Sg Pensiangan
SCALE
0 20000 40000
0
SCALE
20
40 Km
Keningau
0 50000 100000
Kudat
50
100km
Sook Amenity F.R.
Laut Sulu
Tenom
Mt Mandalom Commercial F.R. Sook
Nabawan
KOTA KINABALU
alan
Ranau
Sandakan
Telupid
P eg
DIVISION OF SANDAKAN
LABUAN
Beaufort
Keningau
Sg Milia n
Sg
Ku am ut
Tenom
Sook
Nabawan
Lahad Datu
PENDALAMAN
BRUNEI
Project Site
Semporna
Sapulut
Pensiangan
Sg
Sapulut
Pensiangan Kalabakan KALIM AN TAN (I N D O N E S I A)
DIVISION OF PENSIANGAN
SCALE 0 15 30 Km
SARAWAK
Tawau
22
23
Keningau
Sook Forest Reserve F.D.No 71/1E ( Class IV ) [9,317 ha]
Ulu Sg Milian Sg Mangkuwagu Forest Forest Reserve Reserve F.D.No 56/1D (Class II) F.D.No 57/4A ( Class II ) [77,732 ha] [8,335 ha]
Papar Tambunan
Crocker Range Forest Reserve
Pe ga lan
FMU 5
Trus Madi Forest Reserve
Telupid
Tenom
Sook
Nabawan
Kuala Tomani Forest Reserve F.D.No 85 /15B ( Class II ) [20,790 ha] Sg Telekosang Forest Reserve F.D.No 98/8B ( Class II ) Pensiangan [14,560 ha] Forest Reserve
Beaufort
Maliau Basin Conservation Area (39,000 ha) Gn Lumaku Forest Reserve
Sg
n Lo ka Sg
FMU 17
Sg Tagul [102,964 ha] Forest Reserve F.D.No 99/3A ( Class II ) [105,769 ha] Ulu Sg Padas Forest Reserve F.D.No 111/1D Pensiangan ( Class II ) [60,502 ha] Sg Kabu Sg Temalasak Forest Reserve Forest Reserve F.D.No 112/1C F.D.No 113/1B ( Class II ) ( Class II ) [14,280 ha] [10,312 ha]
Sg Pa
das
Sg Siliawan Forest Reserve Sg Sansiang Forest Reserve ( Class VI ) F.D.No 101/17A ( Class VI ) Sapulut [344 ha] Sapulut Forest Reserve F.D.No 101/5D ( Class II ) [244,021 ha]
FMU 19
Tenom
Sook
Sipitang
Nabawan
SCALE 0 10 20 Km
SARAWAK
FMU 12 FMU 8
Sg Tagul Forest Reserve Pensiangan Forest Reserve Sapulut
FMU 14
Sapulut Forest Reserve
Pensiangan
LEGEND
LEGEND (GAZETTED)
INDONESIA (KALIMANTAN)
SCALE
0 20 40 Km
Figure 3.4 Assessment of stream order (after Strahler, 1964). When two first order streams meet, the river becomes 2nd order and when two 2nd order streams join the river is then classified as 3 order.
rd
24
Figure 3.6 Catchment boundaries for the project area as abstracted from a 1:50,000 map
25
The environmental assessment for oil palm plantation development shall be based on size and sensitivity of the locality. Size and sensitivity are defined in Table 3.1: Table 3.1. Project size & sensitivity definition Size Small Medium Large Sensitivity Normal Sensitive Area (inclusive of adjacent lands for oil palm plantation) Less than 500 ha 500 to 5000* ha More than 5000 ha Locality Anywhere not listed as sensitive Riparian reserve; gazetted conservation areas; high risks erosion sites; flood plains; mangrove swamp/forest; water supply catchment and intake point
*As a rule of thumb, a planted area of at least 5000 ha justifies the establishment of a palm oil mill
The representation of spatial data by means of a Geographical Information System (GIS) provides an appropriate tool for representing and analysing spatial data sets, particularly for larger, more complex and sensitive projects. Geographical Information Systems therefore offer good opportunities to examine the environmental impact of conversion activities. Results obtained from computer models need to be verified against field data. It should be recognised that for the results to be representative, the data requirements are high and
26
limited by the quality of the input data. To enable verification by ECD actual procedures must be made available. Before using computer models, prior consultation and approval with ECD is required.
3.3
The establishment of plantations will result in the permanent loss of forest and the local extinction of nearly all species. If nearby undisturbed forest exists and it is assumed that it is in ecological equilibrium, opportunities for the absorption of displaced neighbouring populations will be limited, if they exist at all. It can be assumed that displaced individuals die or out-compete the resident individuals, resulting in their displacement or eventual loss of the residents. Locality and site preparation activities are the two main aspects that create ecological impacts of oil palm plantation development. Location within areas classified as ecologically sensitive and site clearing for access road, nursery and plantation will directly damage the habitats for a broad range of terrestrial and aquatic flora and fauna species.
Assessment methods for impacts on flora and fauna Assessment A: Determine the need to study flora and fauna impact Whether or not flora and fauna impacts need to be addressed in the EIA depends on a number of factors, some of which would have been determined in the initial assessment of the project (section 3.2 above). For example:
Assessment of the geographical location and size of the project area Assessment of the status and land development trends in the area and within the State Assessment of existing regulatory bodies and agreements governing the project Assessment of the main project activities Assessment of the project site.
Based on the above is might be assessed that there is no need for a flora and fauna study, and related proposal of mitigation measures and monitoring programmes. For a small to medium scale clearance project, there would generally be no need or little purpose to study the flora and fauna impacts as the land has already been designated for alienation. The reasons for not including a more detailed assessment of impact on flora and fauna need to be clearly outlined and presented and supported with relevant land-use maps. Assessment B: Assessment of impacts on flora and fauna If the review in Assessment A above determines a need for studying flora and fauna, or if an assessment has been specifically requested in the Terms of Reference (TOR), a more detailed study shall be undertaken. The overall objective of an assessment of flora and fauna would be to identify areas that may need special attention and treatment or protection because of an identified significance.
27
Appropriate assessment methodologies need to be identified depending upon the scale and significance of the project. The following assessment method might be applied:
Step 1. Habitat classification and mapping of the project site and surrounding areas. A useful inventory for management purposes is a habitat map based on aerial photography or satellite imagery with ground checks augmented by information on the distribution of important species. Habitat mapping based on surrogate factors such as altitude and precipitation are other possible ways of further subdividing the landscape (Figure 3.7). The habitat scale of analysis may provide opportunities for estimating the given range of a species. For example, it may be known that a particular species occurs from sea level to nearly 1,000 meters in elevation, as long as there is adequate forest cover. Existing data and maps of habitat and species distribution should be consulted to prepare the habitat maps. Range data are often more readily available for mammals such as primates or popular bird species. Reptiles, fish, insects and plant range data are generally not as well documented. A faunal survey of Sabah was compiled in 1982 (Davies & Payne, 1982).
28
Step 2. Initial flora and fauna inventory survey. An initial flora and fauna inventory survey should be undertaken. The survey should include collection of the following data: (i) Data from Wildlife Department and other relevant governmental and non-governmental organisations, (ii) data from the local villagers. List of consulted persons shall be included in the EIA report An assessment, based on step 1 and 2, should identify sensitive habitats/species by determining the conservation status of the habitat/species within the project area and the surrounding areas. For example, if the conversion is likely to result in the extinction or endangerment of a species at an international level, there would be strong grounds for conducting a more detailed survey with the ultimate aim of protecting the habitat to ensure the survival of the species. However, if for example the species is found elsewhere or is sufficiently protected in other conservation areas - then the assessment would have to acknowledge that locally the loss of that species might not be significant Legally protected are listed by the State Wildlife Conservation Enactment (1997)
Step 3. Design the field survey. If it is specified in the Terms of Reference (TOR) for the EIA study that a detailed flora and fauna assessment must be conducted, a relevant specialist or team shall be commissioned. Detailed flora and fauna surveys are time consuming and are typically associated with actual field observations. It is strongly advised that the Wildlife Department are consulted in planning the survey and that the overall approach is approved by the ECD prior to embarking on any fieldwork The survey should answer the following question: what species occur within the project site, where and in approximately what numbers? Data should be collected on those species which are ecologically dominant forms, endangered species or species whose numbers reflect important ecological processes. Step 4. Indicator species survey. Given the limited time and resources available for assessments, it is recommended that the survey be selective and should restrict observations to a few indicator species or key phenomena that reflect broader trends, and to other measurements that give an indication of the general biological condition of the environment. Data represented spatially on maps are easier to evaluate than a database format only (Figure 3.8). For the largest most important sites, habitat maps should ideally, consist a polygon-structured base map to which point structured wildlife data are related.
