Series of 2024: Ml.18 Onni
Series of 2024: Ml.18 Onni
Series of 2024: Ml.18 Onni
18 OnNI
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
03.ou.co2:1
..I-_-t!p[ OFFICE OF THE SECRETARY
Bonifacio Drive, Port Area Manila
|*cO\'O *lLl|I,l*S
MAR 0 4 2024
Pursuant to the provision of Section 5, item (i) of Executive Order No. 124, dated January 30,
1987, the DPWH is mandated to ``Classify roads and highways into national, regional,
provincial, city, municipal, and barangay roads and highways, based on objective criteria it
shall adopt; provide or authorize the conversion of roads and highways from one category to
another", based on the DPWH functional classification criteria stated in the most current
issuance on the guidelines for conversion of local roads to national roads and vice-versa.
In line with the Departmenrs efforts to continue its function anent the abovementioned
activity, amidst the insufficient budget allocated for Fiscal Year 2024, and in pursuit of coping
with the financial constraints and curtailing expenses associated with the field validation of
proposed road conversion from local to national roads and vice versa, the following alternative
procedures are hereby adopted:
1. The Regional Offices (ROs) / District Engineering Offices (DEOs) shall be responsible
for all the requests for road conversion under their respective area of ].urisdiction and
initially identify if the proposed roads for nationalization meet any of the criteria per
the most current issuance on the guidelines for conversion of local roads to national
roads and vice-versa, using the Road classification/Conversion Evaluation Sheet
contained therein; Inspect and survey the configuration of the proposed road sections
for conversion into national roads using the Road Classification/Conversion Inventory
Survey Field Sheet; Validate the exact alignment by recording the station limits of the
proposed .road sections with the existing national road network in the area, including
the geotagged photos of their start and end points; Identify and record notable
establishments or infrastructures adjacent to the proposed road section that hold
national significance.
Note: Requests from other proponent offices (aside from the RO/DEO) such as the
LGU, Congress, and Senate received by the Planning Service, will be forvarded to the
concerned RO/DEO for initia/ evaluation.
2. The ROs/DEOs shall forward the result of the actual field survey (including, but not
limited to, geotagged photos of the start and end points of the road, a map reflecting
the location of the alignment, and the multi-year project profile of the proposed road),
as well as their injpal evaluation, to the Statistics Division (SD), Planning Service (PS)
For Firtzul evalurlid]on. [P/ease refer to Appendix A for the draft temp/ate intended for use
in the initial evaluation to ensure consistency and uniformity in the submitted
documents from the office(s) concerned].
© Website: https://www.dpwh.gov.ph
Q§Tel. No(s),: 5304-3000/ (02) 165-02 ` -.so=T=c _,i_
DO NO. Jar s.2024
Roles and Responsibilities for the Conduct of Field Validation and Evaluation on Proposed
Local Roads for Conversion into National Roads (vice-versa) for CY 2024
Page 2 of 3
3. The ROs/DEOs shall ensure that proactive measures are taken by their office(s) in
conducting the said survey to uphold the integrity and quality of the submitted data.
It is also worth mentioning that the conduct of the field validation and initial evaluation
bry ThJha P!Os|r}H0s does not guarantee immediate conversion Of the rcaiuesf yf ed rords
for nationalization. These will still be subjected to further evaluation by the planning.
Service for the approval of the Secretary.
Relative thereto, the abovementioned activities are to be carried out solely under the
supervision and in the presence of both the Regional and District Road and Bridge
Information Application (RBIA) Ccordinators of the office(s) concerned.
1. The SD, PS will review the submitted results of the field survey and initial evaluation
of the proposed roads based on their conformity with the prevailing criteria and
guidelines on road conversion for the final evaluation. Consequently, for roads found
to be functionally meritorious, the concerned office(s) must ascertain whether the 20-
meter Road Right-of-Way (RROW) for these sections has. been fully acquired,
correspondingly providing the below-listed documents, Otherwise, failure to confirm
the acquisition of the 20-in RROW on the proposed roads will withhold the conversion
process.
Page 3 of 3
The abovementioned technical documents will be reviewed and assessed by the SD,
PS requisite to drafting a DO together with its Aide Memoire, Registration and Impact
Analysis Form (RIAF), and other related documents,
The ROs/DEOs, however, have the discretion whether to request for the actual
supervision of the representatives from the PS in the conduct of the field surveys,
otherwise, the PS will evaluate the request based on the submitted data/information
and justifications of the concerned ROs/DEOs.
The proposed local roads evaluated to be meritorious in function by SD, PS and have
complied with the necessary technical documents will be nationalized through the
issuance of a DO, for their eventual integration in the RBIA.
CFRENOAN
4.1.5 DAG/NBL/ATD/EMF
Departnen6ffTc:uo?l{:ewfr:#an#Hlghvvays
1111111111111111111111111111111111111
WIN4Q51333
-a.
ANNEX A
Guidelines for the
Evaluation F>rocess
on Local F2oads
Proposed for
Conversion into
National F2oads (or
Vice-Versa) for CY
2024
Annex A: Roles and Responsibilities for the Conduct of Field Validation and Evaluation
on Proposed Local Roads for Conversion into National Roads (vice-versa) for CY 2024
Page 1 Of 2
Guidelines for the Evaluation Process on Local Roads Proposed for Conversion
into National Roads (or Vice-Versa) for CY 2024
1. The ROs/DEOs shall initially identify if the proposed roads for nationalization meet
any of the criteria per D.O. No, 133, s. 2018 using the Road
Classification/Conversion Evaluation Sheet ITa4 'W 7;
A/ode,` Requests from other proponent office (aside from the RO/DEO) such as the LGU,
Congress, Senate received by the planning Service, will be forwarded to the concerned
RO/DEO for initial evaluation.
