0% found this document useful (0 votes)
229 views2 pages

Technical Feasibility Report 1

Technical feasibility report BESCOM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
229 views2 pages

Technical Feasibility Report 1

Technical feasibility report BESCOM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

(Wholly owned by Government of Karnataka Undertaking)


Technical Feasibility Report
For the SRTPV plants from 1kWp to 50kWp
(To be submitted by the Assistant Executive Engineer(AEE))
Sl
Parameter Utility Observation
No.
A Distribution Transformer Details
1 Location
2 Capacity in KVA
3 Total Connected load in kW
4 SRTPV capacity already connected in kWp

5 SRTPV Capacity already proposed which is under


progress in kWp
6 Proposed SRTPV capacity in kWp
7 Total Generation Capacity (4+5+6) in kWp
Whether the transformer capacity is adequate to
deliver the proposed SRTPV system in addition to
8 existing/ already proposed under progress solar
Yes/No
RTPV systems* ( The Transformer shall be loaded
upto 80% of capacity)
B Feeder Details
1 Name of the 11kV feeder
2 Feeder Number
3 Name of the 66/11kV Sub-Station
4 Type of the conductor/cable (size)
5 Total connected load on the feeder in kVA
6 Total capacity (kWp) of SRTPV systems connected
on the feeder
7 Peak load on the feeder in Amps
8 Proposed SRTPV installation is technically feasible, Yes/No (if it is not feasible,
if the total SRTPV capacity is less than or equal to state reasons)
the 11kV feeder capacity.

The Transformer shall be loaded upto 80% of capacity.


Enclosure: 11kV feeder & LT Distribution sketch of the transformer.
I hereby certify that the above said SRTPV installation is technically feasible/not.

Signature and Name


AEE(Ele)
C, O&M Section ____________,
BESCOM
Technical Feasibility Report
For SRTPV plants - Above 50 to upto 1000kWp
(To be submitted by the Assistant Executive Engineer(AEE))
Sl
Parameter Utility Observation
No.
A Distribution Transformer Details
1 Location
2 Capacity in KVA
3 Total Connected load in kW
4 SRTPV capacity already connected in kWp

5 SRTPV Capacity already proposed which is under


progress in kWp
6 Proposed SRTPV capacity in kWp
7 Total Generation Capacity of SRTPV (4+5+6) in kWp
B Feeder Details
1 Name of the 66/11kV Sub-Station
2 Feeder Number
3 Name of the 11kV feeder
4 Type of the conductor/cable (size)

5 Rate current carrying capacity of the conductor / cable


in Amps
6 Total connected load on the feeder in Amps
7 SRTPV capacity already connected on the feeder in
Amps
8 SRTPV Capacity already proposed which is under
progress on the feeder in Amps
9 Proposed SRTPV capacity on the feeder in Amps

Total Generation Capacity of SRTPV (7+8+9) on the


10 feeder in Amps
Whether Proposed SRTPV installation is technically
11 feasible or not Yes/No
Note: Total Generation Capacity of SRTPV (7+8+9) ( if not state the reasons)
on the feeder in Amps should be less than 80% of
the current carrying capacity of the feeder in Amps,
for Technically Feasible cases