0% found this document useful (0 votes)
10 views2 pages

PPM Imcs

upload

Uploaded by

xp78jm7cdq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views2 pages

PPM Imcs

upload

Uploaded by

xp78jm7cdq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

For

0362 PC Iraq Holding B.V Internal DATE: 01/12/2023


Use - For
IQ01 PC Iraq Holding B.V TIME: 08:05:18
Internal
Distributio PAGE: 1 OF 2
MAINTENANCE
n Only ORDER

Notification No: Functional Location : IQ01 – PROCESS - ELECT Priority : 3


Order No : 80680834 Functional Location Desc: P 6 8 8 9 B MPG : CL2
Order Type : PPM Eqpt No : Main Work Ctr : HVELEC
Notif Crtd By : Eqpt Description : M Act Type : PM
Permit Reqd : Technical ID Basic Start Date: 01/12/2023
Counter Reading: Assembly : Basic End Date : 28/12/2023
Location : CPF 1
Description : PERIODIC PREVANTIVE MAINTENANCE

Ops Work Description Actual Actual No of Plan


Ac Center Start Date End Date People Work Hours (MHR)
0010 HVELEC 6M IEHVA01 EX PERIODIC MAINTENANCE 2 8.0
WORK DESCRIPTION:
1. Check visual condition. Yes/No
2. Check apparatus to area classification Yes/No
3. Inspect all bolts and nuts tightness Yes/No
4. check for lessness Yes/No
5. check for Lost or missing or Brocken parts. Yes/No
6. Check cable entry. Yes/No
7. Record EX data. Yes/No
8. Check area classification Yes/No
For
0362 PC Iraq Holding B.V Internal DATE: 01/12/2023
Use - For
IQ01 PC Iraq Holding B.V TIME: 08:05:18
Internal
Distributio PAGE: 2 OF 2
n Only
Equipment downtime report
Is equipment taken out of service during maintenance? (YES/NO).To be filled for REM work only. Dismantle Reinstall
Activities Remarks Date
Feedback to notification activity and maintenance order user status REWORK Time
Adjustment
Calibration
Rebuild
Replace
Repair
Rework
Technical Report
Damage parts:
Nature of damage:

Cause of damage:

Executed by: Reported by: Verified by:


Staff No. Name: Staff No. Name: Staff No. Name:

You might also like