29
Figure 3.8 Approximate range of two indicator selected species for the project area
Step 5. Assessment of procedures to provide protection. If the steps above have shown the presence of important species the study should proceed with an assessment of alternatives for providing protection. The assessment as to whether or not some form of protected status should be given to an area is a difficult and complicated process and is largely dependent upon an assessment of the protected area needs of the State alongside the conservation requirements of a given habitat/species. Ideally, in the first instance, this should be determined at a national/State level using some form of spatial analysis (GIS) of existing protected areas, habitat and species distribution. Conservation gaps gap analysis highlight the difference between what needs to be protected and what is actually being protected. The protection of an individual site would generally not be sufficient to protect general levels of biodiversity, instead an appropriate and well-planned network of protected areas is needed. Protected area gaps then need to be assessed alongside mechanisms for providing protection, i.e. what are the options for gazetting an area and affording it realistic long-term protection. Whereas some opportunities may exist to incorporate parts of the plantation into existing protected areas, or if the area is of sufficient importance it could be gazetted as a protected area on its own right, it must be recognised that as part of the overall economic development process, large areas of State land will continue to be alienated. As such, opportunities for conservation will often be related to the size and location of the project.
30
Protection options available include buffer zones, forest fragmentation and wildlife corridors: Buffer Zones. As a general principle, oil palm plantations and protected areas do not make good neighbours and the development of buffer zones or some areas of intermediate land use is often desirable between the two. Sometimes it may be sufficient to utilise an adequate natural barrier such as a river, estuary, ridge crest or swamp that forms a deterrent to exotic species and human incursion. Protected area buffer zones can be defined as areas adjacent to protected areas, on which land use is partially restricted to give an added layer of protection to the protected area itself while providing valued benefits to the neighbouring land-user. Extension buffering extends the areas of those habitats contained within the protected area into the buffer zone, thus allowing larger total breeding populations of plant and animals than could survive within the reserve alone In determining the type and extent of buffer zones needed, the following factors should be considered: (i) Needs of threatened wildlife species for use of additional habitat outside the reserve boundaries. Knowledge of the habits and range of the species will give some indication of the extent of the buffer zone, (ii) the need of the buffer zone to serve other protective functions, such as soil and water conservation or fire break protection, (iii) the need to contain wildlife species likely to move out of the reserve, (iv) the amount of land available for buffer use, whether it is currently under natural or other vegetation and whether it is vacant or being used Forest Fragmentation. As land and vegetation is converted, forests become fragmented until the remaining undisturbed habitats are isolated as patches. In tropical forests the isolation process may take many years, undergoing several stages of development, particularly if the forest is part of a rotational production stand. Rates of species survival will depend upon the remaining habitat and the proximity to other undisturbed areas. The fate of the remaining habitat islands and the changes that result from the isolation has drawn much research. The impacts are complicated by a number of variables and no one example is representative of all, however, it is generally acknowledged that larger reserves minimise edge effects and are better able to accommodate wide ranging species. However, it is also acknowledged that small well-placed reserves play an important role as a number of small reserves may be better able to conserve a greater variety of habitat types and more populations of rare species than a large block of the same area As a fragmented area diminishes in size it will eventually reach a stage when it is no longer able to support the critical minimum population size for more and more species. A species in a patch may become locally extinct, only to recolonise later. This will depend on the species and the proximity of the next fragment containing the species Wildlife corridors. It has been argued that, by conserving corridors of land between similar habitats, recolonisation may be aided and the overwhelming problem of habitat fragmentation may in part be addressed. However, some researchers and practitioners who argue that the negative aspects of corridors are detrimental to the larger conservation area dispute this. Corridors may
31
provide a pathway for the spread of disease and fire. After the debate, however, often there is no other choice than to manage the remaining fragments as best possible Corridors that facilitate the natural patterns of migration will probably be most successful at protecting species, however, the equatorial humid tropics with limited seasonality experiences little or no migrations of terrestrial land vertebrates although there may be irregular grouping and movements of some animals such as pigs and elephants. Corridors facilitating the movement of wildlife have to be well thought out with a priority of joining areas of like habitat. Often there are only very limited options for expanding the protected area network with corridors.
3.4
When site clearing is carried out, removal of the protective vegetation cover and disturbance to the soil surface will inevitably increase soil erosion rates. The activities that impact these rates are tabulated in Table 3.2.
Table 3.2: Summary of soil erosion impacts for oil palm plantation development Key impacts Soil Erosion Possible cause Clearing and earthworks construction of access road Clearing and earthworks establishment of base camp Site clearing and earthworks for the nursery site clearing and earthworks terracing, drainage works, infrastructure Typical effects Reduction in arable soil from plantation area Elevated Total Suspended Solids content and turbidity in waterways downstream Reduction in channel capacity of waterways due to sedimentation leading floods to potential localised
Eroded soil as a result of oil palm plantation development will be deposited in the waterways. The washing of surface runoff laden with eroded soil particles will increase the total suspended solids (TSS) and turbidity of the receiving water bodies, which in turn will affect the aquatic life therein. High concentrations of sediment reduce stream clarity, inhibit respiration and feeding of stream biota, diminish light needed for plant photosynthesis, and promote infections. Deposited sediment in stream bottoms can suffocate benthic organisms. Socially and economically, high sediment concentrations can add considerably to the cost of water treatment for human use and also significantly decrease the storage capacity of reservoirs. As more and more eroded soil being deposited in the waterways bed, channel capacity will be reduced. Soil loss to the streams or rivers is expected to reduce as time progresses when palm trees mature and ground vegetation establishes and grows.
32
The dominant factor controlling soil erosion in the humid tropics is rainfall volume and intensity, which in turn is controlled by:
The erodibility of the soil The slope of the land The nature of the vegetation cover The location of project activities The area of land exposed to erosion The period of exposure.
For at specific project the key soil erosion issues relate to:
The project location The area of land exposed to erosion The period of exposure.
Assessment methods for soil erosion risk The proposed method for assessing soil erosion impacts is:
Erosion hazard assessment incorporating biophysical data i.e. slope and stream drainage network, and when requested, vegetation cover, rainfall distribution and/or intensity and soil classification Assessment of intended management procedures i.e. area to be exposed, length of time exposed and schedule of oil palm plantation development.
The impact analysis should focus on identifying potential areas of erosion hazard. A theoretical approach would be to analyse thematic data layers based on the factors that control erosion, i.e. slope, rainfall, vegetation cover and intended sites and schedules of disturbance i.e. location of roads and terraces. Additional layers should include all permanent streams and catchment boundaries. Subsequent overlay analysis of these factors will help identify site suitability at a reconnaissance scale of mapping, based on erosion hazard. Given the poor resolution of available rainfall intensity and soil data in Sabah, suitable data is seldom available and will not normally be required given the associated difficulties of making good decisions based on such data. However, for specific projects it may be required that such data is produced when it is thought that such an assessment can better assist decision-making. Geographical Information System (GIS) is well suited for overlay analysis. Manual methods may, however, also be employed. The assessment of erosion hazard is a specialised form of land resource evaluation, the objective of which is to identify areas of land that will be threatened by or are prone to excessive soil loss. The assessment aims at dividing a land area into regions of similar erosion hazard as a basis for planning project activities and soil conservation work. Although the rate and amount of soil erosion under undisturbed conditions is controlled by a number of known factors, the impact of the disturbance often overrides these. This therefore
33
requires the identification of the existing or planned disturbance i.e. road network, terraces, road and drainage networks and other land clearings indicated in the plantation development plan. As a minimum requirement an assessment should include the flowing steps and data layers:
Step 1: Elevation and slope. Topographical data should be abstracted from the available 1:50,000 national map sheets. If larger scale 1:25,000 data are available, this may be used or at least reported that it is available. Elevation data is required to derive slope (Figure 3.9 & 3.10) A minimum data requirement is that slope is captured from topographic data from the 1:50,000 scale maps using the minimum contour interval spacing available, which on most map sheets is 100 feet. Once data on elevation has been captured it is usually easier to utilise computerised methods to determine slope and several commercial software packages are available to do this. Details of the software and the basic principles of the derivation should be presented with the slope map. Digitally derived slope maps captured from 1:50,000 topographic maps provide a general assessment of the distribution of steep land, however, it should be recognised that important local topographic variation may be missed, and therefore the local erosion risk may be underestimated
Slopes of 25 degrees and above to be clearly marked on a map. As described above, factors other than slope do affect rates of erosion, however, such a map will provide important indicative information as to high risk areas. It is also recognised that in some cases when other data is not available, then slope may be the only indicator of erosion hazard available
Figure 3.9 Elevation and geographical location of project abstracted from 1:50,000 map sheet (Required to derive slope RSO projection).
34
Figure 3.10 Slope as derived from elevation (Figure 3.9). Additional information and data layers that may be used of specifically requested include:
Vegetation: Available data on vegetation cover, habitat and/or current land-use should be presented at the same 1:50,000 scale. If current information is not available this data may be mapped for larger oil palm plantation developments, by for example, remotely sensed data e.g. satellite imagery or air photographs, or by site visits for smaller projects. It should be recognised that it is the removal of vegetation that increases the hazard, therefore the intended or existing road network may also provide important information for the data layer
Rainfall: Data on average annual rainfall over the project location, presented at the same 1:50,000 scale, may in some instances provide information for planning and assessment. If more appropriate rain data is available i.e. data available from agricultural stations, research stations, Department of Irrigation and Drainage, etc., this data should also be incorporated. In general soil erosion rates will increase with increased rainfall intensities.
