LOAD OF SLAB
Density (D.L) Self Wt
SLAB NO. type of slab B (m) Depth (m) L.L.(KN/m)
(KN/m3) (KN/m)
Two way
Countineous
s1 Slab 1 25 0.125 3.125 1
Two way
Countineous
s2 Slab 1 25 0.125 3.125 1

one way ss
s3 Slab 1 25 0.145 3.625 1

one way ss
s4 Slab 1 25 0.145 3.625 1
Two way
Countineous
s5 Slab 1 25 0.125 3.125 1
Two way
Countineous
s6 Slab 1 25 0.125 3.125 1
Two Way SS
s7 slab 1 25 0.125 3.125 1

LOAD OF SLAB TRANSFERED TO BEAMS


Rect. Half Tianguler Trapzoid
SLAB NO.
(w) (KN/m) ly(m) lx(m) Load KN/m Load(KN/m) Load (KN/m)
(w*lx/2*(1-1/
(w*Lx/2) (w*Lx/3) β2)
s1Two way
Countineous Slab 5.625 3.53 3.38 0 6.34 6.60
s2Two way
Countineous Slab 5.625 4.06 3.38 0 6.34 7.31
s3one way ss Slab 6.125 3.53 1.5 4.59375 0.00 0.00
s4one way ss Slab 6.125 4.06 1.5 4.59375 0.00 0.00
s5Two way
Countineous Slab 5.625 3.99 3.53 0 6.62 7.34
s6Two way
Countineous Slab 5.625 4.06 3.99 0 7.48 7.61
s7Two Way SS slab 5.625 4.06 3.99 0 7.48 7.61

Masonary Load
Thickness Density (KN/mHeight Total Load
Parapet Wall 0.23 20 1 4.6 KN/m
Main Wall 0.23 20 3.2 14.72 KN/m
Internal Wall 0.2 20 3.2 12.8 KN/m

Page 1
Sheet1

Total Load on Beam


Density( KN/ Rect. Half
Beam No. b(m) D(m) d(m) Self Wt
m2) Load KN/m
B1 0.23 0.45 0.4 25 2.588 0
B2 0.23 0.45 0.4 25 2.588 0
B3 0.23 0.45 0.4 25 2.588 4.59375
B4 0.23 0.45 0.4 25 2.588 4.59375
B5 0.23 0.45 0.4 25 2.588 4.59375
B6 0.23 0.45 0.4 25 2.588 4.59375
B7 0.23 0.45 0.4 25 2.588
B8 0.23 0.45 0.4 25 2.588
B9 0.23 0.45 0.4 25 2.588
B10 0.23 0.45 0.4 25 2.588
B11 0.23 0.45 0.4 25 2.588
B12 0.23 0.45 0.4 25 2.588 4.59375
B13 0.23 0.45 0.4 25 2.588
B14 0.23 0.45 0.4 25 2.588
B15 0.23 0.75 0.7 25 4.313

Page 2
Sheet1

Unfacto
Roof Finish SLAB
red load
(KN/m) NO.
(KN/m)

Cantilever
1.5 5.625 s1 Slab

one way ss
1.5 5.625 s2 Slab
One way
Countineous
1.5 6.125 s3 Slab
Two way
Countineous
1.5 6.125 s4 Slab

Two Way SS
1.5 5.625 s5 slab

1.5 5.625 s5

1.5 5.625 s5

S ft inch m
SLAB NO.
13.0833 13 1 3.9878

Two
s1 way
Two
s2 way
s3 one way
s4 one way
Two
s5 way
Two
s6 way
Two
s7 way

Page 3
Sheet1

on Beam
Trapzoi
Tianguler Parapet Main Internal Total Factore Beam
d Load
Load(KN/m) load Wall wall Load d Load No.
(KN/m)
6.34 6.60 4.6 14.72 34.846 52.269 B1
6.34 7.31 4.6 14.72 35.555 53.333 B2
6.34 6.60 14.72 34.840 52.260 B3
6.34 7.31 14.72 35.549 53.323 B4
6.62 7.34 14.72 35.858 53.787 B5
7.48 7.34 14.72 36.720 55.080 B6
2.588 3.881 B7
2.588 3.881 B8
2.588 3.881 B9
2.588 3.881 B10
2.588 3.881 B11
7.181 10.772 B12
2.588 3.881 B13
2.588 3.881 B14
4.313 6.469 B15