Hybrid Power Plant Using Synchronization Controller System To Save Electricity Cost
Hybrid Power Plant Using Synchronization Controller System To Save Electricity Cost
Hybrid Power Plant Using Synchronization Controller System To Save Electricity Cost
Corresponding Author:
Sardi Salim
Department of Electrical Engineering, Faculty of Engineering, Gorontalo State University
Jenderal Sudirman Street No. 6, Gorontalo City, Gorontalo Province 96128, Indonesia
Email: [email protected]
1. INTRODUCTION
Hybrid energy power generation is a power plant that combines non-renewable energy with new
renewable energy [1]. Photovoltaic (PV) hybrid energy power plants often have lower costs and can offer
higher reliability [2]–[4]. A hybrid power plant uses both non-renewable and renewable energy sources in its
operation [5]. One of the renewable fuels that has a lot of potential for utilization is solar energy, which is
accessible anywhere that receives sunlight [6]. The problem with using hybrid power plants that use solar
energy sources and paid electricity networks is that sunlight energy cannot produce energy consistently from
sunrise to sunset. Maximum energy can only be obtained when the maximum solar intensity can be received
evenly by all solar cell components [7]. The utilization of solar energy as an alternative energy source for the
community is currently not the main solution to replacing paid electrical energy [8].
In addition to the problem of a short duration of time to obtain electrical energy, PV power plants
need to be installed in a location that can receive sunlight effectively and use a lot of solar cell modules, such
as the roof of a building with an appropriate slope [9]–[11]. Building a hybrid energy power plant that uses
both renewable and non-renewable energy is required to achieve savings in the usage of electrical energy on
a paid electricity network [12], [13]. The problem experienced by large users of electrical energy, such as
industries, government offices, and universities is the high cost of paying for electricity [14]. Research
conducted in the United States shows that a campus building with an area of approximately 50,000 square
feet can cost more than USD 100,000 to pay for electricity each year. The largest electrical energy use is
mostly for air conditioning and lighting equipment [15].
Hybrid photovoltaic systems have been shown to cut electricity costs and harmful emissions from
fossil fuels [16]. To obtain adequate savings in the use of electrical energy, hybrid power plants must be
designed, taking into consideration the factors that could make the power plant run continuously for a long
time. The PV component system’s quick disintegration is a challenge that is frequently encountered [17].
This is because hybrid electricity generation planning has not been carried out, which considers aspects that
affect PV energy generation and the installation of installations divided into several groups to obtain an
effective energy supply from the PV system, even though PV performance is low. The majority of the energy
drawn from electric storage batteries is also consumed until the battery is depleted [18].
Building a hybrid power plant with a layered control system for the electric supply divider is the aim
of this effort. In hybrid energy power plants that use the synchronization controller system (SCS), the value
of electrical energy provided to the load will be arranged in stages according to the PV energy capacity.
Despite a decline in photovoltaic performance, energy supply can still be provided to other load groups with
lower electricity data requirements. A multilevel electrical energy supply is designed so that the PV is at its
lowest performance. Large power requirements will automatically be diverted to be supplied via a paid
electricity grid. A recent innovation employed in hybrid energy power generation systems to reduce the cost
of using electrical energy is the application of SCS. The application of SCS is a new breakthrough used in
hybrid energy power generation systems to save the cost of using electrical energy. To undertake a financial
analysis of the development of a hybrid power plant, the budget plan is generated using the pertinent national
unit pricing standard [19]. For the purpose of determining the return on investment, the feasibility of creating
a hybrid power plant to function efficiently, conserve electricity, and be consistent is estimated using the
return on investment (ROI) approach [20].
2. METHOD
The research method combines design analysis and simulation techniques to create a hybrid energy
power plant that makes use of a synchronization control system to reduce electricity consumption on the
Gorontalo State University campus. Investment needs for the construction of hybrid power plants are
determined by calculating the cost budget plan with the applicable national unit price standard. To calculate
the length of time the return on investment takes using the return on investment (ROI).