Soil: Erodibility defines the resistance of soil to both detachment and transport. Although a soil's resistance to erosion depends in part on topographic position, slope steepness and the amount of disturbance, erodibility varies with soil texture, aggregate stability, shear strength, infiltration capacity and organic and chemical content. Given the inherent difficulties associated with determining any one of these factors - a thematic layer might be constructed using available soils data, also preferably at a scale of 1:50,000 or the largest scale available (see for example 'The Soils and Crop Suitability Report of the Sungai Bole Area, Lahad Datu - map scale 1:25,000). It may
35
be that if a site is identified as potentially having a high erosion hazard, more data or an additional survey might be requested. If requested, the survey adopted should use an internationally accepted procedure e.g. Food and Agriculture Organisation (FAO) of the United Nations guidelines for soil description (FAO, 1970) or should follow the recommendations of the Department of Agriculture, Sabah. The soils of Sabah have been described down to the Family (1975). A soil family is a unit of classification defined specifically by the type of parent material, which in Sabah has been quite broadly classified. The soil parent material would for example be described as sedimentary, intrusive igneous or crystalline basement rock. For the existing soils map of Sabah, soil associations have been mapped at a scale of 1:250,000. A soil association is not a classification unit but has been adapted to enable mapping based on landform classes, dominant soil units and characteristic vegetation, this mapping level is broad and may be used for the initial assessment. In general large particles are more resistant to transport because of the greater force required to entrain them. Fine particles are also resistant to detachment because of their cohesiveness. The least resistant particles are silts and fine sands. When necessary a geologic data layer should be provided. It should be borne in mind that following disturbance the physical properties of most soils are changed so dramatically that often there is little relationship to the original data and survey results. If soil data is used for erosion risk modelling or is presented as part of the assessment, the significance of the data must be stated. For example, one soil type may be more erodible because it has a higher percentage of sands and silts. The presentation of soil data without accompanying explanatory information is not acceptable
Step 2: Schedule and phasing of operations. The schedule and phasing of operations should be clearly stated and when possible represented in a spatial format. Information on the time lag between logging, clearance and conversion to oil palm plantation is required. The conversion should preferably take place in phase or immediately after the forest clearance and clear-cutting operations. If replanting is delayed, the adverse physical environmental impacts will increase, resulting in long term consequences, particularly in relation to soil erosion and water pollution
Step 3. Hazard assessment map. The overall assessment of erosion hazard could either be based on slope alone or incorporate the above data layers. The resulting hazard map should identify regions that are at risk should they be disturbed, i.e. a range or collection of steep regions with high erosion hazard or isolated areas of high erosion hazard i.e. single hill slopes (Figures 3.11). Each locality should be given an identification number or code for reference. Due to the difficulties associated with locating and identifying specific steep areas in the field, the data will later require the integration of other data e.g. human impacts, to focus the assessment on specific high-risk areas.
36
Figure 3.11 Erosion risk as derived from data on slope, vegetation and rainfall.
3.5
Site preparation and field maintenance result in generation of large quantities of biomass. Site clearing comprises activities such as underbrushing and clear felling that generate biomass in the form of re-useable/marketable timber and vegetative wastes. Field maintenance will results in the generation of manually removed weeds as well as vegetative wastes from pruning. During site preparation, remnant biomass needs to be removed from the project site to enable terracing and other works to proceed. Improper biomass disposal into streams and rivers may block or pollute rivers and thereby impact downstream settlements. In the past, burning and re-burning of dried biomass has been practised on the grounds that it was the easiest and most economical means of disposal. However, since the occurrence of transboundary haze problems experienced by the nation in 1997, the result of widespread open burning for land development, a zero burning policy has been implemented. The zero-burning technique is a method of land clearing whereby the remaining tree stands are felled and chipped and left to decompose in-situ or used as mulch for young palms. Zero burning enhances the soil organic matter status, thus helping to restore and improve the fertility and physical status of soils as plant nutrients are recycled, thereby the need for the inorganic fertilisers could be reduced. However, this method does not go without disadvantages; one of which is that termites proliferate in the rotting wood material and the other is that plant diseases may be not be fully eliminated (i.e. the diseased parts of the plant or plants are not removed or eliminated). Controlled application of pesticide may eradicate these problems.
37
Estimate of biomass to be generated. Site survey will be used to ascertain the estimated amount of biomass to be disposed. The determining factors would be the size of the area and the extent of vegetation cover and the species therein. The findings of the biomass estimation shall be used to assess the possible reduction in the amount of biomass to be disposed off by sorting/recovery of re-useable biomass (segregate re-useable timber from vegetative wastes). After undergoing sorting and recovery of useable biomass, the leftover biomass from clearing activities, which is mainly vegetative wastes, must be disposed off by adopting the zero burning technique.
3.6
Oil palm plantation development can result in a number of interrelated adverse impacts on human settlements. The potential impacts that require investigation include:
Deterioration of drinking water quality. Increased sediment loads and improper waste handling may degrade the quality of drinking water obtained from Gravity Feed Systems or water intake points, and thereby increase health hazard issues. In remote areas, especially areas where piped treated potable water supply is not available, there is a possibility that the oil palm plantation encroaches into the catchment for local water supply (normally in the form of a weir and gravity feed distribution line). Quality of water supply may be affected and the local people may face difficulty in obtaining potable water for their daily use
Landscape degradation and loss of existing and potential eco-tourism opportunities. Excessive damage to the natural vegetation cover may degrade the landscape and impact aesthetic values. Sediment polluted rivers may lead to the degradation or loss of water recreation sites
Landownership issues, for example land ownership conflicts and disagreements, increased landlessness, loss or degradation of sacred areas i.e. areas that have cultural or religious value for the local residents
Dust and noise problems related to road construction, operation and haulage. Water resource issues i.e. reduced availability of water if it is intended to abstract water for the purpose of irrigation or to meet the domestic needs of the workforce
If the EIA study reveals other adverse impacts on local settlements, these must also be documented, studied and assessed in the EIA study.
Assessment method for impacts on human settlements The objective of the assessment is to identify areas that may need special attention, and appropriate assessment methodologies need to be identified depending upon the scale and significance of the project. The following steps are suggested:
38
Step 1. Initial assessment of potential adverse impacts. An initial assessment based on available data, information, interviews and maps should be undertaken
Step 2. Survey of potential affected settlements. Based on the initial assessment, a semi-structured questionnaire should be developed. The questionnaire should include; (i) a number of close-ended questions, for example; Where do your house get water from? Do you use the forest for income-generation purposes? and, (ii) a number of open-ended questions, including for example; What do you think are the main problems associated with the project? and, What are the important mitigation measures that you would like to have imposed. An example questionnaire is shown (Box 3.1) The results of the questions have to be quantified and/or documented. Two maps of the settlements/houses shall be provided. The first map should be at the same 1:50,000 base scale as the other data layers and the second shall be at a larger scale and include the name and/house location of the respondents. If logistically feasible, all directly impacted settlements should be included in the survey (Figure 3.12). Photographs may also be used to supplement survey data (Plates 3.2)
Step 3. Detailed study and assessment of the key adverse impacts. Based on the results of step 1 and 2, a detailed study and assessment of specific impacts should be undertaken. For example: Deterioration of potable water supply, for example mapping existing catchments used for potable water, documenting number of on-site and downstream users, investments costs to install alternative water supply, with reference to the physical impacts state the probable length of time the impact will last e.g. during the period of active clearance only, short term or permanent (Figure 3.13) Landownership issues, for example the reason and seriousness of land ownership conflicts, or number of settlers to be relocated. Land alienated for the proposed oil palm plantation development may be subject to claims as native customary rights, which are stipulated in Part IV of the Land Ordinance (Sabah Cap. 68). The definition of native customary rights is specified in Section 15 of the Land Ordinance as follows: 15. Native customary rights shall be held to be - (a) land possessed by customary tenure; (b) land planted with fruit trees, when the number of fruit trees amounts to fifty and upwards to each hectare; (c) isolated fruit trees, and sago, rotan, or other plants of economic value, that the claimant can prove to the satisfaction of the Collector were planted or upkept and regularly enjoyed by him as his personal property; (d) grazing land that the claimant agrees to keep stocked with a sufficient number of cattle or horses to keep down the undergrowth; (e) land that has been cultivated or built on within three years; (f) burial grounds or shrines; (g) usual rights of way for men or animals from rivers, roads, or houses to any or all the above. Status of land may be determined by obtaining the cadastral map for the relevant area. If the land is not yet alienated, ground truthing should be carried out to verify whether there are any claimants. Any land under dispute or claims by the locals should be clearly demarcated until decisions are made as to whether it will be acquired or excluded. Under Section 16 of the Land Ordinance, the procedure to follow is as follows: Native customary rights established under section 15 shall be dealt with either
39
