0% found this document useful (0 votes)
188 views36 pages

Project Presentation

Project Presentation

Uploaded by

Ahmad Remah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
188 views36 pages

Project Presentation

Project Presentation

Uploaded by

Ahmad Remah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 36

14 FEBRUARY 2018

PROJECT PRESENTATION
AFNOR AUDIT
A. Organisation of the joint venture

 Client : Ministry of Transport - National Authority for Tunnels

 Consulting Engineer :

 Control : SYSTRA

 Project Management and risk assessment: HILL International

 Joint Venture :

 Vinci Construction Grands Projets (Leader : 27.1%)

 Bouygues Travaux Publics (25%)

 Arab Contractors (26.15%)

 Orascom Construction (21.75%)


A. Organisation of the joint venture

 Project duration:

67 months including 3 months at the beginning of the contract to decide on alternatives and 2 months for the EWP (Experimented Working
Period).

 Amount of contract (New proposal) : - 422.240.848 euros (39%)


- 6.244.655.680 EGP (61%) / Total amount: 1.083.750.984 €
 Chart organization:

 Total of manpower: 6 000 people


A. Group of works

NAT

Consulting Engineer

G1 G2 G3 G4 G5 G6

Signalling,
telecommunication and
Civil Works, TBM, Power Supply -
Control Track works Rolling Stock Toll Equipment
Coordination Electromechanical
B. CAIRO METRO LINES
C. LINE 3 PHASE 3: GENERAL DESCRIPTION

Line 3 Phase 3

 17.7km total lenght:

 Bored tunnel: 7.6 km


 Stations: 2.6 km
 Cut & cover: 0.9 km
 Viaduct: 5.0 km
 At grade: 1.6 km

 15 Stations:

 8 Underground Stations
 5 Elevated Stations
 2 At grade Stations

 A Diverting Box
 7 Annexed Structures
Phase 3A CW  2 TBM Shafts
 2 Cut & Cover structures
 3 Ramps
C. LINE 3 PHASE 3: GENERAL DESCRIPTION

Line 3 Phase 3

 Main quantities:

• Total Concrete (without loss): 836 114 M3

• Total Reinforcement (without loss): 99 761 T

• Total Excavation: 1 657 596 M3

• Total Backfill: 205 978 M3

• Total Structural Steelwork: 11 849 T

Phase 3A CW
C. LINE 3 PHASE 3: GENERAL DESCRIPTION

Metro Line 3 Phase 3

Warracq

Abu Rawash DW Reinforcement Assembling

• Overground Management Office


• Viaduct Deck Precasting
• Main Workshop / Store
• Cut & Bent manufacturing

Bab El Louk Headoffice

Underground
Management Office
C. LINE 3 PHASE 3: GENERAL DESCRIPTION

Metro Line 3 Phase 3

3a 2b
4
Warracq

Abu Rawash DW Reinforcement Assembling

• Overground Management Office


• Viaduct Deck Precasting
• Main Workshop / Store
• Cut & Bent manufacturing

3b
2a
1 Cut & Bent area

Standard Segment - Reinforcement Cage


2a Assembly area
Bab El Louk Headoffice

2b Cantilever Segment – Reinforcement Cage


Assembly area

3a Standard Segment – Short-Line Bed 1


Underground

3b Cantilever Segment – Short-Line Bed Management Office

4 Segment Storage
D. Phase 3 : Viaduct Section
D. Phase 3 : Viaduct Section
 Concrete viaduct inside Elevated Stations (Example of El Bohy Station)

Benefits
• Erections of viaduct and station are independant
• No stop in the progress of launching girders through
stations

Constraints
• Marginal modifications of stations internal
arrangements

Merits
•Stations architectural signature maintained
• Functional areas maintained
• Reduced risk in construction time schedu
E. Phase 3 : Underground Station
 Underground station : TOP DOWN Method
E. Phase 3 : Underground Station
 Undergournd station phasing
E. Phase 3 : Underground Station
 Undergournd station phasing
E. Phase 3 : Underground Station
 Undergournd station phasing
E. Phase 3 : Underground Station
 Undergournd station phasing
F. Phase 3 : Annexed Structure & bored Tunnel

 Annexe 53A Plan Sections/Plan Views


K. Contract Program – Progress Bar – Jan 2018
K. Internal Program Updated with the second TBM
G. Nasser Station - UG Station – Works Progress

D wall Box 1 &2 Planned Progress =100 % D wall Box 3 Planned Progress =100 % D wall Box 4 Planned Progress = 100 %

D Wall Box 1 & 2 Actual Progress = 0 % D Wall Box 3 Actual Progress =50% D Wall Box 4 Actual Progress = 95 %
G. Nasser Station - UG Station – Works Progress
G. Nasser Station - UG Station – Works Progress
G. Maspero Station - UG Station – Works Progress
G. Maspero Station - UG Station – Works Progress
G. Maspero Station - UG Station – Works Progress
G. Zamalek Station - UG Station – Works Progress

D Wall Box 1 & 2 Planned Progress = 100 %


D Wall Box 1& 2 Actual Progress = 0 %

Utilities Diversion Planned progress of Works = 100 %


Utilities Diversion Actual Progress of Works = 10 %
Finishes Works For SAS building is in progress .
Site Preparation for Bauer installation are in progress
G. Zamalek Station - UG Station – Works Progress
G. Zamalek Station - UG Station – Works Progress
H. Tunnel Progress

 ATTABA TMB SHAFT: READY TO BORE the 08/05/2018


H. Tunnel Progress

 ATTABA TMB SHAFT: READY TO BORE the 08/05/2018


I. Oveground Station : El Bohy
I. Oveground Station : El Bohy