Int J Pow Elect & Dri Syst, Vol. 15, No. 1, March 2024: 377-385
Int J Pow Elect & Dri Syst ISSN: 2088-8694 379
The (2) is used to convert electrical energy (E) to kilowatt hours (kWh) [24], where:
- GSR is calculated as kWh/m2/month over a five-year period
- Direct current (DC) is changed into alternating current (AC) using a derate factor value
- The derate factor (D) has a value between 0.6 and 0.8. A standard derate factor of 0.75 is used in this study
𝐸 = 𝐶𝑅 × 𝐺𝑆𝑅 × 𝐷 (2)
Where is installing a single monocrystalline solar panel allows for testing the production of electrical energy
from solar cells, 300 WP, at the Faculty of Engineering Building’s rooftop, which is designated as the testing
and simulation planning site. Store voltage and current data using a current and voltage logger circuit module
with ZMPT101B and SCT-013-100 sensors [25] and an SD card as a data storage medium. To obtain the
performance value of solar cells in producing electrical energy, electric light loads are used with regulated
power to show the highest solar cell power capacity. Tests and simulations were conducted on September 1 st-
30th, 2022, at the UNG Faculty of Engineering.
Solar intensity data were obtained from campbell stokes, a solar light intensity measuring station.
campbell stokes measures the amount of sunlight that falls on the earth also the time and duration of the sun’s
exposure in one day. The campbell stokes location is installed close to the campus location with a distance of
±120 meters, belonging to the Bone Bolango Regency’s Gorontalo Meteorology, Climatology, and
Geophysics Agency. To obtain solar cell electrical energy data for the previous months (January to August
2022) was carried out through curved curve analysis using the linear regression analysis method with the
independent variable X as solar intensity data and the dependent variable Y as the solar cell power value. To
obtain accurate results, solar intensity, and solar cell energy data are juxtaposed according to the same
incident time (hours/minutes). Calculations from (3) can be used to determine the electrical energy generated
by a hybrid power plant utilizing SCS from January to September 2022, from 6 a.m. to 6 p.m., during sun
radiation in the Faculty of Engineering Building’s. As in (3), where:
- EPV stands for photovoltaic output power (Wh) during solar irradiation
- effPV for photovoltaic efficiency
- nPV stands for the most solar panels that may be installed on a building’s roof
A simulation process using the same methodology as in the Faculty of Engineering Building’s is used to
determine the value of electrical energy in other buildings on the UNG Campus.
2.2. Analysis of saving energy use, investment value, and investment payback period
By determining the value of electrical energy supplied by the PV system in every building on the
UNG Campus every month, an analysis of the reduction of electrical energy use in buildings is carried out.
The energy value produced by the PV system per kWh is multiplied by the price according to government
regulations. The value of cost savings is obtained from the electricity costs paid each month minus the
electricity costs obtained from the PV system.
Relating to rooftop solar power plants connected to the electric power network regulation number 26
of 2021 of the Minister of Energy and Mineral Resources, it is converting the energy generated by the PV
system to expenses in Indonesian Rupiah. Export and import kWh must be used by the government.
Customers of the roof PV system utilize electrical energy each month based on the difference between the
value of imported kWh and the value of exported kWh. Given that the UNG Campus control panel uses more
than 500 kW of electricity, it is required to have a Certificate of Operation Worthiness (SLO). The price of
PV roof system electricity is determined to be IDR 1,440.7 per kWh. Based on the budget plan and the
current national unit pricing, an analysis of the investment value needed to build a hybrid power plant is
performed to calculate the ROI for developing a hybrid power plant using return on investment (ROI)
methodology.
Hybrid power plant using synchronization controller system to save electricity cost (Sardi Salim)
380 ISSN: 2088-8694
a 4858.93 m2 roof area. The rooftop space utilized is 3044.91 m 2, or 62.66%, based on the findings of the
solar cell installation pattern according to the ratio of the building’s roof area and the solar cell’s dimensions.