by money compensation or by a grant of the land to the claimant and in the latter case a title shall be issued under Part IV Landscape degradation and loss of existing and potential eco-tourism opportunities, for example the severity and extent of landscape degradation (e.g. compared to other similarly plantation sites, the extent of damage to water ways, mapping and photographing existing valuable landscapes as for example waterfalls, rocky streams, flat riverbanks for picnics, hills with views, plateaus with hills, scenic lookouts, wildlife, rare plants, scenic forest stands, geological formations, archaeological sites, culture heritage sites Dust and noise problems related to road construction and transportation to be assessed by predicting the increase in traffic, the timing and scheduling of the transport activities, comparisons with transport activities in similar areas in Sabah, the number and location of settlements affected. The existing or intended route should be clearly marked alongside settlements that potentially may be impacted. Water resource issues. If it is intended to abstract water for the purpose of irrigation or to meet the domestic needs of the workforce, the following shall be described: (i) intended pumping schedule (ii) volume of water to be abstracted, (iii) pumping and storage device and, (iv) intended source of water i.e. the river system. If there are other users on the same river system then existing usage and demand should be described. The volumetric assessment shall include details on the water resource of the intended source river, i.e. actual discharge if the river is gauged or an estimate if the river is ungauged. For the latter, the estimate should be based on extrapolation of data from a short term gauging exercise or by estimating the discharge using a water balance equation. Project Title: Household no./address: Name: Open questions (to be qualitative reported and analysed), for example: Main problems associated with the project _______________________________________________________________ _______________________________________________________________ Ideas for improvements of project implementation _______________________________________________________________ _______________________________________________________________ Closed questions (to be quantitatively reported and analysed), for example: 4 I strongly support the implementation of the project Etc 3 2 1
40
Figure 3.12 Example of location map to supplement survey data at a project site
41
42
(a)
(b)
Plate 3.3: Any encounter with (a) boundary marker for local water supply catchment area or (b) local water intake points, shall be noted and mapped into the overall land use map
Plate 3.4: An example of a land ownership marking. Such markings need to be noted and marked in the land use map and further investigated
43
Figure 3.13 Social assessment highlighting gravity feed water supply catchments
3.7
Additional impacts
Additional impact I: Land development on flood plains A floodplain is a particular type of valley floor, formed through lateral and vertical accumulation of alluvial sediments and inundated in perhaps two years out of three unless protected by a flood defence scheme. In built up areas lateral channel migration is usually precluded by buildings and infrastructure located close to the channel. To maximise floodplain development, heavy bank protection may be widespread and the channel width may well be artificially reduced. Because channels in rural areas receive little or no operational maintenance or flood defence works, the landuse on the floodplain should be planned accordingly. The inclusion of river flood plain areas within plantation areas is a frequent occurrence as such lands are often fertile and easy to cultivate due to low lying nature of the land, however, it should be acknowledged that there are impacts and risks associated with such a practice and the impact of modifying existing or natural vegetation should be assessed. The purpose of mapping a floodplain is to characterise the presence, size and nature of the low-lying area around the river channel, extending to the valley sides. Vegetation plays several important roles in floodplain hydrology, overbank hydraulics and sediment dynamics. It is useful to know the type of vegetation assemblage on the floodplain
44
to gauge its influence on present hydrological, hydraulic and sediment processes, and to assess the potential for instability induced by changes in vegetation, landuse or floodplain management. The presence and extent of any natural corridor along the course of the river (riparian corridor) has long been known to provide important ecological habitat, but more recently it has been recognized that riparian vegetation has other significant effects. First, a buffer strip creates space within which river form and process can be allowed to adjust freely, reducing the need for engineering stabilization and heavy maintenance. Second, it reduces near-bank flow velocities. Experience has shown that bank instability often occurs when the buffering effect of riparian vegetation is lost because cultivation extends right up to the bank edge. Third it intercepts and reduces surface runoff, reducing the potential for erosion by drainage over and through the bank. Fourth, riparian vegetation and the presence of a natural vegetation corridor around the channel are important scenic elements that add significant aesthetic value to any landscape. An assessment of the river channel form may provide some useful information for planning. The extent of a flood plain can best be determined from geomorphological data i.e. site visits combined with air photo interpretation. It is relatively simple to identify old river channels and flow paths from air photographs. A site survey would also help to visually determine signs of recent and historical floods e.g. vegetation damage, vegetation trash lines and vegetation communities. In some instances information on the flood history of the area may be obtained from the Department of Irrigation and Drainage as well as by interviewing local peoples. Demarcation of flood plain. An estimate of the extent of the flood plain should be demarcated for the proposed plantation and the flood risk areas for specified return periods should be marked e.g. 1,5,10,50 year floods. The flood plain area should be mapped on the topographic or river catchment base map.
45
Plate 3.5: Flood plain areas should be developed with caution. The removal of riparian vegetation weakens the bank, leading to bank erosion and collapse. Crops planted on the flood plain of larger river systems may be periodically inundated which may lead to crop mortality. This example shows that even for a relatively small 3 order stream, disturbance of the flood plain can result in degradation and loss of river bank and damage to crops.
rd
46
Additional impact II: Drainage of land (wetlands) Wetland environments are heavily influenced by the pattern of water movment. Once water is drained out of peat soils, the structure of the soil is irreversibly changed. In dry conditions, peat soils become a fire hazard. Drainage projects in wetland areas can affect a wider area than originally intended. Although drainage is usually intended to remove surface water and lower the water level of the water table to support agriculture or assist in flood mitigation, these modifications may impose physical, chemical and biological impacts on the overall wetland environment, well beyond the project boundary. When waterlogged sulphidic soils become exposed by drainage, oxidation of the iron sulphide produces sulphuric acid, which further reacts with other natural compounds to generate aluminium. When both acid and aluminium are released into streams they have the potential to cause levels of deoxygenation lethal to wetland lifeforms. This causes biological death in waterways. Subsidence is another problem associated with drainage of peat soils. When peat soils dry out they lose their buoyancy and increase the load on underwater layers of peat. The loss of water and reduced porosity causes the peat soils to consolidate, gradually lowering the level of the land. In low-lying areas this can lead to increased frequency of flooding, increased salinity due to the inflow of sea water and the destabilisation of buildings and structures. Changes in the balance of saltwater and freshwater in the river systems will affect the productivity of a site. If it is proposed to drain a project location or part thereof, then it is a requirement that an agricultural or drainage engineer is consulted to assess and report on the following: Identify specific areas within the project area where if drainage and disturbance took place, adjacent habitats are threatened Identify potential threats to the project area due to drainage and land use change in adjacent lands Identify sites (soils) that if drained would result in acid sulphate conditions.
Additional impact III: Water pollution due to use of agro-chemicals Deterioration in water quality within plantations may occur due to infiltration of chemicals following the application of fertilisers and usage of agro-chemicals such as pesticides and weedicides. Excessive levels of chemicals can seriously affect aquatic life and freshwater supply.
47
The application of artificial fertilisers can lead to a marked increase in the nutrient concentrations of water draining from the fertilised areas. The main elements compounded in fertilisers are nitrogen (N), potassium (K), phosphorus (P) and magnesium (Mg). Fertilisers find their ways into the natural water sources via a few processes:
They are eroded away together with the surface soil and washed into the watercourses Leaching conveys soluble compounds into the groundwater Runoff carries both soluble and insoluble compounds into surface water sources.
Nitrogen and phosphorus will have a significant impact on water quality. Nitrogen is mainly supplied bound in the forms of ammonium and / or nitrate compounds, and urea. Both ammonium compounds and urea are eventually converted into nitrate in the soil under well-drained condition. Nitrate, being soluble in water, will easily enter the river system if precautions are not taken. Excess nitrate promotes undesirable growth of aquatic micro flora in watercourses (eutrophication). Eutrophication in turn depletes dissolved oxygen, imparts undesirable tastes and odours in the water and clogs water supply intakes. High nitrate concentrations in drinking water can result in methemoglobinemia, a potentially fatal disease in infants. Phosphorus in the form of phosphate has the same euthrophication effect in surface water as nitrate, causing excessive wanton growth of algae, stopping sunlight from reaching aquatic life in deeper water. However, phosphate is less mobile than nitrate. Therefore, leaching loss of phosphate is small. Loss is mainly through runoff and soil erosion. Fertilisers, if applied at the correct rate and evenly distributed over the ground surface during fine weather conditions should not pose environmental hazards as they are readily absorbed by plant roots. Some surplus that is not taken up by the roots would become absorbed or be converted into more insoluble forms within the soil environment and be released slowly, thereby posing no pollution hazards. Excessive and inappropriate applications will, however, create the potential for significant environmental impacts. The use of pesticides on oil palm plantations is normally minimal. Biological control methods have proven to be quite effective (e.g. encouraging owl and snake populations). Under such a scenario, environmental impacts from pesticides will not usually be of concern unless pest infestations occur. There are two types of pests, namely vertebrates and invertebrates. Vertebrate pests normally consist of rats, porcupines, squirrels, monkeys, pigs, elephants and birds, whereas invertebrate pests are nematodes, ants/termites, slugs/snails, grasshoppers, wasps/bees, beetles (leaf miner, weevils, cockchafers), oil palm bunch pests, sucking insects and leaf-eating caterpillars. Invertebrate pest infestations may occur when large amounts of biomass are left on site to degrade naturally i.e. zero burning method. Under such conditions not only will the growth and production of palm trees be severely affected, intervention by using extra amounts of pesticides will be necessary, which in turn may be a cause of water pollution. The presence of large quantities of biomass will also provide shelter for certain pests such as rodents, which will forage on available palm fruits and thus create the necessity to provide some form of control i.e. chemical or biological. Again, chemical control may become a source of water pollution.
