MRVC has conceptualized all rail projects for Sustainable Urban Transport in the
City of Mumbai and put it in a single basket, named MUTP 3A.
Page 1 of 6
3. Extension of Harbour Line between Goregaon to Borivali :
Kalyan to Kasara is important route connecting Mumbai with North part of Country.
The existing two lines are carrying mix traffic of Mail/ express, Goods trains and also
suburban services. There is substantial development of residential area up to
Asangaon on Kalyan- Kasara section.
There is sanctioned work of 3rd line between Kalyan –Kasara presently in execution by
Central Railway. Present services are run with terminal at Titwala, Asangaon & Kasara.
Construction of 4th line upto Asangaon will provide proper suburban connectivity to
this upcoming section which is home to millions of Mumbaikars.
The existing two lines between Kalyan and Karjat are carrying mix traffic of Mail/
express, Goods trains and also suburban services.
The Satellite towns and cities of Badlapur, Ambarnath, Ulhasnagar need proper
suburban rail connection for journey to Kalyan and Mumbai. Present services are run
with terminals at Ambernath, Badlapur, Karjat, Khopoli and cannot be increased due to
saturation on Kalyan Badlapur section
The new suburban corridor from Kalyan to Badlapur will enable augmentation of
suburban rail services and will provide much need suburban rail connectivity to these
towns and will provide the infrastructure for their development.
Page 2 of 6
7. Kalyan Yard - Segregation of Long distance and Suburban Traffic -
After Kalyan Yard modification, there will be complete segregation of suburban and
long distance traffic. It will decongest the crowding on platforms, facilitate smooth
movements & augmentation of suburban services. This will facilitate better suburban
network connectivity with proposed corridors between Kalyan-Asangaon and Kalyan-
Badlapur under MUTP 3A. Separate and independent Platforms will be available for
dealing with long distance trains avoiding their clashing with Suburban traffic.
With the introduction of CBTC, it would be possible to provide the Platform Screen
Doors (PSD). Platform screen doors will minimize the cases of trespass at stations
which results in the casualties as people cross the platforms through track and not using
FOBs.
9. Station Improvement
There are total 119 stations on Mumbai Suburban Railway System. Most of the stations
are more than 80 years old and highly congested. All suburban stations need to be
improved and upgraded from passenger’s amenities point of view.
In addition, the circulating space for passengers has become restricted due to
augmentation of service and increase of length of trains to 12/15 coach. There is
urgent need for additional circulating space by provision of elevated decks,
Page 3 of 6
interconnection between FoBs, improving entry/exit projects. It is planned to
upgrade about 16 Suburban Stations by provision of FoB’s, elevated decks, inter
connection between deck/FoB’s, skywalk, relocation of service buildings, stalls,
kiosks etc., improving entry/exit, improve circulating area, provision of green
space, improvement in general lighting and general electrical services etc. A sum
of Rs. 947 cr has been earmarked for this work.
Bhayander Chembur
At present 258/12 car EMU rakes are used for providing 2951 trains services
every day.
Page 4 of 6
11. EMU Maintenance facilities -
Suitable EMU facilities to take care of maintenance of the enhanced number of EMU
rakes by way of additional facilities in existing workshops and car shed and additional
car shed and workshop have been planned.
SN Source Amount
(Rs. In cr)
Ministry of Railways
1 MFA/ IRFC/Commercial Bank 3500
2 GBS 4729
3 Deferred funding 8616
Total MoR 16845
Govt. of Maharashtra
1 MFA/ IRFC/Commercial Bank 3500
2 GBS 4729
3 Deferred funding 8616
Total GoM 16845
Grand Total (MoR + GoM) 33690
Page 5 of 6
MUMBAI SUBURBAN RAIL NETWORK
Page 6 of 6