2023 Projects Status 20th-Mar-2024
2023 Projects Status 20th-Mar-2024
2023 Projects Status 20th-Mar-2024
a) Latest Revisions
4 Setpoints required for the switches and ranges for the transmitters.
320 50
272 70
280 200
385 150
190 200
350 350
140
2743 1110
Remarks
Termination drawings submitted
Containment Pending
AVFM documents pending
IR for Gas detectors, Bulk MTO and Cable
routing plan Pending
3 NPP0085 In process
PPGL In process
11
12 AL EBB & LEABAIB HOLD
13
MEP UPGRADE PACKAGE- In Process
1
16
CUC Chiller Upgrade In Process
Project
s Reports for ongoing projects
Pending tasks Remarks
IR for Gas detectors CRS from ESS received and reshared with remarks
dated: 30/10/23, Quote finalized waiting for PM
advise.
IR for pressure guages Quote finalized, IR on Hold as per advised by PM.
IR for Cables and glands Glands quotes to be finalize.
IR for Bulk MTO/MANpower RFQ for manpower services sent.
OTF MAS As per PM approval, Ordering of Overall project
CUP DPS RFQ from TEMA is cables Proceeded.
awaited for finalization of
ordering.
Termination schedule working
started.
14
2
b
2
20 no. of projects
Q22-08-005 Sheehaniyan Project
Scope: Supply & Installation of field instruments, cables and accessories
Overall Status: HOLD (August)
Status: MAS APPROVED with code B
RFQs in progress, approval pending from PMT to initiate ordering.
Project Manager: Syed Ayyaz
Sr No. Deliverables Schedule (hrs) From To
1 Feburary
1 Feburary
2 RFQs 15 Feburary
3 Import Request 15 March
4 Process Hook-up Drawings 20 March
5 Cable Schedule 25 April
6 Cable Block Diagram 20 April
7 Cable Routing Plan (markup) 20 April
8 Method Statement 15 May
9 Power Consumption List 0
10 Termination Schedule 20 May
11 MTO/ Manpower Services 15 May
12 O&M Manuals 10 May
High Priority
In Hand Task:
RFQs Working
an Project
Status Remarks
In process
In process Initial Quotes Received
Open
Open
Open
Open
Open
Open
Open
Open
Hold
Q22-04-002 Doha No
Scope: Supply and installation of field instruments & cables with accessories
Overall Status: HOLD (August) ;
Status: Deliverables issued, MAS Approved, ordering of some instruments on HOLD by PMT.
Latest CRS for GAS detectors from ESS received Dated: 25/09/23, Gas Detectors MAS APPROVED with comm
MAS for Instruments has been APPROVED,
2 15
3 Instrument List 10
4 Instrument Location Layout 10
5 RFQs 15
a) Siemens
b) Xylem
c) E&H
General (Petrosolutions)
d)
e) VEGA (RLT)
f) Honeywell (Gas detectors)
g) Bulk MTO
6 Import Request 10
a) Siemens
b) Xylem
c) E&H
d) General (Petrosolutions)
e) VEGA
f) Cable
f) Honeywell detectors
7 Process Hook-up Drawings 22 15
Cable Schedule
8 20
9 Cable Block Diagram 20
10 Cable Routing Plan (markup) 30
11 Method Statement 20
13 Termination Schedule 20
14 MTO/ Manpower Services 12
15 O&M Manuals 15
High Priority
In Hand Task:
Q22-04-002 Doha North Project
PMT.
APPROVED with comments dated:25/05/23, MAS Rev-2 resubmitted Dated 14/06/23 in order to get code A.
Submitted
Feburary
Submitted
Open 10/7/2023
Feburary Closed
Closed
Closed
Closed
Closed
Closed
Closed
In Process 21/07/23
Feburary HOLD 31/07/23
Closed
Closed
Closed
HOLD 24/07/23
Closed
Closed
HOLD 27/07/23
Feburary Submitted
Feburary Submitted
Feburary Submitted
Feburary Submitted
March Submitted
April Open 31/08/23
March HOLD 27/07/23
March Submitted
itted Dated 14/06/23 in order to get code A.
Remarks
MAS approval received from PM
Quote received
Quote received
Quote received
Quote received
Quote received
Waiting for Final discounted offer from vendor
Completed, to be submitted.
As per advised by PM
IR has been raised, PO generated.
IR has been raised, PO generated.
IR has been raised, PO generated.
As per advised by PM
IR has been raised, PO generated.
IR has been raised.
As per PM Advised.
Submitted Dated: 16/03/23
RFQ sent
Q21-08-00
Scope: Supply & Installation of field instruments, cables and accessories
Overall Status: HOLD (september);
Status: Updated CS, CBD and Inst. List of underpass and Attenuation Tank and MIA un
attenuation tank is pending.