48
Site assessment: Produce a map indicating areas at risk. The landuse map and topographic base map should be prepared to identify areas that may potentially be at risk due to the usage of agro-chemicals in and outside the plantation. As a minimum requirement human settlements and water intake points should be identified. In addition, the risk assessment should be based on topography (flat, undulating, steep or very steep, soil types (different soil types will have different erosion rates), and usage of agrochemicals (different amount and properties of agrochemical will give different scenarios of pollution impacts).
Additional impact IV: Land and water pollution from hazardous materials Use and storage of hazardous materials such as used lubricants and agrochemicals may be a potential pollution source to surface water quality and land. Appropriate storage locations and disposal procedures, specific to the material being stored, should be designed and located to prevent possible spillage and inadvertent pollution.
A site assessment should identify the proposed storage location and the areas downstream that will be affected if spillage or leakage were to take place. An assessment of the potential amount of lubricants to be used and agrochemicals, including storage requirements and location, should also be made. Additional impact V: Land and water pollution from workforce housing Environmental problems that can be associated with the development of workforce housing include the indiscriminate disposal of wastes and sewage which could lead to the spread of disease and other disease vectors, creating a potential health hazard to the residents and other settlements downstream. Domestic wastewater may also cause contamination of surface water rendering the water unsafe to use. An assessment of the potential impact shall include the proposed capacity of the camp i.e. number of families and residents to be accommodated, the proposed location of the camp alongside the areas downstream areas that will be affected due to surface water pollution.
49
Mitigation measures
50
Mitigation measures
51
Mitigation measures
Issues
Demarcation of water catchments as boundary Exclusion of high risk soil erosion areas River reserves Reducing soil erosion Zoning of flood prone areas Buffer zones Zero burning Securing potable water supply.
Step 3
Monitoring
This chapter covers identification of the major mitigation measures for the key environmental impacts identified, elaboration on implementation methodologies to be used to help minimise or eliminate the impacts, and description of other mitigation measures. Mitigation measures include: Preventive to be addressed during the pre-feasibility study and land application including site selection, exclusion of areas e.g. risk areas for soil erosion and flooding, plantation layout particularly for drainage system and road network Control to be addressed during development and operational phases and related to working practices such as implementing zero burning, controlled fertiliser application and usage of pesticides, establishment of cover crops at cleared areas Compensatory whereby it is recognised that there will be an impact and that some compensation for the loss is to be made. This could include compensations to local settlements.
52
4.1
Key mitigation measures for oil palm plantation development activity include:
Provision of zones to buffer adjacent or nearby protected areas Demarcation of water catchments as the boundary for the plantation development area Exclusion of high risk soil erosion areas or steep areas to minimise soil erosion and water pollution River reserves to act as filter for soil erosion and protect important ecological habitats Implement practices to reduce soil erosion when developing the plantation Exclusion of flood prone areas Practice zero burning to eliminate air pollution problem Exclusion of catchment areas or provision of alternatives for local water supply.
Use of agro-chemicals Pest control Maintenance of waterways Sanitation facilities Management of hazardous materials.
4.2
Project boundary demarcation and alignment frequently does not follow the local topography and water catchment boundaries. This condition will make it difficult in terms of controlling environmental impacts since pollution sources may be external to the project location. Boundary demarcation can facilitate control of potential environmental impacts. This can be achieved when topography is given due consideration when assigning the plantation boundary. Thereafter, the identification of environmental impacts and their related control/mitigation measures can focus on the Project Proponent residing in a given catchment. This will also facilitate enforcement as well as clearly defining the spatial responsibility of the Project Proponent. Assessment of and proposals for mitigation measures for demarcation of water catchment as boundary have to be made. The following can be used as a guide:
Step 1: Mapping. From the assessment exercise, overlay the proposed plantation boundary onto the topography map
Step 2: Adjust boundary. If necessary adjust the project boundary to follow the catchment boundaries. Initiate administrative procedures to adjust the boundary of the proposed project location
53
4.3
Exclusion of high risk soil erosion areas or very steep slopes will substantially reduce soil erosion rates and improve water quality. Reserved areas will furthermore provide habitat for flora and fauna within the plantation area. Assessment of and proposals for mitigation measures for zoning of high risk soil erosion areas have to be made. The following can be used as a guide:
Step 1: Zoning. From the results of the soil erosion high-risk hazard assessment, the project site should be zoned accordingly. Areas comprising of significant regions of high risk shall be excised from the project plan. If the steep areas are few and isolated, then a decision may be taken to progress with the development. Intensive conversion should be restricted to low risk more gentle terrain, generally in the lower parts of catchments. No trees are to be felled within the hill reserves (Plate 4.1). Machine access is prohibited in the hill reserve
Step 2: Localising. The risk areas shall be clearly mapped (Figure 4.1), numbered and described in the EIA report. Global positioning system (GPS) or other waypoint data of all high-risk areas are required (Table 4.1). If it is already possible to access the site, the boundary of the high-risk area should be surveyed. If it is not possible to access the site, the coordinates of the boundary should be abstracted from the 1:50,000 base map (Figure 4.2). To facilitate the monitoring of compliance and to aide implementation, recommended mitigation measures should be described or mapped in such away i.e. information transferred back to the original 1:50,000 base map scale, so as to allow position location to be unmistakably determined in the field
Step 3: Demarcation. The identified high-risk soil erosion areas to be demarcated in the field (e.g. red or yellow paint) within two months of signing the Agreement of Environmental Conditions
Step 4: Estimate of Cost. If it is proposed to excise an area then an estimate of lost revenue should be made.
54
Figure 4.2 In this mitigation example it is proposed to exclude the upper part of a catchment, an area of high risk soil erosion coinciding with a catchment area, which is used to supply water by means of a gravity feed system. At intervals along the boundary, waypoint data is provided. The waypoint will later be used for photographic monitoring points
55
Table 4.1 Example of GPS (Geographical Positioning System) waypoint data for locating and demarcating steep land reserve N4.76712 N4.76900 N4.76984 N4.74087 N4.74454 N4.74336 N4.74318 N4.73634 N4.73292 N4.74250 N4.75357 N4.76394 N4.76710 E116.92590 E116.92423 E116.92176 E116.96955 E116.96515 E116.97051 E116.88271 E116.88340 E116.88396 E116.91799 E116.91913 E116.92719 E116.92588 Point 1 Point 2 Point 3 P5A P5B P5C P6A P6B P6C P7A P7B P7C P1
4.4
The impact of plantation development in terms of ecology, soil erosion and water pollution can be minimised by the provision of river reserves for waterways affected by or related to the plantation. The purpose of maintaining river reserves along rivers is to minimize the amount of sediments entering the river system, to minimize erosion of riverbanks and to minimize destruction of riparian habitat. River reserves serves as natural filters for surface runoff from the plantation areas. The reserves also play a major role in protecting the banks of the waterways from channel erosion. River reserves within the plantation area will provide evacuation corridor and sanctuary for mobile fauna. In the long run, these excluded areas will provide habitats for most of the original species prior to the plantation development thus preventing their extinction. In addition the reserves maintain an aesthetic value and provide cover for some wildlife. The implementation of river reserves will also help protect the hydrological environment. Assessment of and proposals for mitigation measures for zoning of river reserves have to be made. The following can be used as a guide:
Step 1: Mapping. The river reserves to be clearly mapped. In accordance with the Water Resources Enactment (1998), all permanent watercourses more than 3 metres wide should maintain a river reserve of at least twenty metres from the top of each riverbank. During clearance activities this should be adhered to at all times. However, the width of the river might be wider depending on elevation contours, landscape and the provision of protection for flora and fauna protection. River reserves shall be clearly mapped and described in the EIA report
56
Step 2: Location. Global positioning system (GPS) or other waypoint data of all proposed reserves are required for the demarcated area. If it is not possible to access the site, coordinates defining the proposed boundary to be excised should at least be abstracted from the 1:50,000 base map (Figure 4.3)
Step 3: Demarcation. The identified river reserves to be demarcated in the field (e.g. red or yellow paint) within two months of signing the Agreement of Environmental Conditions. Irregular terrain may complicate demarcation of the reserve strip in the field, particularly for smaller rivers in steeper terrain but any proposed reserve must be clearly identified and maintained. No trees are to be felled within the river reserves. Trees immediately outside the river reserves must be felled in a direction away from the reserve. Machine access is prohibited in the river reserve, except for the specifically assigned road routes.
Step 4: Cost estimation. The economic implications of limiting the project i.e. volume of timber lost, productive land lost, shall be assessed (Table 4.2).