Table 1. Shows how much roof space there is on each level of the Faculty of Engineering Building’s
No. Name of building section Available rooftop area (m2) Rooftop area used for solar cells (m2)
1. C2 1276.78 1085.26
2. C3 636.48 541.03
3. C4 460.82 391.72
4. C5 541.22 460.06
5. C6 396.72 337.23
6. Civil laboratory section 926.81 787.79
7. Industrial laboratory section 620.10 527.08
Total 4858.93 3044.91
The roof area of Faculty of Engineering Building is 4858.93 m2. The rooftop space utilized is
3044.91 m2, or 62.66%, based on the findings of the solar cell installation pattern according to the ratio of the
Building’s roof area and the solar cell’s dimensions. According to the layout results, 384 modules of solar
cells, each measuring 1640×992×35 mm, can be mounted on the roof of the Faculty of Engineering
Building’s. Using the same planning process, the Faculty of Mathematics and Natural Sciences roof can
support 200 solar cell modules, 136 modules on the roof of the Faculty of Agriculture Building’s, and a total
of 1,036 modules on the rooftop of the Faculty of Engineering Building’s. The roof of the Faculty of Letters
and Culture building is 122 modules, and the rooftop of the library building is 34 modules. As a result, 876
modules worth of solar cells can be put in all UNG Campus Building’s.
Int J Pow Elect & Dri Syst, Vol. 15, No. 1, March 2024: 377-385
Int J Pow Elect & Dri Syst ISSN: 2088-8694 381
3000
2500
Power PV (Wh)
2000
1500 Y=0.0035+1389.3
R2=0.8837
1000
500
0
0 50000 100000 150000 200000 250000 300000 350000 400000
Solar intensity (W/m2)
Figure 2. Equation of linear regression line of solar intensity vs. PV power in September 2022
(a) (b)
(c) (d)
(e) (f)
(g) (h)
Figure 3. Graph of electrical energy generated by the PV system in the Faculty of Engineering Building’s
from January-August 2022: (a) January 20,722 kWh, (b) February 19,223 kWh, (c) March 20,770 kWh,
(d) April 20,319 kWh, (e) May 20,719 kWh, (f) June 20,375 kWh, (g) July 20,289 kWh,
and (h) August 20,353 kWh
Hybrid power plant using synchronization controller system to save electricity cost (Sardi Salim)
382 ISSN: 2088-8694
Figure 4. Results of electrical energy analysis of PV systems in other faculties and library building’s at UNG,
January-September 2022
Figure 5. Total electrical energy generated by the PV system at the UNG Building,
January-September 2022
Int J Pow Elect & Dri Syst, Vol. 15, No. 1, March 2024: 377-385
Int J Pow Elect & Dri Syst ISSN: 2088-8694 383
grid system. Controller drivers system, as shown in Figure 6. The installation of the synchronization
controller’s load transfer mechanism is shown in Figure 7:
- Current sensors 1 is set at the highest capacity current, which occurs at 11 a.m.-2 p.m;
- Current sensor 2 medium capacity currents occur at 9.00-10.59 a.m. and 2.05-3.30 p.m.; and
- Sensor 3 at low capacity currents, which occur at 6.30-8.55 a.m. and 3.35-5.30 pm.
3.6. An examination of the project’s return on investment for building hybrid power plants
According to the findings of the bill of quantity (BoQ) method analysis of the construction of hybrid
power plants at the Faculty of Engineering, the total budget required is IDR 6,653,590,025. Faculty of
Literature and Culture is IDR 4,247,720,000; Faculty of Agriculture is IDR 3,720,675,000; Faculty of
Mathematics and Natural Sciences is IDR 5,530,550,000; library building is IDR 810,000,000. Hybrid PV
construction at UNG will cost a total of IDR 20,962,535,025.
4. CONCLUSION
Hybrid energy power plants using S in the electricity system on the Gorontalo State University
Campus is a good solution for saving electricity use. The results showed that a hybrid energy power plant
with SCS could save Rp 68,301,440 or 82% of electricity bills per year at Gorontalo State University. And
for the return on investment (ROI) can be achieved for 34 years.
ACKNOWLEDGMENTS
Thank you to the Gorontalo State University for research and community service, which provided
funding for the study under UNG Chancellor’s Decree Number: B/173a/UN47-D1/PT-01.03.2022.
REFERENCES
[1] M. Y. Naz, M. Bou-Rabee, S. Shukrullah, A. Ghaffar, A. Gungor, and S. A. Sulaiman, “A review of hybrid energy technologies
tenets, controls and combinational strategies,” Cleaner Engineering and Technology, vol. 5, p. 100340, Dec. 2021, doi:
10.1016/j.clet.2021.100340.