Project Manager: Syed Ayyaz
Sr No. Deliverables Schedule (hrs)
IR
(Attenuation Tank) Attenuation Tank:
Level Switches (Flygt)
FITs (Pulsar)
DULT (Siemens)
ULT (Siemens)
HLTs (Siemens)
PITs (Siemens)
16 TT (Siemens)
17 IR Cables 20
18 Developing a count discrepency report
High Priority
InHand Task:
Q21-08-009 Doha Corniche Project
ies
pass and Attenuation Tank and MIA underpass have been submitted. Selection of Suitable Ins
March
Status Remarks
Submitted
Submitted
Submitted Submitted
Submitted Submitted
Selection for flow meter pending from client.
Submitted AVFM Hookup submitted dated: 19/04/23
In Process Termination List preparation
Closed
Closed
Closed
Closed
Overall Status: HOLD; Worked on CRS and Segregated the HOOKups areawise. Contai
Project Manager: Syed Ayyaz
Schedule
Sr No. Deliverables (hrs) From To
2
3 RFQs
4 Import Request
a) Siemens
b) Flyget
C) TEMA
d) OMCH
e) Cables
f) Man Power Service Installation Contractor
5 Process Hook-up Drawings
6 Cable Schedule
7 Cable Block Diagram
8 20 Feburary
Containment Drawings
9 30 Feburary
10 Method Statement
11 Termination Schedule 20 March
12 O&M Manual
High Priority
Q21-08-002 QDSBG Projec t
ssories
Submitted
Submitted
Installation
Contractor
Scope
In-Progress
Closed
Closed
Closed
Closed
Closed
Closed
N/A
Closed
Submitted
Submitted
Submitted
Installation
Contractor
Scope
Feburary On-Hold
Installation
Contractor
Scope
Feburary On-Hold
Submitted
Module Wiring Drawing Required From Control Team Open
Submitted
Remarks
MAS received from the subcontractor and reviewed by Instrumentation team, queries to
be discussed with subcontractor related to BOQ, Scope of work and compliance.
Installation Contractor finalized on 14-12-2022 Al-Amrit Trading (JOULES)
Installation subcontractor will mark the route on the instrument location layouts shared
to finalize the containment BOQ.
1 Material submittals 30
RFQs
a). Flowmeter DN300 -
b). Pressure Switch -
c). Pressure Transmitter -
d). Hydrostatic Level transmitter -
e). Radar type level transmitter -
f). Room Temp Sensor -
g). Rain Sensor
2 IR 40
a). Flowmeter DN300 -
b). Pressure Switch -
c). Pressure Transmitter -
d). Hydrostatic Level transmitter -
e). Radar type level transmitter -
3 Import Request 20
a). IR Instruments -
4 Process Hook-up Drawings 10
5 Method Statement 10
6 O&M Manuals 10
6 CBD 15
In Hand Task:
Method Statement
O&M Manual
Waab City Project
To Status Remarks
Instrumentation related data for MAS has already been
submitted to Controls team for updation.
RECEIVED P&IDs with markup for flowmeter Dated: 27/09/23.
Queries shared, Waiting for client clarifications and kickoff
Submitted meeting
In Process
Closed
Closed Final Quotes received, waiting for MAS approval
Closed Final Quotes received, waiting for MAS approval
Closed Final Quotes received, waiting for MAS approval
Closed Final Quotes received, waiting for MAS approval
Closed Final Quotes received, waiting for MAS approval
In Process Not Finalized Yet, manufacturer may need to be changed.
In Process
Submitted Ordering Done.
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Submitted
Q23-07-005 Parks and Road
Scope: Supply and Installation of Pressure transmitters and Cables.
Overall Status: HOLD
Status: MAS Submitted, But Changes required.
Project Manager: Muhammad Bilal Anwar
Sr No. Deliverables Schedule (Hours) Information Required From
1 Material submittals 15
2 RFQs 10
a). Pressure Transmitters -
b). Cables -
c). Bulk Material -
3 Import request 5
a). Pressure Transmitters -
b). Cables -
c). Bulk Material -
4 Process Hook-up Drawings 10
5 Method Statement 5
6 O&M Manuals 5
In Hand Task:
5 Parks and Roads
To Status Remarks
In Process Instrumentation & Cables data already shared with controls team.
In Process
In Process Quote received for PT
In Process Cables quantity is low, vendor denied to share quote.
Open
Open
Open
Open
Open
Open
Open
Open
Q23-11-003 Al-Ebb & Leabaib Pro
Scope: Supply of field instruments, No Installation and No Cables under Scope.