Table 4.2 An indicative estimate of land area excised for provision of river reserves in Sabah Plantation size 970 hectares Length of rivers 8 km 32 hectares Percentage land area excised
Figure 4.3 Rivers assessed as requiring riparian reserves. In this example all fourth order rivers and above have been identified. Waypoint data for the start and finish of each river reserve section is required. For example: River section A B RSO coordinates = (7270051, 652003) (729097, 651088) and River section C D RSO coordinates = (731751, 654945) (732909, 652088)
57
4.5
Soil conservation practices will minimise or eliminate the impact of soil erosion within the plantation, which in turn will prevent related impacts such as water pollution due to high total suspended solid content in stream water. A major step is recognising the potential soil hazard sites and the subsequent zoning of activities. Areas comprising significant regions of high soil erosion risk steep areas - shall be excised from the project, see section 4.1.2. Provision of river reserves also contributes to reduced soil erosion, see section 4.1.3. Thereafter the key mitigation measure is to minimise ground disturbance during clearing and site development operations. Mitigation measures should focus on reducing the land area disturbed and reducing the time of soil exposure after disturbance. A summary of approaches to soil conservation practices are given in Annex 3.1. Assessment of and proposals for mitigation measures for reducing soil erosion have to be made. The following can be used as a guide:
Step 1. Reducing time of soil exposure after disturbance. The forest conversion schedule should minimise the time between harvesting, conversion and planting, thus minimising the period of exposure and increased erosion risk. Large exposed areas should be re-vegetated with fast growing species such as Centrosema pubescen, Calapogonium caerulum, Calapogonium muconoides, Pueraria phaseoloides and Pueraria javanica or indigenous species of same attribute. Ground cover not only protects against soil erosion but if leguminous plants are used they may also enrich the soil through their nitrogen fixing abilities. Exposed areas where planting of cover crops is not favourable (e.g. road sides) may be compacted as soil in large particles are more resistant to transport by erosive agents because of the greater force required to entrain them. Compaction or other soil management practices may be implemented to reduce as much as possible detachment of soil particles. Practices intended used should be clearly stated in the EIA report
Step 2. Use existing access roads. Reducing the area of disturbed land may be achieved by minimising fresh clearing for access roads through improvement and use of existing timber tracks within the area. Access road during nursery establishment and site preparation stages should be based on available existing logging tracks in order to minimise or prevent fresh clearing of vegetation. This approach will also reduce the cost for site development as the only cost that is necessary is for upgrading of these existing access roads. Existing and new road structures should be clearly marked in the EIA report.
Step 3. Provision of surface runoff control measures. Drainage system for effective conveyance of surface runoff away from disturbed areas will minimise the extent of erosion. For plantation planting field, roadside drains may play this function and river reserves provided will further retain direct discharge of eroded soil particles into the waterways. However, for areas that were cleared for the plantation complex, a sedimentation pond that corresponds to at least 5 to 15% of the total cleared area may be constructed to retain the surface runoff and allow for sedimentation of eroded soils prior to discharge into existing waterways. Any intended application of surface runoff control systems should be clearly indicated in the EIA report.
58
Plate 4.2: Typical site clearing sequence that entails clearing of underbrush followed by felling of tree stands. To reduce ground surface exposure to erosion, the activities may be modified by carrying out tree felling first and followed by spot clearing of under brush along oil palm planting lines
Plate 4.3: Rapid establishment of cover crops will prevent further erosion of cleared areas within the plantation
59
Plate 4.4: Establishment of cover crops at areas not meant for further development will significantly reduce soil erosion
4.6
In addition to zoning of river reserves, the floodplain assessment may identify areas that are frequently inundated and it should be brought to the Project Proponents attention the consequences of planting in such zones. Frequently inundated areas should be excised and demarcated in the field as with other zoning exercises.
Plate 4.5: The effect of developing oil palm plantation on flood plains floodwater inundates oil palm trees. Prolonged inundation may result in tree mortality.
60
4.7
The impacts of oil palm plantation development on the biodiversity of nearby protected areas can be minimised by provision of buffer zones between the plantation site and the protected area. Proposals for mitigation measures for buffer zones to protected areas have to be made. The following can be used as a guide:
Step 1: Demarcation. Clearly demarcation of areas where the plantation borders protected areas Step 2: Type of buffer zone. Assess and propose the most appropriate buffer zone system. In practice this will be restricted to the zoning of land use around the protected area, for example, leaving a strip of forest cover immediately adjacent to the protected area.
Step 3: Width of buffer zone. Assess and propose width of the buffer strip from boundary of the protected area.
Step 4: Plantations immediately adjacent to forested areas will find it necessary to consider other wildlife exclusion measures such as ditches or fences.
Boundary ditch
Boundary ditch
Plate 4.6: The newly constructed boundary ditch that serves as a physical barrier preventing possible elephant encroachment into areas already planted with oil palm.
61
4.8
Zero burning practiced during the development stage of an oil palm plantation will eliminate air pollution impacts. Assessment of and proposals for mitigation measures for air pollution have to be made. The following can be used as a guide:
Step 1: Zero burning. Zero-burning technique is a method of land clearing whereby the remaining tree stands are felled and left in-situ to decompose naturally or to be used as mulch for young palms. Zero burning enhances the soil organic matter status, thus help to restore and improve the fertility and physical status of soils. Large quantities of plant nutrients are recycled in the soil through decomposition of crop residues. With the recycling of plant nutrients, the input of inorganic fertilisers could be reduced. With zero burning, the decomposing debris would enrich the underlying soil (substitute for the applied inorganic fertilisers) and less erosion thereby resulting in better conservation of the natural soil resource and less water pollution.
The windrow is a process whereby vegetative wastes are stacked in the inter-rows for natural decomposition to take place. Windrowing conserves the chemical nutrients in the vegetative wastes and enhances the soil nutrients or organic matter status.
The EIA report should assess the practicability of the application of the zero-burning technique for the specific project, and make recommendations regarding the application
Step 2: Alternatives or modifications. The EIA report should elaborate alternatives or improvements of the zero burning system particularly in relation to plantation pests within vegetative wastes.
Should the zero-burning policy change, making open burning allowed, particularly for first cycle development where the biomass volume might not be effectively disposed through natural decomposition, the air pollution impact may be minimised by limiting the area per burning session. Based on past experience, ease of control and acceptable level of air pollution due to burning activity can be achieved by only allowing 50 ha of fully dry biomass to be burned at any one time. Adjacent farms may have to negotiate on their respective burn area in order not to compound the pollution impact.
62
Plate 4.9: Vegetative wastes from site clearing may be left on site (preferably properly stacked) to degrade naturally instead of being burnt
63
4.9
Exclusion of water supply catchment areas from development is one of the best approaches to eliminate or minimize the social impacts arising from plantation development. However, if exclusion cannot be implemented or water quality is eventually impacted, the Project Proponent shall be made responsible for providing an alternative water supply for the affected community. Assessment of and proposals for mitigation measures for local water supply have to be made. The following can be used as a guide: Mitigation A. Exclusion of water catchment areas:
Step 1: Mapping. Water supply areas shall be clearly identified on a map (Figure 4 4) and waypoints to be supplied (Figure 4.5). The boundaries of the local water supply catchment areas have to be agreed upon by the Project Proponent and the claimants. The Lands and Survey Department should be involved
Step 2: Demarcation. Project Proponent to mark and maintain a 2-m wide rentice marking catchment boundary. Step 3: Cost estimation. Estimated costs for securing potable water supply to affected settlements should be stated. If tanks are proposed, the number of tanks and intended recipients should also be detailed.
64
Figure 4.4 Identification of water supply catchments. For this example geographical positioning system (GPS) waypoint locations have been identified for water catchment 1
Figure 4.5 Waypoint/GPS (geographical positioning system) locations for water catchment 2 (See Figure 4.4)
65
Step 1: Potential sources. Identification of alternative water resources. This includes assessment of nearest Government piped water mains, the nearest existing reservoirs (for water supply or hydropower generation that can be modified to supply water), as well as rainfall collection
Step 2: Provide sources. If nearest Government piped water mains are available, the Project Proponent shall assist the affected local communities to be included in the water supply scheme by making the necessary arrangements with the relevant agencies. If there are no piped water mains nearby, but there is a reservoir accessible to the affected communities, the Project Proponent shall assist in providing the necessary resources (e.g. cost, labour and materials) for the water supply to be extended to the affected community. However, before decisions are made to mplement this alternative, the following shall be investigated:
(a) Catchment capacity The catchment capacity shall be determined in terms of water quantity and sustainability. Water quantity needs to be ascertained as the size of the catchment will determine the number of communities it can support.
(b) Water quality The quality of water from the reservoir for the supply scheme shall be determined to ensure that it is potable and fit for human consumption as well as other domestic uses. Water quality analysis can be carried out and the results shall be compared to the WHO (World Health Organisation) Drinking Water Standards. Any variations from the potable water quality will result in the need for treatment prior to use, the stage that Project Proponent may initiate assistance and support from the relevant Government agencies for further implementation.
If piped water mains and water reservoirs are not available, a remaining option would be to improve the rainwater collection capacity. This can be implemented by providing rainwater collection drums and tanks.
Considering the difficulties in implementing alternative approaches, it is logistically more feasible to excluded existing catchment areas from plantation development
Step 3: Cost estimation. Estimated costs for securing alternative potable water supply to affected settlements should be stated. If tanks are proposed, the number of tanks and intended recipients should also be detailed.
