Global Processing r1001pdf
Global Processing r1001pdf
Welcome to the “Global Processing Part – I” learning unit. In this learning unit you will learn
ow pro uct w a ow n epen ent ose o us ness process ng or certa n companes
whilst other companies continue to process online transactions in one T24 installation. This
mode of operation is particularly suitable to implementations where a single T24
environment is used in multiple geographical locations. The time difference means that it
would not be possible to run a single Close of Business process.
Branch Company
Its financial level data will be shared with a Lead Company
A branch should be linked to a Lead Company
No other Company could be linked to a Branch Company
A Branch in addition will always share its local currency and Batch holiday table with the
Lead Company.
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 3/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 4/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 5/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
In a Multi Company environment, application level COB batches will be separate for each
ea ompany,
In this example there are 3 Lead Companies US0030303, JP0040404, CH0040505
Example : The Lead Companies USG, JPN, SWL will have their own Batch records :
USG/AC.REPORTS, JPN/AC.REPORTS, SWL/AC.REPORTS
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 6/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
You can run COB for an individual company or for a group of companies. In this example
there three lead companies US0030303, JP0040404, CH0040505. Notice that two lead
companies JP0040404 and CH0040505 are in the same group 004 (digit 3-5) and one lead
company
can run forUS0030303 are inwhich
two companies 003 group. While
are in the executing
same group orCOB in individual
for an an GP environment you
company in the
same group. How? You will learn as you go along.
Independent COB processing can take place using the GLOBAL PROCESSING (GP)
product
Different local currencies can be set up for Lead Companies
If the bank operates over a large geographical area with different time zones, and a separate
COB processing is required for the Companies using the GP functionality.
Example: Two offices of a bank one in CH (Switzerland) with local currency CHF and
another in USA with local currency USD each setup as a Lead Company.
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 7/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
If there is only one Lead Company with multiple Branch Companies, the T24
nsta at on s ca e a u t oo etup.
All Branches will share the files of the Lead Company and will not have their own
files at database level.
In an installation of T24 in which the local currency is the same, then there is no need to
create erent ea compan es. owever, you nee you may a so create mu t p e ea
companies with the same currency.
When a bank has branches spread across different geographical locations with different
local currency
branches for in
located each
thecountry there must
same country a different
with the company
same local setup.
currency When aenvironment
multi-book bank has
would suffice.
In a Multi Book environment, application level Close of Business (COB) batches for the
ranc es w e n e to t e r ea ompany
Example: For the LD application level Batch, there will be only one Batch record :
MF1/LD.END.OF.DAY for the Lead Company: MF1 and its Branches: MF2 and MF3
The LD records of the Lead Company and its Branches will be processed in the same Batch
job
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 10/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
There is no need to have separate COB processing (Global Processing) for the Companies,
or examp e, w en t ey are n t e same t me zone
Example: All the offices in a bank in UK, with one office designated as a Lead Company and
other Offices as Branch Companies attached to the Lead Company
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 11/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
Implementation in which both Multi Company and Multi Book type environments will
co-ex st.
INT files will be shared by all the Lead and Branch Companies. Example –
F.COMPANY, F.SPF.
FIN files are Company specific. Example – FUSG.ACCOUNT, FJPN.ACCOUNT,
FSWL.ACCOUNT.
CUS files can be Company specific or can be shared. Example –
FUSG.CUSTOMER only or FUSG.CUSTOMER, FJPN.CUSTOMER and
FSWL.CUSTOMER
Banks that implement T24 can have branches around the world. Different countries have
erent oca currenc es. n suc a case n you s ou create at east one ea
company for each local currency in T24.
In an Extended Multi Company environment, application level COB batches will be separate
or eac ea ompany
Example : The Lead Companies USG and JPN, will have their own Batch records :
USG/LD.END.OF.DAY and JPN/LD.END.OF.DAY
In a Multi Book environment, application level Close of Business (COB) batches for the
Branches will be linked to their Lead Company
Example: For the LD application level Batch, there will be only one Batch recod :
USG/LD.END.OF.DAY for the Lead Company: USG and its Branches: CR1 and CR2
The LD records of the Lead Company and its Branches will be processed in the same Batch
job
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 14/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
If a bank operates in different countries with different local currencies. Each country will be
set up w t a ea ompany an ts own ranc es
Possible for the Lead Companies to share the same Customer file, but have different local
currencies and currency table.
Each country can run its own COB (using Global Processing)
In any installation of T24 when you run COB it gets executed for all companies by default
t at means n a on – nv ronment t e process ng or a compan es ta es p ace at
the same time on a common system calendar. This implies that the common calendar
must ensure that a working day in one country must be a working day for all companies.