Overall Status: HOLD
Status: MAS to be resubmitted dated: 31/01/24 after updation of Level logger OEM. CBD with updated drawing n
Project Manager: Muhammad Bilal Anwar
Sr No. Deliverables Schedule (Hours) Information Required From
1 Material submittals 40
RFQs 20
a). Level Switch (Float Type) -
Level Element (LE)/ Level
Indicator Transmitter (LIT)
(Ultrasonic
b). Type) -
c). Level Data Logger -
d). Proximity Switch -
2 IR 15
a). Level Switch (Float Type) -
Level Element (LE)/ Level
Indicator Transmitter (LIT)
(Ultrasonic
b). Type) -
c). Level Data Logger -
d). Proximity Switch -
3 Process Hook-up Drawings 15
4 Method Statement 10
5 O&M Manuals 10
6 CBD 10
In Hand Task:
MAS updation
bb & Leabaib Project
To Status Remarks
MAS to be submitted again as per PM's command by
incorporating Ashghal's comments
MAS to be resubmitted dated: 31/01/24 after updation of Level
logger OEM.
In Process Instrumentation related data for MAS has already been
submitted to Controls team on 28 Dec,2023 for updation in
MAS.
Queries shared, Responses received from PM on 26 Dec,2023.
In Process
In Process Quote received, waiting for MAS approval
In Process
Quote received, waiting for MAS approval
In Process Manufacturer will be changed, RFQ to be shared
In Process Quote received, waiting for MAS approval
Open Waiting for MAS approval to initiate ordering
Open
Open
Open
Open
Open
Open
Open
Submitted with updated drawing numbers submitted dated 13/02/24
Pumping stations SWS
Scope: Supply and installation supervision of field instruments.
Overall Status: Closed
Status: Revised MOS submitted for H2S and Conductivity analyzers, Updated shared.
Project Manager: Muhammad Bilal
Sr No. Deliverables Schedule (Hours) Information Required From
1 Material submittals
June
2 RFQs 20 August
Siemens August
Xylem August
Omron
August
3 E&H 15 August
ASHCROFT August
IR's
Siemens
Xylem
Omron
E&H
ASHCROFT
4
15 september
5
Method Statement
50 september
6
O&M Manuals
10 september
High Priority
In Hand Task:
Method Statement
O&M Manual
stations SWS
To Status Remarks
MAS for proximity remaining.
Previously, MAS for all Instruments was approved.
In process
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed Tender specs. Are not complying by Approved vendors
Closed
Closed
Hookups to be revise and submit dated 15/02/24 as per clinet
comments.
Revised Hookups as per clinet format submitted dated:
20/11/23
submitted Revised Hookups and MOS as per latest comments will be
submitted only H2S detectors and Level switches remaining.
Open
DETAIL ENGINEERING SERVICES FOR THE DEVELO
Scope: Design, Selection, Supply & Installation supervision of field instruments, cables and accessories for Attock LPG Storage
Task in Hand: Technical Clarification and Scope Finalazation with PM
Pending Tasks:
0 Closed
0 Closed
0 Submitted
0 OPEN
0 OPEN
0 Approved
0 Approved
0 OPEN
0 OPEN
0 OPEN
0 OPEN
0 OPEN
0 OPEN
0 OPEN
0 OPEN
0 OPEN
0 In-Progress
0 OPEN
0 OPEN
0 OPEN
0 OPEN
0 OPEN
0 In-Progress
0
323
G PLANT AT MORGAH, RAWALPINDI
Remarks
Handover Meeting
Clarifications Shared
Email sent to procurement for arranging instruments/ Valves quotation. Quotations Awaited.
Q23-04-002 MTC NPP00085 PROJECT
Scope: Supply and installation of field instruments & cables with accessories
Overall Status: In process;
Status:TEMA Quote received PM Meeting required , vendor communication in process, Cables IR Raised, Termina
working pending.
Project Manager: Syed Ayyaz
Sr No. Deliverables Schedule (hrs) From To Status
1 Material submittal for OTF 40 In Process
2 Material submittal for Cup 10 submitted
3 Instrument List 10 Open
4 Instrument Location Layout 10 Open
5 RFQs 35 Open
a) E&H Open
Itech / TEMA
b) 21/2/24 In Process
Cables for CUP
c) 19/2/24 submitted
In Hand Tasks
termination schedules
OTF MAS
es IR Raised, Termination schedule
Remarks
a) Additional instruments
(Flow meter, Chlorine and pH
analyzers, pressure guages,
pressure switch)
2 RFQs 20 Feburary
PT, RLT, FLS ,CLS, PS Feburary
Analyzers (Conductivity,
Turbidity, pH/ORP, DO) Feburary
Additional instruments (PGs,
PS, FM, Chlorine/pH analyzer)
3 Import Request 15 March
Asad Qureshi:
PT, RLT, FLS ,CLS, PS Feburary
Analyzers (Conductivity,
Turbidity, pH/ORP, DO) Feburary
Additional instruments (PGs,
PS, FM, Chlorine/pH analyzer)
Additional instruments of
Chlorinartion area (FM, PIT,
PI, LS, LIT)
4
Process Hook-up Drawings
20 March
5
Method Statement
10 April
6
O&M Manuals
10 April
High Priority
In Hand Task:
MAS Rev 6
Method statement
goon Project
Sales Handover Documents received on 01-11-2022
or PM to share latest revision of Hookups, Method statement along with CRs need to be
To Status Remarks
Asad Qur New Comments received dated 17/03/24, updated MAS rev 6
along with CRS to be submitted dated: 25/03/24
MAS rev-5 Submitted dated: 26/01/24
In process
Closed
Closed
Closed
Closed
RFQ sent, waiting for final discounted quotes.