[2] P. Roy, J. He, T. Zhao, and Y. V. Singh, “Recent Advances of Wind-Solar Hybrid Renewable Energy Systems for Power
Generation: A Review,” IEEE Open Journal of the Industrial Electronics Society, vol. 3, pp. 81–104, 2022, doi:
10.1109/OJIES.2022.3144093.
[3] B. E. K. Nsafon, A. B. Owolabi, H. M. Butu, J. W. Roh, D. Suh, and J.-S. Huh, “Optimization and sustainability analysis of
PV/wind/diesel hybrid energy system for decentralized energy generation,” Energy Strategy Reviews, vol. 32, p. 100570, Nov.
2020, doi: 10.1016/j.esr.2020.100570.
[4] M. Simão and H. M. Ramos, “Hybrid Pumped Hydro Storage Energy Solutions towards Wind and PV Integration: Improvement
on Flexibility, Reliability and Energy Costs,” Water, vol. 12, no. 9, p. 2457, Sep. 2020, doi: 10.3390/w12092457.
[5] V. T. Widyaningrum and A. S. Romadhon, “Hybrid Powerplant Using Solar and Wind Energy,” MATEC Web of Conferences,
vol. 372, p. 09004, Dec. 2022, doi: 10.1051/matecconf/202237209004.
[6] M. B. Hayat, D. Ali, K. C. Monyake, L. Alagha, and N. Ahmed, “Solar energy-A look into power generation, challenges, and a
solar-powered future,” International Journal of Energy Research, vol. 43, no. 3, pp. 1049–1067, Mar. 2018, doi: 10.1002/er.4252.
[7] E. Crespi, P. Colbertaldo, G. Guandalini, and S. Campanari, “Design of hybrid power-to-power systems for continuous clean PV-
based energy supply,” International Journal of Hydrogen Energy, vol. 46, no. 26, pp. 13691–13708, Apr. 2021, doi:
10.1016/j.ijhydene.2020.09.152.
[8] V. Todeschi, P. Marocco, G. Mutani, A. Lanzini, and M. Santarelli, “Towards Energy Self-consumption and Self-sufficiency in Urban
Energy Communities,” International Journal of Heat and Technology, vol. 39, no. 1, pp. 1–11, Feb. 2021, doi: 10.18280/ijht.390101.
[9] F. T. Abed, H. D. S. Altai, H. T. Hazim, and H. T. S. ALRikabi, “Enhancement of the efficiency of solar energy cells by selecting
suitable places based on the simulation of PV System,” Periodicals of Engineering and Natural Sciences (PEN), vol. 10, no. 2,
pp. 80–88, Mar. 2022, doi: 10.21533/pen.v10i2.2777.
[10] Z. Čorba, D. Milićević, B. Dumnić, and B. Popadić, “The experiences of the realization of PV power plants after implementation of
the prosumers status,” Journal on Processing and Energy in Agriculture, vol. 27, no. 1, pp. 13–15, 2023, doi: 10.5937/jpea27-43506.
[11] S. P. E. Cheruku and M. T. L. Browne, “Utility-Scale Photovoltaic Power Plants,” 2020.
[12] H. El-houari et al., “Feasibility evaluation of a hybrid renewable power generation system for sustainable electricity supply in a
Moroccan remote site,” Journal of Cleaner Production, vol. 277, p. 123534, Dec. 2020, doi: 10.1016/j.jclepro.2020.123534.
[13] S. Obukhov, A. Ibrahim, M. A. Tolba, and A. M. El-Rifaie, “Power Balance Management of an Autonomous Hybrid Energy
System Based on the Dual-Energy Storage,” Energies, vol. 12, no. 24, p. 4690, Dec. 2019, doi: 10.3390/en12244690.
[14] M. A. Brown, A. Soni, M. V Lapsa, K. Southworth, and M. Cox, “High energy burden and low-income energy affordability:
conclusions from a literature review,” Progress in Energy, vol. 2, no. 4, p. 042003, Oct. 2020, doi: 10.1088/2516-1083/abb954.