Each company
implies must share
that a shared a calendar
system common is LOCAL.COUNTRY orprocessing,
used for the bank’s LOCAL.REGION table. This
even though the
actual financial entities may exist in different countries
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 16/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
In a GP Environment
The ability to allow COB processes to run at different times for companies or groups of
companies requires the system to allow each company to use a different system calendar,
since different countries will have different holidays.
Look at the example above, there are 3 lead companies in different region that is
US0010001 (New York) which is in North America, GB0010002 (London) which is in Europe
region, JP0010003 (Japan) is in Asia region.
If you would like to run COB at different times for these companies or group of companies
system should allow each company to use different a different calendar since each country
follow different holiday table.
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 17/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
The Global Processing product allows independent operation of companies within a T24
envronment. e pro uct w a ow n epen ent c ose o us ness process ng or
companies whilst other companies continue to process online transactions.
environment
would not be is used into
possible multiple geographical
run a single close of locations. The time difference means that it
business process.
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 18/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
Backup of System
At the end of the online processing the system is switched offline and a backup (either tape
or disk) is made of the entire T24 database. At this point the system is unavailable to all
users for entry of transactions.
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 19/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
Many large banks wish to use the multi-company functionality provided by the system, and
w s to mp ement n mu t p e s tes. s s current y poss e an wor s w t n a s m ar
geographical area, as COB processing can be run at a common time when the system can
be offline.
However in different
of day process means geographical
that finding regions
the timethe need
to do thistoistake theasystem
either offline
very small to runor
window, the end
does
not actually exist. In order to provide this ability the concept of Global Processing has been
introduced. Essentially this is the ability to manage many financial entities (Multi-Company)
in a single T24 database, and allow each financial entity to work independently of date
restrictions.
In this learning unit you will learn the functionality changes required to allow processing of
different entities COB processing. The requirement is to allow the running of the COB
processes for an entity or group of entities independently from one another.
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 20/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 21/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
In a Multi-Company setup, whether independent COB processing can take place using the
pro uct
YES
In a Multi-Book setup, that is for the Companies within the same Lead Company structure
whether independent COB processing can take place using the Global Processing (GP) ?
NO
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 22/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 23/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
BALANCE.INTERCOMP
Indicates in a multi company system that multi company processing will take place.
This basically allows financial level data to be stored in a separate table for each company.
YES indicates a Multi Company environment whereas YES in the BALANCE.INTERDEPT
field indicates that a Multi Branch environment is set up.
Validation Rules
Allowed Values are YES and NO. Mandatory input. Default Value of NO. No Change Field.
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 24/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
BALANCE.INTERDEPT
Indicates in a multi branch system that multi branch (or multi-book) processing will take
place.
This basically allows financial level data to be stored in the same database table for all
companies, as opposed to Multi Company where the data is stored in a separate table for
each company.
YES indicates a multi branch environment whereas YES in the BALANCE.INTERCOMP
field indicates that a Multi Company environment is set up.
Validation Rules
Allowed Values are YES and NO. Mandatory input. Default Value of NO. No Change Field.
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 25/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
Multi-Company
T24 supports the processing and production of financial balanced books from separate
financial entities within the same database. Each entity (COMPANY) maintains it’s own
transaction base, and can share common static information such as Customers, Currency
definitions. Companies may reside in different locations and have different local currencies.
This is configurable upon creation of the COMPANY.
Each company must share a common LOCAL.COUNTRY or LOCAL.REGION table. This
implies that a shared system calendar is used for the bank’s processing, even though the
actual financial entities may exist in different countries. As a result the system may have a
local holiday defined as a working day, and an ‘empty’ processing day will exist for that
entity.
The system supports full inter-company accounting and will raise the correct inter-company
accounting entries when transactions involving accounts or P&L in different companies is
used in a transaction.
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 26/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 27/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
The requirements for using Global Processing in the T24 system is listed below
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 28/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
The SPF application has to be updated with the GP product code. The field
. as to e mar e as ‘ .
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 29/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 30/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
Similarly, COMPANY application has been amended to incorporate GP with T24. Notice the
e s . , . , . , . nee
to be setup accordingly.
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 31/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 32/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 33/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 34/38
8/11/2019 GP1[1].Global Processing-R10.01.pdf
(1) In a Multi-Book setup independent COB processing using the Global Processing (GP)
product is not possible.
a. True
b. False
(2) In a Multi-Co. setup independent COB processing using the Global Processing (GP)
product is not possible.
a. True
b. False
(3) Application VERSION and VERSION.CONTROL has new field added which deals with
Global Process (GP) product.
a.NORMAL
b.RESTRICTED
c. BUSINESS.DAY
d. CLOSED
(4) To operate in a GP mode and allow the use of independent Close of Business you must
set the GLOBAL.PROCESS flag to Y in.
a. DATES
b. COMPANY
c. SPF
d. HOLIDAY
http://slidepdf.com/reader/full/gp11global-processing-r1001pdf 38/38