0% found this document useful (0 votes)
41 views1 page

Elevation

elevation design

Uploaded by

ayeleleul30
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views1 page

Elevation

elevation design

Uploaded by

ayeleleul30
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ELEVATION

Scale 1:50
Y-Y ELEVATION
Scale 1:50
Y-Y Front
Scale 1:50
elevation X-X

A B C C B A
1 2 3

666666

15
6

110

3 47 3 87

87
110 110

130

3
65

65

65

47
3
280

265
3
12 12 12

3
3 3

150
140

140
40 44

90

90
20
60 60 230 60 60 5 5 90

A B C A B C 45
X

Details - OFFICE INTERIOR DESIGN

200
380 MAIN TABLE
1 1 10

50
60

60
90 290 220

50
GARDEN
30 210 60

70
60

320
215
Y Y 31 40

42 44
100
FURNITURE

87
8
R3

45
40
163

485

230

370

230
652 55
FURNITURE (*3)
50 170
LOGO TEXT
110 110

20
60

70
DAYNAMICS ARCHITECT'S AND ENGINERS

10 380 210
30 100 110
60

PHONE No. "0970171979"


120 PICTURE

65
30

BORED (*3)
2 2 PHONE No. "0970171979"

3
110

100

PROJECT
INTERIOR PROJECT
3 3 CARPET (160*215) CLINET : SINQEE BANK

LOCATION :
X

WEST ARSI ZONE SHASHEMENA


ARCHITECTURAL DESIGN
PLAN TITLE:
LIGHTING Details - OFFICE INTERIOR DESIGN & DETAILS
PLAN DESIGN BY:
REVISIONS
SPOT SWITCH LIGHT POINT, 14 SPOT LIGHT YONAS GELETA
FLOOR
Scale 1:50
PLAN CEILING
Scale 1:50
PLAN LOCATION TOP
REG NO: GE/2462
No. DATE REVISO

ZELEALEM ADANE TESFAYE


FEEDER 4 x 35sqmm) REG NO: PPAR/099

POWER SOURCE EEPCO TRAFO DRAWN BY :-

CHECKED BY:
MAIN SWITCH LIGHT POINT, 2 MAIN LIGHTS SCALE :
1:50
LOCATION TOP SIGN

FEEDER 4 x 35sqmm) APROVED BY:


DRAWING TYPE
AR
01-02
POWER SOURCE EEPCO TRAFO SIGN DRAWING NO:
PROJECT STATUS: DATE :
NEW MODIFICATION AS-BUILT 12/2/2015

You might also like