[15] E. A. O. Batlle, J. C. E. Palacio, E. E. S. Lora, A. M. M. Reyes, M. M. Moreno, and M. B. Morejón, “A methodology to estimate
baseline energy use and quantify savings in electrical energy consumption in higher education institution buildings: Case study,
Federal University of Itajubá (UNIFEI),” Journal of Cleaner Production, vol. 244, p. 118551, Jan. 2020, doi:
10.1016/j.jclepro.2019.118551.
[16] A. Kasaeian, P. Rahdan, M. A. V. Rad, and W. M. Yan, “Optimal design and technical analysis of a grid-connected hybrid
photovoltaic/diesel/biogas under different economic conditions: A case study,” Energy Conversion and Management, vol. 198,
2019, doi: 10.1016/j.enconman.2019.111810.
Int J Pow Elect & Dri Syst, Vol. 15, No. 1, March 2024: 377-385
Int J Pow Elect & Dri Syst ISSN: 2088-8694 385
[17] L. Polleux, G. Guerassimoff, J.-P. Marmorat, J. Sandoval-Moreno, and T. Schuhler, “An overview of the challenges of solar
power integration in isolated industrial microgrids with reliability constraints,” Renewable and Sustainable Energy Reviews, vol.
155, p. 111955, Mar. 2022, doi: 10.1016/j.rser.2021.111955.
[18] G. J. May, A. Davidson, and B. Monahov, “Lead batteries for utility energy storage: A review,” Journal of Energy Storage, vol.
15, pp. 145–157, Feb. 2018, doi: 10.1016/j.est.2017.11.008.
[19] O. Smyrnov, A. Borysenko, I. Trynova, I. Levchenko, and A. Marchenko, “Determining the technical and economic parameters
for designing hybrid power units for the budget segment,” Eastern-European Journal of Enterprise Technologies, vol. 1, no. 8,
pp. 43–49, Feb. 2020, doi: 10.15587/1729-4061.2020.194642.
[20] C. Kousky, L. Ritchie, K. Tierney, and B. Lingle, “Return on investment analysis and its applicability to community disaster
preparedness activities: Calculating costs and returns,” International Journal of Disaster Risk Reduction, vol. 41, p. 101296, Dec.
2019, doi: 10.1016/j.ijdrr.2019.101296.
[21] E. S. Haq and F. Panduardi, “GIS-Based Area Suitability Analysis for Development Planning Purposes Campus: Case Study
Banyuwangi State Polytechnic,” Journal of Engineering and Scientific Research, vol. 2, no. 2, pp. 78–84, Dec. 2020, doi:
10.23960/jesr.v2i2.60.
[22] E. Rhode, “Types of Solar Panels: Pros and Cons,” Ssutainability for All, Treehugger, 2021. .
[23] P. Mavsar, K. Sredenšek, B. Štumberger, M. Hadžiselimović, and S. Seme, “Simplified Method for Analyzing the Availability of
Rooftop Photovoltaic Potential,” Energies, vol. 12, no. 22, p. 4233, Nov. 2019, doi: 10.3390/en12224233.
[24] D. A. Widodo, P. Purwanto, and H. Hermawan, “Potential of Solar Energy in Residential Rooftop Surface Area in Semarang City,
Indonesia,” Advances in Science, Technology and Engineering Systems Journal, vol. 5, no. 4, pp. 397–404, 2020, doi:
10.25046/aj050446.
[25] M. H. I. Hajar, A. W. Dani, and S. Miharno, “Monitoring of electrical system using internet of things with smart current electric
sensors,” SINERGI, vol. 22, no. 3, pp. 211–218, Oct. 2018, doi: 10.22441/sinergi.2018.3.010.
[26] A. N. N. Chamim, A. P. Irawan, and R. Syahputra, “Implementation of Automatic Transfer Switch on the Solar Home System at
the Goat Farm Houses,” Journal of Electrical Technology UMY, vol. 4, no. 2, pp. 79–86, Dec. 2020, doi:
10.18196/jet.v4i2.10680.
[27] Sardi Salim, Ade Irawaty Tolago, and Maharani R.P. Syafii, “Electrical Energy Intensity Analysis in Electricity Saving at the
Faculty of Engineering UNG,” Jurnal Nasional Teknik Elektro dan Teknologi Informasi, vol. 11, no. 3, pp. 229–235, Aug. 2022,
doi: 10.22146/jnteti.v11i3.3836.