0% found this document useful (0 votes)
94 views3 pages

Flow Chart For OHSAS 18001

FLOW CHART

Uploaded by

avmr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
94 views3 pages

Flow Chart For OHSAS 18001

FLOW CHART

Uploaded by

avmr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Flow Chart for obtain

OHSAS 18001:2007, Occupational Health and Safety Management


Systems - Certification

Initiation to obtain
OHSAS
18001:2007
Certification

Awareness training on
OHSAS 18001:2007

Appointing a Safety
Manager and Safety
Team

Framing the OH & S


Policy

Preparation of Safety
Manual, Procedures
and Forms.

Hazard Identification & Risk


Assessment and preparation
Objectives

Internal Auditor’s
Training

Continue Page: 2
From Page: 1
Harsha Technologies Page: 1 of 3
2-47/3, Chandanagar (post), Hyderabad – 500 050
Phone: +91 97014 55393, Website: www.harshatech.com
E-mail: [email protected]; [email protected]
Implementation of OH
& S Policy by meeting
Objectives &
Programmes

Conducting Internal
Audit and Reporting
Results

Closing Observations /
Nonconformities rose
in Internal Audit

Conducting
Management Review
Meeting

Stage – 1 Audit (Pre-


Assessment Audit) by
Certification Body

Closing of
Observation(s) given
in Stage-1 audit

Stage – 2 Audit
(Certification Audit) by
Certification Body

Continue Page: 3
From Page: 2

Harsha Technologies
Recommendation for Page: 2 of 3
2-47/3, Chandanagar (post),OHSAS 18001:2007
Hyderabad – 500 050
Certification
Phone: +91 97014 55393, Website: www.harshatech.com
E-mail: [email protected]; [email protected]
Receipt of OHSAS Certificate Valid for 3
18001:2007 Certificate years subjected to
Annual Surveillance
Audits

Conducting Internal
Audits and MRM at Continual
planned Intervals Improvement in Safety

Surveillance Audit -1
after 10 to 12 Months
from the date of
certification

Surveillance Audit -2
after 22 to 24 Months
from the date of
certification

Re-certification after
34 months from the
date Certification

Conducting Internal
Audits and MRM at
planned Intervals
and Repeat the
same

Harsha Technologies Page: 3 of 3


2-47/3, Chandanagar (post), Hyderabad – 500 050
Phone: +91 97014 55393, Website: www.harshatech.com
E-mail: [email protected]; [email protected]

You might also like