Closed
Asad Qureshi: Closed Raised on 07/03/23, PO generated on 08/03/23
Closed
Raised on 13/04/23
IR for FLS Raised, for PGs, FMs and Chlorine analyzers waiting for
Closed
discounted offers
1 ATG 45
2 Technical Clarifications -
Technical Review and Vendor
a). Coordination -
Material Submittal/BOM
b). IR Issuance -
Hookups
ITP
2 F&G 45
a). Technical Clarifications -
Technical Review and Vendor
b). Coordination -
Material Submittal/BOM
c). IR Issuance -
Hookups
ITP
3 TLAS 45
a). Technical Clarifications -
Technical Review and Vendor
b). Coordination -
Material Submittal/BOM
c). IR Issuance -
Hookups
ITP
4 Field Instruments 45
a). Technical Clarifications -
Technical Review and Vendor
b). Coordination -
Material Submittal/BOM
c). IR Issuance -
Hookups 19/2/23
User Manuals
In Hand Task:
Hookups for ATG TLAS and F&G
1 PPGL LPG Project
To Status Remarks
Closed
Closed
Closed
Closed
In process Drawing for Temp transmitter and Level transmitter submitted dated:
31/01/24, remaining pending
Submitted
Closed
Closed
Closed
Closed
Open
Submitted
Closed
Closed
Closed
Closed
Open
Submitted
Closed
Closed
Closed
Closed
Submitted
Submitted
Q23-12-004, MEP UPGRADE PACKA
Scope: Supply of field instruments, No Installation and No Cables under Scope.
Overall Status: In process
Status: Field Instruments ordered dated 8/3/24, MAS to be resubmit with previous approvals for code - A, PM to
Project Manager: Syed Ayyaz
Sr No. Deliverables Schedule (Hours) Information Required From
RFQs 19/2/24
To Status Remarks
MAS to be resubmit with previous approvals for code - A
In process
Closed
Closed
Closed
Closed
Closed
Open
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Open
Open
Submitted
Open
Q24-01-003, QAFCO CCC HVAC pro
Scope: Supply and installation of field instruments and cables
Overall Status: In process
Status: Material submittals for Field instruments to be submitted as per new format shared by client, Cables datas
Project Manager: Bilal anwar
Sr No. Deliverables Schedule (Hours) Information Required From
2 RFQs 10 20/2/23
3 IR 10
4 Cables schedules 45
5 Cable/containment layouts 50
ed by client, Cables datasheet awaited while Instruments Count is not yet finalized.
To Status Remarks
MAS for CCR and SS resubmitted as per new format dated:
18/03/24.
Submitted
In process
Open
In process Cable Schedule for CCR Submitted, SS Cable schedule pending.
In process
CCR layout Submitted, SS Layout in process.
Open
Open
A23-11-002, CUC CHILLER UPGRADE
Scope: Supply and installation of field instruments and cables (first and second fix) supply, laying, installation and terminati
Overall Status: In process
Status: Material submittals for Field instruments and Cables (first and second fix) to be submitted. Vendor respon
and cable lengths
Project Manager: Adnan Saeed
Sr No. Deliverables Schedule (Hours) Information Required From
In Hand Task:
Material Submittal of
Instruments and Cables (first and
second fix)
HILLER UPGRADE project
, installation and termination is in scope
ubmitted. Vendor responses and cable schedule working is in process to finalize the selection
To Status Remarks
Material submittals for Field instruments and Cables to be
submitted. Vendor responses and cable schedule working is in
In process process to finalize the selection and cable lengths
6 MTO 22
8 Method Statement 15
In Hand Task:
1 Technical coordination with PM, ASASCO team regarding primary cable containment.
KSAB - SCADA System for Dirab Project
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
In Progress
Primary Cable Containment markup comments
pending from PM. Comments will be expected till Open
18-03-2024
cable containment.
Remarks