0% found this document useful (0 votes)
18 views2 pages

Building Code Matrix1'

Building Code Matrix1'

Uploaded by

celineturbaq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views2 pages

Building Code Matrix1'

Building Code Matrix1'

Uploaded by

celineturbaq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Item Ontario Building Code Data Matrix Parts 3 & 9 OBC Reference

1 Project Description: New Part 11 ■


Part 3 Part 9
Addition 2.1.1

Change of Use Alteration 9.10.1.3
2 Major Occupancy(s) Group A and C 3.1.2.1.(1) 9.10.2
3 250
Building Area (m²) Existing __________ 0 Total __________
New __________ 250 1.1.3.2 1.1.3.2
4 Gross Area 430
Existing __________ New __________ 430
0 Total __________ 1.1.3.2 1.1.3.2
5 Number of Storeys 2
Above grade _______ 0
Below grade _________ 3.2.1.1 & 1.1.3.2 2.1.1.3
6 Height of Building (m) 9 2.1.1.3
7 Number of Streets/Access Routes 2 3.2.2.10 & 3.2.5.5
8 Building Classification Group A Div 2 ( 3.2.2.25) and C (3.2.2.47) 3.2.2.20-.83 9.10.4
9 Sprinkler System Proposed entire building 9.10.8
basement only 3.2.2.20-.83
in lieu of roof rating 3.2.1.5

not required 3.2.2.17
10 Standpipe required Yes ■
No 3.2.9
11 Fire Alarm required Yes ■
No 3.2.4 9.10.7.2
12 Water Service/Supply is Adequate ■
Yes No
13 High Building Yes No 3.2.6
14 Permitted Construction ■
Combustible Non-combustible Both 3.2.2.20-.83 9.10.6
Actual Construction ■
Combustible Non-combustible Both
15 Mezzanine(s) Area m² 0 3.2.1.1.(3)-(8) 9.10.4.1
16 Occupant load based on m²/person design of building

3.1.1.6 9.9.1.3
Basement: Occupancy __________ 0
Load ________ persons
1st Floor 33
Occupancy __________ 10
Load ________ persons
2nd
Floor Occupancy __________ 0
Load ________ persons
rd
3 Floor Occupancy __________ 0
Load ________ persons
For Additional Floors, go to page 2.
17 Barrier-free Design ■
Yes No (Explain) 3.8 9.5.2
18 Hazardous Substances Yes ■
No 3.3.1.2.(1) & 3.3.1.19(1) 9.10.1.3
19 Required Horizontal Assemblies Listed Design No. 3.2.2.20-.83 & 3.2.1.4 9.10.8
Fire FRR (Hours) or Description (SG-2) 9.10.9
Resistance 1hr
Floors __________ Hours
Rating N/A
Roof ___________ Hours
(FRR) N/A
Mezzanine ______ Hours
FRR of Supporting Listed Design No. Or
Members Description (SG-2)
1hr
Floors __________ Hours
N/A
Roof ___________ Hours
N/A
Mezzanine ______ Hours
20 Spatial Separation – Construction of Exterior Walls 3.2.3 9.10.14
Wall Area of L.D. L/H Permitted Proposed FRR Listed Comb Comb. Constr. Non-comb.
EBF (m) or Max. % of % of (Hours) Design or Const Nonc. Constr.
(m²) H/L Openings Openings Description Cladding
North N/A
South N/A
East N/A
West N/A
For Additional Walls, go to page 2
21 Other – Describe

16 (Continued)

____ Floor Occupancy __________ Load ________ persons


____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons
____ Floor Occupancy __________ Load ________ persons

20 (Continued)
Spatial Separation – Construction of Exterior Walls 3.2.3 9.10.14
Wall Area of L.D. L/H Permitted Proposed FRR Listed Comb Comb. Constr. Non-comb.
EBF (m) or Max. % of % of (Hours) Design or Const Nonc. Constr.
(m²) H/L Openings Openings Description Cladding