66
Plate 4.11: A typical headland where weirs for water supply are constructed to impound water for the gravity feed water supply
4.10
4.10.1
Excessive usage and untimely application of agro-chemicals not only results in higher operating cost but also pollution of surface water systems. Manuring/fertiliser application should be based on the palms requirements (i.e. through foliar sampling and analysis). Use of pesticides, weedicides and the like should be minimised and limited to serious cases of infestation and priority should be given to biological control and manual weeding. In brief, for pest control as far as possible use of agrochemicals should be taken as the last resort and biological control should be given priority. If use of agrochemicals is inevitable, controlled usage should be implemented with emphasis on the amount and timing of application.
67
4.10.2
When carrying out zero burning method for biomass disposal, pests such as rats and termites may become a concern. The problem may be mitigated by:
Providing breaks within the alignment of the biomass windrows to prevent any potential for extensive infestation Controlled usage of pesticides, particularly when infestation is extensive.
68
4.10.3
Waterways on site should be maintained and kept clear from any blockages in the form of vegetative wastes. Removal and disposal of blocking materials should be incorporated into the plantation work schedule to ensure smooth conveyance of surface water and prevention of flash floods on site. As far as possible, stream crossings should be provided where natural waterways within the oil palm plantation are affected. This approach will prevent occurrence of flash flooding as well as ensuring smooth conveyance of surface runoff. Use of available logs on site (during site preparation stage) to construct temporary crossings can further justify the need to sort and recover useable biomass generated.
69
4.10.4
Improper sanitation facilities may lead to disease outbreak (either air-borne, water-borne or vector-borne). Adequate sanitation facilities include:
Toilets with septic tanks that are maintained regularly to ensure their effectiveness Domestic waste disposal system that is capable of ensuring proper disposal, prevention of scavenging by rodents and other scavengers.
It is important that the Project Proponent allocates sufficient funds for providing the above facilities adequately for the plantation population.
4.10.5
In the operation of an oil palm plantation, there are two types of materials that are of environmental concerns, namely the agrochemicals (pesticides and fertilisers) and oil/grease wastes. Both materials can be a source of significant water pollution. Oil and grease wastes and mishandling of used lubricants or other petrochemical products such as fuel and fuel enhancers may result in episodic pollution. The following measures may be implemented to minimise potential environmental pollution arising from these materials:
Agrochemicals used containers to be returned to suppliers or collected for approved disposal the disposal procedure should be described. Used lubricants collected for reuse and/or disposed off as scheduled wastes Fuel dispensing to be carried out at bunded area and by trained and experienced personnel to prevent spillage Containers for fuel and fuel enhancers to be collected and disposed of by approved procedures.
4.10.6
When the native rights had been established, recognizing those rights is the main measure to mitigate potential social impacts relating to land ownership issues. Recognition of rights may be further enhanced through formation of a joint-venture between the Project Proponent and interested landowners to develop their lands in tandem with the plantation development. This approach will reduce potential conflicts due to land matters and helps to provide an additional source of income for the affected people that may be translated into improved standard and quality of living. Formation of joint-ventures between the smallholders and Project Proponent may be implemented by:
Identifying the plantation area that comprises native land. The areas shall be properly surveyed and marked on the ground. The acreage shall then be determined and the coverage incorporated into the overall plantation plan
70
Exclusion of native land area from Land Title. Based on the information from above, the Project Proponent may now appeal to the Land and Survey Department for exclusion of such areas from the Land Title and thus will effect some reduction in payable premiums as well as other payments related to the holding the land. On the landowners side, this information will ascertain their land area that will be included in the joint-venture
Development arrangements. Prior to execution of the joint-venture, the following aspects shall be clarified between the Project Proponent and the smallholders: Distribution of development costs, distribution of profits and possible employment of the smallholders to work at the plantation.
The concept brought forward in the Handbook on New Concept of Development on Native Customary Rights (NCR) Land : Policies, Benefits, Issues & Responses published by Ministry of Land Development, Sarawak, may be modified to suit the Sabah context.
71
Monitoring
72
Monitoring
73
Monitoring
Issues
This chapter includes (i) monitoring requirements to ensure compliance of the recommended mitigation measures, and (ii) procedures for monitoring residual environmental impacts.
74
5.1.1
Based on the flow chart on the land application procedure in Figure 1.1, the project proponent, upon issuance of the Draft Land Title, should carry out an EIA study for submission to and approval by the ECD. The findings in the EIA shall be used to determine the final plantation boundary that has taken into consideration the water catchments relevant to the proposed plantation. The project proponent should provide the ECD with a layout plan showing the boundaries of water catchment within the plantation and the proposed project site that will be used by the Lands and Survey Department to issue the Final Land Title to the Project Proponent.
5.1.2
The high-risk soil erosion areas identified in the assessment, with proposed mitigation measures, to be clearly mapped in the EIA report GPS (geographical positioning system) waypoint data used for demarcation as proposed under mitigation measures to be provided (Figure 5.1) Self-monitoring to include submission to the ECD of, for example (i), a description of works undertaken in relation to protection and demarcation of the high risk soil erosion area, (ii) a map at the largest available scale showing the actual demarcated area, and (iii) pictures of the demarcation as per map in the EIA report, from at least five different locations (locations to be indicated on map)
Schedule to follow up site visits to provide updated information on the above. This should include at least a midterm and end of project compliance report.
Figure 5.1 Compliance monitoring locations for the proposed mitigation measures
75
5.1.3
The river reserves to be clearly mapped in the EIA report GPS (geographical positioning system) waypoints for the demarcated area to be provided Self-monitoring to include submission to the ECD of, for example (i), a description of works undertaken in relation to protection and demarcation of the river reserves, (ii) a map at the largest available scale showing the actual demarcated area, and (iii) pictures of the demarcation as per map in the EIA report, from at least five different locations (locations to be indicated on map Figure 5.2 and Table 5.1)
Schedule two follow up site visits to provide updated information on the above. This should include at least a midterm and end of project compliance report.
Figure 5.2 Example of map used to plan river reserve compliance monitoring activities Table 5.1. Example coordinates for photographic monitoring Photographic monitoring point 1 2 3 4 5 6 X coordinate (RSO) 731682.04 731692.33 731846.63 731849.20 731967.5 732255.53 Y coordinate (RSO) 654223.74 654172.31 654141.45 654108.02 654262.32 654264.89
76
5.1.4
The project proponent should provide records on implementation of soil conservation practices supported with photographs after completion of new phases or as per the Agreement of Environment Conditions (AEC).
5.1.5
The project proponent should provide a layout plan clearly marking excluded flood prone areas. The updated map should be submitted to ECD upon completion of any new development phases or as per the AEC.
5.1.6
A layout plan clearly marking areas bordering protected areas GPS (geographical positioning system) waypoints for the demarcated area to be provided Self-monitoring to include submission to the ECD of, for example (i), a description of works undertaken in relation to the demarcated area, (ii) a map at the largest available scale showing the actual demarcated area, and (iii) pictures of the demarcation as per map in the EIA report, from at least five different locations (locations to be indicated on map)
Schedule two follow up site visits to provide updated information on the above. This should include at least a midterm and end of project compliance report.
5.1.7
Zero burning
The project proponent should provide the record on practice of zero burning methods supported with photographs. The information should be submitted to ECD upon completion of any new development phases or as per the AEC.
5.1.8
The site location map overlay onto topography map showing boundaries of local water supply catchment found within the project site. The map showing the above exclusion should be submitted to ECD upon completion of any new development phases or as per the AEC Self-monitoring to include submission to the ECD of, for example, a description and map of mitigation measures implemented to secure continued supply of drinking water Schedule two follow up site visits to provide updated information on the above. This should at least include a midterm and end of project compliance report.
The project proponent should, if alternative water supply is provided, provide the following information:
77
Overall land use map showing the plantation and locations of the nearest Government piped water mains and approximate alignment of water pipelines to affected villages; and/or
Overall land use map showing the plantation and the locations of water catchment, reservoirs/intake points and approximate alignment of water pipelines to affected villages; and/or Photographs showing implementation of the above and/or provision of tanks/drums for collection of rainwater.
The above information should be submitted to ECD upon completion of any new development phases or as per the AEC.
Monitoring techniques Compliance monitoring will be undertaken primarily by means of the techniques listed below: Photographs. Photographs to provide evidence of the implementation of the recommended mitigation measures. Photographs could, for example, be used to verify compliance with
Provision of hill/steep land reserves Provision of river reserves Reducing the time of soil exposure after disturbance Provision of buffer zones Proper hazardous waste handling.
When photographs are submitted for compliance monitoring, the exact location should be clearly marked on a map together with a GPS (geographical positioning system) reading and a direction bearing. The date and time shall be noted. Field checks. Periodic field checks at appropriate stages of the operation should be undertaken in order to ensure compliance of e.g.
Provision of hill/steep land reserves Provision of river reserves Reducing the time of soil exposure after disturbance Maintaining potable water supply Provision of buffer zones.
Impact statements concerning affected settlements. Periodic statements, in written or oral form, from affected settlements can be used to check compliance of for example
Provision of hill/steep land reserves Provision of river reserves Resolving landownership issues Maintaining potable water supply.