2. The ROs/DEOs shall inspect and survey the configuratl.on of the proposed road
sections for conversion into national roads using the Road Classification/Conversion
Inventory Survey Field Sheet ITa4 "G?
3. The ROs/DEOs shall validate the exact alignment by recording the station limits of
the proposed road sections in relation to the existing national road network in the
area;
5. The ROs/DEOs shall forward the result of the actual field survey (including, but not
limited to, geotagged photos of the start and end points of the road, a map
reflecting the location of the alignment, and the multi-year project profile of the
proposed road), as well as their initial evaluation, to the SD, PS for final evaluation.
[P/ease refer to Appendix A for the draft temp/ate intended for use in the initial
evaluation to ensure consisteney and uniformity in the submitted documents from
the office(s) concerned].
6. The ROs/DEOs shall ensure that proactive measures are taken by their office(s) in
conducting the said survey to uphold the integrity and quality of the submitted
data. It is also worth mentioning that the conduct of the field validation and initial
evFrfuatron r]ry TJha R!Os|r}H0s does not guarantee immediate conversion Of TJha
requested roads for nationalization. These will still be subjected to further
evaluation by the Planning Service for the approval of the Secretary.
Relative thereto, the abovementioned actiMties are to be carried out solely under the
supervision and in the presence of both the Regional RBIA Coordinator and the RBIA
District Coordinator of the office(s) concerned. It is, however, the discretion of the
proponent ROs/DEOs whether to request for the actual supervision of the representatives
from the PS in the conduct of the field surveys, otherwise, the PS will evaluate the request
based on the submitted data/information and justifications of the concerned ROs/DEOs.
Lil
Annex A: Roles and Responsibilities for the Conduct of Field Validation and Evaluation
on Proposed Local Roads for Conversion into National Roads (vice-versa) for CY 2024
Page 2 of 2
1. The SD, PS will review the submitted results of the field survey and initial evaluation
on the proposed roads based on their conformity with the prevailing criteria and
guidelines for road conversion per DO No. 133, s. 2018 for the final evaluation.
2. If the proposed road for nationalization was evaluated by the SD, PS to be
functionally meritorious, the concerned office(s) must ascertain whether the 20-
meter Road Right-of-Way (RROW) for these sections has been fully acquired,
correspondingly providing the below-listed documents. Otherwise, failure to
confirm the acquisition of the 20-in RROW on the proposed roads will withhold the
conversion process.
The pfoposed locaf roads evaluated to be meritorious in function by SD, PS, and have
complied the necessary technical documents will be nationalized through the issuance
of a .,,
D.O. and upon the approval of the Honorable Secretary, for their eventual
integration in the RBIA.
`fi:Hat
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<DISTRICT ENGINEERING OFFICE/
REGIONAL OFFICE>
|J\cO,'e ®IL'ri,I^s
<Location>
MEMORANDUM
<Rcad Name>
DESCRIPTION:
The <Road Name> is a ( ocal/unclassified) road situated in <location of the proposed
road>
ALIGNMENT=
(Kindly specify the initial and terminal junctions cFf the propclsed road)
START: Begins at K_ +
END: Ends at K +
LENGTH: _kin
The affgnment is a (single/deal) carriageway road section that
TECHNICALCONDITIONS :
has a carriageway width Of _ with (gravel/concrete/asphalt)surface
FUNCTIONAL.CONDITIONS:
RECOMMENDATIONS=
(Presertt a coricise surrtmary, outf ine the findings, and prmth reecfmmendatiofis derived from
the lnltiaf evpluatfon) `&
© Website: www.dpwh.gov.ph
Q§ Tel. No(s).: (032) 436 2069 SOCOTEC
Initial Evaluation on the Proposed Conversion of <Road Name> into a National Road
under the Jurisdiction of <District Engineering Office (DEO)>, <Region>
Page 2 of 2
PREPARED BY:
<l`IAME OF EVALUATOR>
<Designation>
<DEO/RO>
<NAME OF CHIEF>
Chief, (Planning and Desisn Section/Planning and Design Division)
<DEO/RO=
NOTED:
L&
LIST OF ROAD RIGHT-OF-WAY DOCUMENTS
a.-__t.I: TO BE CERTIFIED BY THE CONCERNED
DPWH REGIONAL OFFICE
e^ooro plL\-Iwas
The submission of Certification, serving as proof of the acquisition of the required 20-meter .
Road Right-of-Way (RROW), constitutes a legally binding document. It confirms that, at the
time of signing, all pertinent documents-including Payments; Master List of Claimants (which
details lot owner(s), lot number, affected area, appraisal cost, and payment status); Parcellary
Plans (indicating owner names, lot numbers, and areas); Duly Notarized Deeds of Donation/
Deeds of Sale, and Transfer Certificate Title (TCT)-are readily accessible. This also
guarantees the availability of legally accepted copies of these documents for any future
instances where such documentation may be necessary.
•&
3 T¥.eR:,i:i , :hgg6£,.,3#¥;dtpow2;.::¥:3: i:
SOCOTEC