Flexible protective coating based on styrene – acrylic copolymer for exterior or interior use
PRIMING: APPLICATION:
All surfaces should be primed with MasterProtect 200 MasterProtect 200 is applied to the prepared surface
primer applied at a rate of 100gr/m², to eliminate in two coats, the first being allowed to dry, before the
excessive suction and promote adhesion. second is applied. In hot dry climates, application will
Allow the MasterProtect 200 PRIMER to dry before be assisted by dampening brushes.
proceeding with the top coats. Where the Where the roof is in poor condition, or where
MasterProtect 200 primer is used for chloride ion or substantial movement is expected in the roof structure,
carbonation protection then MasterProtect 200 primer apply a sandwich system incorporating reinforcing
should be used as the priming system. It is necessary fabric. In this application, the fabric is bedded into the
to open the concrete pores prior to the application of wet film of the first coat of MasterProtect 200 using a
the MasterProtect 200 primer. charged brush. Ensure that full contact is achieved
and there is no air entrapped. Apply a second coat of
FILLER/SCRAPE COAT: MasterProtect 200 when the first has dried, at right
Surface depressions, blow holes, aggregate pop-outs, angles to the first.
etc. should be rectified with MasterEmaco N 303.
Allow to dry before over-coating. WEATHER CONDITIONS
MasterProtect 200 is not resistant to rain until the film
APPLICATION: has dried. This may take less than 30 minutes in hot
Apply in one or more coats ensuring a continuous dry climates and up to 24 hours in temperate humid
even film. The finish may be textured if desired. conditions. Generally, the product should not be
Successive coats should be applied at right angles to applied in rain or if rain is forecast. Similarly,
each other. MasterProtect 200 will freeze in its wet state so
should not be applied to frozen substrates or when the
SURFACE PREPARATION: temperature is below 5°C, or is likely to fall during
application.
ROOF WATERPROOFING
Surfaces to be treated should be clean and dust free.
All traces of oil, grease, mould release agent and COVERAGE
residual curing compounds should be removed First Coat: should be diluted with 15% water and apply
together with any other contaminant that could impair 0.15kg/m². Second Coat: dilute with 10% water and
adhesion. Previous waterproofing treatments should apply 0.13kg/m². Third coat (Optional) : dilute with 5%
be either completely removed or put in order. Cracked, water and apply 0.1kg/m².
broken, slipped or missing tiles, sheets, slates or other
forms of covering must be replaced or refixed. Cracks
PRIMER:
in
Should be diluted at the rate of 1:1, MasterProtect
asphalt or built-up felt systems should be filled with
200 primer to Water.and applied to approx. 100gr/m²
mastic and allowed to cure.
depending on substrate condition.
Failure to comply with the recommended storage Master Builders Solutions reserves the right to have
conditions may result in premature deterioration of the the true cause of any difficulty determined by accepted
product or packaging. For specific storage advice, test methods.
consult Master Builders Solutions's Technical Services
Department. QUALITY STATEMENT
All products manufactured by Master Builders
SHELF LIFE Solutions Egypt, or imported from Master Builders
Up to 12 months if stored in unopened containers Solutions affiliate companies world-wide, are
according to manufacturer’s instructions. manufactured to procedures certified to conform to the
quality, environment, health & safety management
systems described in the ISO 9001:2015, ISO
SPECIFICATION CLAUSE COATING:
14001:2015 & OHSAS 18001:2007 standards.
The protective/decorative coating shall be
MasterProtect.
* Properties listed are based on laboratory controlled
tests.
Surface preparation and application shall be strictly in
accordance with the manufacturer's recommendations.
® Registered trademark of a MBCC Group member in
many countries of the world
PREPARATION:
All concrete surfaces shall be sound, clean and free
of any loose material, non-compatible curing
compounds, dirt and dust.
SAFETY PRECAUTIONS
As with all chemical products, care should be taken,
during use and storage, to avoid contact with eyes,
mouth, skin and foodstuffs. Treat splashes to eyes and
skin immediately.
Master_Builders_Solutions_CC-EG/Seal_200_09_10/v1/08_17
MBS Construction Chemicals Egypt (S.A.E), Business Park A, Building A1, Cairo Festival City, Ring Road, New Cairo, Egypt
Hotline: 15560, Phone: +202 2128 7800, Fax: +202 2128 7801
Website: https://www.master-builders-solutions.com/en-eg