1.

Which of the following is a test document in which you would expect to find the
preconditions to start executing a level of testing?
A. Test plan
B. Test design specification
C. Incident report
D. Project plan

2. Which of the following is the most likely reason a user might be included in test
execution?
A. Their application domain knowledge
B. Their technical expertise
C. Their testing expertise
D. Their management expertise

3. Consider the following list of test process activities:


I Analysis and Design
II Test Closure activities
III Evaluating exit criteria and reporting
IV Planning and Control
V Implementation and execution
Which of the following places these in their logical sequence?
A. I, II, III, IV and V
B. IV, I, V, III and II
C. IV, I, V, II and III
D. I, IV, V, III and II

4. Reviewing the test Basis is a part of which phase


A. Test Analysis and Design
B. Test Implementation and execution
C. Test Closure Activities
D. Evaluating exit criteria and reporting

5. Designing the test environment set-up and identifying any required infrastructure and
tools are a part of which phase
A. Test Implementation and execution
B. Test Analysis and Design
C. Evaluating the Exit Criteria and reporting
D. Test Closure Activities
6. Testing process comprised of
A. Test plan and test cases
B. Test log and test status
C. Defect tracking
D. All of the above

7. Which is not the fundamental test process?


A. Planning and control
B. Test closure activities
C. Analysis and design
D. None

8. During which fundamental test process activity do we determine if MORE tests are
needed?
A. Test implementation and execution.
B. Evaluating test exit criteria.
C. Test analysis and design.
D. Test planning and control

9. Which of the following is NOT a part of the Test Implementation and Execution Phase?
A. Creating test suites from the test cases
B. Executing test cases either manually or by using test execution tools
C. Comparing actual results
D. Designing the Tests

10. Handover of Testware is a part of which Phase


A. Test Analysis and Design
B. Test Planning and control
C. Test Closure Activities
D. Evaluating exit criteria and reporting

11. During which test activity could faults be found most cost effectively?
A. Execution
B. Design
C. Planning
D. Check Exit criteria completion

12. Software testing activities should start


A. as soon as the code is written
B. during the design stage
C. when the requirements have been formally documented
D. As soon as possible in the development life cycle

13. Test Implementation and execution has which of the following major tasks?
i. Developing and prioritizing test cases, creating test data, writing test procedures and
optionally preparing the test harnesses and writing automated test scripts.
ii. Creating the test suite from the test cases for efficient test execution.
iii. Verifying that the test environment has been set up correctly.
iv. Determining the exit criteria.

A. i, ii, iii are true and iv is false


B. i, iv are true and ii is false
C. i, ii are true and iii, iv are false
D. ii, iii, iv are true and i is false
14. As part of which test process do you determine the exit criteria?
A. Test planning.
B. Evaluating exit criteria and reporting.
C. Test closure.
D. Test control

15. Which activity in the fundamental test process creates test suites for efficient test
execution?
A. Implementation and execution.
B. Planning and control.
C. Analysis and design.
D. Test closure.

16. Reporting Discrepancies as incidents is a part of which phase:


A. Test Analysis and Design
B. Test Implementation and execution
C. Test Closure Activities
D. Evaluating exit criteria and reporting

17. Which of the following is a MAJOR task of test implementation and execution?
A. Measuring and analyzing results.
B. Reporting discrepancies as incidents.
C. Identifying test conditions or test requirements.
D. Assessing if more tests are needed

18. Which of the following is a part of Test Closure Activities?


i. Checking which planned deliverables have been delivered
ii. Defect report analysis.
iii. Finalizing and archiving testware.
iv. Analyzing lessons.
A. i , ii , iv are true and iii is false
B. i , ii , iii are true and iv is false
C. i , iii , iv are true and ii is false
D. All of above are true

19. During the software development process, at what point can the test process start?
A. When the code is complete.
B. When the design is complete.
C. When the software requirements have been approved.
D. When the first code module is ready for unit testing

20. Which of the following is not phase of the Fundamental Test Process?
A. Test Planning and Control
B. Test implementation and Execution
C. Requirement Analysis
D. Evaluating Exit criteria and reporting

21. Evaluating testability of the requirements and system are a part of which phase:
A. Test Analysis and Design
B. Test Planning and control
C. Test Implementation and execution
D. Evaluating exit criteria and reporting

22. Test basis documentation is analyzed in which phase of testing


A. Test Analysis
B. Test Design
C. Test Execution
D. Test Planning

23. The _________ Is the activity where general testing objectives are transformed into
tangible test conditions and test designs
A. Testing Planning
B. Test Control
C. Test analysis and design
D. Test implementation
24. What information need NOT be included in a test incident report:
A. How to fix the fault
B. How to reproduce the fault
C. Test environment details
D. Severity, priority
E. The actual and expected outcomes
25. Which of the following is NOT included in the Test Plan document of the Test
Documentation Standard:
A. Test items (i.e. software versions)
B. What is not to be tested
C. Test environments
D. Quality plans
E. Schedules and deadlines
26. IEEE 829 test plan documentation standard contains all of the following except:
A. Test items
B. Test deliverables
C. Test tasks
D. Test environment
E. Test specification
27. Which is not the fundamental test process

A. Planning and control

B. Test closure activities

C. Analysis and design

D. None

28. Test planning has which of the following major tasks?


i. Determining the scope and risks, and identifying the objectives of testing.
ii. Determining the test approach (techniques,test items, coverage, identifying and
interfacing the teams involved in testing , testware)
iii. Reviewing the Test Basis (such as requirements,architecture,design,interface)
iv. Determining the exit criteria.
A. i,ii,iv are true and iii is false
B. i,,iv are true and ii is false
C. i,ii are true and iii,iv are false
D. ii,iii,iv are true and i is false

29. Which of the following helps in monitoring the Test Progress:


i. Percentage of Test Case Execution
ii. Percentage of work done in test environment preparation.
iii. Defect Information e.g. defect density, defects found and fixed
iv. The size of the testing Team and skills of the engineers
A. iv is correct and i,ii,iii are incorrect
B. i,ii,iii are correct and iv is incorrect
C. i,ii are correct and iii,iv are incorrect
D. i,iv are correct and ii , iii are incorrect