78
Satellite images. Larger projects or projects nearby sensitive sites, might be required to utilise satellite imagery taken at various stages during the life cycle of the project to monitor compliance i.e. implementation of mitigation measures such as:
River reserves Hill/steep land reserves Percentage area of exposed soil and vegetated zones. Provision of buffer zones.
All requirement laid down in the Agreement of Environmental Conditions, which is possible to check through the use of satellite images, as for example the above, will be overlain on the image to check for compliance. If satellite imagery is used, a compromise has to be made between cost and spatial resolution. An appropriate image type would be SPOT as it has a resolution of 20 metres for multi-spectral images and 10 metres for panchromatic. The land area covered by a full SPOT image is 60km x 60km. Normally two satellite images will be required: One before initiation of the project and one (or two or more for large scale projects) at the near end of the project activities (Plate 5.1).
Plate 5.1 This SPOT image shows undisturbed forest (far right) and logging roads and skid trails (centre and above). The bright area left of centre represents an area that has been clear felled for oil palm plantation development.
79
Table 5.2 Approximate costs as of September 2000. If the image is purchased overseas, costs will also vary with exchange rates Description SPOT Scene in level 1B Multi-spectral (XS) Full scene / Quarter scene 60km x 60km or 30km x 30 km SPOT Scene in level 1B Panchromatic (P) or Multi-spectral (XI i.e. SPOT 4) Full scene / Quarter scene 60km x 60km or 30km x 30 km 11,440 Unit Price (Ringgit) 8,580
Scheduling and responsibilities As the EIA covers the entire project period the need for images and other monitoring requirements should be planned accordingly. The monitoring programme should be formulated in advance, by the EIA consultant in collaboration with the ground operator in accordance with the schedule of operations, and be approved by the ECD through the Agreement of Environmental Conditions. The EIA should clearly state the responsibilities and actions to be taken in relation to compliance monitoring:
Allocate institutional/administrative responsibilities for planning, implementation and monitoring of the environmental requirements
management
Allocate responsibilities to execute mitigation measures, including the detailed design of the mitigation measures.
Non-compliance Non-compliance will normally be followed by the issuance of an Order to comply and a simultaneously and immediate compounding of the non-compliance offence according to the Compounding of Environmental Offences Rules, 1999, Environmental Conservation Department. Penalties for not complying with the mitigation measures should be spelt out.
80
5.2.1 Ecology The effectiveness of mitigation measures for ecological impacts can be determined by monitoring the extent of ecological impacts on the species identified within the zoned areas. Adequate and effective buffer zones will clearly demarcate the plantation and the protected areas, whereas riparian reserves can provide sanctuary for mobile fauna as well as establish new habitats for displaced species. Impacts on the species can be identified by determining the changes that take place within that particular species. Changes within a particular species can be ascertained by determining variations in terms of population size (increase, remain, decrease) and growth condition (good, retarded, normal, etc.). The baseline data will serve as the yardstick to ascertain the extent of changes taking places.
5.2.2 Soil Erosion If the environmental assessment indicates that the oil palm plantation may result in significant soil erosion, periodical monitoring might be required carried out for signs of soil erosion on site and water quality deterioration that could be attributed to the soil erosion. Visual inspection of soil erosion incidence within the plantation area can be used to assess soil erosion on site. Variations in the level for soil erosion indicators, particularly Total Suspended Solids and turbidity in water quality of waterways relevant to the plantation, will have to be determined. Physical appearance on site - photographs of these erosion incidences gully, sheet, etc. shall be included in the report. Test results and assessment shall be reported and submitted to the ECD as per the AEC.
5.2.4 Water quality Soil erosion, use of agro-chemicals and other on site activities will inevitably affect water quality of waterways within the oil palm plantation. The impact monitoring of water quality can be carried out by determining the changes in water quality of waterways relevant to the oil palm plantation. This can be achieved by taking water samples at locations that are representative of the sites condition, which will be determined and agreed by ECD. Report on the variations to be submitted to the ECD as per the AEC. Water quality changes for waterways relevant to the oil palm plantation can be ascertained by determining variations between the existing water quality and the baseline data. Parameters that should be determined are total suspended solids, turbidity, dissolved oxygen, pH, biochemical oxygen demand (BOD), chemical oxygen demand (COD), oil and grease, agro-chemicals. Known aquatic life for the area such as fish may be used as the biological indicator for water pollution.
5.2.5 Water supply Matters pertaining to water supply that has not been properly planned and implemented will result in possible conflicts between the Project Proponent and those affected. In extreme situation, hostility may ensue, particularly when livelihood of the locals is seriously affected.
81
The impact monitoring on water supply can be carried out by noting any feedback, comments or grievances from affected communities. This can be achieved by having dialogue sessions with these communities as and when necessary. Report on the findings from these sessions to be submitted to the ECD as per the AEC. Any negative feedback or grievances can be considered as the presence of unresolved water supply issues. The Project Proponent, being the party that had initiated the change within the affected communities, should be responsive to these feedbacks by taking actions that could minimize or eliminate the negative or adverse impacts to all parties. Involvement or cooperation with the relevant Government agencies, especially the District Office, should be looked into.
82
83
The magnitude of change/effect, which is the importance in relation to the spatial boundaries The permanence of the impact, which defines whether the condition is temporary or permanent The reversibility of the condition, which defines whether the condition can be changed and is a measure of the control over the effect of the condition To what extent the impact is cumulative, which is the effect will have a single direct effect or whether there will be a cumulative effect over time, or a synergistic effect with other conditions.
Project stage
Magnitude 1 1 1 2 3 1 1 1 1 3 3 3 1 2 3 1 1 1 3 3 1 1
Permanence 3 2 2 2 2 2 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Reversibi lity 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 1 3 3 3 3 1
Cumulative 3 3 3 3 3 1 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 1
Nursery establishment
Ecology Vegetative waste Soil erosion Water quality Air pollution Pest infestation
Site preparation
Ecology Vegetative waste Soil erosion Water quality Floods Air pollution Pest infestation
Replanting
Abandonment
Traffic
Magnitude of change/effect: 1:within project site; 2:local conditions; 3: regional/national/international. Permanence: 1:no change/not applicable; 2: temporary; 3: permanent. Reversibility: 1: no change/not applicable; 2: reversible; 3: irreversible. Cumulative: 1: no change/not applicable; 2: non-cumulative/single; 3: cumulative/synergistic
84
85
Agronomic measures
Soil management
Mechanical methods
Conservation tillage
Contour tillage
Terracing
Waterways
Structures
Mulching
Crop management
Natural
Synthetic
High-density planting
Multiple cropping
Cover cropping
Crop rotations
Strip-cropping
86
References
Department of Agriculture, Sabah, (1998). Sabah Agricultural Policy, Department of Agriculture, Sabah Canter, L.W. (1977). Environmental Impact Assessment. Mc Graw-Hill, U.S.A Edwin D. Ongley, 1996. Control of water pollution from agriculture FAO Irrigation and Drainage Paper 55, http://www.fao.org/docrep/ W2598E/w2598e00.htm Environmental Conservation Department Sabah (ECD) (2000). Handbook for Environmental Impact Assessment (EIA) in Sabah. Kota Kinabalu Jabatan Alam Sekitar (DOE) (1996). Guidelines for the Prevention & Control of Soil Erosion & Siltation in Malaysia. Kuala Lumpur Kato, R., Y. Tadaki & H. Ogawa, 1978. Plant biomass and growth increment studies in Pasoh Forest. Malayan Naturse Journal, 30(2): 211 - 224 Ministry of Land Development, Sarawak, 1997. Handbook on New Concept of Development on Native Customary Rights (NCR) Land: Policies, Benefits, Issues & Responses Morgan, R.P.C., 1986. Soil Erosion and Conservation. Longman Group UK Limited Payne, Junaidi, 1997. Potential Benefits of Rtaining Forests in Malaysian Plantations. Paper presented in the One-day Workshop on Forests Plantations, Kota Kinabalu, 09th October 1997 Raghavan Srinivasan, J. Arnold, H. Wang & C. H. Walker, 2000. Nonpoint Source Sediment and Organic Nutrient Loadings to Major River Bodies in the U.S., Blackland Research Centre, USA Soepadmo, E., 1987. Structure, above ground biomass and floristic composition of forest formations at Gunung Janing Barat, Ulu Endau, Johore, Malaysia. Malayan Nature Journal 41: 275 - 290 State of Sabah (1930). Land Ordinance 1930. Kota Kinabalu State of Sabah (1961). Water Supply Ordinance 1961. Kota Kinabalu State of Sabah (1996). Conservation of Environment Enactment 1996. Kota Kinabalu State of Sabah (1997). The Land (Quarry) Rules 1997. Kota Kinabalu State of Sabah (1998). Sabah Water Resources Enactment 1998. Kota Kinabalu State of Sabah (1999). Conservation of Environment (Prescribed Activities) Order 1999. Kota Kinabalu Turner, P.D. & Gillbanks, R.A., 1974. Oil Palm Cultivation and Management. The Incorporated Society of Planters, Kuala Lumpur, Malaysia