Major Project BCA Guidelines
Major Project BCA Guidelines
1. Problem definition
2. Analyze Systems requirements.
3. Plan the systems design phase of the SDLC.
4. Decide the s/w requirement specifications and h/w requirement specifications.
5. Perform and evaluate feasibility studies like cost-benefit analysis, technical feasibility, time
feasibility and operational feasibility for the project.
6. Work on data collection methods for fact finding.
7. Construct and evaluate data dictionaries/ decision trees/ decision table.
8. Create and evaluate graphical tools as systems flow charts, entity-relationship (er) diagrams
and state transition diagrams.
9. Construct and evaluate data flow diagrams.
Page specification: leftmargin-3.0cms, right margin- 2.0 cm, top margin 2.54 cm, bottom margin 2.54
cm, line spacing – single, font size – 12 for normal text, 14 for headings, 16 for chapter heading, page
numbers - all text pages as well as program source code listing should be numbered at the bottom of
the pages. Employ MS-Word or open-source software.
Two copies of the original project report in bound form are to be submitted. Each group is required to
prepare individual copy of project report in cd and submit along with his/hers project report in MS-
Word as well as PDF. The same must contain the report, results, screenshots, errors, databases, source
codes (wherever it is not feasible explicit approval from the supervisor must be obtained).
Project evaluation
Single project report will prepared and submitted by each group .The project report should be
prepared as per given guideline.
To fulfill the above presentation must be carried out phase wise in the whole semester for internal
assessment of the project.
Format of Front Page
SESSION :20XX-20YY
Submitted to
Project Certificate
This is to certify that the project report entitled “………………….” submitted to Amity Institute of
Information Technology, AUP in partial fulfillment of the requirement for the award of the degree
of BACHELOR OF COMPUTER APPLICATIONS (BCA), is original work carried out by Mr / Ms
………………….,enrollment number………………under the Supervision of Prof/Dr/Mr/Ms
……………………….. .
The matter embodied in this project is genuine work done by me and has not been submitted to this
University or to any other University / Institute for the fulfillment of the requirement of any course
of study.
Date:
This project being an enormous piece of work happens to be the outcome of time, hard work and
patience of a multitude and was unfeasible to accomplish single handed. It. I/ We feel and express
our gratitude for AMITY UNIVERSITY, PATNA for giving us/me a strong foundation and
infinite opportunities to harness our/my skills. This esteemed institute, under the proficient
administration of Honorable Vice Chancellor, Dr Vivekanand Pandey Sir who has been providing
I/ We took on this task with assurance coming from our Assistant Director, Dr Rashmi Shekhar
Ma’am and an unremitting guidance and support of our/my mentor [name, post of the professor
of the particular subject]. Their direction and tutorial skills were the stimuli behind the
completion of this project. I/We thank all the faculty members of [name of the department] for
Our/My parents being the source of inspiration and encouragement all the time deserve our/my
indebtedness. I/we must mention our/ my friends and family who stood there as a backbone.
Signature of Student
(Name of student)
(Roll No--------------)
(Enrollment No--------)
Self-Certificate
Signature of Student
(Name of student)
(Roll No--------------)
(Enrollment No--------)
Certificate from Project Guide
This is certify that this Major Project entitled "------------------------------------" submitted in
partial fulfillment of the requirements for the award of the degree of Bachelor of Computer
Application (BCA) in session (years 20—to 20---) to the A m i t y I n s t i t u t e o f
I n f o r m a t i o n T e c h n o l o g y , Amity University Patna done by (student name
),……(student name) is an authentic work carried out by them under my guidance. The matter and
software embodied in this project work has not been submitted earlier for the award of any degree or
diploma to the best of my knowledge and belief.
Signature of Teacher
(Project Guide )
The format of the report is as follows:
Front Page
Declaration by the candidate
Certificate
Certificate from the organization
Acknowledgement
Synopsis
Table of contents
Chapters
Bibliography (in the alphabetical order of authors)
1. INTRODUCTION
2. SYSTEM STUDY ANALYSIS
a. EXISTING SYSTEM
b. PROPOSED SYSTEM
c. FEASIBILTY ANALYSIS
3. REQUIREMENT ANALYSIS & SPECIFICIFICATION
a. FUNCTIONAL & NON- FUNCTIONAL REQUIREMENTS
b. USECASE DIAGRAMS
4. SOFTWARE DESIGN
a. INPUT DESIGN
b. OUTPUT DESIGN
c. DATA FLOW DIAGRAMS
d. SOFTWARE DESIGN
i. ARCHITECHURAL DESIGN
ii. USER INTERFACE DESIGN
iii. PROCEDURAL DESIGN
iv. DATABASE DESIGN
5. SYSTEM IMPLEMENTATION
a. MODULE DESCRIPTION
b. IMPLEMENTATION DETAILS
6. SYSTEM TESTING
a. TEST CASES
b. UNIT , INTEGRATION , USER ACCEPTANCE, OUTPUT, VALIDATION
7. CONCLUSION & FUTURE ENHANCEMENT
8. BIBLIOGRAPHY & REFERENCES
9. USER MANUAL
(Screen shots)
NOTE:
1) There should be n number of Project certificate, Self-Certificate in the hard document
which is to be submitted to the university.
Where n=number of students in a group
2) There should be one common acknowledgment signed by all members at the bottom in
the project document which is to be submitted to the university.
3) Every group should submit one common document to the university.
4) Every individual should have one spiral document copy having individual Project
Certificate, Self-Certificate in the documents.